23R2602 Amendment 0002.pdf

PDF 156 KB Posted

Attached to
B79 DBB 2nd and 3rd Floor Renovations Federal contract opportunity
Solicitation number
N4008523R2602
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This amendment modifies a solicitation for design-bid-build renovations to the second and third floors of a building at the Portsmouth Naval Shipyard in Kittery, Maine. The solicitation seeks bids for interior renovations including revisions to mechanical, electrical, plumbing, and security systems. Revisions include updated specifications, drawings, and a revised price proposal form. Additional scope is required prior to phase one to support second floor turnover. The amendment provides a site visit log and requires control systems to be of the brand Delta Controls or Distech Controls per the state of Maine standard. Labeling must follow NMCI standards. Keypads are removed from various doors and badge readers relocated on plans. Basis of design is updated for certain access control equipment.

View the file

Other files for this federal contract opportunity

Other files attached to B79 DBB 2nd and 3rd Floor Renovations, newest first.
File Type Posted
23R2602 Amendment 0006.pdf PDF
Attachment D Price Proposal Form (Revision 3).docx DOCX document
23R2602 Amendment 0005.pdf PDF
Attachment D Price Proposal Form (Revision 2).docx DOCX document
23R2602 Amendment 0004.pdf PDF
Attachment M - B79 Amendment 0003 DWGS.pdf PDF
23R2602 Amendment 0003.pdf PDF
Attachment K - NMCI Label Standards.pdf PDF
Attachment L - B79 Amendment 0002 DWGS.pdf PDF
B79 Site Visit Log.pdf PDF
Attachment D Price Proposal Form (Revised).docx DOCX document
23R2602 Amendment 0001.pdf PDF
Attachment G - DWGS.pdf PDF
Attachment E - PIEE Vendor Access Instructions.pdf PDF
Attachment B - Construction Experience Project Data Sheet.docx DOCX document
Attachment J - 5500 DBIDS Form.docx DOCX document
Attachment H - Spec Attach 1 Specifications.pdf PDF
Attachment H - Spec Attach 1 SOW.pdf PDF
Attachment C - Past Performance Questionnaire.docx DOCX document
Attachment F - B79 Specifications Volume 1.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Solicitation N4008523R2602.pdf PDF
Attachment I - SECNAV 5512.pdf PDF
Attachment H - Spec Attach 1 Drawings.pdf PDF
Attachment F - B79 Specifications Volume 2.pdf PDF
Attachment D Price Proposal Form.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N40085-23-R-2602 DESIGN-BID-BUILD (DBB) B79 2ND AND 3RD FLOOR RENOVATIONS, PORTSMOUTH NAVAL SHIPYARD, KITTERY, MAINE

This amendment is issued to provide revisions to the specifications and draw ings, revised Attachment D - Price Proposal Form, and site visit log.

See Continuation Page(s).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Mar-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008523R2602

X 9B. DATED (SEE ITEM 11)

02-Mar-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Mar-2023

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008523R2602

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

This Amendment is issued to incorporate the following:

1. Provide revisions to Specifications and Drawings.

2. Provide revised Attachment D – Price Proposal Form.

3. Provide Site Visit Log.

This Amendment is issued prior to receipt of the bids and does hereby become a part of the Contract Documents, and in case of conflict, it shall supersede original project manual and drawings.

The work of the Amendment shall comply with all contract requirements including Division 00 and 01 specifications and the following specific items noted.

Each bidder shall be responsible for issuing information contained herein to sub-contractors and suppliers to ensure that his/her proposal covers all work required by the Contract Documents including this Amendment.

Specifications Revisions

SECTION 00 41 00 – BID SCHEDULES

1. Delete Section 00 41 00 BID SCHEDULES and Replace with revised 00 41 00 BID SCHEDULES attached.

SECTION 08 71 00 – DOOR HARDWARE

2. Paragraph 3.6, HARDWARE SETS, Set HW-11 (Elevator Lobby – 1st Floor):

a. Add the following note after “Reuse remaining door hardware.”: “Coordinate existing electronic strike with Badge Reader.”

SECTION 23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL

SYSTEMS

1. ADD the following paragraph:

“1.1.3 Control System Vendor Requirement

The control system provided under this Section must be of the brand name Delta Controls or Distech Controls. Configure the equipment as indicated in the latest version of the PWD-Maine ICS Standard.”

SECTION 27 10 00 – BUILDING TELECOMMUNICATIONS CABLING SYSTEM

1. Add Paragraph 3.2.4, NMCI: “Provide labeling for NMCI jacks, wall plates, cables, and patch panels in accordance with NMCI Label Standards Guide (GD) and NMCI_NUMBER_EXAMPLE plan. References to Cat 5e cable in the NMCI Label Standards Guide (GD) must be changed to Cat 6.” This document is provided as Attachment J.

Drawings Revisions

SHEET G-006 – CONSTRUCTION SEQUENCE STRAGEGY 2

1. Add the following Note after 10.1 Pre-Phase 1: “10.1.1 Prior to the start of Phase 1, the scope included on ESK-3 within Amendment 0002 must be coordinated and completed to support second floor turnover. A minimum of 3 weeks’ notice of Contractors proposed mobilization date for this scope is required.”

2. Change Paragraph Number 10.1.1 to 10.1.2.

SHEET ED403 – STAIR ELECTRICAL REMOVALS 2

1. Add Removals Keynote 9, "Remove existing badge reader. Salvage and protect existing electric strike, request to exit, and wiring for reuse.

2. Add badge reader, in remove line type, and Removals Keynote 9 at Door 100C.

SHEET ET102 – SECOND FLOOR TECHNOLOGY PART PLAN – SOUTH

1. Delete Network 1 wireless access point (“AP”) in Open Offices 247, 249, and 250 (total quantity 3).

SHEET ET103 – THIRD FLOOR TECHNOLOGY PART PLAN – NORTH

1. Delete Network 1 wireless access point (“AP”) in Corridor 307 and Open Office 310 (total quantity 3).

SHEET ET104 – THIRD FLOOR TECHNOLOGY PART PLAN – SOUTH

1. Delete Network 1 wireless access point (“AP”) in Open Office 337 (total quantity 1).

SHEET ET503 – TECHNOLOGY DETAILS 1

1. Add the following to the end of Detail C3/ET503, Note 2, “For NMCI, refer to “NMCI Label Standards Guide (GD) and NMCI_NUMBER_EXAMPLE plan.”

SHEET EY101 – SECOND FLOOR SECURITY PART PLAN – NORTH

1. Delete Keypad at the following doors: 200A, 202, 204, 210A, 210B, 212, 213, 214, and 219.

SHEET EY102 – SECOND FLOOR SECURITY PART PLAN – SOUTH

1. Delete Keypad at the following doors: 200C, 236, 238, 239, 247, 249, 250A, and 250B.

2. Revise Keynote 5, “Provide badge reader at Door 100C on the first floor. Connect to salvaged wiring.

Coordinate exact location with the Contracting Officer. Refer to Detail A2/EY501.”

3. Add Keynote 5 in Elev Lobby 234A.

SHEET EY103 – THIRD FLOOR SECURITY PART PLAN – NORTH

1. Delete Keypad at the following doors: 300A, 300B, 308A, 308B, and 351.

2. Move Badge Reader at Door 308A to the non-secure side of the door.

3. Move Badge Reader at Door 351 to the non-secure side of the door.

4. Revise Keynote 10 to Keynote 8 in Room 351.

SHEET EY104 – THIRD FLOOR SECURITY PART PLAN – SOUTH

1. Delete Keypad at the following doors: 300C, 329, 337A, and 337B.

2. Move Badge Reader at Door 329 to the non-secure side of the door.

3. Move Badge Reader at Door 337A to the non-secure side of the door.

4. Delete Keynote 2 at Doors 329, 337A, and 337B.

SHEET EY501 – ACCESS CONTROL SYSTEM ONE-LINE, SCHEDULE AND DETAIL

1. Revise Access Control System Equipment Schedule as follows:

a. Type 2 Keypad Basis of Design must be Innometriks Cheetah SE, INN-SECHTA-CTO.

b. Type 3 Building Exterior Keypad/Badge Reader, CAC compatible, Basis of Design must be

Innometriks Cheetah SE, INN-SECHTA-CTO.

c. Type 4 Building Interior Keypad/Badge Reader, CAC compatible, Basis of Design must be

Innometriks Cheetah SE, INN-SECHTA-CTO.

2. Add to Access Control System Equipment Schedule as follows:

a. Input Board: Basis of Design must be Software House Input Board RM AS0073-CSI or current model. Under “Base Bid” column, Add Notes A and B. Under “Option #1” column, Add Notes 1 and 2.

SHEET EY502 – AUTOMATED ACCESS CONTROL SYSTEM ONE-LINE, SCHEDULE AND DETAIL

1. Revise Automated Access Control and Intrusion Detection System Equipment Schedule, Basis of Design for the motion sensor must be BRAVO-5 BV-500, PIR.

2. Revise Keynote 3 to, “Not Used.”

3. In Detail A2/EY502 Delete Keypad CAC Reader and associated Keynote 3.

4. In Detail B4/EY502 Delete Keypad (IDS).

SHEET EY503 – ACCESS CONTROL SYSTEM ONE-LINE DIAGRAM

1. Delete Keypad at the following doors: 200A, 200C, 202, 204, 210A, 210B, 212, 213, 214, 219, 225A, 225B, 236, 238, 239, 247, 249, 250A, 250B, 300A, 300B, 300C, 308A, 308B, 329, 337A, 337B, and 351.

2. At First Floor, Add Door 100C. At Door 100C, Add badge reader, electric door strike (existing), and request to exit (existing). Add Keynotes 1 and 11 to this badge reader.

(End of Summary of Changes)