Attachment F - B79 Specifications Volume 2.pdf
PDF 7 MB Posted
- Attached to
- B79 DBB 2nd and 3rd Floor Renovations Federal contract opportunity
- Solicitation number
- N4008523R2602
About this file
This solicitation is for a roof renovation project at the Portsmouth Naval Shipyard in Kittery, Maine. The Navy seeks a contractor to replace the roof on the second and third floors of Building B79. The work includes removal of the existing modified bitumen membrane roof system and installation of a new three-ply SBS modified bitumen roof membrane. The contractor must also perform related work such as insulation installation, flashing, walkways and platforms. The solicitation includes specifications for materials and systems to be installed. The Navy will evaluate bids and award a firm fixed-price contract for the project, with an estimated period of performance of 365 days from notice to proceed.
The solicitation provides detailed technical requirements for the roofing system and components. Products and materials must meet referenced industry standards and fire ratings. The contractor's work must also maintain the existing roof system warranty.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRIBUTION STATEMENT F. Further dissemination only as directed by Portsmouth Naval Shipyard, NAVFAC (December 3, 2018) or higher DoD authority.
NAVFAC MIDLANT, Public Works Department, Maine eProjects Work Order No.: 1591147
SPECIFICATIONS
RM 18-0661, B79 – 2nd & 3rd Floor Renovations
At the
Portsmouth Naval Shipyard, Kittery, Maine
Volume 2 of 2
PREPARED BY:
NAVFAC Midlant PWD ME Building 59
Portsmouth Naval Shipyard Kittery, Maine 03801-2032
REQUEST FOR PROPOSAL PREPARED BY:
Architectural: William Van Benthuysen, AIA Electrical: Wayne Whippie, P.E.
Civil: Donald E. Wallace, Jr., P.E. Fire Protection: Laura Clebak, P.E.
Structural: David N. Martin, P.E., S.E. Environmental: N/A Mechanical: Christine Lyle, P.E. Estimating: Oak Point Associates
Submitted By: Peter F. Dunn, P.E. Signature Date: February 28, 2023
Approved By PME: Jeffrey Hoyt, P.E. Signature Date:
Design Manager: Mitchell R. Lahar, R.A. Signature Date:
B79 - 2ND & 3RD FLOOR RENOVATIONS 1591147
PORTSMOUTH NAVAL SHIPYARD, KITTERY, MAINE
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15 LIST OF DRAWINGS
00 41 00 BID SCHEDULES
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00.00 22 SUMMARY OF WORK (PWD ME)
01 14 00.00 22 WORK RESTRICTIONS (PWD ME)
01 20 00.00 22 PRICE AND PAYMENT PROCEDURES (PWD ME)
01 30 00.00 22 ADMINISTRATIVE REQUIREMENTS (PWD ME)
01 30 10.00 22 COORDINATION PROCEDURES AND COORDINATION DRAWINGS
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 17.00 20 NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 35 26.00 22 GOVERNMENTAL SAFETY REQUIREMENTS (PWD ME)
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 22 QUALITY CONTROL (PWD ME)
01 45 35 SPECIAL INSPECTIONS
01 50 00.00 22 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS (PWD ME)
01 57 19.00 22 TEMPORARY ENVIRONMENTAL CONTROLS - PORTSMOUTH NAVAL
SHIPYARD (PWD ME)
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00.00 22 CLOSEOUT SUBMITTALS (PWD ME)
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT
INFORMATION (eOMSI)
01 91 00.15 20 TOTAL BUILDING COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 82 00.00 22 ASBESTOS REMEDIATION (PNS PROJECTS)
02 83 00.00 22 MANAGEMENT OF LEAD, CADMIUM, AND CHROMIUM DURING
RENOVATION, DEMOLITION, REMOVAL, AND ABATEMENT (PNS
PROJECTS)
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
DI VI SI ON 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DI VI SI ON 04 - MASONRY
04 20 00 UNIT MASONRY
DI VI SI ON 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 52 00 METAL RAILINGS
PROJECT TABLE OF CONTENTS Page 1
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DI VI SI ON 09 - FI NI SHES
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 39 FOLDING PANEL PARTITIONS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DI VI SI ON 12 - FURNI SHI NGS
12 24 13 ROLLER WINDOW SHADES
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBING, GENERAL PURPOSE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
PROJECT TABLE OF CONTENTS Page 2
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 22 26.00 20 STEAM SYSTEM AND TERMINAL UNITS
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END AND
INTEGRATION
DI VI SI ON 26 - ELECTRI CAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM (OPTION 2)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 05 29.00 10 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR NETWORK 2
COMMUNICATION SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING (OPTION 1)
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS) (PATHWAYS AND
COORDINATION: BASE BID) (ESS SYSTEM: OPTION 1)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
SECTION 07 21 13
BOARD AND BLOCK INSULATION
02/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C272/C272M (2016) Standard Test Method for Water Absorption of Core Materials for Sandwich Constructions
ASTM C578 (2018) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation
ASTM C930 (2019) Standard Classification of Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories
ASTM D1621 (2016) Standard Test Method for Compressive Properties of Rigid Cellular Plastics
ASTM E84 (2021a) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2018) International Building Code
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 31 (2016) Standard for the Installation of Oil-Burning Equipment
NFPA 54 (2018) National Fuel Gas Code
NFPA 70 (2020; ERTA 20-1 2020; ERTA 20-2 2020; TIA
20-1; TIA 20-2; TIA 20-3; TIA 20-4)
National Electrical Code
NFPA 211 (2019) Standard for Chimneys, Fireplaces, Vents, and Solid Fuel-Burning Appliances
SECTION 07 21 13 Page 1
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-03 Product Data
Manufacturer's Standard Details; G
Block or Board Insulation; G
Accessories
SD-07 Certificates
Block or Board Insulation
Final Special Warranties; G
SD-08 Manufacturer's Instructions
Block or Board Insulation
Adhesive
1.3 MANUFACTURER'S DETAILS
Submit manufacturer's standard details indicating methods of attachment and spacing, transition and termination details, and installation details. Include verification of existing conditions.
1.4 PRODUCT DATA
Include data for material descriptions, recommendations for product shelf life, and precautions for flammability and toxicity. Include data to verify compatibility of sealants with insulation.
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
Deliver materials to the site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.
1.5.2 Storage
Inspect materials delivered to the site for damage and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling. Keep materials wrapped and separated from off-gassing materials (such as drying paints and adhesives). Do not use materials that have visible moisture or biological growth. Comply with
SECTION 07 21 13 Page 2 manufacturer's recommendations for handling, storage, and protection of materials before and during installation.
1.6 SAFETY PRECAUTIONS
1.6.1 Other Safety Considerations
Comply with the safety requirements of ASTM C930.
1.7 SPECIAL WARRANTIES
1.7.1 Guarantee
Guarantee insulation installation against failure due to ultraviolet light exposure for a period of three years from the date of Beneficial Occupancy. Submit draft and final guarantees in accordance with Section
01 78 00.00 22 CLOSEOUT SUBMITTALS (PWD ME).
1.7.2 Warranty
Provide manufacturer's material warranty for all system components for a period of three years from the date of Beneficial Occupancy. Submit draft and final warranties in accordance with Section 01 78 00.00 22 CLOSEOUT
SUBMITTALS (PWD ME).
PART 2 PRODUCTS
2.1 BLOCK OR BOARD INSULATION
Provide thermal insulating materials as recommended by manufacturer for each type of application indicated. Provide insulation with the following physical properties and in accordance with the following standards:
a. Extruded Preformed Cellular Polystyrene: ASTM C578 REV A.
2.1.1 Thermal Resistance
Unless otherwise indicated, R-5 per inch.
2.1.2 Fire Protection Requirements
a. Flame spread index of 25 or less when tested in accordance with
ASTM E84.
b. Smoke developed index of 450 or less when tested in accordance with
ASTM E84.
c. Provide insulated assemblies in accordance ICC IBC Chapter Fire and Smoke Protection Features.
2.1.3 Other Material Properties
Provide thermal insulating materials with the following properties:
a. Rigid cellular plastics: Compressive Resistance at Yield: Not less than 10 pounds per square inch (psi) when measured according to
ASTM D1621.
b. Water Vapor Permeance: Not more than 1.1 Perms or less when measured
SECTION 07 21 13 Page 3 according to ASTM E96/E96M, desiccant method, in the thickness required to provide the specified thermal resistance, including facings, if any.
c. Water Absorption: Not more than 2 percent by total immersion, by volume, when measured according to ASTM C272/C272M.
2.2 ACCESSORIES
2.2.1 Adhesive
As recommended by insulation manufacturer.
2.2.2 Mechanical Fasteners
Corrosion resistant fasteners as recommended by the insulation manufacturer.
PART 3 EXECUTION
3.1 EXISTING CONDITIONS
Prior to installation, ensure all areas that are in contact with the insulation are dry and free of projections that could cause voids, compressed insulation, or punctured vapor retarders. For foundation perimeter or under slab applications, check that subsurface fill is flat, smooth, dry, and well tamped. Do not proceed with installation if moisture or other conditions are present, and notify the Contracting Officer of such conditions. Do not proceed with the work until conditions have been corrected and verified to be dry.
3.2 PREPARATION
3.2.1 Blocking Around Heat Producing Devices
Provide noncombustible blocking at all spaces between heat producing devices and the floors, ceilings and roofs through which they pass.
Provide in accordance with ICC IBC Section 2111.12 Fireplace Blocking and with the following clearances:
a. Recessed lighting fixtures, including wiring compartments, ballasts, and other heat producing devices, unless certified for installation surrounded by insulation: 3 inches from outside face of fixtures and devices or as required by NFPA 70 and, if insulation is placed above fixture or device, 24 inches above fixture.
b. Vents and vent connectors used for venting products of combustion, flues, and chimneys other than masonry chimneys: Minimum clearances as required by NFPA 211 .
c. Gas Fired Appliances: Clearances as required in NFPA 54 .
d. Oil Fired Appliances: Clearances as required in NFPA 31 .
Blocking is not required if chimneys or flues are certified in writing by the chimney or flue manufacturer for use in contact with specific insulating materials.
SECTION 07 21 13 Page 4
3.3 INSTALLATION
3.3.1 Installation and Handling
Provide insulation in accordance with the manufacturer's printed installation instructions. Keep material dry and free of extraneous materials.
3.3.2 Electrical Wiring
Do not install insulation in a manner that would enclose electrical wiring between two layers of insulation.
3.3.3 Cold Climate Requirement
Place insulation on the outside of pipes.
3.3.4 Continuity of Insulation
Butt tightly against adjoining boards, studs, rafters, joists, sill plates, headers and obstructions. Provide continuity and integrity of insulation at corners, wall to ceiling joint, roof, and floor. Avoid creating thermal bridges and voids. Provide and verify continuity of insulative barrier throughout the building enclosure.
3.3.5 Coordination
Verify final installed insulation thicknesses comply with thicknesses indicated, R-values specified herein, and with the approved insulation submittal(s).
3.4 INSTALLATION ON WALLS
3.4.1 Installation on Exterior Sheathing
Apply board directly to exterior sheathing with adhesive or fasteners as recommended by the insulation manufacturer. Fit between obstructions without impaling board. Apply in parallel courses with joints breaking midway over course below. Place boards in moderate contact with adjoining insulation without forcing and without gaps. Cut and shape as required to fit around wall penetrations, projections or openings to accommodate conduit or other utilities. Seal around cutouts with sealant. Install insulation in wall cavities so that it leaves at least a nominal 1 inch air space outside of the insulation to allow for cavity drainage.
3.4.2 Adhesive Attachment to Exterior Sheathing
Apply adhesive to wall and completely cover wall with insulation.
a. Spot method: Provide at least six spots having diameter of approximately 4 inches, located at each corner and mid points of each of the longer sides of each board.
b. As recommended by the insulation manufacturer.
3.5 ACCESS PANELS AND DOORS
Attach insulation to all access panels greater than 1 square foot and all access doors in insulated floors and ceilings. Use insulation with same
SECTION 07 21 13 Page 5
R-Value as that for the floor or ceiling in which each panel occurs.
-- End of Section --
SECTION 07 21 13 Page 6
SECTION 07 21 16
MINERAL FIBER BLANKET INSULATION
11/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C665 (2017) Standard Specification for Mineral-Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing
ASTM C930 (2019) Standard Classification of Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories
ASTM D3833/D3833M (1996; R 2011) Water Vapor Transmission of Pressure-Sensitive Tapes
ASTM D5359 (2015) Standard Specification for Glass Cullet Recovered from Waste for Use in Manufacture of Glass Fiber
ASTM E84 (2021a) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials
ASTM E136 (2019) Standard Test Method for Assessing Combustibility of Materials Using a Vertical Tube Furnace at 750 Degrees C
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 31 (2016) Standard for the Installation of Oil-Burning Equipment
NFPA 54 (2018) National Fuel Gas Code
NFPA 70 (2020; ERTA 20-1 2020; ERTA 20-2 2020; TIA
20-1; TIA 20-2; TIA 20-3; TIA 20-4)
National Electrical Code
NFPA 211 (2019) Standard for Chimneys, Fireplaces, Vents, and Solid Fuel-Burning Appliances
SECTION 07 21 16 Page 1
TECHNICAL ASSOCIATION OF THE PULP AND PAPER INDUSTRY (TAPPI)
TAPPI T803 OM (2010) Puncture Test of Container Board
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.134 Respiratory Protection
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-03 Product Data
Blanket Insulation; G
Vapor Retarder
Pressure Sensitive Tape
Accessories
SD-08 Manufacturer's Instructions
Insulation
1.3 DELIVERY, STORAGE, AND HANDLING
1.3.1 Delivery
Deliver materials to site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.
1.3.2 Storage
Inspect materials delivered to the site for damage; unload and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling.
1.4 SAFETY PRECAUTIONS
1.4.1 Respirators
Provide installers with dust/mist respirators, training in their use, and protective clothing, all approved by National Institute for Occupational Safety and Health (NIOSH)/Mine Safety and Health Administration (MSHA) in accordance with 29 CFR 1910.134 .
SECTION 07 21 16 Page 2
1.4.2 Other Safety Concerns
Consider other safety concerns and measures as outlined in ASTM C930.
PART 2 PRODUCTS
2.1 BLANKET INSULATION
ASTM C665, Type I, blankets without membrane coverings; with a flame spread of 25 or less and a smoke developed rating of 50 or less when tested in accordance with ASTM E84.
2.1.1 Thermal Resistance Value (R-VALUE)
The R-Value must be as indicated on drawings.
2.1.2 Recycled Materials
Provide insulation materials containing the following minimum percentage of recycled material content by weight:
Fiberglass: 20 percent glass cullet complying with ASTM D5359
2.1.3 Prohibited Materials
Do not provide asbestos-containing materials.
2.2 BLOCKING
Wood, metal, unfaced mineral fiber blankets in accordance with ASTM C665, Type I, or other approved materials. Use only non-combustible materials meeting the requirements of ASTM E136 for blocking around chimneys and heat producing devices.
2.3 VAPOR RETARDER
a. Membrane with the following properties:
Water Vapor Permeance: ASTM E96/E96M: 1 perm Maximum Flame Spread: ASTM E84: 25 Combustion Characteristics: Passing ASTM E136 Puncture Resistance: TAPPI T803 OM : 25
2.4 PRESSURE SENSITIVE TAPE
As recommended by the vapor retarder manufacturer and having a water vapor permeance rating of one perm or less when tested in accordance with
ASTM D3833/D3833M .
2.5 ACCESSORIES
2.5.1 Mechanical Fasteners
Corrosion resistant fasteners as recommended by the insulation manufacturer.
2.5.2 Wire Mesh
Corrosion resistant and as recommended by the insulation manufacturer.
SECTION 07 21 16 Page 3
PART 3 EXECUTION
3.1 EXISTING CONDITIONS
Before installing insulation, ensure that areas that will be in contact with the insulation are dry and free of projections which could cause voids, compressed insulation, or punctured vapor retarders. If moisture or other conditions are found that do not allow the workmanlike installation of the insulation, do not proceed but notify Contracting Officer of such conditions.
3.2 PREPARATION
3.2.1 Blocking at Attic Vents and Access Doors
Prior to installation of insulation, install permanent blocking to prevent insulation from slipping over, clogging, or restricting air flow through soffit vents at eaves. Install permanent blocking to maintain accessibility to equipment or controls that require maintenance or adjustment.
3.2.2 Blocking Around Heat Producing Devices
Install non-combustible blocking around heat producing devices to provide the following clearances:
a. Recessed lighting fixtures, including wiring compartments, ballasts, and other heat producing devices, unless these are certified by the manufacturer for installation surrounded by insulation: 3 inches from outside face of fixtures and devices or as required by NFPA 70 and, if insulation is to be placed above fixture or device, 24 inches above fixture.
b. Vents and vent connectors used for venting the products of combustion, flues, and chimneys other than masonry chimneys: Minimum clearances as required by NFPA 211 .
c. Gas Fired Appliances: Clearances as required in NFPA 54 .
d. Oil Fired Appliances: Clearances as required in NFPA 31 .
Blocking around flues and chimneys is not required when insulation blanket, including any attached vapor retarder, passed ASTM E136, in addition to meeting all other requirements stipulated in Part 2. Blocking is also not required if the chimneys are certified by the manufacturer for use in contact with insulating materials.
3.3 INSTALLATION
3.3.1 Insulation
Install and handle insulation in accordance with manufacturer's instructions. Keep material dry and free of extraneous materials. Any materials that show visual evidence of biological growth due to presence of moisture must not be installed on the building project. Ensure personal protective clothing and respiratory equipment is used as required. Observe safe work practices.
SECTION 07 21 16 Page 4
3.3.1.1 Electrical wiring
Do not install insulation in a manner that would sandwich electrical wiring between two layers of insulation.
3.3.1.2 Continuity of Insulation
Install blanket insulation to butt tightly against adjoining blankets and to studs, rafters, joists, sill plates, headers and any obstructions.
Provide continuity and integrity of insulation at corners, wall to ceiling joints, roof, and floor. Avoid creating thermal bridges.
3.3.1.3 Installation at Bridging and Cross Bracing
Insulate at bridging and cross bracing by splitting blanket vertically at center and packing one half into each opening. Butt insulation at bridging and cross bracing; fill in bridged area with loose or scrap insulation.
3.3.1.4 Cold Climate Requirement
Place insulation to the outside of pipes.
3.3.1.5 Insulation without Affixed Vapor Retarder
Provide snug friction fit to hold insulation in place. Stuff pieces of insulation into cracks between trusses, joists, studs and other framing, such as at attic access doors, door and window heads, jambs, and sills, band joists, and headers.
3.3.1.6 Sizing of Blankets
Provide only full width blankets when insulating between trusses, joists, or studs. Size width of blankets for a snug fit where trusses, joists or studs are irregularly spaced.
3.3.1.7 Special Requirements for Ceilings
Place insulation under electrical wiring occurring across joists. Pack insulation into narrowly spaced framing. Do not block flow of air through soffit vents.
3.3.2 Installation of Separate Vapor Retarder
Apply continuous vapor retarder as indicated. Overlap joints at least 6 inches and seal with pressure sensitive tape. Seal at sill, header, windows, doors and utility penetrations. Repair punctures or tears with pressure sensitive tape.
SECTION 07 21 16 Page 5
SECTION 07 22 00
ROOF AND DECK INSULATION
02/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C1177/C1177M (2017) Standard Specification for Glass Mat Gypsum Substrate for Use as Sheathing
ASTM C1289 (2018a) Standard Specification for Faced Rigid Cellular Polyisocyanurate Thermal Insulation Board
ASTM E84 (2021a) Standard Test Method for Surface Burning Characteristics of Building Materials
FM GLOBAL (FM)
FM 4450 (1989) Approval Standard for Class 1 Insulated Steel Deck Roofs
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2018) International Building Code
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Insulation Board Layout and Attachment; G
Verification of Existing Conditions; G
SD-03 Product Data
Insulation; G
Cover Board; G
Fasteners
SECTION 07 22 00 Page 1
Moisture Control
SD-06 Test Reports
Flame Spread Rating
SD-07 Certificates
Installer Qualifications
SD-08 Manufacturer's Instructions
Nails and Fasteners
Roof Insulation
1.3 SHOP DRAWINGS
Submit insulation board layout and attachment indicating methods of attachment and spacing, transitions, tapered components, thicknesses of materials, and closure and termination conditions. Show locations of ridges, valleys, crickets, interface with, and slope to, roof drains.
Base shop drawings on verified field measurements and include verification of existing conditions.
1.4 PRODUCT DATA
Include data for material descriptions, recommendations for product shelf life, requirements for cover board or coatings, and precautions for flammability and toxicity. Include data to verify compatibility of sealants with insulation.
1.5 MANUFACTURER'S INSTRUCTIONS
Include field of roof and perimeter attachment requirements.
Provide a complete description of installation sequencing for each phase of the roofing system. Include weatherproofing procedures.
1.6 QUALITY CONTROL
Provide certification of installer qualifications from the insulation manufacturer confirming the specific installer has the required qualifications for installing the specific roof insulation system(s) indicated.
1.7 FM APPROVAL REQUIREMENTS
Provide fastening patterns in accordance with FM 1-90 for insulation on steel decks.
1.8 FIRE PERFORMANCE REQUIREMENTS
1.8.1 Insulation in Roof Systems
Comply with the requirements of ICC IBC . Roof insulation to have a flame spread rating of 75 or less when tested in accordance with ASTM E84.
Additional documentation of compliance with flame spread rating is not
SECTION 07 22 00 Page 2 required when insulation of the type used for this project as part of the specific roof assembly is listed and labeled as FM Class 1 approved.
1.8.2 Fire Resistance Ratings for Roofs
Provide in accordance with ICC IBC Chapter 7 and Table 721.1(3) Min Fire and Smoke Protection For Floor and Roof Systems.
1.9 DELIVERY, STORAGE, AND HANDLING
1.9.1 Delivery
Deliver materials to the project site in manufacturer's unopened and undamaged standard commercial containers bearing the following legible information:
a. Name of manufacturer
b. Brand designation
c. Specification number, type, and class, as applicable, where materials are covered by a referenced specification
Deliver materials in sufficient quantity to allow continuity of the work.
1.9.2 Storage and Handling
Store and handle materials in accordance with manufacturer's printed instructions. Protect from damage, exposure to open flame or other ignition sources, wetting, condensation, and moisture absorption. Keep materials wrapped and separated from off-gassing materials (such as drying paints and adhesives). Do not use materials that have visible moisture or biological growth. Store in an enclosed building or trailer that provides a dry, adequately ventilated environment. Replace damaged material with new material.
1.10 ENVIRONMENTAL CONDITIONS
Do not install roof insulation during inclement weather or when air temperature is below 40 degrees F and interior humidity is 45 percent or greater, or when there is visible ice, frost, or moisture on the roof deck.
1.11 PROTECTION
1.11.1 Special Protection
Provide special protection as approved by the insulation manufacturer.
1.11.2 Completed Work
Cover completed work with cover board for the duration of construction.
Avoid traffic on completed work particularly when ambient temperature is above 80 degrees F. Replace crushed or damaged insulation prior to roof surface installation.
SECTION 07 22 00 Page 3
PART 2 PRODUCTS
2.1 INSULATION
2.1.1 Insulation Types
Provide following roof insulation materials. Provide roof insulation that is compatible with attachment methods for the specified insulation and roof membrane.
a. Polyisocyanurate Board: Provide in accordance with ASTM C1289 REV A Type II, fibrous felt or glass mat membrane both sides, except minimum compressive strength of 20 pounds per square inch (psi).
2.1.2 Recycled Materials
Provide thermal insulation materials containing recycled content. Unless specified otherwise, the minimum required recycled content for listed materials are:
Polyisocyanurate/polyurethane: 9 percent recovered material
2.1.3 Insulation Thickness
As necessary to provide the thermal resistance (R-value) indicated for average thickness of tapered system. Base calculation on the R-value for aged insulation. For insulation over steel decks, satisfy both specified R-value and minimum thickness for width of rib opening recommended in insulation manufacturer's published literature.
2.1.4 Tapered Roof Insulation
One layer of the tapered roof insulation assembly must be factory tapered to a slope of not less than one in 1/4 inch per foot. Factory fabricate mitered joints from two diagonally cut boards or one board shaped to provide required slopes.
2.1.5 Cants and Tapered Edge Strips
Provide preformed cants and tapered edge strips of the same material as the roof insulation. When unavailable, provide pressure-preservative treated wood, wood fiberboard, or rigid perlite board cants and edge strips as recommended by the roofing manufacturer for the specific application, unless otherwise indicated. Face of cant strips to incline at 45 degrees with a minimum vertical height of 4 inches. Taper edge strips at a rate of one to 1 1/2 inch per foot down to approximately 1/8 inch thick.
2.2 COVER BOARD
For use as a thermal barrier (underlayment), fire barrier (overlayment), or cover board for adhesive-applied roofing membrane over roof insulation.
2.2.1 Glass Mat Gypsum Roof Board (Thermal Barrier)
ASTM C1177/C1177M , 0 Flame Spread and 0 Smoke Developed when tested in accordance with ASTM E84, 500 psi, Class A, non-combustible, 1/2 inch thick, 4 by 8 feet board size.
SECTION 07 22 00 Page 4
2.2.2 High Density Polyisocyanurate Insulation (Cover Board)
Provide ASTM C1289 polyisocyanurate insulation, Type II, Class 4, Grade 1, 1/2-inch thick.
2.3 MOISTURE CONTROL
2.3.1 Vapor Barrier
2.3.1.1 Self-Adhering Membrane Vapor Barrier
Provide self-adhering SBS modified bitumen adhesive factory-laminated to tri-laminate woven, high-density polyethylene face with 0.02 perm rating and maximum water absorption less than 0.10.
2.4 FASTENERS
Provide flush-driven fasteners through flat round or hexagonal steel or plastic plates. Provide zinc-coated steel plates, flat round not less than 1 3/8 inch diameter, hexagonal not less than 28 gage. Provide high-density plastic plates, molded thermoplastic with smooth top surface, reinforcing ribs and not less than 3 inches in diameter. Fully recess fastener head into plastic plate after it is driven. Form plates to prevent dishing. Do not use bell or cup shaped plates. Provide fasteners in accordance with insulation manufacturer's recommendations for holding power when driven, or a minimum of 120 pounds each in steel deck, whichever is the higher minimum. Provide fasteners for steel or concrete decks in accordance with FM APP GUIDE ( http://www.approvalguide.com/ ) for Class I roof deck construction, and spaced to withstand uplift pressure of 90 pounds per square foot.
2.4.1 Fasteners for Steel Decks
Approved hardened penetrating fasteners or screws in accordance with FM 4450 and listed in FM APP GUIDE for Class I roof deck construction.
Quantity and placement to withstand a minimum uplift pressure of 90 psf in accordance with FM APP GUIDE.
2.4.2 Adhesives
As specified for roof membrane application. See Section 07 52 00 MODIFIED
BITUMINOUS MEMBRANE ROOFING.
PART 3 EXECUTION
3.1 EXAMINATION AND PREPARATION
3.1.1 Surface Inspection
Ensure surfaces are clean, smooth, and dry prior to application. Check roof deck surfaces, including surfaces sloped to roof drains and outlets, for defects before starting work.
Inspect and approve the surfaces immediately before starting installation. Prior to installing vapor retarder, perform the following:
a. Examine steel decks to ensure that panels are properly secured to structural members and to each other and that surfaces of top flanges
SECTION 07 22 00 Page 5 are flat or slightly convex.
3.1.2 Surface Preparation
Correct defects and inaccuracies in roof deck surface to eliminate poor drainage from hollow or low spots, perform the following:
a. Provide wood nailers of the same thickness as the insulation at eaves, edges, curbs, walls, and roof openings for securing of cant strips, gravel stops, and flashing flanges.
b. Cover steel decks with a layer of 1/2 inch glass mat gypsum roof board (thermal barrier) to span the width of a deck rib opening, and in accordance with fire safety requirements. Secure with piercing or self-drilling, self-tapping fasteners of quantity and placement in accordance with FM APP GUIDE. Locate insulation parallel to ribs of deck on solid bearing surfaces only, not over open ribs.
3.2 INSTALLATION OF VAPOR BARRIER
Adhere vapor barrier directly to face of the glass mat gypsum roof board (thermal barrier). Prime thermal barrier as recommended by manufacturer.
Install vapor barrier with 3-inch side laps and 6-inch end laps. Roll vapor barrier as required per manufacturer's directions.
3.3 INSULATION INSTALLATION
Apply insulation in two layers with staggered joints when total required thickness of insulation exceeds 1/2 inch. Lay insulation so that continuous longitudinal joints are perpendicular to direction of roofing, as specified in Section 07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING, and end joints of each course are staggered with those of adjoining courses.
When using multiple layers of insulation, provide joints of each succeeding layer that are parallel and offset in both directions with respect to the layer below. Keep insulation 1/2 inch clear of vertical surfaces penetrating and projecting from roof surface. Verify required slopes to each roof drain.
3.3.1 Installation Using Adhesives on Steel Decks
Secure first layer of insulation and thermal barrier to deck with piercing or self-drilling, self-tapping fasteners. Engage fasteners by driving them through insulation into top flange of steel deck. Use driving method prescribed by fastener manufacturer. Locate insulation joints parallel to ribs of deck on solid bearing surfaces only, not over open ribs. Secure succeeding layers with cold-applied adhesive bed. Where insulation is applied over steel deck, locate long edge joints so that they bear continuously on the steel deck. Insulation that can be readily lifted after installation is not considered adequately secured. Apply insulation only in quantities that can be entirely waterproofed the same day. Phased construction is not permitted. Apply impermeable faced insulation without damage to the facing.
3.3.2 Special Precautions for Installation of Foam Insulation
3.3.2.1 Polyisocyanurate Insulation
Where polyisocyanurate foam board insulation is provided, adhere high density polyisocyanurate insulation cover board insulation in a
SECTION 07 22 00 Page 6 cold-applied adhesive bed over top surface of foam board insulation.
Stagger joints of insulation with respect to foam board insulation below.
3.3.3 Cant Strips
Where indicated, provide cant strips at intersections of roof with walls, parapets, and curbs extending above roof. Wood cant strips must bear on and be anchored to wood blocking. Fit cant strips flush to vertical surfaces. Where possible, nail cant strips to adjoining surfaces. Where cant strips are installed against non-nailable materials, install in an approved adhesive.
3.3.4 Tapered Edge Strips
Where indicated, provide edge strips in the right angle formed by the juncture of roof and wood nailing strips that extend above the level of the roof. Install edge strips flush to vertical surfaces of wood nailing strips. Where possible, nail edge strips to adjoining surfaces. Where installed against non-nailable materials, install in an approved adhesive.
3.4 PROTECTION
3.4.1 Protection of Applied Insulation
Completely cover each day's installation of insulation with finished roofing specified in Section 07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING on same day. Phased construction is not permitted. Protect open spaces between insulation and parapets or other walls and spaces at curbs, scuttles, and expansion joints, until permanent roofing and flashing are applied. Storing, walking, wheeling, or trucking directly on insulation or on roofed surfaces is not permitted. Provide smooth, clean board or plank walkways, runways, and platforms near supports, as necessary, to distribute weight in accordance with indicated live load limits of roof construction. Protect exposed edges of insulation with cutoffs at the end of each work day or whenever precipitation is imminent. Cutoffs must be two layers of bituminous-saturated felt set in plastic bituminous cement.
Fill all profile voids in cutoffs to prevent trapping moisture below the membrane. Remove cutoffs when work resumes.
3.4.2 Damaged Work and Materials
Restore work and materials that become damaged during construction to original condition or replace with new materials.
3.5 INSPECTION
Establish and maintain inspection procedures to assure compliance of the installed roof insulation with contract requirements. Remove, replace, correct in an approved manner, any work found not in compliance. Quality control must include, but is not limited to, the following:
a. Observation of environmental conditions; number and skill level of insulation workers; start and end time of work.
b. Verification of certification, listing or label compliance with FM Data Sheets. ( https://www.fmglobal.com/fmglobalregistration/Downloads.aspx )
c. Verification of proper storage and handling of insulation and vapor
SECTION 07 22 00 Page 7 retarder materials before, during, and after installation .
d. Inspection of vapor retarder application, including edge envelopes and mechanical fastening.
e. Inspection of mechanical fasteners; type, number, length, and spacing.
f. Coordination with other materials, cants, sleepers, and nailing strips.
g. Inspection of insulation joint orientation and laps between layers, joint width and bearing of edges of insulation on deck.
h. Installation of cutoffs and proper joining of work on subsequent days.
i. Continuation of complete roofing system installation to cover insulation installed same day.
j. Verification of required slope to each roof drain.
SECTION 07 22 00 Page 8
SECTION 07 27 19.01
SELF-ADHERING AIR BARRIERS
05/17
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR BARRIER ASSOCIATION OF AMERICA (ABAA)
ABAA Accreditation Accreditation
ABAA QAP Quality Assurance Program
ASTM INTERNATIONAL (ASTM)
ASTM D146/D146M (2004; E 2012; R 2012) Sampling and Testing Bitumen-Saturated Felts and Woven Fabrics for Roofing and Waterproofing
ASTM D412 (2016) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension
ASTM D570 (1998; E 2010; R 2010) Standard Test Method for Water Absorption of Plastics
ASTM D903 (1998; R 2017) Standard Test Method for Peel or Stripping Strength of Adhesive Bonds
ASTM D1876 (2008; R 2015; E 2015) Standard Test Method for Peel Resistance of Adhesives (T-Peel Test)
ASTM D4263 (1983; R 2018) Standard Test Method for Indicating Moisture in Concrete by the Plastic Sheet Method
ASTM D4541 (2017) Standard Test Method for Pull-Off Strength of Coatings Using Portable Adhesion Testers
ASTM E84 (2021a) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials
ASTM E154/E154M (2008a; R 2013; E 2013) Water Vapor Retarders Used in Contact with Earth Under Concrete Slabs, on Walls, or as Ground
SECTION 07 27 19.01 Page 1
Cover
ASTM E283 (2004; R 2012) Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen
ASTM E331 (2000; R 2016) Standard Test Method for Water Penetration of Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform Static Air Pressure Difference
ASTM E2178 (2013) Standard Test Method for Air Permeance of Building Materials
ASTM E2357 (2017) Standard Test Method for Determining Air Leakage of Air Barrier Assemblies
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 285 (2012) Standard Fire Test Method for Evaluation of Fire Propagation Characteristics of Exterior Non-Load-Bearing Wall Assemblies Containing Combustible Components
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Qualifications of Manufacturer; G
Qualifications of Installer; G
SD-03 Product Data
Self-adhering Air Barrier; G
Primers, Adhesives, and Mastics
Safety Data Sheets
SD-06 Test Reports
Field Peel Adhesion Test
Flame Propagation of Wall Assemblies
Flame Spread and Smoke Developed Index Ratings
Site Inspections and Testing
SD-07 Certificates
SECTION 07 27 19.01 Page 2
Self-adhering Air Barrier
Qualifications of Manufacturer
Qualifications of Installer
SD-08 Manufacturer's Instructions
Self-adhering Air Barrier
Primers, Adhesives, and Mastics
1.3 MISCELLANEOUS REQUIREMENTS
For self-adhering air barrier provide the following:
1.3.1 Product Data
Submit manufacturer's technical data indicating compliance with performance and environmental requirements, manufacturer's printed instructions for evaluating, preparing, and treating substrates, temperature and other limitations of installation conditions, safety requirements for installation, and Safety Data Sheets. Indicate flame and smoke spread ratings for all products.
1.3.2 Mockup
Provide a mockup of the self-adhering air barrier system specified. Apply product in an area designated by the Contracting Officer. Apply an area of not less than 54 square feet. Include all components specified as representative of the complete system. Notify the Contracting Officer a minimum of 48 hours prior to the test application. Select a test area representative of conditions to be covered including window or door openings, wall to ceiling transitions, flashings, and penetrations, as applicable.
1.3.3 Test Reports
Submit test reports indicating that field peel-adhesion tests on all materials have been performed and the changes made, if required, in order to achieve successful and lasting adhesion. Submit test reports for flame propagation of wall assemblies tested in accordance with NFPA 285 . Submit test reports for flame spread and smoke developed index ratings of barrier system materials tested in accordance with ASTM E84.
1.4 DELIVERY, STORAGE, AND HANDLING
1.4.1 Delivery
Deliver and store materials in sufficient quantity to allow for uninterrupted flow of work. Inspect materials delivered to the site for damage and store out of weather. Deliver materials to the jobsite in their original unopened packages, clearly marked with the manufacturer's name, brand designation, description of contents, and shelf life of containerized materials. Store and handle to protect from damage.
SECTION 07 27 19.01 Page 3
1.4.2 Storage
Inspect materials delivered to the site for damage; unload and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling. Protect stored materials from direct sunlight.
Keep materials sealed and separated from absorptive materials, such as wood and insulation.
1.5 FIELD PEEL ADHESION TEST
Perform a field peel-adhesion test on the construction mockup. Test the self-adhering air barrier for adhesion in accordance with ASTM D4541 using a Type II pull tester except use a disk that is 4 inches in diameter and cut through the membrane to separate the material attached to the dish from the surrounding material. Perform test after curing period in accordance with manufacturer's written recommendations. Record mode of failure and area which failed in accordance with ASTM D4541. Compare adhesion values with the manufacturer's established minimum values for the particular combination of material and substrate. Indicate on the inspection report whether the manufacturer's requirement has been met.
Where the manufacturer has not declared a minimum adhesion value for their product and substrate combination, the inspector must record actual values.
1.6 QUALITY ASSURANCE
1.6.1 Qualifications of Manufacturer
Submit documentation verifying that the manufacturer of the self-adhering air barrier is currently accredited by Air Barrier Association of America ( ABAA Accreditation https://www.airbarrier.org/ ).
1.6.2 Qualifications of Installer
Submit documentation verifying that installers of the self-adhering air barrier are currently certified in accordance with the ABAA QAP Quality Assurance Program ( https://www.airbarrier.org/qap/ ).
1.7 PRECONSTRUCTION MEETING
Conduct a preconstruction meeting a minimum of two weeks prior to commencing work specified in this Section. Agenda must include, at a minimum, construction and testing of mockup, sequence of construction, coordination with substrate preparation, materials approved for use, compatibility of materials, coordination with installation of adjacent and covering materials, and details of construction. Attendance is required by representatives of related trades including covering materials, substrate materials, adjacent materials, and materials and components of the air barrier system.
1.8 ENVIRONMENTAL CONDITIONS
1.8.1 Temperature
Install air barrier within the range of ambient and substrate temperatures as recommended in writing by the air barrier manufacturer. Verify that the surface to receive self-adhering air barrier is dry for a minimum of 48 hours prior to the installation of the barrier. Do not apply air barrier to damp or wet substrates. Do not apply during inclement weather
SECTION 07 27 19.01 Page 4 or when ice, frost, surface moisture, or visible dampness is present on surfaces to be covered, or when precipitation is imminent.
1.8.2 Exposure to Weather and Ultraviolet Light
Protect air barrier products from direct exposure to rain, snow, sunlight, mist, and other extreme weather conditions. Replace, at no additional cost to the government, barrier products that have been exposed to ultraviolet (sun)light longer than allowed by manufacturer's written requirements.
PART 2 PRODUCTS
2.1 SELF ADHERING AIR BARRIER
Provide minimum 0.040 inch thick self-adhering, vapor retarding, air barrier membrane consisting of a cross-laminated high density polyethylene (HDPE) film, fully coated with rubberized asphalt adhesive. Provide membrane in rolls of various widths interleaved with disposable silicone release paper. Self-adhering air barrier must exhibit no visible water leakage when tested in accordance with ASTM E331 and must perform as a liquid water drainage plane flashed to discharge to the exterior any incidental condensation or water penetration. Use regular or low temperature formulation depending on site conditions, within temperature ranges specified by manufacturer.
2.1.1 Physical Properties
a. Air Permeance ( ASTM E2178): Less than 0.004 CFM per sf at 1.57 psf.
b. Air Leakage ( ASTM E2357, ASTM E283): Less than 0.004 CFM per sf at
1.57 psf at one inch.
c. Tensile Strength ( ASTM D412 die C modified): Not less than 400 psi.
d. Tensile Elongation ( ASTM D412 die C modified): Not less than 200 percent.
e. Puncture Resistance ( ASTM E154/E154M ): Not less than 40 lbs.
f. Pliability ( ASTM D146/D146M): Unaffected at minus 25 degrees F, 0.063 inch mandrel.
g. Lap Adhesion ( ASTM D1876 modified): Not less than 4.0 lbs per inch.
h. Peel Adhesion ( ASTM D903): Not less than 5.0 lbs per inch.
i. Water Vapor Permeance (Vapor Impermeable Air Barrier) ( ASTM E96/E96M, desiccant method A): 0.1 perms or less.
j. Water Absorption ( ASTM D570): Not to exceed 0.12 percent by weight.
k. Flame propagation of wall assemblies ( NFPA 285 ): Pass
l. Surface Burning Characteristics ( ASTM E84):
(1) Flame Spread Index Rating not higher than 75.
(2) Smoke Developed Index Rating not higher than 150.
SECTION 07 27 19.01 Page 5
2.2 PRIMERS, ADHESIVES, AND MASTICS
Provide primers, adhesives, mastics and other accessory materials as recommended in writing by the manufacturer of the self-adhering air barrier for adequate bonding to each type of substrate.
2.3 SHEET METAL FLASHING
Provide as specified in Section 07 60 00 FLASHING AND SHEET METAL.
2.4 JOINT SEALANTS
Provide as specified in Section 07 92 00 JOINT SEALANTS. Verify compatibility with adjacent products that are or will be in contact with one another.
PART 3 EXECUTION
3.1 EXAMINATION
Before installing air barrier, examine substrates, areas, and conditions under which air barrier assemblies will be applied, with Installer present, for compliance with requirements.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .