Solicitation N4008523R2602.pdf
PDF 658 KB Posted
- Attached to
- B79 DBB 2nd and 3rd Floor Renovations Federal contract opportunity
- Solicitation number
- N4008523R2602
About this file
This solicitation requests proposals for a design-bid-build construction project to replace mechanical systems on the second and third floors of Building 79 at Portsmouth Naval Shipyard in Kittery, Maine. The work includes replacing the heating system with a new steam to hot water plant, installing a new hot water circulation pumping system, replacing the entire hot water distribution system, and upgrading the HVAC and controls. The project is set aside for total small businesses with a NAICS code of 236220 and size standard of $45,000,000. Proposals are due by 2:00 PM local time on April 17, 2023. Award is expected to be a fixed-price contract with a period of performance of 743 calendar days from the anticipated June 2023 award date. Evaluation will be based on price and non-price factors including corporate experience, management approach and schedule, safety, and past performance.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NUMBER N40085-23-R-2602 DESIGN-BID-BUILD, B79 2ND AND 3RD FLOOR RENOVATIONS, PORTSMOUTH NAVAL
SHIPYARD, KITTERY, MAINE
This project replaces mechanical systems on the second and third f loors in Building 79, a historic w aterfront support facility. Repairs w ill include replacing the heating system, HVAC, and controls. The heating system shall be replaced w ith a new steam to hot w ater plant, hot w ater circulation pumping system and a complete new hot w ater distribution system. The proposed HVAC system w ill allow for more precise control of the environment and w ill allow for future space f lexibility. Systems w ill be designed and located to allow safe and accessible maintenance w ithout disrupting the customer. Ventilation air supply and control w ill be energy eff icient and w ill utilize BACnet based controls, allow ing for full integration to the base w ide netw ork and Regional smart Grid. Building envelope repairs are also included but limited to repairing f lashing around w indow s, roof repair, repointing masonry, and addressing w ater infiltration issues.
** All correspondence regarding this solicitation shall be directed via email to James Godw in at james.a.godw in41.civ@us.navy.mil.
JAMES A. GODWIN 757-341-1659
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
02-Mar-2023
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________743 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________17 Apr 2023 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVFACSYSCOM MID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
N4008523R2602 71
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
N4008523R2602
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Base Price
FFP
Total Price for the entire work for Project B79 – 2nd and 3rd Floor Renovations in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.
FOB: Destination
PSC CD: Z2JZ
NET AMT
Randolph Sheppard Act (RSA)
FFP
All RSA work complete in accordance with the drawings and specifications.
OPTION Option 1 - Electronic Security System
FFP
Price for providing work including: ESS Panels, ESS Power Supplies, ESS security devices, ESS wiring, ESS system installation, ESS testing, and commissioning.
OPTION Option 2 - Repair Roof/Repoint Masonry
FFP
Price for providing work in connection with the procurement and installation of all labor, material, equipment, transportation, coordination, testing, commissioning, and supervision required.
OPTION Option 3 - FF&E
FFP
Price for providing work in connection with the procurement and installation of all labor, material, equipment, transportation, coordination, testing, commissioning, and supervision required.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
0002 N/A N/A N/A N/A
0003 N/A N/A N/A N/A
0004 N/A N/A N/A N/A
0005 N/A N/A N/A N/A
Section 00 21 16 - Instructions to Proposers
INSTRUCTIONS TO OFFERORS
TABLE OF CONTENTS
1. GENERAL
1.1 GENERAL OVERVIEW OF PROCUREMENT PROCESS
1.2 GENERAL OVERVIEW OF CONTRACT
2. BASIS FOR AWARD
3. EVALUATION FACTORS FOR AWARD
4. PROPOSAL REQUIREMENTS
4.1 PRE-PROPOSAL CONFERENCE AND SITE VISIT
4.2 PROPOSAL SUBMISSION INSTRUCTIONS
4.3 PRE-PROPOSAL INQUIRIES (PPI’S)
4.4 CONTRACT OPPORTUNITIES (SAM.GOV)
5. INCORPORATION OF TECHNICAL PROPOSALS
6. ATTACHMENTS: WILL BE LOCATED ON CONTRACT OPPORTUNITIES UNDER ATTACHMENTS
6.1 ATTACHMENT A – PRE-PROPOSAL INQUIRY LOG
6.2 ATTACHMENT B – CONSTRUCTION EXPERIENCE PROJECT DATA SHEET
6.3 ATTACHMENT C – PAST PERFORMANCE QUESTIONNAIRE
6.4 ATTACHMENT D – PRICE PROPOSAL FORM
6.5 ATTACHMENT E – PIEE VENDOR ACCESS INSTRUCTIONS
6.6 ATTACHMENT F – SPECIFICATIONS
6.7 ATTACHMENT G – DRAWINGS
6.8 ATTACHMENT H – SPEC ATTACHMENT 1
6.9 ATTACHMENT I – SECNAV 5512
6.10 ATTACHMENT J – 5500 DBIDS FORM
1. GENERAL
1.1 GENERAL OVERVIEW OF PROCUREMENT PROCESS
1.1.1 This solicitation is being issued as a TOTAL SMALL BUSINESS SET-ASIDE.
1.1.2 The NAICS Code for this procurement is 236220 and the Size Standard is $45,000,000.
1.1.3 This acquisition will be advertised utilizing FAR Part 15 – Contracting by Negotiation resulting in a Firm- Fixed Price (FFP) Contract for Construction Services.
1.1.4 In accordance with DFARS 236.204, the estimated magnitude of construction is between $10,000,000 and $25,000,000.
1.2 GENERAL OVERVIEW OF THE CONTRACT
The general intent of this solicitation is to award a Fixed Price Construction Contract for design-bid-build (DBB) B79 2nd and 3rd Floor Renovations, Portsmouth Naval Shipyard, Kittery, Maine.
This project replaces mechanical systems on the second and third floors in Building 79, a historic waterfront support facility. Repairs will include replacing the heating system, HVAC, and controls. The heating system shall be replaced with a new steam to hot water plant, hot water circulation pumping system and a complete new hot water distribution system. The proposed HVAC system will allow for more precise control of the environment and will allow for future space flexibility. Systems will be designed and located to allow safe and accessible maintenance without disrupting the customer. Ventilation air supply and control will be energy efficient and will utilize BACnet based controls, allowing for full integration to the base wide network and Regional smart Grid. Building envelope repairs are also included but limited to repairing flashing around windows, roof repair, repointing masonry, and addressing water infiltration issues.
Furthermore, the project reorganizes waterfront engineering support and training spaces required to accommodate recent hiring necessary to support the Shipyard's mission. Combining mechanical repairs with this reorganization provides for a more efficient approach that reduces impacts and accommodates hiring by increasing density and efficiently configuring existing spaces.
2. BASIS FOR AWARD
1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the proposal determined to represent the best value—the proposal most advantageous to the Government, price and other factors considered.
2. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
3. The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.
4. All technical factors, when combined, are of equal importance to the performance confidence assessment (past performance) rating; and all technical factors and the performance confidence assessment (past performance) rating, when combined, are approximately equal to price.
5. Any proposal found to have a deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the deficiency is corrected through discussions. An Unacceptable rating in any of the non-cost/price factors will result in an overall rating of “Unacceptable” for the non-cost/price factors, unless corrected through discussions Proposals may be found to have either a significant weakness or multiple weaknesses that impact either the individual factor rating or the overall rating for the proposal.
The evaluation report must document the evaluation board’s assessment of the identified weakness(s) and the associated risk to successful contract performance resulting from the weakness(s). This assessment must provide the rationale for proceeding to award without discussions.
3. EVALUATION FACTORS FOR AWARD
1. The solicitation requires the evaluation of price and the following non-cost/price factors:
Factor 1 – Corporate Experience Factor 2 – Management Approach and Schedule Factor 3 – Safety Factor 4 – Past Performance
The distinction between experience and past performance is that experience pertains to the volume of work completed by a contractor that are comparable to the types of work described under the definition of recent, relevant projects, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
2. The relative order of importance of the non-cost/price evaluation factors is the technical factors (Factors 1, 2 and 3) are of equal importance to each other and, when combined, are equal in importance to the past performance evaluation/performance confidence assessment factor (Factor 4). When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the non-cost/price evaluation factors) are approximately equal to price.
The importance of price will increase if the Offerors’ non-cost/price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-cost/price proposal’s superiority to the Government. Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.
3. Basis of Evaluation and Submittal Requirements for Each Factor.
(a) Price:
(1) Solicitation Submittal Requirements:
Price shall be submitted on the Price Proposal Form included in the solicitation. The offeror shall submit the proposal in accordance with INSTRUCTIONS TO OFFERORS, 4. PROPOSAL REQUIREMENTS, 4.2 PROPOSAL SUBMISSION INSTRUCTIONS. All submissions shall include the following:
• Cover page with solicitation number, solicitation title, offeror name, address, phone number, fax number, Unique Entity Identifier (UEI), CAGE code, Point of Contact (POC), POC phone number, and POC email address (if proposing as a JV, please include the UEI of each partner firm);
• Completed SF 1442 signed with all amendments acknowledged;
• Price Proposal Form;
• Copy of Representation and Certifications and proof of registration in System for Award
Management (SAM)1;
• Confirmation of filing of Veterans’ Employment and Training (VETS) VETS-4212 for the 2022 filing cycle;
• Bid Guarantee in accordance with FAR Clause 52.228-1, Bid Guarantee. Amount shall be at least 20 percent of the proposed price, but shall not exceed $3 million; and
• Responsibility Determination Information (see below).
NOTE 1: A small business joint venture offeror must submit, with its offer, the representation required in paragraph
(c) of FAR solicitation provision 52.212-3, Offeror Representations and Certifications-Commercial Products and Commercial Services, and paragraph (c) of FAR solicitation provision 52.219-1, Small Business Program Representations, in accordance with 52.204-8(d) and 52.212-3(b) for the following categories:
(A) Small business;
(B) Service-disabled veteran-owned small business;
(C) Women-owned small business (WOSB) under the WOSB Program;
(D) Economically disadvantaged women-owned small business under the WOSB Program; or
(E) Historically underutilized business zone small business.
Note: Price information included in the non-price/technical proposal will not be considered. Likewise, non-price/technical information included in the price proposal will not be considered.
In the event of a discrepancy between the original and copies, the electronic version marked “Original” of the proposal will govern. Additionally, hard copy proposals shall match the electronic version of the proposal.
The offeror is required to submit a complete Price Schedule that includes completion of all contract line items numbers (CLINs). Pricing information is not required to be completed under Section 00010 – Solicitation Contract Form in SF 1442. All required proposal documents shall be submitted in accordance with FAR 15.208.
Proposal packages from unsuccessful offerors will not be returned to the offeror, but shall be destroyed by the Contracting Officer. No certificate of destruction will be issued.
ADDITIONAL INFORMATION TO BE SUBMITTED WITH PRICE PROPOSAL PACKAGE:
RESPONSIBILTY DETERMINATION INFORMATION – In order to be eligible for award, the offeror must be determined responsible in accordance with FAR Part 9, specifically FAR 9.104-1, General Standards. Although required to be submitted with offeror’s price proposal, this information will not be evaluated as part of the price proposal. This information forms the basis of your firm’s responsibility determination should your firm be considered for award. In a separate tab, the offeror shall provide the following information in the price proposal package:
1. One (1) signed bank reference demonstrating adequate financial resources. If offeror’s firm has a line of credit – provide information on how many figures offeror can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required).
2. The offeror shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization. Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the offeror.
3. Description of offeror’s facilities and equipment.
4. Other offeror’s work presently under contract.
(2) Basis of Evaluation:
The Government will evaluate price based on the total price. Total price consists of the basic requirements and all option items (see attached Price Proposal Form). The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in Section 00 21 16 of the solicitation. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s).
Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
(i) Comparison of proposed prices received in response to the RFP.
(ii) Comparison of proposed prices with the IGCE.
(iii) Comparison of proposed prices with available historical information.
(iv) Comparison of market survey results.
(b) Non-cost/price Factors:
The offeror shall submit the proposal in accordance with INSTRUCTIONS TO OFFERORS, 4. PROPOSAL REQUIREMENTS, 4.2 PROPOSAL SUBMISSION INSTRUCTIONS. All submissions shall include the following:
• Cover page with solicitation number, solicitation title, offeror name, address, phone number, fax number, UEI, CAGE code, Point of Contact (POC), POC phone number, and POC email address;
• 8 ½ x 11 paper, 10-point font;
• Refer to individual factors for page limitations. Pages that exceed indicated page limitations shall not be evaluated;
• Additionally, include an electronic version of the price and non-price proposal on one
CD-ROM.
Note: If proposing as a Joint-Venture (JV), please submit the POC, UEI, and CAGE Code for each JV partner.
Note: Price information included in the non-price/technical proposal will not be considered. Likewise, non-price/technical information included in the price proposal will not be considered.
(1) Factor 1 – Corporate Experience:
(i) Solicitation Submittal Requirements:
The offeror shall submit the following information:
Submit a minimum of two (2) up to a maximum of five (5) construction projects performed by the Offeror that best demonstrates the Offeror’s relevant experience (projects similar in size, scope, and complexity to this project).
Projects submitted for the Offeror shall have been completed within the past ten (10) years from the date of issuance of this RFP.
For purposes of this procurement, relevant projects are further defined as:
Size: A final construction cost of $10 million dollars or greater.
Scope: Renovation to a historic building.
Complexity: Each project submitted does not require demonstrated experience with all of the following components, but collectively, they must demonstrate experience with all elements on a relevant project:
a) Experience with renovation to a historic government building.
b) Experience with sequencing and/or phasing requirements.
c) Experience with installing and/or replacing HVAC, electrical (power/tel/data), and plumbing systems.
Projects completed outside of the time frame required by the RFP will be considered “Not Relevant”.
A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as whole shall not be submitted as a project;
rather offerors shall submit the work performed under a task order as a project. The submission of a multiple award and/or indefinite delivery/indefinite quantity type contract as a whole will be considered Not Relevant.
The attached Construction Experience Project Data Sheet (Attachment B) is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed two (2) double-sided pages (or four (4) single-sided pages).
Ensure that the project description clearly identifies whether the project is new construction or addition, addresses how the project meets the scope and complexity requirements as delineated above, and provides the final construction cost. The absence of any such information may result in the Project being considered Not Relevant, which could result in a rating of UNACCEPTABLE for this Factor.
If the offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members. Experience submitted for one of the Offeror’s Joint Venture members while the Joint Venture member was a member in a different Joint Venture entity may be submitted to demonstrate relevant project experience. Offerors who fail to submit experience for all Joint Venture members may be rated lower. Offerors are still limited to a total of five (5) total projects.
If the Offeror is proposing as a single corporate entity (i.e. not as a Joint Venture), the Offeror may submit relevant project experience it performed as a partner in a previous Joint Venture. Offerors are still limited to a total of five
(5) projects.
If an offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.
(ii) Basis of Evaluation:
The basis of evaluation will include the offeror’s demonstrated experience and depth of experience in performing relevant construction as defined in the solicitation submittal requirements. The assessment of the offeror’s relevant experience will be used as a means of evaluating the capability of the offeror to successfully meet the requirements of the RFP. The Government will only review five (5) projects total. Any projects submitted in excess of the five (5) for Experience will not be considered. An offeror that does not submit a minimum of two (2) relevant projects as defined above will receive a rating of “Unacceptable” and will not be eligible for award.
Offerors who demonstrate relevant experience with removal and abatement of hazardous materials may be considered more favorably.
Offerors who demonstrate relevant experience with construction that allowed the facility to remain partially occupied and open for operations throughout the project may be considered more favorably.
Offerors who demonstrate relevant experience with temporary shoring of structural loadbearing elements may be considered more favorably.
Offerors who demonstrate relevant experience with adherence to the Secretary of the Interior guidelines may be considered more favorably.
Offerors who demonstrate relevant experience with construction in congested urban or industrial areas with limited construction laydown space and restricted access may be considered more favorably.
Offerors who demonstrate relevant experience with coordinating access into and through secure boundaries may be considered more favorably.
(2) Factor 2 – Management Approach and Schedule:
Submit the following documentation, as detailed throughout in this Factor, in order to describe your approach to managing the project, risk, and ensuring adherence to the project schedule:
1) Management Approach
a) Narrative Work Plan
b) Space Planning and Usage
2) Critical Path Schedule
See below for details concerning the required content of each item listed above. Factor submission shall not exceed fifteen (15) double-sided pages (or thirty (30) single-sided pages). No page restrictions on the project schedule but they must be printed on 11”x17” paper.
1. Management Approach
Provide a written work plan that addresses major elements of work, project risks, and space planning and usage.
1.a) Narrative Work Plan –The work plan shall demonstrate understanding of the scope, all phases and major milestones, technical complexities, and construction schedule required to achieve the work as identified in the RFP. Identify activities that may affect the project timeline, including other/off site work activities. Identify key project risks including their likelihood and consequences, along with mitigation or management strategies to minimize or eliminate impacts to the project cost and schedule. The plan shall address the following technical complexities:
a) Phased construction
b) Compliance with the Construction Security Plan (CSP)
c) Removal and abatement of hazardous materials
1.b) Space Planning and Usage – The offeror shall provide a written plan identifying anticipated use of on-site options, methods for material and equipment storage both on and off site. Space use shall also provide plan for avoiding conflicts with other active construction projects and airfield operations in the project area.
2. Critical Path Schedule
The project schedule shall illustrate the offeror’s ability to achieve or improve on the contract completion date set out in the RFP. The total duration of the contract is 743 calendar days. Identify the overall completion time for this project, in accordance with the RFP, as well as interim completion times and key milestones for sequences as required to complete construction. The schedule shall demonstrate an understanding of the work to include the base CLIN and all options, a logical sequence of events to accomplish the work, and contain enough information to identify all of the major milestones, as defined in the phasing plans of the RFP. The schedule shall be based on a contract award date of JUNE 2023. This is for proposal purposes only and not dispositive of an anticipated/planned award date.
If an Offeror proposed a realistic and feasible schedule that is shorter than the required duration and is selected for award, that schedule and duration will be incorporated into the award document and replace the advertised required duration.
A schedule that proposes a contract duration longer than indicated in the RFP will be rated UNACCEPTABLE.
Offeror shall provide a critical path method (CPM) schedule for execution and completion of the work to achieve the required interim and final completion milestones for the project. At a minimum, the CPM schedule shall address the following:
• Identify major activities and milestones
• Provide sequencing (precedence/succession) of critical activities
• Demonstrate knowledge of project regulatory constraints
• Sufficiently detailed to identify critical and near-critical activities
1. Management Approach - Offerors will be evaluated on the extent to which they demonstrate a clear understanding of the requirements of the RFP. An Offeror’s narrative work plan that identifies areas of risk in logistics and resource management and provides a comprehensive contingency plan that addresses mitigation of any identified risks with potential solutions may be considered more favorably than those that do not.
2. Schedule - Offerors will be evaluated on the extent to which they demonstrate a clear understanding of the requirements of the RFP. A schedule that proposes a realistic and feasible contract duration shorter than the required duration indicated in the RFP may be considered more favorably than those that do not.
(3) Factor 3 – Safety:
The Offeror shall submit the following information: The Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate; and Total Case Rate (TCR) for the specified five (5) Calendar Years [CY2022, CY2021, CY2020, CY2019, and CY2018], as well as a safety narrative, as described further below. For a partnership or joint venture, the Offeror shall submit separate DART rates and TCR for the specified five (5) CY for each contractor who is part of the partnership/joint venture; however, only one safety narrative is required. Any fatalities experienced within this 5-year timeframe must be explained in detail, to include root cause and corrective actions.
NOTE: DART and TCR shall not be submitted for subcontractors.
1. DART Rate: Submit five (5) previous complete calendar years’ [CY2022, CY2021, CY2020, CY2019, and CY2018] worth of data (not an overall average). If the Offeror has no DART rate, for any year, affirmatively state so and explain why. Should a negative trend occur above moderate risk levels, an acceptable/detailed explanation is required that includes any corrective actions taken for improvement.
a. DART cases include injuries or illnesses resulting in death, days away from work, and/or restricted work or transfer to another job days beyond the day of injury/illness.
b. Calculation of DART rate: Multiply the total number of DART cases by 200,000, and then divide by the number of employee labor hours worked.
2. TCR Rate: Submit five (5) previous complete calendar years’ [CY2022, CY2021, CY2020, CY2019, and CY2018] worth of data (not an overall average). If the Offeror has no TCR rate, for any year, affirmatively state so and explain why. Should a negative trend occur above moderate risk levels, an acceptable/detailed explanation is required that includes any corrective actions taken for improvement.
a. TCR cases include injuries or illnesses resulting in death, days away from work, restricted work or transfer to another job days beyond the day of injury/illness, medical treatment beyond first aid, or loss of consciousness.
b. Calculation of TCR rate: Multiply the total number of TCR incidents by 200,000, and then divide by the number of employee labor hours worked.
3. Technical Approach to Safety: Submit a narrative that addresses the following:
a. Describe the Offeror’ s approach to implementing and executing a Safety Management System (SMS) including Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.
b. Describe the evaluation process used to select potential subcontractors.
c. Describe the processes of how the Offeror will oversee safety compliance of subcontractors at all levels throughout performance of the contract (to include the Offeror’s own in-house workforce).
d. The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one (1) double-sided page.
4. The Government reserves the right to review other available sources (public/Government internal) of information.
These may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc.
The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The evaluation will collectively consider the DART rate, TCR, Technical Approach to Safety, and other sources of information available to the Government as part of such collective evaluation. The board will evaluate the DART rates and TCR to determine if the Offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.
1. DART Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above moderate risk levels require the offeror to provide a detailed explanation that includes any corrective actions taken for improvement.
a. Missing data without an explanation is considered a deficiency.
b. Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) would indicate a strength.
c. An increasing DART rate trend could be considered a weakness (i.e. MR or better to High Risk (HR) or Extremely High Risk EHR)) if an acceptable explanation is not provided for any trends that rise above Moderate.
d. This chart correlates the DART rate to the level of risk:
Risk DART Rate Very Low Risk Less Than 1.0 Low Risk From 1.0 to 1.99 Moderate Risk From 2.0 to 2.99 High Risk From 3.0 to 4.0 Extremely High Risk Greater than 4.0
2. TCR Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above moderate risk levels require the offeror to provide a detailed explanation that includes any corrective actions taken for improvement.
a. Missing data without an explanation is considered a deficiency.
b. Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) would indicate a strength.
c. An increasing TCR rate trend could be considered a weakness (i.e. MR or better to High Risk (HR) or Extremely High Risk EHR)) if an acceptable explanation is not provided for any trends that rise above Moderate.
d. This chart correlates the TCR rate to the level of risk:
Risk TCR Rate Very Low Risk Less Than 2.49 Low Risk From 2.5 to 3.49 Moderate Risk From 3.5 to 4.49 High Risk From 4.5 to 5.99 Extremely High Risk Greater than 6.0
3. The Technical Approach to Safety Narrative. To determine the degree to which the Offeror:
a. Describes a viable SMS that addresses elements; such as Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.
b. Describes a methodical process of evaluating subcontractor’s safety performance in their selection process.
c. Describes a logical management plan to hold themselves and their subcontractors accountable for adhering to the safety requirements of the contract.
d. The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one (1) double-sided page. Information on pages beyond this will not be considered.
4. The Government reserves the right to review other available sources (public/Government internal) of information.
These may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc.
(4) Factor 4 – Past Performance:
If a completed CPARS evaluation is available, it shall be submitted with the proposal. Note: submit all CPARS evaluations (interim and final) for each project. If there is not a completed CPARS evaluation, the Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each construction and design project the offeror includes in its proposal for Factor 1 – Corporate Experience. AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS IS AVAILABLE.
If a CPARS evaluation is not available, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment C), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, James Godwin, via email at james.a.godwin41.civ@us.navy.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
Offerors are highly encouraged to provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 – Corporate Experience. Additionally, Offerors are highly encouraged to address any adverse past performance issues. Explanations shall not exceed two (2) double-sided pages (or four (4) single-sided pages) in total. Information provided beyond this page limit will not be considered.
In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS) using all CAGE/Entity Identifier numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
IMPORTANT: It is the responsibility of the offeror to provide accurate points of contact for each identified contract and current telephone numbers and/or email addresses. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being considered less qualified.
The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the offeror’s references or the references’ unwillingness to provide the information requested may affect the Government’s evaluation of this factor.
A copy of the blank Past Performance Questionnaire to be used for requesting client references is included as Attachment C.
(ii) Basis of Evaluation:
This evaluation focuses on how well the offeror performed on the projects submitted under Factor 1 – Corporate Experience and past performance on other projects currently documented in known sources.
The degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., PPIRS, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), performance recognition documents, and information obtained from any other source) reflect a trend of satisfactory performance considering:
- A pattern of successful completion of tasks;
- A pattern of deliverables that are timely and of good quality;
- A pattern of cooperativeness and teamwork with the Government at all levels (task managers, contracting officers, auditors, etc.); and
- Recency of tasks performed that are identical to, similar to, or related to the task at hand.
4. PROPOSAL REQUIREMENTS
4.1 PRE-PROPOSAL CONFERENCE AND SITE VISIT
Date: Wednesday, March 22nd, 2023 @ 1300 EDT
Site Visit POC: Mitchell Lahar, (207) 252-4802, mitchell.r.lahar.civ@us.navy.mil
Meeting Location: For Offerors who already have base and CIA access, please meet at the entrance to B79 (B343 side of B79) at Portsmouth Naval Shipyard. For those Offerors needing to be escorted, please arrive at the pass office (B384 at the end of Walker Street) 30 minutes prior to the time of the site visit.
Additional Site Visit Instructions for N4008523R2602 – B79 2nd and 3rd Floor Renovations:
This site visit is located inside the CIA, Required Steps for Visitors:
1) For those who require access/badging, return completed “DBIDS Access Request Form” (Attachment J) to james.a.godwin41.civ@us.navy.mil.
a. All completed “DBIDS Access Request Form” must be submitted by 14 March 2023 to enable sufficient processing time.
b. A completed 5500 DBIDS Form (Attachment J) for each company. If there are multiple subcontracting companies, a 5500 form is required for each company. If there are multiple individuals coming from a company, only one 5500 is required, however please include the attendee list on page two with the following information:
i. Full first name, last name, middle initial
ii. Company name
iii. State of Residence
iv. US Citizenship (Y or N?)
2) Each person must schedule an appointment with the Pass & ID office by using the “QLESS” app (https://www.qless.com/L).
3) Each person must complete SF 5512 form (Attachment I) and hand carry this form, along with 2 forms of approved photo ID, with them to their scheduled appointment at the pass office.
a. Anyone expecting to be badged should have either a VALID US passport (not expired) and a regular license, OR, a license, accompanied with a social security card or birth certificate.
b. Do NOT email the 5512 form as it has personal identification information.
NOTE: IF THE SITE VISIT DATE NEEDS TO BE CHANGED IT WILL BE ANNOUNCED VIA RFP
AMENDMENT.
Additional information:
1) PPE will be required to enter the CIA for the site visit (i.e. hard hat, hearing protection, etc.)
2) Reminder: Contractors with base/CIA access can meet the site visit team at the main entrance to B79 at 1300 EDT. However please submit the names of those attending the site visit to assist with coordination.
In Summary, Prime contractors must identify the contractors without base/CIA access who will attend the site visit and immediately book an appointment at Pass & ID as well as submit the respective DBIDS request form by the suspense date. Contractors must ensure attendees have completed SECNAV 5512s brought with them to their Pass & ID appointment date.
Lastly please submit to james.a.godwin41.civ@us.navy.mil a list of all attendees NO LATER THAN 16 March, 2023.
4.2 PROPOSAL SUBMISSION INSTRUCTIONS
In response to this request for proposal, the complete proposal shall include the Price Proposal and the Non-Price Factors Proposal, submitted in accordance with the above Basis of Evaluation and Submittal Requirements for Each Factor.
Electronic Copies
Offerors shall submit electronic proposals (.pdf format) in response to this solicitation. Only the PIEE Solicitation Module is authorized for the submission of electronic proposals in response to this solicitation. Electronic proposal submissions should be no larger than 1.9 GB per file. Electronic proposals shall match the hard copy version of the proposal. In the event of a discrepancy, the electronic copy will govern. Offerors shall ensure that the Government has received the electronic proposal prior to the date and time specified. PIEE Solicitation Vendor Access Instructions are provided via Attachment E. Emailed submissions will not be accepted.
Offerors shall allow adequate time to upload files which may be slower for non-DoD users and to avoid other technical difficulties that may be encountered. Offerors are also responsible for submitting files in the format specified and consistent with requirements stated elsewhere in this solicitation. Files that cannot be opened, or are otherwise missing the required content are the responsibility of the Offeror.
PIEE system will record the date and time of package submittal. The date and time of package submittal recorded in PIEE shall govern the timeliness of any proposal submission. LATE PROPOSALS WILL NOT BE
CONSIDERED.
Mailed Hard Copies
One (1) original, one (1) CD-ROM, and one (1) copy of the hard copy proposal shall be delivered by mail five (5) business days after the electronic copy due date. Proposal shall be labeled “PRICE PROPOSAL OR NON- COST/PRICE FACTORS PROPOSAL FOR RFP N40085-23-R-2602, ATTN: JAMES GODWIN; DO NOT OPEN
IN MAIL ROOM”.
Express Mail to:
Naval Facilities Engineering Command, Mid-Atlantic 9324 Virginia Avenue Building Z-140, Room 225 Norfolk, Virginia 23511 Attn: James Godwin, CON21
LATE PROPOSALS WILL NOT BE CONSIDERED. PROPOSALS THAT ARE HAND CARRIED WILL NOT
BE ACCEPTED.
It is the sole responsibility of the Offeror to obtain the RFP files, along with any amendments, from PIEE/Contract Opportunities (www.sam.gov).
4.3 PRE-PROPOSAL INQUIRIES (PPIs): All inquiries must be submitted in writing and received by the Contract Specialist no later than fourteen (14) days prior to the proposal due date in order to permit adequate time to reply to the inquiry. There is no guarantee that PPI’s submitted after the cut-off date will be answered before the solicitation closes. Submit all questions to James Godwin at james.a.godwin41.civ@us.navy.mil. Use of the PPI Log template is required. The PPI Log Template (Attachment A) can be found on PIEE or the Contract Opportunities website (Sam.gov) under the Attachments section.
4.4 CONTRACT OPPORTUNITIES: Amendments will be posted directly to PIEE and Contract Opportunities/Sam.gov. The drawings and specifications will be posted on PIEE/Sam.gov under the Attachments section of this RFP. Additionally, other postings will be made to PIEE/Sam.gov, such as the pre-proposal inquires (PPI) log, revised drawings, etc., under the Attachments section of the RFP. It is recommended contractors check PIEE/Sam.gov and the Attachments section of the RFP periodically to see if additional postings have been made. It is the contractor’s responsibility to check PIEE/Sam.gov for all postings.
5. INCORPORATION OF TECHNICAL PROPOSALS
The Contractor’s technical proposal, including revisions and amendments, made prior to contract award and a copy of which is in the possession of both parties, will be incorporated into this contract upon award by reference with the same force and effect as if set forth in full text. All contractor personnel shall meet or exceed the qualification standards, experience levels and trade background set forth in the technical proposal.
In the event of an inconsistency between the provisions of this contract and the technical proposal, the inconsistency shall be resolved by giving precedence in the following order: (i) the contract (excluding the technical proposal), and then (ii) the technical proposal.
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-1 Instructions to Offerors--Competitive Acquisition NOV 2021 52.215-20 Requirements for Certified Cost or Pricing Data and Data
Other Than Certified Cost or Pricing Data
NOV 2021
52.215-22 Limitations on Pass-Through Charges--Identification of Subcontract Effort
OCT 2009
252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements MAR 2022 252.215-7008 Only One Offer DEC 2022
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of provision)
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends…
This is the start of the file's text. The full file is on GovTribe.