Attachment B - Construction Experience Project Data Sheet.docx

DOCX document 14 KB Posted

Attached to
B79 DBB 2nd and 3rd Floor Renovations Federal contract opportunity
Solicitation number
N4008523R2602
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document contains an attachment for collecting construction experience project data sheets from offerors. It requests information on up to five past projects, including the firm name, address, point of contact, role on the project as prime contractor, subcontractor or joint venture partner. Additional details sought include the contract and completion dates, type of work performed, type of contract as fixed price, time and materials or other. It asks for the award and final contract amounts, as well as a description of the project relevancy, unique features, construction methods and sustainable features. Offerors are to describe the specific work their firm self-performed. The related federal contract opportunity is solicitation number N4008523R2602 for 2nd and 3rd floor renovations for the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files for this federal contract opportunity

Other files attached to B79 DBB 2nd and 3rd Floor Renovations, newest first.
File Type Posted
23R2602 Amendment 0006.pdf PDF
Attachment D Price Proposal Form (Revision 3).docx DOCX document
23R2602 Amendment 0005.pdf PDF
Attachment D Price Proposal Form (Revision 2).docx DOCX document
23R2602 Amendment 0004.pdf PDF
Attachment M - B79 Amendment 0003 DWGS.pdf PDF
23R2602 Amendment 0003.pdf PDF
Attachment L - B79 Amendment 0002 DWGS.pdf PDF
B79 Site Visit Log.pdf PDF
Attachment D Price Proposal Form (Revised).docx DOCX document
23R2602 Amendment 0002.pdf PDF
Attachment K - NMCI Label Standards.pdf PDF
23R2602 Amendment 0001.pdf PDF
Attachment J - 5500 DBIDS Form.docx DOCX document
Attachment H - Spec Attach 1 Specifications.pdf PDF
Attachment H - Spec Attach 1 SOW.pdf PDF
Attachment C - Past Performance Questionnaire.docx DOCX document
Attachment F - B79 Specifications Volume 1.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Solicitation N4008523R2602.pdf PDF
Attachment I - SECNAV 5512.pdf PDF
Attachment H - Spec Attach 1 Drawings.pdf PDF
Attachment F - B79 Specifications Volume 2.pdf PDF
Attachment D Price Proposal Form.pdf PDF
Attachment G - DWGS.pdf PDF
Attachment E - PIEE Vendor Access Instructions.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B

CONSTRUCTION EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5

1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)

Firm Name:

Address:

Phone Number:

UEI Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

5. Type of work:

|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.

9. Provide a detailed description of what work your firm self-performed on this project:

10. Other Information:

File details come from the government source that posted it. Updated .