This document is an amendment to a solicitation for the repair by replacement of TC601. The amendment provides responses to six questions from potential offerors. It replaces three drawings and one continuation sheet to clarify requirements.
The amendment maintains the same time and date for receipt of proposals. It allows the use of PEX-A piping instead of copper for domestic water piping under the slab to obtain jointless runs. For hydronic piping, joints must be as specified. It clarifies that louvers require factory-installed motorized dampers with actuators and end switches, except for L04 which will be dampered at the air handling unit. The emergency gas shutoff push buttons located by doors on plans are explained. All other terms and conditions remain unchanged.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amen07 220049.pdf | ||
| Amen 07 Photos3of3.pdf | ||
| Amen07 Photos1of3.pdf | ||
| Amen07 Photos2of3.pdf | ||
| Amen06 220049.pdf | ||
| Amen06 Dwg SKS-1.pdf | ||
| Amen05 220049.pdf | ||
| Amen04 220049.pdf | ||
| Amen04 dwg 60039111r1.pdf | ||
| Amen04 Spec 23 07 00r1.pdf | ||
| Amen04 dwg 60039100r2.pdf | ||
| Amen03 220049.pdf | ||
| Amen02 dwg 60039105r1.pdf | ||
| Amen02 dwg 60039100r1.pdf | ||
| Amen02 220049.pdf | ||
| Amen02 dwg 60039115r1.pdf | ||
| 22-0049 Design Analysis.pdf | ||
| Amen01 220049.pdf | ||
| 22-0049 APPD.pdf | ||
| 22-0049 PIS.pdf | ||
| N4008522B0049 SPECS.pdf | ||
| 22-0049 Geotechnical Report.pdf | ||
| N4008522B0049 DRWGS.pdf | ||
| RFP 220049.pdf |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 3
AMENDMENT NO. 0002 08/09/23
5. PROJECT NO. (If applicable) 22-0049
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-23-R-2850
7/31/23
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
22-0049, Repair By Replacement TC601, Amendment 0002, RFI responses
The time and date for receipt of proposals remains unchanged.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
See Continuation Page(s)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
N40085-23-R-2850 Amendment 0002
A. The following RFI responses have been provided:
1. Question: Drawing PW101 notes that no joints permitted when routed domestic water piping under slab. There will be pre-insulated domestic hot and pre-insulated domestic hot water return piping routed under the floor slab to various parts of the building. Spec section 33 61 14 paragraph 2.2.1 Copper Tubing states to use type “L” or “M” copper tubing for hot domestic water piping, chilled water piping, chilled-hot water piping and hot water piping. This specification also states the various types of joint connections that are allowed. Will the joints listed in this specification be allowed for use under the slab for the domestic hot water and domestic hot water return piping? Will pre-insulated copper pipe be allowed with brazed joints under the slab?
Answer: To obtain a jointless pipe run under slab, contractor can use PEX-A for domestic water piping. Use piping as specified in 33 61 14 for hydronic piping.
2. Question: If pre-insulated type “L” or “M” copper pipe with brazed joints for the domestic hot water and domestic hot water return piping under the slab will not be allowed, what type of pipe will be allowed as to eliminate joints under the slab?
Answer: To obtain a jointless pipe run under slab, contractor can use PEX-A for domestic water piping.
3. Question: Will the underground chilled water and heating hot water pipe that will be located under the slab follow the same specifications pertaining to the “no pipe joints” as the underground domestic hot water piping below the slab?
Answer: Piping and joints must be as specified in 33 61 14 for hydronic piping.
4. Question: MH101 does not show a return air motorized damper for AH01. M-804 shows an RA damper. The equipment schedule says the AH has a return damper. Should an RA damper be shown on MH101?
Answer: The unit must be provided with a return and an outside air damper. Only one damper for each air stream is needed.
5. Question: Mechanical room on MH101 shows an “E” in a circle with light radiating next to the door, inside. This symbol does not appear in legends. What is it? A similar symbol is outside the door. What is that?
N40085-23-R-2850 Amendment 0002
Answer: The symbol is the push button for the emergency gas shutoff valve. Refer to PG101. The button shall be hardwired to shut of gas delivery to boilers, shutdown boilers and send a signal to the building DDC system to generate an alarm.
6. Question: MH101 and MH401 show one duct mounted motorized damper in series with each of the four louvers. The equipment schedule requires louvers to be provided with factory installed motorized dampers and actuators, however, those dampers and actuators do not appear on the floor plans. Please clarify if louvers actually require factory installed motorized dampers that will be redundant to field installed duct dampers.
Answer: All louvers except L04 require (1) motorized low leak aluminum damper with actuator and end proving switch. Air from louver L04 will be dampered at the unit
AH01.
B. In response to the above RFIs, Replace sheet PW401 (60039100) with the attached sheet PW401 (60039100r1) Replace sheet MH101 (60039105) with the attached sheet MH101 (60039105r1) Replace sheet M-802 (60039115) with the attached sheet M-802 (60039115r1)
C. All other terms and conditions remain unchanged.