Amen04 Spec 23 07 00r1.pdf

PDF 46 KB Posted

Attached to
Repair By Replacement TC601 Federal contract opportunity
Solicitation number
N4008523R2850
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document is a technical specification for insulation of mechanical systems for a federal construction project. It specifies requirements for insulating piping, ductwork, and equipment for heating, ventilation, and air conditioning systems. Materials required include mineral fiber, polyisocyanurate, and cellular glass insulation for pipes, as well as mineral fiber blanket and rigid board insulation for ducts. Metal jackets, adhesives, mastics, and accessories are also specified. The project is to repair and replace insulation at Camp Geiger Chapel located at Marine Corps Base Camp Lejeune for the Department of the Navy Naval Facilities Engineering Command under solicitation number N4008523R2850.

View the file

Other files for this federal contract opportunity

Other files attached to Repair By Replacement TC601, newest first.
File Type Posted
Amen 07 Photos3of3.pdf PDF
Amen07 Photos1of3.pdf PDF
Amen07 Photos2of3.pdf PDF
Amen07 220049.pdf PDF
Amen06 Dwg SKS-1.pdf PDF
Amen06 220049.pdf PDF
Amen05 220049.pdf PDF
Amen04 220049.pdf PDF
Amen04 dwg 60039100r2.pdf PDF
Amen04 dwg 60039111r1.pdf PDF
Amen03 220049.pdf PDF
Amen02 220049.pdf PDF
Amen02 dwg 60039115r1.pdf PDF
Amen02 220049.pdf PDF
Amen02 dwg 60039105r1.pdf PDF
Amen02 dwg 60039100r1.pdf PDF
Amen01 220049.pdf PDF
22-0049 APPD.pdf PDF
22-0049 PIS.pdf PDF
22-0049 Design Analysis.pdf PDF
RFP 220049.pdf PDF
22-0049 Geotechnical Report.pdf PDF
N4008522B0049 DRWGS.pdf PDF
N4008522B0049 SPECS.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TC601 Repair by Replacement Camp Geiger Chapel 22225TC601

SECTION 23 07 00

INSULATION OF MECHANICAL SYSTEMS

03/11

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A167 (2011) Standard Specification for Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and Strip

ASTM A240/A240M (2018) Standard Specification for Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels and for General Applications

ASTM B209 (2014) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate

ASTM C177 (2019) Standard Test Method for Steady-State Heat Flux Measurements and Thermal Transmission Properties by Means of the Guarded-Hot-Plate Apparatus

ASTM C195 (2007; R 2013) Standard Specification for Mineral Fiber Thermal Insulating Cement

ASTM C534/C534M (2016) Standard Specification for Preformed Flexible Elastomeric Cellular Thermal Insulation in Sheet and Tubular Form

ASTM C547 (2017) Standard Specification for Mineral Fiber Pipe Insulation

ASTM C552 (2021) Standard Specification for Cellular Glass Thermal Insulation

ASTM C553 (2013; R 2019) Standard Specification for Mineral Fiber Blanket Thermal Insulation for Commercial and Industrial Applications

SECTION 23 07 00 Page 1

ASTM C591 (2021) Standard Specification for Unfaced Preformed Rigid Cellular Polyisocyanurate Thermal Insulation

ASTM C612 (2014) Mineral Fiber Block and Board Thermal Insulation

ASTM C916 (2014) Standard Specification for Adhesives for Duct Thermal Insulation

ASTM C1136 (2017a) Standard Specification for Flexible, Low Permeance Vapor Retarders for Thermal Insulation

ASTM D828 (1993) Tensile Breaking Strength of Paper and Paperboard

ASTM E84 (2018a) Standard Test Method for Surface Burning Characteristics of Building Materials

ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

FS L-P-535 (Rev. E; Notice 2) Plastic Sheet (Sheeting): Plastic Strip: Poly (Vinyl Chloride) and Poly(Vinyl Chloride-Vinyl Acetate), Rigid

U.S. DEPARTMENT OF DEFENSE (DOD)

MIL-A-3316 (1987; Rev C; Am 2 1990) Adhesives, Fire-Resistant, Thermal Insulation

MIL-PRF-19565 (1988; Rev C) Coating Compounds, Thermal Insulation, Fire- and Water-Resistant, Vapor-Barrier

MIL-C-20079 (Rev. H) Cloth, Glass: Tape, Textile Glass; and Thread, Glass and Wire-Reinforced Glass

MIL-A-24179 (1969; Rev A; Am 2 1980; Notice 1 1987) Adhesive, Flexible Unicellular-Plastic Thermal Insulation

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 255 (2006; Errata 2006) Standard Method of Test of Surface Burning Characteristics of Building Materials

UNDERWRITERS LABORATORIES (UL)

UL 723 (2018) UL Standard for Safety Test for Surface Burning Characteristics of Building Materials

SECTION 23 07 00 Page 2

1.2 SYSTEM DESCRIPTION

Provide new and modify existing field-applied insulation for heating, ventilating, and cooling (HVAC) air distribution systems and piping systems which are located within, on, under, and adjacent to buildings;

and for plumbing piping systems.

1.2.1 Air Distribution System

Obtain Contracting Officer's written approval of systems under Section 23 05 9 3, " TESTING, ADJUSTING, AND BALANCING FOR HVAC " before applying field-applied insulation to air distribution systems.

1.2.2 Piping Systems

Obtain Contracting Officer's written approval of HVAC water distribution systems under Section 23 05 9 3, " TESTING, ADJUSTING, AND BALANCING FOR HVAC " before applying field-applied insulation to HVAC water distribution systems. At the Contractor's option and with Contracting Officer's written approval, the piping systems may be insulated before systems are tested, adjusted, and balanced (TAB'd). Piping insulation shall terminate immediately adjacent to each flow control valve, automatic control valve, or device. For chilled water and chilled-hot water piping, the ends of pipe insulation and the space between ends of pipe insulation and piping shall be sealed with waterproof vapor barrier coating. After systems are TAB'd, the control valves and devices shall be insulated.

1.3 DEFINITIONS

1.3.1 Finished Spaces

Spaces used for habitation or occupancy where rough surfaces are plastered, panelled, or otherwise treated to provide a pleasing appearance.

1.3.2 Unfinished Spaces

Spaces used for storage or work areas where appearance is not a factor, such as unexcavated spaces and crawl space.

1.3.3 Concealed Spaces

Spaces out of sight. For example, above ceilings; below floors; between double walls; furred-in areas; pipe and duct shafts; and similar spaces.

1.3.4 Exposed

Open to view. For example, pipe running through a room and not covered by other construction.

1.3.5 Fugitive Treatments

Treatment subject to deterioration due to aging, moisture, high humidity, oxygen, ozone, and heat. Fugitive materials are entrapped materials that can cause deterioration, such as solvents and water vapor.

1.3.6 Outside

Open to view up to 5 feet beyond the exterior side of walls, above the

SECTION 23 07 00 Page 3 roof, and unexcavated or crawl spaces.

1.3.7 Conditioned Space

An area, room or space normally occupied and being heated or cooled for human habitation by any equipment.

1.4 SUBMITTALS

Submit the following in accordance with Section 01 33 00 , "Submittal Procedures."

SD-03 Product Data

Piping insulation

Piping insulation finishes

Heating, ventilating, and air conditioning systems insulation

Duct insulation finishes

Accessory materials

Adhesives, sealants, and coating compounds

1.5 QUALITY ASSURANCE

Every package or standard container of insulation, jackets, cements, adhesives, and coatings delivered to the project site shall have the manufacturer's stamp or label attached giving name of manufacturer, brand and description of material. Insulation packages and containers shall be asbestos-free.

1.6 FLAME-SPREAD AND SMOKE-DEVELOPED RATINGS

In accordance with NFPA 255 , ASTM E84 or UL 723 , the materials on interior of the building shall have a flame-spread rating of not more than 25 and a smoke-developed rating of not more than 150 interior to the bulding.

1.6.1 Materials Tests

Test factory-applied materials as assembled. Field-applied materials may be tested individually. Use no fugitive or corrosive treatments to impart flame resistance. UL label or satisfactory certified test report from a testing laboratory will be required to indicate that fire hazard ratings for materials proposed for use do not exceed those specified.

Flame-proofing treatments subject to deterioration due to effects of moisture or high humidity are not acceptable.

1.6.2 Materials Exempt From Fire-Resistant Rating

Nylon anchors.

SECTION 23 07 00 Page 4

PART 2 PRODUCTS

2.1 PIPING INSULATION

Piping systems, except buried pipe requiring insulation, types of insulation required, and insulation thickness shall be as listed in Tables I herein. Unless otherwise specified, insulate all fittings, flanges, and valves, except valve stems, hand wheels, and operators. Provide factory premolded, precut, or field-fabricated insulation of the same thickness and conductivity as insulation on adjacent piping. Insulation exterior shall be factory cleanable, grease resistant, non-flaking and non-peeling. Pipe insulation shall conform to the referenced publications.

2.1.1 Buried Water Pipe Insulation

Section 33 61 14 , "Exterior Buried Preinsulated Water Piping."

2.1.2 Flexible Unicellular Insulation

2.1.2.1 Recommended Adhesive

ASTM C534/C534M. Provide adhesive as recommended by insulation manufacturer or conforming with MIL-A-24179 , Type II, Class 1.

2.1.2.2 Polyolefin thermoplastic

Polyolefin thermoplastic meets ASTM C534/C534M, except density.

2.1.2.3 Adhesive For Finishing Flexible Unicellular Insulation

MIL-A-3316 , Class 1, Grade A.

2.1.2.4 Glass Cloth For Finishing Flexible Unicellular Insulation

MIL-C-20079 , Type I, Class 1, 3, or 5.

2.1.3 Polyisocyanurate Insulation

ASTM C591, Type I. Supply the insulation with a factory applied vapor retarder/barrier that complies with Section 23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS. The insulation and all covering must pass the flame spread index of 25 and the smoke developed index of 50 when tested in accordance with ASTM E84.

2.1.4 Mineral Fiber

ASTM C547, Class I.

2.1.5 Piping Insulation Finishes

2.1.5.1 All-Purpose Jacket

Provide a factory applied all-purpose jacket when field applied jacketing is not specified. All purpose jackets shall include integral vapor barrier as required by service. Provide jackets in exposed locations with a white surface suitable for field painting. Allow a maximum water vapor permeance of 0.05 perm in accordance with ASTM E96/E96M, a puncture

SECTION 23 07 00 Page 5 resistance of not less than 50 Beach units, and a minimum tensile strength of 35 pounds-force per inch of width in accordance with ASTM D828.

2.1.5.2 Vapor-Barrier Material

ASTM C1136. Resistant to flame, moisture penetration, and mold growth.

Provide vapor-barrier material on pipe insulation as required in Table I.

2.1.5.3 Metal Jackets

Provide metal jackets on all piping exposed to weather.

a. Aluminum Jackets: ASTM B209, Temper H14, minimum thickness of 27 gage (0.016 inch), with factory-applied polyethylene and kraft paper moisture barrier on inside surface. Provide smooth surface jackets for jacket outside diameters less than 8 inches. Provide corrugated surface jackets for jacket outside diameters 8 inches and larger. Provide stainless steel bands, minimum width of 0.5 inch. Provide factory prefabricated aluminum covers for insulation on fittings, valves and flanges.

b. Stainless Steel Jackets: ASTM A167 or ASTM A240/A240M ; Type 304, minimum thickness of 33 gage (0.010 inch), smooth surface with factory-applied polyethylene and kraft paper moisture barrier on inside surface. Provide stainless steel bands, minimum width of

0.5 inch. Provide factory prefabricated stainless steel covers for insulation on fittings, valves, and flanges.

c. Piping, Fittings, Flanges, and Valves in Outside Locations:

Finish elbows and curved piping with factory-fabricated metal covers. Finish tees, flanges, and valves with metal covers.

Covers shall be same thickness and material as jackets on adjacent piping.

2.2 HEATING, VENTILATING, AND AIR CONDITIONING SYSTEMS INSULATION

Provide insulation on ducts ,plenums ,mixing boxes ,filter boxes ,casings and diffusers of Heating, Ventilating and Air Conditioning Systems (HVAC).)

2.2.1 Duct Insulation in Concealed Spaces

Blanket flexible mineral fiber insulation conforming to ASTM C553, Type 1, Class B-3, .75 pound per cubic foot nominal, 3.0 inches thick, minimum installed R8. Provide flexible insulation in concealed spaces only.

2.2.2 Duct Insulation Not in Concealed Spaces

Mineral fiber in accordance with ASTM C612, Class 2 (maximum surface temperature 400 degrees F), 6 pcf (pounds per cubic foot) average, 1.5 inch thick.

2.2.3 Duct Insulation Finishes

2.2.3.1 All-Purpose Jacket

Provide a factory applied all-purpose jacket with or without integral vapor barrier as required by the service. In exposed locations, provide jackets with a white surface suitable for field painting. All-purpose jacket shall have a maximum water vapor permeance of 0.05 perm per ASTM E

SECTION 23 07 00 Page 6

96/E96M ; a puncture resistance of not less than 50 Beach units; and a tensile strength of not less than 35 pounds-force per inch of width in accordance with ASTM D828.

2.2.3.2 Vapor-Barrier Material

ASTM C1136, for duct in equipment room and exposed areas and Type I or II in remaining areas. Material shall be resistant to flame, moisture penetration, and shall not support mold growth. Provide vapor barrier on HVAC duct insulation, except insulation for heating only.

2.3 EQUIPMENT

Insulate all equipment and accessories as specified in Table II. In outside locations, provide insulation one inch thicker than specified.

Increase the specified insulation thickness for equipment only where necessary to equal the thickness of angles or other structural members to make a smooth, exterior surface. Factory applied insulation shall meet the flame spread and smoke-developed rating of 25/50.

2.4 ADHESIVES, SEALANTS, AND COATING COMPOUNDS

2.4.1 Insulation and Vapor Barrier Adhesive

Provide ASTM C916, Type I or Type II adhesive for securing insulation to metal surfaces and for vapor barrier lap only in building interior.

Provide Type I when an adhesive in which the vehicle is nonflammable in the liquid (wet) state and which will pass the edge-burning test is required. Provide Type II when an adhesive in which the vehicle is nonflammable in the liquid (wet) state and which will not pass the edge-burning test is required.

2.4.2 Lagging Adhesive

MIL-A-3316 , Class 1, for bonding fibrous glass cloth to unfaced fibrous glass insulation; for bonding cotton brattice cloth to faced and unfaced fibrous glass insulation board; for sealing edges of and bounding fibrous glass tape to joints of fibrous glass board; or for bonding lagging cloth to thermal insulation, or Class 2, for attaching fibrous glass insulation to metal surfaces.

2.4.3 Mineral Fiber Insulation Cement

ASTM C195, thermal conductivity 0.85 maximum at 200 degrees F mean when tested in accordance with ASTM C177.

2.4.4 Vapor Barrier Coating

MIL-PRF-19565 , Type II, indoor only above surface temperature 60 degrees F, color white.

2.4.5 Weatherproof Coating

For outside applications provide a weatherproof coating recommended by the manufacturer of the insulation and jackets.

SECTION 23 07 00 Page 7

2.5 ACCESSORY MATERIALS

2.5.1 Staples

ASTM A167, Type 304 stainless steel outside-clinch type.

2.5.2 Insulation Bands

1/2 inch wide; 0.24 gage galvanized steel or 0.26 gage stainless steel or

0.24 gage aluminum.

2.5.3 Bands for Metal Jackets

3/8-inch minimum width; 0.26 gage stainless steel or 0.24 gage aluminum.

2.5.4 Anchor Pins

Provide anchor pins and speed washers recommended by insulation manufacturer.

2.5.5 Glass Cloth and Tape

MIL-C-20079 , Type I, Class 1 or Class 3 cloth, and Type II, Class 1 or tape; 20 by 20 maximum size mesh. Tape shall be 4-inch wide rolls. Class 3 tape shall be 4.5 ounces per square yard. In lieu of glass cloth and tape, open weave glass membrane may be provided.

2.5.6 Wire

Soft annealed stainless steel, 0.047-inch nominal diameter.

2.5.7 PVC Pipe Fitting Cover

FS L-P-535 , Composition A, Type II, Grade GU, factory premolded, one-piece.

PART 3 EXECUTION

3.1 PREPARATION

Do not insulate materials until system tests have been completed and surfaces to be insulated have been cleaned of dirt, rust, and scale and dried. Insulate return ducts, outside air intakes and supply ducts to the room outlets, flexible runouts, plenums, casings, mixing boxes, filter boxes, coils, fans, and the portion of air terminals not in the conditioned spaces. Ensure full range of motion of equipment actuators.

Modify insulation to avoid obstruction with valve handles, safety reliefs, and other such items. Allow adequate space for pipe expansion. Install insulation with jackets drawn tight and cement down on longitudinal and end laps. Do not use scrap pieces where a full length section will fit.

Insulation shall be continuous through sleeves, wall and ceiling openings, except at fire dampers in duct systems. Extend surface finishes to protect surfaces, ends, and raw edges of insulation. Apply coatings and adhesives at the manufacturer's recommended coverage per gallon.

Individually insulate piping and ductwork. Provide a moisture and vapor seal where insulation terminates against metal hangers, anchors and other projections through the insulation on surfaces for which a vapor seal is specified. Keep insulation dry during application of finish. Bevel and seal the edges of exposed insulation. Unless otherwise indicated, do not

SECTION 23 07 00 Page 8 insulate the following:

a. Factory preinsulated flexible ductwork;

b. Vertical portion of interior roof drain pipelines, chrome plated pipes, and fire protection pipes;

c. Vibration isolating connections;

d. Adjacent insulation;

e. ASME stamps;

f. Fan name plates; and

g. Access plates in fan housings.

3.2 PIPING INSULATION

3.2.1 Mineral Fiber Pipe Insulation

Place sections of insulation around the pipe and joints tightly butted into place. The jacket laps shall be drawn tight and smooth. Secure jacket with fire resistant adhesive factory applied self sealing lap, or stainless steel outward clinching staples spaced not over 4 inches on centers and 1/2 inch minimum from edge of lap. Cover circumferential joints with butt strips, not less than 3 inches wide, of material identical to the jacket material. Overlap longitudinal laps of jacket material not less than 1 1/2 inches. Adhesive used to secure the butt strip shall be the same as used to secure the jacket laps. Apply staples to both edges of the butt strips. Patch damaged jacket material by wrapping a strip of jacket material around the pipe and cementing, stapling, and coating as specified for butt strips. Extend the patch not less than 1 1/2 inches past the break in both directions. At penetrations by pressure gages and thermometers, fill the voids with the vapor barrier coating for outside service. Seal with a brush coat of the same coating.

Where penetrating roofs, insulate piping to a point flush with the top of the flashing and seal with the vapor barrier coating. Butt tightly the exterior insulation to the top of the flashing and interior insulation.

Extend the exterior metal jacket 2 inches down beyond the end of the insulation. Seal the flashing and counterflashing underneath with the vapor barrier coating.

3.2.2 Hangers and Anchors

Pipe insulation shall be continuous through pipe hangers. Where pipe is supported by the insulation, provide galvanized steel shields protection saddles. Band and secure insulation protection shields without damaging pipe insulation. Where shields are used on pipes 2 inches and larger, provide insulation inserts at points of hangers and supports. Insulation inserts shall be of calcium silicate, cellular glass (minimum 8 pcf), molded glass fiber (minimum 8 pcf), or other approved material of the same thickness as adjacent insulation. Inserts shall have sufficient compressive strength to adequately support the pipe without compressing the inserts to a thickness less than the adjacent insulation. Insulation inserts shall cover the bottom half of the pipe circumference 180 degrees and be not less in length than the protection shield. Vapor-barrier facing of the insert shall be of the same material as the facing on the adjacent insulation. Seal inserts into the insulation with vapor barrier

SECTION 23 07 00 Page 9 coating, Type II or for exterior work, manufacturer's recommended weatherproof coating, as applicable. Where protection saddles are used, fill all voids with the same insulation material as used on the adjacent pipe. Where anchors are secured to chilled piping that is to be insulated, insulate the anchors the same as the piping for a distance not less than four times the insulation thickness to prevent condensation.

Vapor seal insulation around anchors.

3.2.3 Sleeves and Wall Chases

Where penetrating interior walls, extend a metal jacket 2 inches out on either side of the wall and secure on each end with a band. Where penetrating floors, extend a metal jacket from a point below the back-up material to a point 10 inches above the floor with one band at the floor and one not more than one inch from end of metal jacket. Where penetrating exterior walls, extend the metal jackets through the sleeve to a point 2 inches beyond the interior surface of the wall.

3.2.4 Flanges, Unions, Valves and Fittings for Hot Piping

Flanges, Unions, Valves, and Fittings Insulation (Except Flexible Unicellular) for Hot Piping: Factory fabricated removable and reusable insulation covers may be used. For inside domestic hot water, heating hot water, A/C condensate drains, high temperature hot water, steam and condensate return systems; exposed hot water piping and drains in handicap areas, place factory premolded, precut or field-fabricated segmented insulation of the same thickness and conductivity as the adjoining pipe insulation around the flange, union, valve, and fitting abutting the adjoining pipe insulation. If nesting size insulation is used, overlap 2 inches or one pipe diameter, whichever is larger. Use insulating cement to fill voids. Elbows insulated using segments shall have not less than three segments per elbow. Place and joint the segments with manufacturer's recommended water-vapor resistant, fire retardant, and adhesive appropriate for the temperature limit of the service. Upon completion of installation of insulation, apply two coats lagging adhesive with glass tape embedded between coats. Overlap tape seams one inch.

Extend adhesive onto adjoining insulation not less than two inches. The total dry film thickness shall be not less than 1/16 inch. Where unions are indicated not to be insulated, taper the insulation to the union at a 45 degree angle. Coat the insulation and all purpose jacket with two coats of lagging adhesive and with glass tape embedded between coats. The total dry film thickness shall be not less than 1/16 inch. At the option of the Contractor, factory premolded one-piece PVC fitting covers may be provided in lieu of two coats of adhesive with tape embedded between coats. Factory premolded field-fabricated segment or blanket insert insulation shall be provided under the fitting covers. Install factory premolded one-piece PVC fitting covers over the insulation and secure by stapling, taping with PVC vapor barrier tape, or with metal or plastic tacks made for securing PVC fitting covers. Do not provide PVC fitting covers where exposed to the weather. Provide PVC fitting covers only in ambient temperatures below 150 degrees F.

3.2.5 Piping Exposed to Weather

3.2.5.1 Metal Jackets

Install over the insulation. Metal jackets shall have side and end lap at least 2 inches wide with the cut edge of the side tap turned inside one inch to provide a smooth edge. Overlap the jacket not less than 2 inches

SECTION 23 07 00 Page 10 at longitudinal and circumferential joints and secure with metal bands at not more than 9-inch centers or with screws at not more than 5-inch centers. Overlap longitudinal joints down to shed water. Seal circumferential joints with a coating recommended by the insulation manufacturer for weatherproofing.

3.2.5.2 Flanges, Unions, Valves, Fittings, and Accessories

Insulate and finish as specified for the applicable service. Apply two coats of an emulsion type weatherproof mastic for hot service and vapor barrier mastic for cold service recommended by the insulation manufacturer. Embed glass tape in the first coat. Overlap tape not less than one inch and the adjoining metal jacket not less than 2 inches.

Factory preformed metal jackets may be provided in lieu of the above for hot service.

3.3 DUCT INSULATION

3.3.1 Rigid Insulation

Secure rigid insulation by impaling over pins or anchors located not more than 3 inches from joint edges of boards, spaced not more than 12 inches on centers and secure with washers and clips. Spot weld anchor pins or attach with a waterproof adhesive especially designed for use on metal surfaces. Apply insulation with joints tightly butted. Neatly bevel insulation around name plates and access plates and doors. Each pin or anchor shall be capable of supporting a 20-pound load. Cut off protruding ends of pins, after clips are sealed with coating compound for inside work or manufacturer's recommended weatherproof coating for outside work, and reinforced with open weave glass membrane.

3.3.2 Flexible Blanket Insulation

Apply insulation with all joints tightly butted. Secure insulation to ductwork with adhesive in 6-inch wide strips on 12-inch centers. Staple laps of jacket with outward clinching staples. Sealing shall be in accordance with paragraph 3.3.3 below. For ductwork over 24 inches on horizontal duct runs, provide pins, washers and clips. Provide pins on sides of vertical ductwork being insulated. Space pins and clips on 18-inch centers and not more than 18 inches from duct corners. Carry insulation over standing seams and trapeze-type hangers. Install speed washers with pins and pin trimmed to washer. Sagging of flexible duct insulation will not be permitted. Cut off protruding ends of pins after clips are secured and sealed with coating compound for inside work. For warm air ducts, overlap insulation not less than 2 inches at joints and secure the laps with outward clinch staples on 4-inch centers. In cold air ducts, vapor seal all joints and staple as specified.

3.3.3 Insulation Finishes and Joint Sealing

Fill all breaks, punctures, and voids with vapor barrier coating compound for inside work or manufacturer's recommended weatherproof coating for outside service. Vapor seal all joints by embedding a single layer of 3-inch wide open weave glass membrane, 20 by 20 mesh maximum size between two 1/16-inch wet film thickness coats of vapor barrier coating compound.

Draw glass fabric smooth and tight with a 1 1/2-inch overlap. At jacket penetrations such as hangers, thermometers, and damper operating rods, fill voids in the insulation with vapor barrier coating. Brush a coat of vapor barrier coating where required on HVAC ducts. Provide vapor barrier

SECTION 23 07 00 Page 11 jacket continuous across seams, reinforcing, and projections. Where height of projections is greater than insulation thickness, carry insulation and jacket over the projection. For joints for heating only systems, provide insulation with two coats of fire resistant adhesive with glass fabric mesh embedded between coats.

3.3.4 Access Plates and Doors

On externally insulated ducts, plenums, and casings, provide insulation-filled hollow steel panels and doors for access openings.

Bevel insulation around access plates and doors.

3.4 EQUIPMENT INSULATION

3.4.1 General Procedures

Apply equipment insulation suitable for temperature and service in rigid block or semirigid board or flexible form to fit as closely as possible to equipment. Groove or score insulation where necessary to fit the contours of equipment. Stagger end joints where possible. Bevel the edges of the insulation for cylindrical surfaces to provide tight joints. Join sections of cellular glass insulation with bedding compound. After the cellular glass insulation is in place on areas to be insulated, except where metal-encased, fill joints, seams, chipped edges, or depressions with bedding compound to form a smooth surface. Fill mineral fiber joints with insulating cement. Bevel insulation around name plates, ASME and access plates. For insulation on equipment that must be opened periodically for inspection, cleaning, or repair, construct insulation to be removable and replaceable without damage. Protect exposed insulation corners with corner angles under wires and bands.

3.4.2 Cold Equipment (Except Pumps)

Secure insulation with 16-gage, galvanized steel or copper clad wire or with 3/4-inch wide 20-gage stainless steel bands spaced on 12-inch centers. Seal joints with joint sealer. Cover non-removable irregular surfaces such as corner angles with a smoothing coat of insulating cement. Provide removable heat exchanger head covers with a male-female shiplap type joint. Apply two coats of vapor barrier coating with a layer of glass cloth embedded between coats. The dry film thickness of the finish shall be 1/32-inch minimum.

3.4.3 Pumps

Insulate pumps used for hot service with 2-inch thick rigid mineral fiber insulation and pumps used for chilled water and brine service with 2-inch thick flexible unicellular sheets as follows: Insulate pumps by forming a box around the pump housing, drive shaft, and piping. Apply insulation to inside surfaces of 20-gage galvanized or stainless steel sheet-metal boxes having openings for drive shaft and pipes. Construct the box by forming the bottom and sides using joints which do not leave raw ends of insulation exposed. Band bottom and sides to form a rigid housing that does not rest on the pump. Between top cover and sides, fit joints tightly forming a female shiplap joint on the side pieces and a male joint on the top cover to make the top cover removable. Secure insulation to the box with adhesive. Allow clearance for draining and adjustment of pump shaft seal.

SECTION 23 07 00 Page 12

3.5 PAINTING AND IDENTIFICATION

Paint in accordance with Section 09 90 00 , "Paints and Coatings." Piping identification shall be as specified in other sections.

3.6 FIELD INSPECTION

Visually inspect to ensure that materials provided conform to specifications. Inspect installations progressively for compliance with requirements.

SECTION 23 07 00 Page 13

TABLE I

Piping Insulation Wall Thickness

Tube And Pipe Size (Inches)

Service Material 1/4-1 1/4 1 1/2-3 3 1/2-5 6-& Larger Vapor

Barrier

Required

Chilled Water Polyisocyanurate 1 (1) 1 (1.0) 1.5 (2.0) 1.5 (2.0)Yes

Domestic Cold Polyisocyanurate 1 1 1 1 Yes Water

Domestic Hot Mineral Fiber 1.5 (2.0) 1.5 (2.5) 2 (2.5) 2 (2.5) No Water

Heating Hot Mineral Fiber 1.5 (2.0) 1.5 (2.5) 2 (2.5) 2 (2.5) No Water

NOTE: Thickness in parenthesis are for:

(1) Cold piping - crawl spaces, mechanical rooms, and outside locations

(2) Hot Piping - outside locations, not including tunnels and crawl spaces.

(3) NP - Not permitted.

SECTION 23 07 00 Page 14

TABLE II

Insulation For Equipment

Material Spec Type Class Vapor Barrier Required Rigid Mineral Fiber, ASTM C612 2 Yes*/No or Cellular Glass ASTM C552 I No

*Yes for chilled water and brine service and no for other services.

Recommended Equipment Wall Thickness Vapor Barrier Required

Expansion Tanks 2" For Chilled Water and Brine Systems Air Separators 2" For Chilled Water and Brine Systems All Pumps 2" For Chilled Water and Brine Systems Drain Pans 2" For Chilled Water Systems

*Exact insulation thickness may be determined by proposed condition of use.

SECTION 23 07 00 Page 15

-- End of Section --