This document is a bid schedule for a federal construction contract solicitation. The solicitation is for second and third floor renovations at the Portsmouth Naval Shipyard in Kittery, Maine issued by the Naval Facilities Engineering Command. The contract includes a base amount for all work under Item 0001, with optional additions for lightning protection under Item 0002, telecommunications under Item 0003, and other optional additions for an electronic security system under Item 0004, repairs to flashing and masonry under Item 0005, and furniture, fixtures and equipment under Item 0006. Unit prices are also requested for various removal and additional work items. Bids are due by the specified closing date, with the contract to be awarded based on evaluation of the base bid and any optional additions exercised according to the terms specified in the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to B79 DBB 2nd and 3rd Floor Renovations, newest first.
File Type Posted
23R2602 Amendment 0006.pdf PDF
Attachment D Price Proposal Form (Revision 3).docx DOCX document
23R2602 Amendment 0005.pdf PDF
23R2602 Amendment 0004.pdf PDF
Attachment M - B79 Amendment 0003 DWGS.pdf PDF
23R2602 Amendment 0003.pdf PDF
Attachment L - B79 Amendment 0002 DWGS.pdf PDF
Attachment K - NMCI Label Standards.pdf PDF
B79 Site Visit Log.pdf PDF
Attachment D Price Proposal Form (Revised).docx DOCX document
23R2602 Amendment 0002.pdf PDF
23R2602 Amendment 0001.pdf PDF
Attachment J - 5500 DBIDS Form.docx DOCX document
Attachment H - Spec Attach 1 Specifications.pdf PDF
Attachment H - Spec Attach 1 SOW.pdf PDF
Attachment C - Past Performance Questionnaire.docx DOCX document
Attachment G - DWGS.pdf PDF
Attachment E - PIEE Vendor Access Instructions.pdf PDF
Attachment B - Construction Experience Project Data Sheet.docx DOCX document
Attachment I - SECNAV 5512.pdf PDF
Attachment H - Spec Attach 1 Drawings.pdf PDF
Attachment F - B79 Specifications Volume 2.pdf PDF
Attachment D Price Proposal Form.pdf PDF
Attachment F - B79 Specifications Volume 1.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Solicitation N4008523R2602.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DOCUMENT 00 41 00

BID SCHEDULES

06/20

PART 1 GENERAL

1.1 BASIS OF BIDS

1.1.1 Options and Unit Prices

This Contract will be awarded with options and unit prices required for specifically selected work. A description of the options and schedule of the unit price work is contained in Standard Form 1442, "Solicitation, Offer and Award." See Contract Clauses, "FAR 52.211-18, Variation in Estimated Quantity" and "FAR 52.236-16, Quantity Surveys."

Options and Unit Prices Form

N40085-23-R-2602

(i) Item 0001: Base Amount

Basis of Bid for Item 0001 must be the Total Amount for Item 0001, but not including the work indicated or specified to be provided under any Option Item.

Item
Description
Estimated Quantity
Unit
Unit Price
Amount
000101
All work complete in accordance with the drawings and specifications, excluding 000102 and

000103.

1 Job
LS
$
$
000102
All Lightning Protection work, as identified in the Oak Point Associates Drawings and Specifications as ‘Option 2’, complete in accordance with the drawings and specifications.
1 Job
LS
$
$
000103
All Telecommunications work, as identified in the Oak Point Associates Drawings and Specifications as ‘Option 4’, complete in accordance with the drawings and specifications.
1 Job
LS
$
$

Total Amount for Item 0001 $

B79 – 2ND &

3RD

FLOOR RENOVATIONS

1591147

PORTSMOUTH NAVAL SHIPYARD, KITTERY, MAINE

Document 00 41 00 Page 1

(ii) Item 0002: Randolph Sheppard Act (RSA)

Basis of Bid for Item 0002 must be the Total Amount for Item 0002, but not including the work indicated or specified to be provided under any Option Item.

Item
Description
Estimated Quantity
Unit
Unit Price
Amount
0002
All RSA work complete in accordance with the drawings and

specifications.

1 Job
LS
$
$

Total Amount for Item 0002 $

In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the bidder shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.

Any bid price for items indicated above which are unbalanced as to price may be rejected as non-responsive. An unbalanced bid is one which is based on price significantly less than cost for some work and price which is significantly overstated for other work.

(iii) Item 0003: Option 1

Option may be exercised at the time of Award or within 70 calendar days after Award by the Contracting Officer. A firm fixed bid price is required for the option. No provision is made for economic price adjustment.

Method for evaluation for bids for Award purposes is specified below.

Basis of Bid for Item 0003 must be the addition of the following work complete:

Electronic Security System (ESS): Price for providing work including: ESS Panels, ESS Power Supplies, ESS security devices, ESS wiring, ESS system installation, ESS testing, and commissioning.

Total Amount for Item 0003 $

If Option is exercised, the Contract Completion Date remains the same.

The low bidder for purposes of Award will be determined as in Clause "FAR 52.217-4, Evaluation of Options Exercised at Time of Contract Award," of Section 00200, "Instructions to Bidders."

(iv) Item 0004: Option 2

Option may be exercised at the time of Award or within 120 calendar days after Award by the Contracting Officer. A firm fixed bid price is required for the option. No provision is made for economic price adjustment.

Method for evaluation for bids for Award purposes is specified below.

Basis of Bid for Item 0004 must be the addition of the following work complete:

Repair Flashing and Repoint Masonry, as identified in the NAVFAC Drawings and Specifications included at the end of Specification Volume 2 as ‘Specification Attachment 1’: Price for providing work in connection with the procurement and installation of all labor, material, equipment, transportation, coordination, testing, commissioning, and supervision required.

Total Amount for Item 0004 $

If Option is exercised, the Contract Completion Date remains the same.

The low bidder for purposes of Award will be determined as in Clause "FAR 52.217-4, Evaluation of Options Exercised at Time of Contract Award," of Section 00200, "Instructions to Bidders."

(v) Item 0005: Option 3

Option may be exercised at the time of Award or within 225 calendar days after Award by the Contracting Officer. A firm fixed bid price is required for the option. No provision is made for economic price adjustment. Method for evaluation for bids for Award purposes is specified below.

Basis of Bid for Item 0005 must be the addition of the following work complete:

FF&E: Price for providing work in connection with the procurement and installation of all labor, material, equipment, transportation, coordination, testing, commissioning, and supervision required.

Total Amount for Item 0005 $

If Option is exercised, the Contract Completion Date remains the same.

The low bidder for purposes of Award will be determined as in Clause "FAR 52.217-4, Evaluation of Options Exercised at Time of Contract Award," of Section 00200, "Instructions to Bidders."

Note: The minimum bid guarantee must be 100 percent of the aggregate amount of Items 0001, 0002, 0003, 0004, and 0005.

Note: If options are exercised, additional bonding and consent of surety will be required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of Items 0001, 0002, 0003, 0004, and 0005.

1.1.1 Unit Prices

This Contract will be solicited with unit prices to be applied to estimated quantities for selected work. A description of the items and schedule of the unit price work is contained below. See Contract Clauses, “FAR 52.211-18, Variation in Estimated Quantity” and “FAR 52.236-16, Quantity Surveys.” Contractor is responsible for field measurement of all quantities.

Item
Description
Estimated Quantity
Unit
Unit Price
Amount
0001a
Removal of asbestos containing joint compound.
60
SF
$
$
0001b
Removal of asbestos- containing thermal system (pipe)

insulation.

1,250
LF
$
$
0001c
Removal of asbestos containing thermal insulation on pipe

fitting.

25
EA
$
$
0001d
Removal of asbestos containing black mastic on window

opening bricks.

20
SF
$
$
0001e
Paint Containing Lead, Cadmium and/or Chromium - Ceiling Tiles: HEPA vacuum ceiling tiles to remove chips, dust, and/or associated debris resulting from paint fallout onto tiles from walls, ceilings, and other surfaces.

Tiles must be cleaned sufficiently to allow disposal as Construction and Demolition (C&D) waste.

1,100
SF
$
$
0001f
Paint Containing Lead, Cadmium and/or Chromium – Ceiling: Remove all loose and flaking paint to substrate on

ceiling.

1,500
SF
$
$
Item
Description
Estimated Quantity
Unit
Unit Price
Amount
0001g
Paint Containing Lead, Cadmium and/or Chromium - Plaster over Brick Walls: Remove all loose and flaking paint to substrate on walls with plaster over brick. After paint removal, remove

plaster.

250
SF
$
$
0001h
Paint Containing Lead, Cadmium and/or Chromium - Brick Walls: Remove all loose and flaking paint to substrate on brick walls.

After paint removal, apply encapsulating paint.

1,300
SF
$
$
0001i
Removal of lighting ballasts containing PCB’s.
555
EA
$
$
0001j
Removal of lighting lamps.
1,585
EA
$
$
0001k
Removal of emergency lighting batteries.
31
EA
$
$
0001l
Removal of top layer of 1/2-inch thick unstable wood subfloor. Provide 1/2-inch thick plywood subfloor to be glued and screwed to existing bottom layer of wood sub

floor.

5,000
SF
$
$
0001m
Provision of additional floor hole patching including: plywood subfloor, patching mortar, firestopping sealant, and mineral wool as shown in Contract Drawings,

detail B4/AE002.

100
SF
$
$
0001n
Provision of additional hardened wall assembly including: metal framing, gypsum wall board, expanded metal mesh, sealant, and mineral wool insulation as shown in Contract Drawing

AE001, wall type NH.

150
SF
$
$
0001o
Removal of additional sprinkler system pipe (3” to 4” dia.), and associated hangers, and the provision of new sprinkler system pipe to match existing sizes, including the provision of associated hangers

and seismic bracing.

100
LF
$
$
0001p
Removal of additional sprinkler system pipe (2” to

<3” dia.), and associated hangers, and the provision of new sprinkler system pipe to match existing sizes, including the provision of associated hangers and seismic bracing.

100
LF
$
$
0001q
Removal of additional sprinkler system pipe (1” to

<2” dia.), and associated hangers, and the provision of new sprinkler system pipe to match existing sizes, including the provision of associated hangers and seismic bracing.

100
LF
$
$

Total Amount for Unit Price Items 0001a through 0001q $

In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the bidder shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.

Note: The Unit Prices provided must be the same amount for both adding and deducting quantities of the items listed.

The Unit Quantities indicated above are only estimates. The QC Manager must identify the types, locations, and quantities of repairs and must coordinate with the engineer of record through the Contracting Officer to confirm types, locations, and quantities of repairs.

The Unit Prices Documentation and Accounting Plan must include, as a minimum, the following:

1. Provide documentation that must include the repairs to be performed, the location of repairs, and the quantity of repairs. Units of measurement must match the unit prices indicated on the Unit Prices Table herein and as indicated on Sheet G-004.

2. For each repair identified, include the assignment of unit price designations (e.g., 0001b) that are indicated in the Unit Prices Table herein. The QC Manager must assign a quantity to each repair identified during the inspection and provide an updated accounting summary for all areas inspected as the inspections progress and are completed for Contracting Officer's review.

3. Provide notification and schedule of inspection dates and times to the Contracting Officer at least 2 weeks in advance. Contracting Officer to coordinate with Engineer of Record to review inspection findings on site with QC Manager prior to execution of repairs to confirm repair types and quantities.

4. Paint Containing Lead, Cadmium, and/or Chromium: All work that may impact building materials with paint containing lead, cadmium, and/or chromium (including hexavalent chromium) must be performed in accordance with: 29 CFR 1926.62, 29 CFR 1926.1126, and 29 CFR 1926.1127. For bidding purposes, Contractors are to include the scope of work for unit prices indicated on the Unit Prices Table herein related to proper preparation, removal, management, etc. of building materials with paint containing lead, cadmium, and/or chromium (including hexavalent chromium).

1.1.2 Contract Line Item Notes

General

1. Award will be made on the total sum of Items 0001, 0002, 0003, 0004, 0005. Offerors must enter unit prices and/or extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended price and the total recomputed accordingly. If an offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.

2. FAR 52.217-5, Evaluation of Options (Jul 1990) - Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for Award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

3. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

4. The Government reserves the unilateral right to Award Items 0003, 0004, and 0005 to the Contractor at the proposed price within 70, 120, and 225 calendar days, respectively, after Contract Award. A firm fixed proposed price is required for Items 0001, 0002, 0003, 0004, 0005. No provision is made for economic price adjustment. If Options are exercised, the Contract Completion Date remains 728 calendar days after Award of the Contract.

5. The Performance Bond must reflect 100 percent of the aggregate amount of all items.