Attachment F - B79 Specifications Volume 1.pdf
PDF 10 MB Posted
- Attached to
- B79 DBB 2nd and 3rd Floor Renovations Federal contract opportunity
- Solicitation number
- N4008523R2602
About this file
This solicitation is for the B79 DBB 2nd and 3rd Floor Renovations project for the Department of the Navy Naval Facilities Engineering Command. The Navy is seeking contractors to renovate the second and third floors of Building 79 at an unspecified location. The solicitation number is N4008523R2602 and responses are due by the date specified in the solicitation and applicable attachments. The renovation work includes unspecified interior construction and upgrades. Contract award will occur following evaluation of responses received by the deadline. No other salient details regarding required products, services, pricing terms, or timelines are provided in the attachment.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRIBUTION STATEMENT F. Further dissemination only as directed by Portsmouth Naval Shipyard, NAVFAC (December 3, 2018) or higher DoD authority.
NAVFAC MIDLANT, Public Works Department, Maine eProjects Work Order No.: 1591147
SPECIFICATIONS
RM 18-0661, B79 – 2nd & 3rd Floor Renovations
At the
Portsmouth Naval Shipyard, Kittery, Maine
Volume 1 of 2
PREPARED BY:
NAVFAC Midlant PWD ME Building 59
Portsmouth Naval Shipyard Kittery, Maine 03801-2032
REQUEST FOR PROPOSAL PREPARED BY:
Architectural: William Van Benthuysen, AIA Electrical: Wayne Whippie, P.E.
Civil: Donald E. Wallace, Jr., P.E. Fire Protection: Laura Clebak, P.E.
Structural: David N. Martin, P.E., S.E. Environmental: N/A Mechanical: Christine Lyle, P.E. Estimating: Oak Point Associates
Submitted By: Peter F. Dunn, P.E. Signature Date: February 28, 2023
Approved By PME: Jeffrey Hoyt, P.E. Signature Date:
Design Manager: Mitchell R. Lahar, R.A.. Signature Date:
B79 - 2ND & 3RD FLOOR RENOVATIONS 1591147
PORTSMOUTH NAVAL SHIPYARD, KITTERY, MAINE
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 LIST OF DRAWINGS
00 41 00 BID SCHEDULES
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.00 22 SUMMARY OF WORK (PWD ME)
01 14 00.00 22 WORK RESTRICTIONS (PWD ME)
01 20 00.00 22 PRICE AND PAYMENT PROCEDURES (PWD ME)
01 30 00.00 22 ADMINISTRATIVE REQUIREMENTS (PWD ME)
01 30 10.00 22 COORDINATION PROCEDURES AND COORDINATION DRAWINGS
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 17.00 20 NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 35 26.00 22 GOVERNMENTAL SAFETY REQUIREMENTS (PWD ME)
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 22 QUALITY CONTROL (PWD ME)
01 45 35 SPECIAL INSPECTIONS
01 50 00.00 22 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS (PWD ME)
01 57 19.00 22 TEMPORARY ENVIRONMENTAL CONTROLS - PORTSMOUTH NAVAL
SHIPYARD (PWD ME)
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00.00 22 CLOSEOUT SUBMITTALS (PWD ME)
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT
INFORMATION (eOMSI)
01 91 00.15 20 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 82 00.00 22 ASBESTOS REMEDIATION (PNS PROJECTS)
02 83 00.00 22 MANAGEMENT OF LEAD, CADMIUM, AND CHROMIUM DURING
RENOVATION, DEMOLITION, REMOVAL, AND ABATEMENT (PNS
PROJECTS)
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 52 00 METAL RAILINGS
PROJECT TABLE OF CONTENTS Page 1
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 39 FOLDING PANEL PARTITIONS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
PROJECT TABLE OF CONTENTS Page 2
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 22 26.00 20 STEAM SYSTEM AND TERMINAL UNITS
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END AND
INTEGRATION
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM (OPTION 2)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 29.00 10 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR NETWORK 2
COMMUNICATION SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING (OPTION 1)
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS) (PATHWAYS AND
COORDINATION: BASE BID) (ESS SYSTEM: OPTION 1)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11, CHG 1: 08/14
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
DRAWING NAVFAC PWD ME
NO. DWG NO. DWG NO. TITLE
G-001 12830817 79-20-627 COVER SHEET
G-002 12830818 79-20-628 LIST OF DRAWINGS 1
G-003 12830819 79-20-629 LIST OF DRAWINGS 2
G-004 12830820 79-20-630 ABBREVIATIONS, GENERAL CONSTRUCTION NOTES,
AND LEGEND
G-005 12830821 79-20-631 CONSTRUCTION SEQUENCE STRATEGY 1
G-006 12830822 79-20-632 CONSTRUCTION SEQUENCE STRATEGY 2
G-007 12830823 79-20-633 CONSTRUCTION SEQUENCE STRATEGY 3
G-008 12830824 79-20-634 CONSTRUCTION SEQUENCE STRATEGY 4
G-009 12830825 79-20-635 UTILITY OUTAGE SCHEDULE AND NOTES
G-101 12830826 79-20-636 CODE COMPLIANCE SUMMARY SHEET
G-102 12830827 79-20-637 FIRST FLOOR LIFE SAFETY PLAN
G-103 12830828 79-20-638 MEZZANINE LIFE SAFETY PLAN
G-104 12830829 79-20-639 SECOND FLOOR LIFE SAFETY PLAN
G-105 12830830 79-20-640 THIRD FLOOR LIFE SAFETY PLAN
CX101 12830831 79-20-641 CONTRACTOR LAYDOWN AND STORAGE SITE PLAN
C-501 12830832 79-20-642 MISCELLANEOUS SITE DETAILS
S-001 12830833 79-20-643 STRUCTURAL NOTES, DESIGN LOADS, AND
ABBREVIATIONS
S-002 12830834 79-20-644 OVERALL GRID REFERENCE PLAN
SD101 12830835 79-20-645 MECHANICAL EQUIPMENT PLATFORM FRAMING
REMOVALS PART PLANS
SF201 12830836 79-20-646 EXISTING ROOF TRUSS REINFORCING ELEVATIONS
SF202 12830837 79-20-647 STAIR TOWER SHEAR WALL ELEVATIONS
SF401 12830838 79-20-648 MECHANICAL EQUIPMENT PLATFORM FRAMING PART
PLANS 1
SF402 12830839 79-20-649 MECHANICAL EQUIPMENT PLATFORM FRAMING PART
PLANS 2
SF403 12830840 79-20-650 MECHANICAL EQUIPMENT PLATFORM FRAMING PART
PLANS 3
SF404 12830841 79-20-651 MECHANICAL EQUIPMENT PLATFORM FRAMING PART
PLANS 4
SF405 12830842 79-20-652 PARTIAL EXISTING 2ND FLOOR FOLDING PARTITION
FRAMING PLANS
SF406 12830843 79-20-653 PARTIAL STAIR AND ROOF FRAMING PLANS
SF501 12830844 79-20-654 STRUCTURAL DETAILS 1
DOCUMENT 00 01 15 Page 1
SF502 12830845 79-20-655 STRUCTURAL DETAILS 2
SF503 12830846 79-20-656 STRUCTURAL DETAILS 3
SF504 12830847 79-20-657 STRUCTURAL DETAILS 4
HD101 12830848 79-20-658 SECOND AND THIRD FLOOR HAZARDOUS MATERIALS
REMOVALS PLANS
AD100 12830849 79-20-659 EXISTING OVERALL SECOND AND THIRD FLOOR PLANS
AD101 12830850 79-20-660 PARTIAL FIRST FLOOR REMOVALS PLANS
AD102 12830851 79-20-661 SECOND FLOOR REMOVALS PART PLAN - NORTH
AD103 12830852 79-20-662 SECOND FLOOR REMOVALS PART PLAN - SOUTH
AD104 12830853 79-20-663 THIRD FLOOR REMOVALS PART PLAN - NORTH
AD105 12830854 79-20-664 THIRD FLOOR REMOVALS PART PLAN - SOUTH
AD120 12830855 79-20-665 EXISTING OVERALL ROOF PLAN
AD121 12830856 79-20-666 REMOVALS PARTIAL ROOF PLAN - NORTH
AD122 12830857 79-20-667 REMOVALS PARTIAL ROOF PLAN - SOUTH
AD200 12830858 79-20-668 EXISTING OVERALL EXTERIOR ELEVATIONS
AD201 12830859 79-20-669 REMOVALS EXTERIOR ELEVATIONS 1
AD202 12830860 79-20-670 REMOVALS EXTERIOR ELEVATIONS 2
AD501 12830861 79-20-671 REMOVAL DETAILS
AD701 12830862 79-20-672 SECOND FLOOR REFLECTED CEILING REMOVALS
PART PLAN - NORTH
AD702 12830863 79-20-673 SECOND FLOOR REFLECTED CEILING REMOVALS
PART PLAN - SOUTH
AD703 12830864 79-20-674 THIRD FLOOR REFLECTED CEILING REMOVALS
PART PLAN - NORTH
AD704 12830865 79-20-675 THIRD FLOOR REFLECTED CEILING REMOVALS
PART PLAN - SOUTH
AD801 12830866 79-20-676 SECOND FLOOR FURNITURE/EQUIPMENT REMOVALS
PART PLAN - NORTH
AD802 12830867 79-20-677 SECOND FLOOR FURNITURE/EQUIPMENT REMOVALS
PART PLAN - SOUTH
AD803 12830868 79-20-678 THIRD FLOOR FURNITURE/EQUIPMENT REMOVALS
PART PLAN - NORTH
AD804 12830869 79-20-679 THIRD FLOOR FURNITURE/EQUIPMENT REMOVALS
PART PLAN - SOUTH
AE001 12830870 79-20-680 WALL TYPES AND DETAILS
AE002 12830871 79-20-681 WALL DETAILS AND FIRESTOPPING DETAILS
AE100 12830872 79-20-682 OVERALL SECOND AND THIRD FLOOR PLANS
AE101 12830873 79-20-683 PARTIAL FIRST FLOOR AND MEZZANINE PLANS
AE102 12830874 79-20-684 SECOND FLOOR PART PLAN - NORTH
AE103 12830875 79-20-685 SECOND FLOOR PART PLAN - SOUTH
AE104 12830876 79-20-686 THIRD FLOOR PART PLAN - NORTH
AE105 12830877 79-20-687 THIRD FLOOR PART PLAN - SOUTH
AE120 12830878 79-20-688 OVERALL ROOF PLAN
AE121 12830879 79-20-689 PARTIAL ROOF PLAN - NORTH
AE122 12830880 79-20-690 PARTIAL ROOF PLAN - SOUTH
AE200 12830881 79-20-691 OVERALL EXTERIOR ELEVATIONS
AE201 12830882 79-20-692 EXTERIOR ELEVATIONS 1
AE202 12830883 79-20-693 EXTERIOR ELEVATIONS 2
AE220 12830884 79-20-694 BUILDING SECTION AND DETAILS
AE301 12830885 79-20-695 ROOF AND WALL DETAILS
AE401 12830886 79-20-696 ENLARGED FLOOR PLANS 1
AE402 12830887 79-20-697 ENLARGED FLOOR PLANS 2
AE403 12830888 79-20-698 ENLARGED FLOOR PLANS AND DETAILS
AE404 12830889 79-20-699 ENLARGED SOUTH STAIR PLANS AND SECTIONS
AE405 12830890 79-20-700 STAIR DETAILS
AE440 12830891 79-20-701 INTERIOR ELEVATIONS 1
AE441 12830892 79-20-702 INTERIOR ELEVATIONS 2
AE442 12830893 79-20-703 INTERIOR ELEVATIONS 3
DOCUMENT 00 01 15 Page 2
AE443 12830894 79-20-704 INTERIOR ELEVATIONS 4
AE444 12830895 79-20-705 INTERIOR ELEVATIONS 5 AND STANDARD MOUNTING
HEIGHTS
AE501 12830896 79-20-706 WALL DETAILS 1
AE502 12830897 79-20-707 WALL DETAILS 2
AE541 12830898 79-20-708 CASEWORK DETAILS
AE601 12830899 79-20-709 DOOR SCHEDULE AND DOOR AND FRAME TYPES
AE602 12830900 79-20-710 DOOR DETAILS
AE610 12830901 79-20-711 INTERIOR WINDOW ELEVATIONS AND DETAILS
AE611 12830902 79-20-712 WINDOW DETAILS
AE640 12830903 79-20-713 ROOM FINISH SCHEDULE
AE641 12830904 79-20-714 FLOOR PATTERNS AND COLOR KEY/MANUFACTURER
GUIDE
AE660 12830905 79-20-715 SIGNAGE SCHEDULE AND DETAILS
AE701 12830906 79-20-716 SECOND FLOOR REFLECTED CEILING PART
PLAN - NORTH
AE702 12830907 79-20-717 SECOND FLOOR REFLECTED CEILING PART
PLAN - SOUTH
AE703 12830908 79-20-718 THIRD FLOOR REFLECTED CEILING PART PLAN
- NORTH
AE704 12830909 79-20-719 THIRD FLOOR REFLECTED CEILING PART PLAN
- SOUTH
AE800 12830910 79-20-720 FURNITURE GENERAL NOTES AND SPECIFICATIONS 1
AE801 12830911 79-20-721 FURNITURE GENERAL NOTES AND SPECIFICATIONS 2
AE802 12830912 79-20-722 SECOND FLOOR FURNITURE PART PLAN - NORTH
AE803 12830913 79-20-723 SECOND FLOOR FURNITURE PART PLAN - SOUTH
AE804 12830914 79-20-724 THIRD FLOOR FURNITURE PART PLAN - NORTH
AE805 12830915 79-20-725 THIRD FLOOR FURNITURE PART PLAN - SOUTH
P-001 12830916 79-20-726 PLUMBING GENERAL NOTES, LEGENDS, AND
ABBREVIATIONS
PD101 12830917 79-20-727 MEZZANINE PLUMBING REMOVALS PART PLAN -
NORTH - PHASE 1
PD102 12830918 79-20-728 MEZZANINE PLUMBING REMOVALS PART PLAN -
SOUTH - PHASE 1
PD103 12830919 79-20-729 SECOND FLOOR PLUMBING REMOVALS PART PLAN -
NORTH - PHASE 1
PD104 12830920 79-20-730 SECOND FLOOR PLUMBING REMOVALS PART PLAN -
SOUTH - PHASE 1
PD105 12830921 79-20-731 THIRD FLOOR PLUMBING REMOVALS PART PLAN -
NORTH - PHASE 2
PD106 12830922 79-20-732 THIRD FLOOR PLUMBING REMOVALS PART PLAN -
SOUTH - PHASE 2
P-101 12830923 79-20-733 MEZZANINE PLUMBING PART PLAN - NORTH -
PHASE 1
P-102 12830924 79-20-734 MEZZANINE PLUMBING PART PLAN - SOUTH -
PHASE 1
P-103 12830925 79-20-735 SECOND FLOOR PLUMBING PART PLAN - NORTH -
PHASE 1
P-104 12830926 79-20-736 SECOND FLOOR PLUMBING PART PLAN - SOUTH -
PHASE 1
P-105 12830927 79-20-737 THIRD FLOOR PLUMBING PART PLAN - NORTH -
PHASE 2
P-106 12830928 79-20-738 THIRD FLOOR PLUMBING PART PLAN - SOUTH -
PHASE 2
P-401 12830929 79-20-739 ENLARGED SECOND FLOOR PLUMBING PART PLANS -
PHASE 1
P-402 12830930 79-20-740 ENLARGED THIRD FLOOR PLUMBING PART PLANS 1 -
PHASE 2
DOCUMENT 00 01 15 Page 3
P-403 12830931 79-20-741 ENLARGED THIRD FLOOR PLUMBING PART PLANS 2 -
PHASE 2
P-501 12830932 79-20-742 PLUMBING DETAILS
P-601 12830933 79-20-743 PLUMBING SCHEDULES
M-001 12830934 79-20-744 MECHANICAL GENERAL NOTES, LEGENDS, AND
ABBREVIATIONS
MD101 12830935 79-20-745 SECOND FLOOR MECHANICAL DUCTWORK REMOVALS
PART PLAN - NORTH - PHASE 1
MD102 12830936 79-20-746 SECOND FLOOR MECHANICAL DUCTWORK REMOVALS
PART PLAN - SOUTH - PHASE 1
MD103 12830937 79-20-747 THIRD FLOOR MECHANICAL DUCTWORK REMOVALS
PART PLAN - NORTH - PHASE 1
MD104 12830938 79-20-748 THIRD FLOOR MECHANICAL DUCTWORK REMOVALS
PART PLAN - SOUTH - PHASE 1
MD105 12830939 79-20-749 THIRD FLOOR MECHANICAL DUCTWORK REMOVALS
PART PLAN - NORTH - PHASE 2
MD106 12830940 79-20-750 THIRD FLOOR MECHANICAL DUCTWORK REMOVALS
PART PLAN - SOUTH - PHASE 2
MD107 12830941 79-20-751 SECOND FLOOR MECHANICAL PIPING REMOVALS
PART PLAN - NORTH - PHASE 1
MD108 12830942 79-20-752 SECOND FLOOR MECHANICAL PIPING REMOVALS
PART PLAN - SOUTH - PHASE 1
MD109 12830943 79-20-753 THIRD FLOOR MECHANICAL PIPING REMOVALS
PART PLAN - NORTH - PHASE 1
MD110 12830944 79-20-754 THIRD FLOOR MECHANICAL PIPING REMOVALS
PART PLAN - SOUTH - PHASE 1
MD111 12830945 79-20-755 THIRD FLOOR MECHANICAL PIPING REMOVALS
PART PLAN - NORTH - PHASE 2
MD112 12830946 79-20-756 THIRD FLOOR MECHANICAL PIPING REMOVALS
PART PLAN - SOUTH - PHASE 2
MD120 12830947 79-20-757 ROOF MECHANICAL REMOVALS PART PLAN - NORTH -
PHASES 1 & 2
MD121 12830948 79-20-758 ROOF MECHANICAL REMOVALS PART PLAN - SOUTH -
PHASES 1 & 2
MD401 12830949 79-20-759 ENLARGED FIRST FLOOR MECH 111 HYDRONIC PIPING
REMOVALS PART PLAN
MD402 12830950 79-20-760 ENLARGED FIRST FLOOR MECH 111 STEAM PIPING
REMOVALS PART PLAN
MD403 12830951 79-20-761 ENLARGED FIRST FLOOR MECH 141 PIPING REMOVALS
PART PLANS
MH101 12830952 79-20-762 SECOND FLOOR MECHANICAL DUCTWORK PART PLAN -
NORTH - PHASE 1
MH102 12830953 79-20-763 SECOND FLOOR MECHANICAL DUCTWORK PART PLAN -
SOUTH - PHASE 1
MH103 12830954 79-20-764 THIRD FLOOR MECHANICAL DUCTWORK PART PLAN -
NORTH - PHASE 1
MH104 12830955 79-20-765 THIRD FLOOR MECHANICAL DUCTWORK PART PLAN -
SOUTH - PHASE 1
MH105 12830956 79-20-766 THIRD FLOOR MECHANICAL DUCTWORK PART PLAN -
NORTH - PHASE 2
MH106 12830957 79-20-767 THIRD FLOOR MECHANICAL DUCTWORK PART PLAN -
SOUTH - PHASE 2
MH120 12830958 79-20-768 ROOF MECHANICAL PART PLAN - NORTH - PHASES
1 & 2
MH121 12830959 79-20-769 ROOF MECHANICAL PART PLAN - SOUTH - PHASES
1 & 2
MP101 12830960 79-20-770 SECOND FLOOR MECHANICAL PIPING PART PLAN -
NORTH - PHASE 1
DOCUMENT 00 01 15 Page 4
MP102 12830961 79-20-771 SECOND FLOOR MECHANICAL PIPING PART PLAN -
SOUTH - PHASE 1
MP103 12830962 79-20-772 THIRD FLOOR MECHANICAL PIPING PART PLAN -
NORTH - PHASE 1
MP104 12830963 79-20-773 THIRD FLOOR MECHANICAL PIPING PART PLAN -
SOUTH - PHASE 1
MP105 12830964 79-20-774 THIRD FLOOR MECHANICAL PIPING PART PLAN -
NORTH - PHASE 2
MP106 12830965 79-20-775 THIRD FLOOR MECHANICAL PIPING PART PLAN -
SOUTH - PHASE 2
MP110 12830966 79-20-776 FIRST FLOOR MECHANICAL PIPING PART PLAN -
NORTH - PHASES 1 & 2
MP111 12830967 79-20-777 FIRST FLOOR MECHANICAL PIPING PART PLAN -
SOUTH - PHASES 1 & 2
MP112 12830968 79-20-778 MEZZANINE MECHANICAL PIPING PART PLAN -
NORTH - PHASES 1 & 2
MP113 12830969 79-20-779 MEZZANINE MECHANICAL PIPING PART PLAN -
SOUTH - PHASES 1 & 2
M-401 12830970 79-20-780 ENLARGED FIRST FLOOR MECH 111 HYDRONIC PIPING
PART PLAN
M-402 12830971 79-20-781 ENLARGED FIRST FLOOR MECH 111 STEAM PIPING
AND MECHANICAL DUCTWORK PART PLANS
M-403 12830972 79-20-782 ENLARGED FIRST FLOOR MECH 141 PIPING PART
PLANS
M-501 12830973 79-20-783 MECHANICAL DETAILS 1
M-502 12830974 79-20-784 MECHANICAL DETAILS 2
M-503 12830975 79-20-785 MECHANICAL DETAILS 3
M-504 12830976 79-20-786 MECHANICAL DETAILS 4
M-505 12830977 79-20-787 MECHANICAL DETAILS 5
M-506 12830978 79-20-788 MECHANICAL AIRFLOW DIAGRAM
M-601 12830979 79-20-789 MECHANICAL SCHEDULES 1
M-602 12830980 79-20-790 MECHANICAL SCHEDULES 2
M-603 12830981 79-20-791 MECHANICAL SCHEDULES 3
M-701 12830982 79-20-792 CONTROL SYSTEM ARCHITECTURE AND SCHEDULE
M-702 12830983 79-20-793 CONTROL DIAGRAMS 1
M-703 12830984 79-20-794 CONTROL DIAGRAMS 2
M-704 12830985 79-20-795 CONTROL DIAGRAMS 3
M-705 12830986 79-20-796 CONTROL DIAGRAMS 4
FX001 12830987 79-20-797 FIRE SUPPRESSION LEGENDS, NOTES, AND
ABBREVIATIONS
FD101 12830988 79-20-798 FIRST FLOOR AND MEZZANINE FIRE SUPPRESSION
EXISTING CONDITIONS AND REMOVALS PART PLANS -
PHASE 1
FD102 12830989 79-20-799 SECOND FLOOR FIRE SUPPRESSION EXISTING
CONDITIONS AND REMOVALS PART PLAN - NORTH -
PHASE 1
FD103 12830990 79-20-800 SECOND FLOOR FIRE SUPPRESSION EXISTING
CONDITIONS AND REMOVALS PART PLAN - SOUTH -
PHASE 1
FD104 12830991 79-20-801 THIRD FLOOR AND ATTIC FIRE SUPPRESSION
EXISTING CONDITIONS AND REMOVALS PART PLANS -
NORTH - PHASES 1 & 2
FD105 12830992 79-20-802 THIRD FLOOR AND ATTIC FIRE SUPPRESSION
EXISTING CONDITIONS AND REMOVALS PART PLANS -
SOUTH - PHASES 1 & 2
FX101 12830993 79-20-803 FIRST FLOOR AND MEZZANINE FIRE SUPPRESSION
PART PLANS - PHASE 1
FX102 12830994 79-20-804 SECOND FLOOR FIRE SUPPRESSION PART PLAN -
DOCUMENT 00 01 15 Page 5
NORTH - PHASE 1
FX103 12830995 79-20-805 SECOND FLOOR FIRE SUPPRESSION PART PLAN -
SOUTH - PHASE 1
FX104 12830996 79-20-806 THIRD FLOOR AND ATTIC FIRE SUPPRESSION PART
PLANS - NORTH - PHASES 1 & 2
FX105 12830997 79-20-807 THIRD FLOOR, ATTIC, AND ROOF FIRE SUPPRESSION
PART PLANS - SOUTH - PHASES 1 & 2
FA001 12830998 79-20-808 GENERAL FIRE ALARM AND MASS NOTIFICATION
NOTES, SYMBOLS, ABBREVIATIONS, RISER, AND
MATRIX
FA101 12830999 79-20-809 FIRST FLOOR AND MEZZANINE FIRE ALARM AND
MASS NOTIFICATION PART PLANS - PHASE 1
FA102 12831000 79-20-810 SECOND FLOOR FIRE ALARM AND MASS NOTIFICATION
PART PLAN - NORTH - PHASE 1
FA103 12831001 79-20-811 SECOND FLOOR FIRE ALARM AND MASS NOTIFICATION
PART PLAN - SOUTH - PHASE 1
FA104 12831002 79-20-812 THIRD FLOOR AND PENTHOUSE FIRE ALARM AND MASS
NOTIFICATION PART PLANS - NORTH -
PHASES 1 & 2
FA105 12831003 79-20-813 THIRD FLOOR AND ROOF FIRE ALARM AND MASS
NOTIFICATION PART PLANS - SOUTH -
PHASES 1 & 2
E-001 12831004 79-20-814 ELECTRICAL SYMBOLS, ABBREVIATIONS, AND
GENERAL NOTES
ED101 12831005 79-20-815 SECOND FLOOR ELECTRICAL REMOVALS PART PLAN -
NORTH
ED102 12831006 79-20-816 SECOND FLOOR ELECTRICAL REMOVALS PART PLAN -
SOUTH
ED103 12831007 79-20-817 THIRD FLOOR ELECTRICAL REMOVALS PART PLAN -
NORTH
ED104 12831008 79-20-818 THIRD FLOOR ELECTRICAL REMOVALS PART PLAN -
SOUTH
ED120 12831009 79-20-819 ROOF ELECTRICAL REMOVALS PLANS
ED401 12831010 79-20-820 FIRST AND SECOND FLOOR ELECTRICAL REMOVALS
PART PLANS
ED402 12831011 79-20-821 STAIR ELECTRICAL REMOVALS 1
ED403 12831012 79-20-822 STAIR ELECTRICAL REMOVALS 2
ED404 12831013 79-20-823 THIRD FLOOR ELECTRICAL REMOVALS PART PLAN
ED501 12831014 79-20-824 ONE-LINE DIAGRAM REMOVALS
ED502 12831015 79-20-825 TEMPORARY POWER - PHASE 1
ED503 12831016 79-20-826 TEMPORARY POWER - PHASE 2
ED601 12831017 79-20-827 SECOND FLOOR EXISTING PANELBOARD SCHEDULES 1
ED602 12831018 79-20-828 SECOND FLOOR EXISTING PANELBOARD SCHEDULES 2
ED603 12831019 79-20-829 SECOND FLOOR EXISTING PANELBOARD SCHEDULES 3
ED604 12831020 79-20-830 THIRD FLOOR EXISTING PANELBOARD SCHEDULES 1
ED605 12831021 79-20-831 THIRD FLOOR EXISTING PANELBOARD SCHEDULES 2
ED606 12831022 79-20-832 THIRD FLOOR EXISTING PANELBOARD SCHEDULES 3
EP101 12831023 79-20-833 SECOND FLOOR POWER PART PLAN - NORTH
EP102 12831024 79-20-834 SECOND FLOOR POWER PART PLAN - SOUTH
EP103 12831025 79-20-835 THIRD FLOOR POWER PART PLAN - NORTH
EP104 12831026 79-20-836 THIRD FLOOR POWER PART PLAN - SOUTH
EP120 12831027 79-20-837 ELECTRICAL ROOF PLANS
EP401 12831028 79-20-838 POWER PART PLANS 1
EP402 12831029 79-20-839 POWER PART PLANS 2
EP501 12831030 79-20-840 ONE-LINE DIAGRAM AND WIRING SCHEDULE
EP502 12831031 79-20-841 POWER DETAILS 1
EP503 12831032 79-20-842 POWER DETAILS 2
EP504 12831033 79-20-843 POWER DETAILS 3
DOCUMENT 00 01 15 Page 6
EP505 12831034 79-20-844 EQUIPMENT WIRING SCHEDULE AND POWER DETAILS
EP601 12831035 79-20-845 PANELBOARD SCHEDULES 1
EP602 12831036 79-20-846 PANELBOARD SCHEDULES 2
EP603 12831037 79-20-847 PANELBOARD SCHEDULES 3
EP604 12831038 79-20-848 PANELBOARD SCHEDULES 4
EP605 12831039 79-20-849 PANELBOARD SCHEDULES 5
EP606 12831040 79-20-850 PANELBOARD SCHEDULES 6
EP607 12831041 79-20-851 PANELBOARD SCHEDULES 7
EP608 12831042 79-20-852 PANELBOARD SCHEDULES 8
EL101 12831043 79-20-853 SECOND FLOOR LIGHTING PART PLAN - NORTH
EL102 12831044 79-20-854 SECOND FLOOR LIGHTING PART PLAN - SOUTH
EL103 12831045 79-20-855 THIRD FLOOR LIGHTING PART PLAN - NORTH
EL104 12831046 79-20-856 THIRD FLOOR LIGHTING PART PLAN - SOUTH
EL401 12831047 79-20-857 STAIR LIGHTING PART PLANS 1
EL402 12831048 79-20-858 STAIR LIGHTING PART PLANS 2
EL403 12831049 79-20-859 STAIR LIGHTING PART PLANS 3
EL701 12831050 79-20-860 LIGHTING FIXTURE SCHEDULE AND DETAILS
EL702 12831051 79-20-861 LIGHTING FIXTURE DETAILS
EL703 12831052 79-20-862 LIGHTING CONTROL DIAGRAMS
ET101 12831053 79-20-863 SECOND FLOOR TECHNOLOGY PART PLAN - NORTH
ET102 12831054 79-20-864 SECOND FLOOR TECHNOLOGY PART PLAN - SOUTH
ET103 12831055 79-20-865 THIRD FLOOR TECHNOLOGY PART PLAN - NORTH
ET104 12831056 79-20-866 THIRD FLOOR TECHNOLOGY PART PLAN - SOUTH
ET401 12831057 79-20-867 INTERIOR ELECTRICAL ELEVATIONS AND
TECHNOLOGY PART PLANS
ET501 12831058 79-20-868 NMCI AND NETWORK 1 TELECOMMUNICATIONS
RISER DIAGRAMS
ET502 12831059 79-20-869 TELEPHONE AND NETWORK 2 RISER DIAGRAMS
ET503 12831060 79-20-870 TECHNOLOGY DETAILS 1
ET504 12831061 79-20-871 TECHNOLOGY DETAILS 2
ET505 12831062 79-20-872 TECHNOLOGY DETAILS 3
EY101 12831063 79-20-873 SECOND FLOOR SECURITY PART PLAN - NORTH
EY102 12831064 79-20-874 SECOND FLOOR SECURITY PART PLAN - SOUTH
EY103 12831065 79-20-875 THIRD FLOOR SECURITY PART PLAN - NORTH
EY104 12831066 79-20-876 THIRD FLOOR SECURITY PART PLAN - SOUTH
EY501 12831067 79-20-877 ACCESS CONTROL SYSTEM ONE-LINE, SCHEDULE,
AND DETAIL
EY502 12831068 79-20-878 AUTOMATED ACCESS CONTROL SYSTEM ONE-LINE,
SCHEDULE, AND DETAIL
EY503 12831069 79-20-879 ACCESS CONTROL SYSTEM ONE-LINE DIAGRAM
-- End of Document --
DOCUMENT 00 01 15 Page 7
B79 – 2ND & 3RD FLOOR RENOVATIONS 1591147
Document 00 41 00 Page 1
DOCUMENT 00 41 00
BID SCHEDULES
06/20
PART 1 GENERAL
1.1 BASIS OF BIDS
1.1.1 Options and Unit Prices
This Contract will be awarded with options and unit prices required for specifically selected work. A description of the options and schedule of the unit price work is contained in Standard Form 1442, "Solicitation, Offer and Award." See Contract Clauses, "FAR 52.211-18, Variation in Estimated Quantity" and "FAR 52.236-16, Quantity Surveys."
Options and Unit Prices Form
N40085-XX-X-XXXX
(i) Item 0001: Base Amount
Basis of Bid for Item 0001 must be the Total Amount for Item 0001, but not including the work indicated or specified to be provided under any Option Item.
Item Description Estimated Quantity
Unit Unit Price Amount
000101 All work complete in accordance with the drawings and specifications, excluding 000102 and 000103.
1 Job LS $ $
000102 All Lightning Protection work complete in accordance with the drawings and specifications.
1 Job LS $ $
000103 All Telecommunications work complete in accordance with the drawings and specifications.
1 Job LS $ $
Total Amount for Item 0001 $
Document 00 41 00 Page 2
(ii) Item 0002: Randolph Sheppard Act (RSA)
Basis of Bid for Item 0002 must be the Total Amount for Item 0002, but not including the work indicated or specified to be provided under any Option Item.
Item Description Estimated Quantity
Unit Unit Price Amount
0002 All RSA work complete in accordance with the drawings and specifications.
1 Job LS $ $
Total Amount for Item 0002 $
In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the bidder shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.
Any bid price for items indicated above which are unbalanced as to price may be rejected as non-responsive. An unbalanced bid is one which is based on price significantly less than cost for some work and price which is significantly overstated for other work.
Document 00 41 00 Page 3
(iii) Item 0003: Option 1
Option may be exercised at the time of Award or within 70 calendar days after Award by the Contracting Officer. A firm fixed bid price is required for the option. No provision is made for economic price adjustment.
Method for evaluation for bids for Award purposes is specified below.
Basis of Bid for Item 0003 must be the addition of the following work complete:
Electronic Security System (ESS): Price for providing work including: ESS Panels, ESS Power Supplies, ESS security devices, ESS wiring, ESS system installation, ESS testing, and commissioning.
Total Amount for Item 0003 $
If Option is exercised, the Contract Completion Date remains the same.
The low bidder for purposes of Award will be determined as in Clause "FAR 52.217-4, Evaluation of Options Exercised at Time of Contract Award," of Section 00200, "Instructions to Bidders."
(iv) Item 0004: Option 2
Option may be exercised at the time of Award or within 120 calendar days after Award by the Contracting Officer. A firm fixed bid price is required for the option. No provision is made for economic price adjustment.
Method for evaluation for bids for Award purposes is specified below.
Basis of Bid for Item 0004 must be the addition of the following work complete:
Repair Roof and Repoint Masonry: Price for providing work in connection with the procurement and installation of all labor, material, equipment, transportation, coordination, testing, commissioning, and supervision required.
Total Amount for Item 0004 $
If Option is exercised, the Contract Completion Date remains the same.
The low bidder for purposes of Award will be determined as in Clause "FAR 52.217-4, Evaluation of Options Exercised at Time of Contract Award," of Section 00200, "Instructions to Bidders."
Document 00 41 00 Page 4
(v) Item 0005: Option 3
Option may be exercised at the time of Award or within 225 calendar days after Award by the Contracting Officer. A firm fixed bid price is required for the option. No provision is made for economic price adjustment. Method for evaluation for bids for Award purposes is specified below.
Basis of Bid for Item 0005 must be the addition of the following work complete:
FF&E: Price for providing work in connection with the procurement and installation of all labor, material, equipment, transportation, coordination, testing, commissioning, and supervision required.
Total Amount for Item 0005 $
If Option is exercised, the Contract Completion Date remains the same.
The low bidder for purposes of Award will be determined as in Clause "FAR 52.217-4, Evaluation of Options Exercised at Time of Contract Award," of Section 00200, "Instructions to Bidders."
Note: The minimum bid guarantee must be 100 percent of the aggregate amount of Items 0001, 0002, 0003, 0004, and 0005.
Note: If options are exercised, additional bonding and consent of surety will be required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of Items 0001, 0002, 0003, 0004, and 0005.
Document 00 41 00 Page 5
1.1.1 Unit Prices
This Contract will be solicited with unit prices to be applied to estimated quantities for selected work. A description of the items and schedule of the unit price work is contained below. See Contract Clauses, “FAR 52.211-18, Variation in Estimated Quantity” and “FAR 52.236-16, Quantity Surveys.”
Contractor is responsible for field measurement of all quantities.
Item Description Estimated
Quantity Unit Unit Price Amount
0001a Removal of asbestos containing joint compound.
60 SF $ $
0001b Removal of asbestos-containing thermal system (pipe) insulation.
1,250 LF $ $
0001c Removal of asbestos containing thermal insulation on pipe fitting.
25 EA $ $
0001d Removal of asbestos containing black mastic on window opening bricks.
20 SF $ $
0001e Paint Containing Lead, Cadmium and/or Chromium - Ceiling Tiles: HEPA vacuum ceiling tiles to remove chips, dust, and/or associated debris resulting from paint fallout onto tiles from walls, ceilings, and other surfaces.
Tiles must be cleaned sufficiently to allow disposal as Construction and Demolition (C&D) waste.
1,100 SF $ $
0001f Paint Containing Lead, Cadmium and/or Chromium – Ceiling:
Remove all loose and flaking paint to substrate on ceiling.
1,500 SF $ $
Document 00 41 00 Page 6
Item Description Estimated
Quantity Unit Unit Price Amount
0001g Paint Containing Lead, Cadmium and/or Chromium - Plaster over Brick Walls:
Remove all loose and flaking paint to substrate on walls with plaster over brick. After paint removal, remove plaster.
250 SF $ $
0001h Paint Containing Lead, Cadmium and/or Chromium - Brick Walls: Remove all loose and flaking paint to substrate on brick walls.
After paint removal, apply encapsulating paint.
1,300 SF $ $
0001i Removal of lighting ballasts containing PCB’s.
555 EA $ $
0001j Removal of lighting lamps.
1,585 EA $ $
0001k Removal of emergency lighting batteries.
31 EA $ $
0001l Removal of top layer of 1/2-inch thick unstable wood subfloor. Provide 1/2-inch thick plywood subfloor to be glued and screwed to existing bottom layer of wood sub floor.
5,000 SF $ $
0001m Provision of additional floor hole patching including: plywood subfloor, patching mortar, firestopping sealant, and mineral wool as shown in Contract Drawings, detail B4/AE002.
100 SF $ $
Document 00 41 00 Page 7
0001n Provision of additional hardened wall assembly including: metal framing, gypsum wall board, expanded metal mesh, sealant, and mineral wool insulation as shown in Contract Drawing AE001, wall type NH.
150 SF $ $
0001o Removal of additional sprinkler system pipe (3” to 4” dia.), and associated hangers, and the provision of new sprinkler system pipe to match existing sizes, including the provision of associated hangers and seismic bracing.
100 LF $ $
0001p Removal of additional sprinkler system pipe (2” to <3” dia.), and associated hangers, and the provision of new sprinkler system pipe to match existing sizes, including the provision of associated hangers and seismic bracing.
100 LF $ $
0001q Removal of additional sprinkler system pipe (1” to <2” dia.), and associated hangers, and the provision of new sprinkler system pipe to match existing sizes, including the provision of associated hangers and seismic bracing.
100 LF $ $
Total Amount for Unit Price Items 0001a through 0001q $
In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid.
If the bidder shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.
Document 00 41 00 Page 8
Note: The Unit Prices provided must be the same amount for both adding and deducting quantities of the items listed.
The Unit Quantities indicated above are only estimates. The QC Manager must identify the types, locations, and quantities of repairs and must coordinate with the engineer of record through the Contracting Officer to confirm types, locations, and quantities of repairs.
The Unit Prices Documentation and Accounting Plan must include, as a minimum, the following:
1. Provide documentation that must include the repairs to be performed, the location of repairs, and the quantity of repairs. Units of measurement must match the unit prices indicated on the Unit Prices Table herein and as indicated on Sheet G-004.
2. For each repair identified, include the assignment of unit price designations (e.g., 0001b) that are indicated in the Unit Prices Table herein. The QC Manager must assign a quantity to each repair identified during the inspection and provide an updated accounting summary for all areas inspected as the inspections progress and are completed for Contracting Officer's review.
3. Provide notification and schedule of inspection dates and times to the
Contracting Officer at least 2 weeks in advance. Contracting Officer to coordinate with Engineer of Record to review inspection findings on site with QC Manager prior to execution of repairs to confirm repair types and quantities.
4. Paint Containing Lead, Cadmium, and/or Chromium: All work that may impact building materials with paint containing lead, cadmium, and/or chromium (including hexavalent chromium) must be performed in accordance with: 29 CFR 1926.62, 29 CFR 1926.1126, and 29 CFR
1926.1127. For bidding purposes, Contractors are to include the scope of work for unit prices indicated on the Unit Prices Table herein related to proper preparation, removal, management, etc. of building materials with paint containing lead, cadmium, and/or chromium (including hexavalent chromium).
1.1.2 Contract Line Item Notes
General
1. Award will be made on the total sum of Items 0001, 0002, 0003, 0004, 0005. Offerors must enter unit prices and/or extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended price and the total recomputed accordingly. If an offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
2. FAR 52.217-5, Evaluation of Options (Jul 1990) - Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for Award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
Document 00 41 00 Page 9
3. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
4. The Government reserves the unilateral right to Award Items 0001, 0002, 0003, 0004, and 0005 to the Contractor at the proposed price within 365 calendar days after Contract Award. A firm fixed proposed price is required for Items 0001, 0002, 0003, 0004, 0005. No provision is made for economic price adjustment. If Options are exercised, the Contract Completion Date remains 728 calendar days after Award of the Contract.
5. The Performance Bond must reflect 100 percent of the aggregate amount of all items.
-- End of Document --
SECTION 01 11 00.00 22
SUMMARY OF WORK (PWD ME)
05/21
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Cross Disciplinary Historic Facility Coordination Drawings; G
Work Sequencing and Preparation Plan; G
Salvage Plan; G
SD-11 Closeout Submittals
Certificate of Beneficial Occupancy Acceptance Checklist; G
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The project includes, but is not limited to; renovations to Building 79 - 2nd and 3rd Floors for Code 2300. Ancillary work is required on the first floor, the Mezzanine, and the roof of the building.
The project consists of administration and office space, personnel support areas, training rooms, conference rooms, extending stair tower at south end of B79 to the roof level, and second and third floor open office areas. Renovations include the following: hazardous materials abatement, interior walls, doors and frames, floor and ceiling finishes, electrical (e.g. power, grounding, etc.), telecommunications coordination and pathways (e.g. telephone, BCO, NMCI, Network 1, and Network 2), electronic security system (ESS) pathways, mechanical (e.g. ventilation, industrial ventilation, etc.), plumbing (e.g. water, etc.), fire protection/life safety (e.g. fire separation, sprinklers, etc.), structural steel, painting; and incidental related work.
Project Options Include:
Option 1: Electronic Security System (ESS)
Option 2: Repair Roof and Repoint Masonry (Refer to Specifications Attachment #1)
Option 3: Furniture, Fixtures, and Equipment (FF&E)
1.3 PROJECT SEQUENCING REQUIREMENTS
Provide Work Sequencing and Preparation Plan indicating how the work is to
SECTION 01 11 00.00 22 Page 1 be accomplished and incorporating Government directives. The intent of this Plan is to show the Government that a complete understanding of the project requirements are understood including subcontractors. The Plan must be carefully prepared and must include every aspect of the project including outages that will be required to support the construction and how it is to be accomplished with an absolute minimum of disruption to Government operations. No work may begin on the project until this plan is reviewed and approved by the Contracting Officer. The following is the proposed sequencing for implementation of the projects construction:
Phase 1: Partial First Floor, Partial Mezzanine, Second Floor, Partial Third Floor, Partial Roof, and Stair Tower Extension
Phase 2: Partial First Floor, Partial Second Floor, Third Floor, Partial Roof, Penthouse, and Stair Tower Extension
The First Floor Heating Plant Replacement must be accomplished during the non-heating season concurrent with either Phase 1 or Phase 2, or overlapping both Phase 1 and Phase 2.
Prior to commencing with the Phase 2 portion of the work, Phase 1 must be fully tested, commissioned, and accepted by the Government for occupancy by the Tenant.
The following restrictions apply to the sequencing of the work:
a. Existing furniture and equipment to remain at First Floor, Mezzanine, and in construction areas (e.g. office furniture, etc.) must be protected from dust, debris, demolition, and construction activities to ensure the items are not damaged and are useable at project completion. Temporary partitions must be full height or the enclosed area(s) provided with ceilings of similar construction as the partitions. Provide daily cleanup as specified in Section 02 41 00 DEMOLITION AND DECONSTRUCTION and as directed by the Contracting Officer.
b. The building will be occupied by Government personnel adjacent to work areas during the project.
c. Construction sequencing plans have been developed in coordination with the Government. Develop an independent construction phasing sequencing plan and construction schedule in coordination with the Contracting Officer.
d. During the phased work of this project, occupied portions of Building 79 must remain fully operational including, but not limited to, the following utilities: plumbing, heat, ventilation, air conditioning, fire suppression, fire alarm, electrical power, communications systems, and security systems.
e. Building 79 is an historic facility and requires special coordination to have limited impact on the historic fabric and character defining features of the structure. Work must comply with the SECRETARY OF THE INTERIOR'S STANDARDS FOR THE TREATMENT OF HISTORIC PROPERTIES. Cross disciplinary historic facility coordination drawings are required for review and approval by the Contracting Officer and the PWD-ME Cultural Resources Manager prior to commencement of work. Refer to Section
01 30 10.00 22 COORDINATION PROCEDURES AND COORDINATION DRAWINGS.
SECTION 01 11 00.00 22 Page 2
f. Electrical power, access control, and monitoring by the Electronic Security System for the existing CIA Gate and Turnstile adjacent to Building 79 is fed from Building 79. Work that will affect these components must be coordinated and approved by Portsmouth Naval Shipyard Security and the Contracting Officer through the Utility Outage process and the requirements of the paragraph entitled WORK ADJACENT TO CIA SECURITY FENCING (PNSY) in Section 01 14 00.00 22 WORK
RESTRICTIONS (PWD ME).
1.3.1 Location
The work is located at the Portsmouth Naval Shipyard, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.4 PROJECT ENVIRONMENTAL GOALS
Distribute copies of the Environmental Goals to each subcontractor and the Contracting Officer. The overall goal for design, construction, and operation is to produce a project that meets the functional program needs and incorporates sustainability principles. Specifically:
a. Avoid site degradation and erosion. Minimize offsite environmental impact.
b. Use the minimum amount of energy, water, and materials feasible to meet the design intent. Select energy and water efficient equipment and strategies.
c. Use environmentally preferable products and decrease toxicity level of materials used.
d. Optimize operational performance (through commissioning efforts) in order to ensure energy efficient equipment operates as intended.
Consider the durability, maintainability, and flexibility of building systems.
e. Manage construction site and storage of materials to ensure no negative impact on the indoor environmental quality of the building.
f. Reduce construction waste through reuse, recycling, and supplier take-back.
1.5 OCCUPANCY OF PREMISES
Building(s) will be occupied during performance of work under this Contract. Post occupancy notifications in prominent locations in the work areas.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways. While the building is occupied, life safety measures and access to egress components must be maintained. Provide temporary egress lighting, emergency lighting, fire alarm, and fire protection systems along paths of egress.
Parking is a critical component of work on the Portsmouth Naval Shipyard and parking and road outages must be submitted to the Contracting Officer for approval as outlined in the Contract Documents.
SECTION 01 11 00.00 22 Page 3
1.6 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.7 LOCATION OF UNDERGROUND UTILITIES
Verify location of underground utilities in accordance with Section
01 35 26.00 22 GOVERNMENTAL SAFETY REQUIREMENTS (PWD ME).
1.7.1 Notification Prior to Excavation
Notify the Contracting Officer at least two (2) working days prior to starting excavation work. Refer to Section 01 35 26.00 22 GOVERNMENTAL SAFETY REQUIREMENTS (PWD ME) Attachment B for Dig Safe requirements.
1.8 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
Pursuant to Contract Clause "FAR 52.245-1, Government Property", the Government will furnish the following materials and equipment for installation by the Contractor:
DESIGNATION NO. DESCRIPTION QUANTITY
Network C Equipment
Equipment, Vaults, and Stands
Three (3)
Quantities indicated for the above-listed items marked with an asterisk are estimates. It is the intention of the Government to furnish all quantities of the asterisk items required to complete the work as specified, and the various quantities will be adjusted when necessary.
Quantities stated for the above items not marked with an asterisk are all that will be furnished by the Government. Provide any additional quantities that are required.
1.8.1 Delivery Schedule
Notify the Contracting Officer in writing at least 30 calendar days in advance of the date on which the materials and equipment are required.
Pick up materials and equipment no later than 30 calendar days after such date. When materials and equipment are not picked up by the 30th day, the Contractor will be charged for storage at the rate of $100 per day or fraction thereof.
Materials and equipment will be available based on when the Contractor has notified the Contracting Officer per the notification requirements.
SECTION 01 11 00.00 22 Page 4
1.8.2 Delivery Location
The materials and equipment will be available at PNSY Building 170.
Coordinate pickup with Contracting Officer not less than 14 calendar days prior to pick up.
1.9 GOVERNMENT-INSTALLED WORK
If Option 1 is not selected, the Government needs to provide the following under the Base Bid:
1. Electronic Security System (ESS) Equipment.
2. ESS Wiring.
3. ESS Testing.
Under any scenario (Base Bid or Options), the Government needs to provide:
1. ESS Security pathway coordination with Contractor.
2. Network 2 equipment and associated UPS.
3. Wireless access point devices/equipment.
4. RFID equipment and associated cables.
5. Upgraded UPS, if required for emergency power off (EPO) function.
6. Equipment required to activate plain old telephone system (POTS) connections.
7. Remove and reinstall existing Network 2 cabinet.
1.10 SECURE NETWORK PROVIDERS (NETWORK N, NETWORK C, NETWORK P, AND
NETWORK S)
1.10.1 Secure Network Providers Contractor Access
The Secure Network Providers Contractor(s) must be allowed access to the facility throughout the project construction phases to maintain existing equipment that is to remain, as well as towards the end of construction (finishes 90% complete, rough-in 100% complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications room and spaces and to make final connections.
Coordinate and facilitate joint use of building spaces with the Secure Network Providers Contractor(s) during the final stages of each phase of construction. After the Contracting Officer has facilitated coordination meetings between the Contractors, within one week, incorporate the effort of additional coordination into the construction schedule to demonstrate maintaining the contract duration.
1.11 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver, and off-load the salvaged property at the Government designated storage area located on the Portsmouth Naval Shipyard.
Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.
SECTION 01 11 00.00 22 Page 5
1.12 BENEFICIAL OCCUPANCY REQUIREMENTS
The Contractor must submit the Certificate of Beneficial Occupancy Acceptance Checklist with the required documentation no later than ten
(10) working days prior to requesting the Government take Beneficial Occupancy. This checklist will be provided to the Contractor by the Contracting Officer.
The Contractor is responsible for ensuring all work noted on this form is complete and accepted by the Contractor's QC Manager prior to submitting the form to the NAVFAC Construction Manager for NAVFAC signatures.
Failure of the Contractor to verify all work and provide the required documentation will delay the processing of acceptance of Beneficial Occupancy.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00.00 22 Page 6
SECTION 01 14 00.00 22
WORK RESTRICTIONS (PWD ME)
08/22
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 241 (2022) Standard for Safeguarding Construction, Alteration, and Demolition Operations
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel; G
Outage Plan; G
1.3 SPECIAL SCHEDULING REQUIREMENTS (PNSY)
a. The facility will remain in operation during the entire construction period. Conduct operations so as to cause the least possible interference with normal operations of the Portsmouth Naval Shipyard.
b. Permission to interrupt any Portsmouth Naval Shipyard roads, crane rail, railroads, and/or utility services must be submitted to the Contracting Officer in writing a minimum of 15 calendar days prior to the desired date of interruption. The Outage process (Instruction 11300.9) is used for this purpose, as discussed under UTILITY CUTOVERS
AND INTERRUPTIONS.
c. The project is located in and adjacent to security islands. The Contractor is not allowed in these areas without continuous Government escorts.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .