This amendment modifies a solicitation for design-bid-build second and third floor renovations at the Portsmouth Naval Shipyard in Kittery, Maine. The amendment provides revisions to specifications, a revised price proposal form, and an updated wage determination. Changes to the specifications include adding language to reference the NMCI Label Standards Guide for telecommunications cabling and updating an attachment reference. Revisions to the price proposal form and inclusion of a revised wage determination are also noted.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N40085-23-R-2602 DESIGN-BID-BUILD (DBB) B79 2ND AND 3RD FLOOR RENOVATIONS, PORTSMOUTH NAVAL SHIPYARD, KITTERY, MAINE
This amendment is issued to provide revisions to Specifications, revised Attachment D - Price Proposal Form, and updated Wage Determination.
See Continuation Page(s).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Apr-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008523R2602
X 9B. DATED (SEE ITEM 11)
02-Mar-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Apr-2023
CODE
NAVFACSYSCOM MID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008523R2602
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0005
This Amendment is issued to incorporate the following:
1. Provide revision to Specifications Section 27 10 00 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM.
2. Provide revisions to Attachment D – Price Proposal Form.
3. Provide revised Wage Determination.
This Amendment is issued prior to receipt of the bids and does hereby become a part of the Contract Documents, and in case of conflict, it shall supersede original project manual and drawings.
The work of the Amendment shall comply with all contract requirements including Division 00 and 01 specifications and the following specific items noted.
Each bidder shall be responsible for issuing information contained herein to subcontractors and suppliers to ensure that his/her proposal covers all work required by the Contract Documents including this Amendment.
Specifications Revisions
SECTION 27 10 00 – BUILDING TELECOMMUNICATIONS CABLING SYSTEM
From:
1. Add Paragraph 3.2.4, NMCI: “Provide labeling for NMCI jacks, wall plates, cables, and patch panels in accordance with NMCI Label Standards Guide (GD) and NMCI_NUMBER_EXAMPLE plan. References to Cat 5e cable in the NMCI Label Standards Guide (GD) must be changed to Cat 6.” This document is provided as Attachment J.
To:
1. Add Paragraph 3.2.4, NMCI: “Provide labeling for NMCI jacks, wall plates, cables, and patch panels in accordance with NMCI Label Standards Guide (GD) and NMCI_NUMBER_EXAMPLE plan. References to Cat 5e cable in the NMCI Label Standards Guide (GD) must be changed to Cat 6.” This document is provided as Attachment K.
SECTION 00 41 00 – BID SCHEDULES (as issued with Amendment 0002)
1. Item 000102: CHANGE the text in the Description field reading “All Lightning Protection work complete in accordance with the drawings and specifications.” to read “All Lightning Protection work, as identified in the Oak Point Associates Drawings and Specifications as ‘Option 2’, complete in accordance with the drawings and specifications.”
2. Item 000103: CHANGE the text in the Description field reading “All Telecommunications work complete in accordance with the drawings and specifications.” to read “All Telecommunications work, as identified in the Oak Point Associates Drawings and Specifications as ‘Option 4’, complete in accordance with the drawings and specifications.”
3. Item 0004: Option 2: CHANGE the descriptive text reading “Repair Roof and Repoint Masonry: Price for providing work in connection with the procurement and installation of all labor, material, equipment, transportation, coordination, testing, commissioning, and supervision required.” to read “Repair Flashing and Repoint Masonry, as identified in the NAVFAC Drawings and Specifications included at the end of Specification Volume 2 as ‘Specification Attachment 1’: Price for providing work in connection with the procurement and installation of all labor, material, equipment, transportation, coordination, testing, commissioning, and supervision required.”
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
WAGE DETERMINATION
"General Decision Number: ME20230019 04/07/2023
Superseded General Decision Number: ME20220019
State: Maine
Construction Type: Building
County: York County in Maine.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all|
|extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2023 1 01/13/2023 2 01/27/2023 3 03/17/2023 4 04/07/2023
* CARP0349-001 03/01/2023
Rates Fringes
CARPENTER
Includes Drywall Hanging and Metal Stud Installation.$ 27.68 18.92
* CARP0352-008 03/01/2023
Rates Fringes
CARPENTER (Includes Drywall Hanging, Form Work, and Metal Stud Installation)...............$ 27.68 18.92
ELEC0490-009 01/01/2023
Rates Fringes
ELECTRICIAN (Includes Low Voltage Wiring)..................$ 33.30 22.05
ELEV0004-006 01/01/2023
Rates Fringes
ELEVATOR MECHANIC................$ 68.38 37.335+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas Day and the Friday after Thanksgiving.
b. VACATION: Employer contributes 8% of basic hourly rate for
5 years or more of service; 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
* IRON0007-034 03/16/2023
Rates Fringes
IRONWORKER (ORNAMENTAL AND
REINFORCING).....................$ 30.08 24.72
LABO0976-007 12/01/2020
Rates Fringes
LABORER: Common or General (Industrial Work Only)...........$ 21.76 20.07
PLUM0131-002 06/06/2022
Rates Fringes
PLUMBER (Includes HVAC Pipe Installation)....................$ 38.50 25.05
* SUME2014-028 01/31/2017
Rates Fringes
BRICKLAYER.......................$ 30.42 2.94
CEMENT MASON/CONCRETE FINISHER...$ 17.65 5.01
INSULATOR - MECHANICAL
(Duct, Pipe & Mechanical System Insulation)...............$ 20.14 2.29
IRONWORKER, STRUCTURAL...........$ 24.16 17.25
LABORER: Common or General......$ 15.29 ** 4.67
LABORER: Demolition.............$ 18.20 5.05
LABORER: Mason Tender - Brick...$ 19.16 3.56
MILLWRIGHT.......................$ 22.17 7.75
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 39.38 8.55
OPERATOR: Crane.................$ 23.33 0.00
PAINTER (Brush and Roller).......$ 15.38 ** 2.95
PAINTER: Spray..................$ 17.47 2.22
ROOFER...........................$ 20.22 2.09
SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 17.30 2.35
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISIO"
(End of Summary of Changes)
File details come from the government source that posted it. Updated .