N4008521R0164Rev3.pdf

PDF 898 KB Posted

Attached to
Design-Bid-Build, Repair B3 Mahan Hall, Naval War College, Naval Station Newport, Newport, RI
Solicitation number
N4008521R0164
Issued by

View the file

Other files

File Type Posted
N4008521R0164Rev5.pdf PDF
N4008521R0164 Amendment 0008.pdf PDF
Attachment R - MEI 2016-2018 Package and Parts Catalog.pdf PDF
Attachment P - 074213 METAL WALL PANELS.pdf PDF
Attachment U - DOR Basis of Design.pdf PDF
Attachment S - United Drilling Review_Mahan Hall.pdf PDF
Attachment T - Inside Air Drilling Double Sided Info Sheet.pdf PDF
N4008521R0164 Amendment 0007.pdf PDF
Attachment Q - Elevator Disconnect.pdf PDF
N4008521R0164Rev4.pdf PDF
N4008521R0164 Amendment 0006.pdf PDF
Attachment M - Door Hardware Revisions.pdf PDF
Attachment L - 01 32 17.00 20 NAS rev 3_30_2021Mahan.pdf PDF
Attachment O - Second Site Visit Log.pdf PDF
Attachment N - Amendments Acknowledged.pdf PDF
Attachment A_Revised - CIVIL COMBINED.pdf PDF
Attachment A_Revised - FIRE PROTECTION COMBINED.pdf PDF
Attachment A_Revised - MECHANICAL COMBINED.pdf PDF
Attachment A_Revised - STRUCTURE COMBINED.pdf PDF
Attachment A_Revised - PLUMBING COMBINED.pdf PDF
N4008521R0164 Amendment 0005.pdf PDF
Attachment K - Updated Base Access Requirements.pdf PDF
Attachment A_Revised - HAZMAT COMBINED.pdf PDF
Attachment A_Revised - LIFE SAFETY COMBINED.pdf PDF
Attachment A_Revised - ELECTRICAL COMBINED.pdf PDF
Attachment A_Revised - 201130_Mahan_Specifications.pdf PDF
Attachment A_Revised - ARCHITECTURE COMBINED.pdf PDF
Attachment A_Revised - FIRE ALARM COMBINED.pdf PDF
Attachment J - Added SOW_Ridem Permit_Test Pit_ Retention.pdf PDF
N4008521R0164 Amendment 0004.pdf PDF
Attachment I-Site Visit Attendee Form.xlsx XLSX spreadsheet
N4008521R0164Rev2.pdf PDF
Attachment G-SOW Mahan Hall Archives.pdf PDF
N4008521R0164 Amendment 0003.pdf PDF
Attachment H - Contractor Laydown Area.pdf PDF
Attachment E - SECNAV FORM 5512 EXAMPLE.PDF PDF
Attachment F-Site Visit Log.pdf PDF
N4008521R0164 Amendment 0002.pdf PDF
Attachment E - Verification of Mode of Transportation Form.xlsx XLSX spreadsheet
N4008521R0164Rev1.pdf PDF
N4008521R0164 Amendment 0001.pdf PDF
Attachment C- Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
Attachment A- A-300s.pdf PDF
Attachment A- I-100s.pdf PDF
Attachment E- SECNAV Form 5512-NSNPT- Dec 2019.pdf PDF
Attachment A- A-400s.pdf PDF
Attachment A- AD-100s.pdf PDF
Attachment A- A-200s.pdf PDF
Attachment E- CO Vetting Memo.pdf PDF
Attachment A- FIRE PROTECTION COMBINED.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVAL FACILITIES ENGINEERING COMMAND, MID-ATLANTIC

ACQUISITION CORE, BUILDING Z140

NORFOLK NAVAL STATION

HUBZONE DESIGN-BUILD (DB)/DESIGN-BID-BUILD (DBB), INDEFINITE DELIVERY/INDEFINITE

QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION

CONTRACT (MACC) FOR FACILITIES IN THE NORTH INTEGRATED PRODUCT TEAM (IPT)

AREA OF RESPONSIBILITY (AOR) TO INCLUDE

CONNECTICUT, DELAWARE, ILLINOIS, INDIANA, MAINE, MARYLAND, MASSACHUSETTS, NEW

HAMPSHIRE, NEW JERSEY, NEW YORK,

PENNSYLVANIA, RHODE ISLAND, AND VERMONT

POC: KATE ARNOLD

kathryn.arnold@navy.mil

(757)341-1659

PROPOSED TASK ORDER:

N4008521R0164

Design-Bid-Build, Repair B3 Mahan Hall, Naval War College, Naval Station Newport, Newport, RI

DATE OF SOLICITATION: February 12, 2021

HUBZONE MACC CONTRACT HOLDERS:

N40085-17-D-5038

The Oak Group Inc.

200 Federal Street, Suite 224

Camden, New Jersey 08103

POC: Eduard Eichen

Sharon Gray

Phone: (856) 377-0060

Email: eje@oakgroup.net est1@oakgroup.net

N40085-17-D-5039 Pontiac Drywall Systems, Inc.

20 W. Huron Street

Pontiac, Michigan 48342

POC: LaVonte Travis

Phone: (248) 332-3011

Email: lavontetravis@pdsicontractors.com

N40085-17-D-5040

QBS, Inc.

1548 Linden Avenue

Alliance, Ohio 44601

POC: James Franks

Phone: (330) 806-1022

Email: jim@qbsinc.com

N40085-17-D-5041 Smart ATI/KMK Joint Venture

16 Whitehall Road, Suite 2

Rochester, New Hampshire 03867

POC: Lori Smart

Phone: (603) 330-3533

Email: lori@smartati.com

Stephanie Mills

Email: smills@kmkconstruction.com

POC: Teri Lavoie

Email: Teri@smartati.com mailto:eje@oakgroup.net mailto:lavontetravis@pdsicontractors.com mailto:jim@qbsinc.com mailto:lori@smartati.com mailto:smills@kmkconstruction.com mailto:Teri@smartati.com

GENERAL REQUIREMENTS

All terms and conditions of N40085-17-D-5038/5039/5040/5041 Indefinite Delivery Quantity Contract apply to this solicitation. Please review your MACC award document for guidance on contract clauses and requirements that may pertain to this order. You are responsible to adhere to all applicable clauses, even if they are not stated in this RFP package or the Task Order award document. For clarification on any clause or other contractual issue, please contact

Kate Arnold at kathryn.arnold@navy.mil.

Amendments will be posted directly to www.beta.sam.gov

NAVFAC Solicitation No.: N4008521R0164

NAVFAC Specification/Drawings: Work Order No. 1637267 (Attachment A)

Title: Design-Bid-Build, Repair B3 Mahan Hall

Location of the Work: Naval War College, Naval Station Newport, Newport, RI

Description of the Work: This Design-Bid-Build project provides construction to upgrade all facets of existing building NWC Mahan Hall, B3 located Naval Station Newport, RI. Construction is allocated by Base Bid and

Option work. Provide new construction 500 SF connector addition to Turner Walkway and provide/install new elevator and elevator shaft with override in existing Mahan Hall. Total existing building area to be renovated is

27,980 SF.

Base Bid construction work includes:

All interior Hazard Materials abatement and disposal work all floors, All interior demolition and new work layout plan revisions, including new egress corridors in stack area, All interior finishes, for new work and repair work, All interior woodwork/casework/wood trim finishes for new work and repair work, All interior structural work noted for existing 1964 stack area- columns and stack work, All demolition mechanical work, All new work general mechanical scope, including all TABS, Controls work, and Acceptance, All demolition work noted for electrical, including lighting, conduit/wire, electric panels, Al new work noted for electrical – lighting, including exterior lighting, lighting controls, including exterior lighting controls, General Branch - new wiring in existing conduit, General Branch – new wiring in new conduit, General Branch – new wiremold /new wire lighting, power distribution, power to electrical and mechanical equipment, All new work noted for fire suppression system, including testing/Government acceptance, new fire suppression line to building, Fire Detection & Alarm Systems, electronic safety and security, and All work noted for existing furniture relocation within 10 miles.

Option 1 construction work includes:

All new work for exterior repairs - masonry repointing, & all granite repair/replacement, flashing repairs/replacement, masonry repairs/replacement and other Misc. Repairs; excluding exterior façade cleaning , All interior Hazard Materials abatement and disposal work for new work layout plan revisions for toilet rooms, All interior demolition and new work layout plan revisions, and interior finishes for new toilet rooms, All interior door replacement and door hardware replacement, All demolition plumbing work, including all exterior work as required to support plumbing scope, All new work for plumbing - Water Distribution, piping and insulation, sanitary sewer, water heaters, equipment, and fixtures, gas piping and testing, All new work for electrical – emergency power, All demolition and new work noted for telecommunications, All demolition and new work noted for site/civil work, including ledge work, for new elevator addition, new drainage, and new utilities, All work noted for the construction of new elevator shaft: including existing building demolition, structural shoring/strengthening of existing building, construction of new elevator shaft and override, elevator cab and associated structure/fitting/equipment, elevator machine room equipment, and all required elevator testing and Government acceptance, All work noted for new mechanical, electrical – power and lighting, life safety, plumbing at new addition, including all testing and acceptance, TABS, Controls work, and Government acceptance, All new work noted for construction of new connector addition, including interior finishes.

mailto:kathryn.arnold@navy.mil

Option 2 construction work includes:

All demolition and new work for replacement flat roofs and replace roof railings, All demolition and new work for repair and replacement windows, All new work for mechanical shade at Reading Room, All new work to refinish decorative scagliola at columns and fireplaces, All new work for electrical item - poke-thru devices, Power

Distribution Add Alternate, All new work for electrical/life safety - mass notification, All new work for repairs to existing skylights, All new work for exterior masonry façade cleaning

Estimated Price Range: In accordance with FAR 36.204(g), the magnitude of construction for this project is between $5,000,000 and $10,000,000.

Time for Completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work, the duration of this task order shall be 630 calendar days from date of award (includes 15 calendar days for submission and approval of bonds and insurance).

Wage Determination: Department of Labor (DoL) General Decision Number RI20210001 Last Revised Mar 05, 2021 applies to this work (Attachment B). The wage determination version in effect at the time of award shall apply to the work performed under this contract.

Liquidated Damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,829.38 for each calendar day of delay until the work is completed or accepted.

Utilities: The Contractor shall be responsible for obtaining, either from available Government sources or local utility companies, all utilities required for construction and testing. The Contractor shall provide these utilities at his expense, paid for at the current utility rate delivered to the job site. The Contractor shall provide and maintain all temporary utility connections and distribution lines, and all meters required to measure the amount of each utility used.

Record Shop Drawings: In accordance with FAR 52.236.21 Specifications and Drawings for Construction, record shop drawings are required. Reproducible copies of these record drawings are also required.

Government Furnished Property: Not Included.

Basis for Award: This task order will be awarded on a fair opportunity basis pursuant to FAR 16.505 ordering procedures. The proposed task order will be awarded to the responsible offeror, offering the best value to the

Government. For this task order, to make a determination of best value, the Government shall evaluate each offeror on price only and the basis for award will be low price.

Bond Requirements: In accordance with FAR 52.228-1, Bid Guarantees, each offeror shall submit with its offer a guarantee bond (Standard Form 24) in a penal sum equal to at least 20 percent of the offer price or $3,000,000, whichever is less.

Performance and Payment Bonds are required from the contract task order awardee ten (10) calendar days after date of award.

Proposal Acceptance Period: Proposal acceptance period shall be 120 days from receipt of offers.

Pre-Proposal Inquiries (PPIs): Offerors who determine that the technical and or contractual requirements of this

RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. All inquiries shall be submitted via email to Kate Arnold at kathryn.arnold@navy.mil no later than Close of

Business (COB), THURSDAY, 25 March 2021. Additionally, all inquiries shall be submitted using the Pre-

Proposal Inquiry (PPI) form (Attachment C). Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. A response will be published via an amendment to www.beta.sam.gov.

http://www.beta.sam.gov/

Site Visit: A second site visit will be held on MONDAY, 22 March 2021 at 1:00 p.m. -- ALL attendees to meet outside South entrance to Mahan Hall under pedestrian bridge.

ALL contractors MUST show form of ID for NWC contractor access badge, Fill out NWC COVID questionnaire, have their temperature taken, and wear a mask at all time - fully covering mouth and nose.

Contractors who do not already have base access should fill out the attached SECNAV 5512 form and provide to

Bethany Collard at bethany.collard@navy.mil. All requests must be submitted NLT Friday, 12 March 2021.

All attendees traveling outside the 175-mile radius of NSN will need to resubmit the Verification of Mode of

Transportation Form (Attachment E - Verification of Mode of Transportation Form).

Submit Verification of Mode of Transportation Form to Kate Arnold at kathryn.arnold@navy.mil NLT 4:00pm

EST, Wednesday, 17 March 2021. Form must include the names and mode of travel for all out of local area (175 mile radius of Newport) attendees. Attendees traveling outside the 175-mile radius of NSN are required to produce a negative PCR test result within 72 hours of the site visit.

Please refer to attached PDF Files labeled as followed:

Attachment E - CO Vetting Memo

Attachment E - CUSFF_NAVNORTH COVID-19 Screening Questionnairev2020.07.16

Attachment E - Verification of Mode of Transportation Form

Attachment E - SECNAV Form 5512-NSNPT- Dec 2019

Attachment E - SECNAV FORM 5512 EXAMPLE

Proposal Due Date: TUESDAY, 06 April 2021 at 02:00PM Eastern Daylight Time. LATE PROPOSALS WILL

NOT BE CONSIDERED.

Proposal Delivery Information: PROPOSALS SHALL BE EMAILED TO Kate Arnold at kathryn.arnold@navy.mil. Facsimile transmissions of proposals, acknowledgements of amendments, or modifications to proposals are not authorized.

Evaluation Factors for Award

1. The proposed task order will be awarded to the responsible offeror offering the best value to the

Government. The lowest price source selection process is selected as appropriate for this acquisition because the best value is expected to result from selection of the proposal with the lowest evaluated price.

To make a determination of best value, the Government shall evaluate each offeror on price only.

2. Basis of Evaluation and Submittal Requirements for Each Factor.

(a) Price:

(1) Solicitation Submittal Requirements: Offeror shall submit the following:

Cover page that includes:

- Solicitation Number

- Solicitation Title

- Prime Contractor Name

- Prime Contractor Address

- Phone Number

- Fax Number

- DUNS

- Cage Code

- Point of Contact

- Point of Contact Phone Number

- Point of Contact Email

Price Proposal Form (Attachment D)

Acknowledged Amendments (if applicable)

Bid Bond

(2) Basis of Evaluation: The government will evaluate price based on the lump sum price. The

Government will evaluate price based on the total price proposal including the base price and all options. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:

a. Comparison of proposed prices received in response to the RFP.

b. Comparison of proposed prices with the Independent Government Cost Estimate

(IGCE).

c. Comparison of proposed prices with available historical information.

d. Comparison of proposed prices with market survey results.

Evaluation

1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the lowest price proposal.

2. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the

Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

Attachments:

1. Attachment A- 201130_Mahan_Specifications

2. Attachment A- 1637267dwg01of01

3. Attachment A- A-100s

4. Attachment A- A-200s

5. Attachment A- A-300s

6. Attachment A- A-400s

7. Attachment A- A-500s

8. Attachment A- A-600s

9. Attachment A- AD-100s

10. Attachment A- G-100s

11. Attachment A- I-100s

12. Attachment A- CIVIL COMBINED

13. Attachment A- ELECTRICAL COMBINED

14. Attachment A- FIRE ALARM COMBINED

15. Attachment A- FIRE PROTECTION COMBINED

16. Attachment A- HAZMAT COMBINED

17. Attachment A- LIFE SAFETY COMBINED

18. Attachment A- MECHANICAL COMBINED

19. Attachment A- PLUMBING COMBINED

20. Attachment A- STRUCTURE COMBINED

21. Attachment A_Revised - 201130_Mahan_Specifications

22. Attachment A_Revised - ARCHITECTURE COMBINED

23. Attachment A_Revised - CIVIL COMBINED

24. Attachment A_Revised - ELECTRICAL COMBINED

25. Attachment A_Revised - FIRE ALARM COMBINED

26. Attachment A_Revised - FIRE PROTECTION COMBINED

27. Attachment A_Revised - HAZMAT COMBINED

28. Attachment A_Revised - LIFE SAFETY COMBINED

29. Attachment A_Revised - MECHANICAL COMBINED

30. Attachment A_Revised - PLUMBING COMBINED

31. Attachment A_Revised - STRUCTURE COMBINED

32. Attachment B- Wage Determination

33. Attachment C- Pre-Proposal Inquiry (PPI) Form

34. Attachment D- Price Proposal Form

35. Attachment E- Site Visit Procedures

36. Attachment E- SECNAV Form 5512-NSNPT- Dec 2019

37. Attachment E- CUSFF_NAVNORTH COVID-19 Screening Questionnairev2020.07.16

38. Attachment E- CO Vetting Memo

28. Attachment E- Verification of Mode of Transportation Form

29. Attachment E - SECNAV FORM 5512 EXAMPLE

30. Attachment F- Site Visit Log

31. Attachment G- SOW Mahan Hall Archives

32. Attachment H- Contractor Laydown Area Site Plan

33. Attachment I - Site Visit Attendee Form

34. Attachment J - Added SOW_Ridem Permit_Test Pit_ Retention

35. Attachment K - Updated Base Access Requirements

ATTACHMENT A

Specifications and Drawings

See attached PDF Files labeled as followed:

1. Attachment A- 201130_Mahan_Specifications

2. Attachment A- 1637267dwg01of01

3. Attachment A- A-100s

4. Attachment A- A-200s

5. Attachment A- A-300s

6. Attachment A- A-400s

7. Attachment A- A-500s

8. Attachment A- A-600s

9. Attachment A- AD-100s

10. Attachment A- G-100s

11. Attachment A- I-100s

12. Attachment A- CIVIL COMBINED

13. Attachment A- ELECTRICAL COMBINED

14. Attachment A- FIRE ALARM COMBINED

15. Attachment A- FIRE PROTECTION COMBINED

16. Attachment A- HAZMAT COMBINED

17. Attachment A- LIFE SAFETY COMBINED

18. Attachment A- MECHANICAL COMBINED

19. Attachment A- PLUMBING COMBINED

20. Attachment A- STRUCTURE COMBINED

21. Attachment A_Revised - 201130_Mahan_Specifications

22. Attachment A_Revised - ARCHITECTURE COMBINED

23. Attachment A_Revised - CIVIL COMBINED

24. Attachment A_Revised - ELECTRICAL COMBINED

25. Attachment A_Revised - FIRE ALARM COMBINED

26. Attachment A_Revised - FIRE PROTECTION COMBINED

27. Attachment A_Revised - HAZMAT COMBINED

28. Attachment A_Revised - LIFE SAFETY COMBINED

29. Attachment A_Revised - MECHANICAL COMBINED

30. Attachment A_Revised - PLUMBING COMBINED

31. Attachment A_Revised - STRUCTURE COMBINED

ATTACHMENT B

Wage Determination

"General Decision Number: RI20210001 03/05/2021

Superseded General Decision Number: RI20200001

State: Rhode Island

Construction Types: Building, Heavy (Heavy and Marine) and

Highway

Counties: Rhode Island Statewide.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories) HEAVY, HIGHWAY AND MARINE

CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January

1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year

2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the

Davis-Bacon Related Acts, including those set forth at 29 CFR

5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/01/2021

1 01/22/2021

2 03/05/2021

ASBE0006-006 12/01/2019

Rates Fringes

HAZARDOUS MATERIAL HANDLER

(Includes preparation, wetting, stripping, removal scrapping, vacuuming, bagging

& disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 36.60 22.40

ASBE0006-008 09/01/2019

Asbestos Worker/Insulator

Includes application of all insulating materials, protective coverings, coatings & finishes to all types of mechanical systems.$ 43.60 29.90

BOIL0029-001 01/01/2017

BOILERMAKER......................$ 42.42 24.92

BRRI0003-001 06/01/2020

Bricklayer, Stonemason, Pointer, Caulker & Cleaner.......$ 42.55 28.02

BRRI0003-002 03/01/2020

Marble Setter, Terrazzo

Worker & Tile Setter.............$ 40.78 28.92

BRRI0003-003 03/01/2020

Marble, Tile & Terrazzo

Finisher.........................$ 34.10 27.88

* CARP0330-001 01/01/2021

CARPENTER (Includes Soft

Floor Layer).....................$ 39.72 28.66

Diver Tender.....................$ 40.72 28.66

DIVER............................$ 51.47 28.66

Piledriver.......................$ 39.72 28.66

WELDER...........................$ 40.72 28.66

FOOTNOTES:

When not diving or tending the diver, the diver and diver tender shall receive the piledriver rate. Diver tenders shall receive $1.00 per hour above the pile driver rate when tending the diver.

Work on free-standing stacks, concrete silos & public utility electrical power houses, which are over 35 ft. in height when constructed: $.50 per hour additional.

Work on exterior concrete shear wall gang forms, 45 ft. or more above ground elevation or on setback: $.50 per hour additional.

The designated piledriver, known as the ""monkey"": $1.00 per hour additional.

CARP1121-002 01/06/2020

MILLWRIGHT.......................$ 39.07 29.15

ELEC0099-002 06/01/2020

ELECTRICIAN......................$ 41.61 57.24%

Teledata System Installer........$ 31.21 13.10%+14.93

Work of a hazardous nature, or where the work height is 30

ft. or more from the floor, except when working

OSHA-approved lifts: 20% per hour additional.

Work in tunnels below ground level in combined sewer outfall:

20% per hour additional.

ELEV0039-001 01/01/2021

ELEVATOR MECHANIC................$ 55.03 35.825+A+B

A. PAID HOLIDAYS: New Years Day; Memorial Day; Independence

Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

B. Employer contributes 8% basic hourly rate for 5 years or more of service of 6% basic hourly rate for 6 months to 5 years of service as vacation pay credit.

ENGI0057-001 12/01/2020

Operating Engineer: (power plants, sewer treatment plants, pumping stations, tunnels, caissons, piers, docks, bridges, wind turbines, subterranean & other marine and heavy construction work)

GROUP 1.....................$ 42.55 27.70+a

GROUP 2.....................$ 40.55 27.70+a

GROUP 3.....................$ 36.17 27.70+a

GROUP 4.....................$ 33.32 27.70+a

GROUP 5.....................$ 39.60 27.70+a

GROUP 6.....................$ 30.40 27.70+a

GROUP 7.....................$ 24.40 27.70+a

GROUP 8.....................$ 36.25 27.70+a

GROUP 9.....................$ 40.17 27.70+a

a. BOOM LENGTHS, INCLUDING JIBS:

150 feet and over + $ 2.00

180 feet and over + $ 3.00

210 feet and over + $ 4.00

240 feet and over + $ 5.00

270 feet and over + $ 7.00

300 feet and over + $ 8.00

350 feet and over + $ 9.00

400 feet and over + $10.00

a. PAID HOLIDAYS:

New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day. a: Any employee who works

3 days in the week in which a holiday falls shall be paid for the holiday.

a. FOOTNOTES:

Hazmat work: $2.00 per hour additional.

Tunnel/Shaft work: $5.00 per hour additional.

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cranes, lighters, boom trucks and derricks

GROUP 2: Digging machine, Ross Carrier, locomotive, hoist, elevator, bidwell-type machine, shot & water blasting machine, paver, spreader, graders, front end loader (3 yds.

and over), vibratory hammer & vacuum truck, roadheaders, forklifts, economobile type equipment, tunnel boring machines, concrete pump and on site concrete plants.

GROUP 3: Oilers on cranes.

GROUP 4: Oiler on crawler backhoe.

GROUP 5: Bulldozer, bobcats, skid steer loader, tractor, scraper, combination loader backhoe, roller, front end loader (less than 3 yds.), street and mobile-powered sweeper (3-yd. capacity), 8-ft. sweeper minimum 65 HP).

GROUP 6: Well-point installation crew.

GROUP 7: Utility Engineers and Signal Persons

GROUP 8: Heater, concrete mixer, stone crusher, welding machine, generator and light plant, gas and electric driven pump and air compressor.

GROUP 9: Boat & tug operator.

ENGI0057-002 11/01/2020

Power Equipment Operator

(highway construction projects; water and sewerline projects which are incidental to highway construction projects; and bridge projects that do not span water)

GROUP 1....................$ 35.70 27.70+a

GROUP 2....................$ 30.40 27.70+a

GROUP 3....................$ 24.40 27.70+a

GROUP 4....................$ 30.98 27.70+a

GROUP 5....................$ 34.68 27.70+a

GROUP 6....................$ 34.30 27.70+a

GROUP 7....................$ 29.95 27.70+a

GROUP 8....................$ 31.33 27.70+a

GROUP 9....................$ 33.28 27.70+a

a. FOOTNOTE: a. Any employee who works three days in the week in which a holiday falls shall be paid for the holiday.

a. PAID HOLIDAYS: New Year's Day, President's Day, Memorial

Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day & Christmas Day.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Digging machine, crane, piledriver, lighter, locomotive, derrick, hoist, boom truck, John Henry's, directional drilling machine, cold planer, reclaimer, paver, spreader, grader, front end loader (3 yds. and over), vacuum truck, test boring machine operator, veemere saw, water blaster, hydro-demolition robot, forklift, economobile, Ross Carrier, concrete pump operator and boats

GROUP 2: Well point installation crew

GROUP 3: Utlity engineers and signal persons

GROUP 4: Oiler on cranes

GROUP 5: Combination loader backhoe, front end loader (less than 3 yds.), forklift, bulldozers & scrapers and boats

GROUP 6: Roller,skid steer loaders, street sweeper

GROUP 7: Gas and electric drive heater, concrete mixer, light plant, welding machine, pump & compressor

GROUP 8: Stone crusher

GROUP 9: Mechanic & welder

ENGI0057-003 12/01/2020

BUILDING CONSTRUCTION

Power Equipment Operator

GROUP 1....................$ 41.82 27.70+a

GROUP 2....................$ 39.82 27.70+a

GROUP 3....................$ 39.60 27.70+a

GROUP 4....................$ 35.60 27.70+a

GROUP 5....................$ 32.75 27.70+a

GROUP 6....................$ 38.90 27.70+a

GROUP 7....................$ 38.47 27.70+a

GROUP 8....................$ 35.79 27.70+a a.BOOM LENTHS, INCLUDING JIBS:

150 ft. and over: + $ 2.00

180 ft. and over: + $ 3.00

210 ft. and over: + $ 4.00

240 ft. and over: + $ 5.00

270 ft. and over: + $ 7.00

300 ft. and over: + $ 8.00

350 ft. and over: + $ 9.00

400 ft. and over: + $10.00

a. PAID HOLIDAYS: New Year's Day, President's Day, Memorial

Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day & Christmas Day. a: Any employee who works 3 days in the week in which a holiday falls shall be paid for the holiday.

a. FOOTNOTE: Hazmat work: $2.00 per hour additional.

Tunnel/Shaft work: $5.00 per hour additional.

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cranes, lighters, boom trucks and derricks.

GROUP 2: Digging machine, Ross carrier, locomotive, hoist, elevator, bidwell-type machine, shot & water blasting machine, paver, spreader, front end loader (3 yds. and over), vibratory hammer and vacuum truck

GROUP 3: Telehandler equipment, forklift, concrete pump & on-site concrete plant

GROUP 4: Fireman & oiler on cranes

GROUP 5: Oiler on crawler backhoe

GROUP 6: Bulldozer,skid steer loaders,bobcats, tractor, grader, scraper,combination loader backhoe, roller, front end loader (less than 3 yds.), street and mobile powered sweeper (3 yds. capacity), 8-ft. sweeper (minimum 65 hp)

GROUP 7: Well point installation crew

GROUP 8: Heater, concrete mixer, stone crusher, welding machine, generator for light plant, gas and electric driven pump & air compressor

IRON0037-001 09/16/2020

IRONWORKER.......................$ 37.43 29.62

LABO0271-001 06/02/2019

LABORER

GROUP 1.....................$ 31.80 25.05

GROUP 2.....................$ 32.05 25.05

GROUP 3.....................$ 32.55 25.05

GROUP 4.....................$ 32.80 25.05

GROUP 5.....................$ 33.80 25.05

LABORERS CLASSIFICATIONS

GROUP 1: Laborer, Carpenter Tender, Mason Tender, Cement

Finisher Tender, Scaffold Erector, Wrecking Laborer, Asbestos Removal [Non-Mechanical Systems]

GROUP 2: Asphalt Raker, Adzemen, Pipe Trench Bracer, Demolition Burner, Chain Saw Operator, Fence & Guard Rail

Erector, Setter of Metal Forms for Roadways, Mortar Mixer, Pipelayer, Riprap & Dry Stonewall Builder, Highway Stone

Spreader, Pneumatic Tool Operator, Wagon Drill Operator, Tree Trimmer, Barco-Type Jumping Tamper, Mechanical Grinder

Operator

GROUP 3: Pre-Cast Floor & Roof Plank Erectors

GROUP 4: Air Track Operator, Hydraulic & Similar Self-Powered

Drill, Block Paver, Rammer, Curb Setter, Powderman & Blaster

GROUP 5: Toxic Waste Remover

LABO0271-002 06/02/2019

HEAVY AND HIGHWAY CONSTRUCTION

LABORER

COMPRESSED AIR

Group 1....................$ 49.23 23.50

Group 2....................$ 38.75 23.50

Group 3....................$ 51.23 23.50

FREE AIR

Group 1....................$ 41.30 23.50

Group 2....................$ 38.75 23.50

Group 3....................$ 43.30 23.50

LABORER

Group 1....................$ 31.80 23.05

Group 2....................$ 32.05 23.05

Group 3....................$ 32.80 23.05

Group 4....................$ 25.30 23.05

Group 5....................$ 33.80 23.05

OPEN AIR CAISSON,

UNDERPINNING WORK AND

BORING CREW

Bottom Man.................$ 37.80 23.05

Top Man & Laborer..........$ 36.85 23.05

TEST BORING

Driller....................$ 38.25 23.05

Laborer....................$ 36.85 23.05

LABORER CLASSIFICATIONS

GROUP 1: Laborer; Carpenter tender; Cement finisher tender;

Wrecking laborer; Asbestos removers [non-mechanical systems]; Plant laborer; Driller in quarries

GROUP 2: Adzeperson; Asphalt raker; Barcotype jumping tamper; Chain saw operators; Concrete and power buggy operator; Concrete saw operator; Demolition burner; Fence and guard rail erector; Highway stone spreader; Laser beam operator; Mechanical grinder operator; Mason tender; Mortar mixer; Pneumatic tool operator; Riprap and dry stonewall builder; Scaffold erector; Setter of metal forms for roadways; Wagon drill operator; Wood chipper operator;

Pipelayer; Pipe trench bracer

GROUP 3: Air track drill operator; Hydraulic and similar powered drills; Brick paver; Block paver; Rammer and curb setter; Powderperson and blaster

GROUP 4: Flagger & signaler

GROUP 5: Toxic waste remover

LABORER - COMPRESSED AIR CLASSIFICATIONS

GROUP 1: Mucking machine operator, tunnel laborer, brake person, track person, miner, grout person, lock tender, gauge tender, miner: motor person & all others in compressed air

GROUP 2: Change house attendant, powder watchperson, top person on iron

GROUP 3: Hazardous waste work within the ""HOT"" zone

LABORER - FREE AIR CLASSIFICATIONS

GROUP 1: Grout person - pumps, brake person, track person, form mover & stripper (wood & steel), shaft laborer, laborer topside, outside motorperson, miner, conveyor operator, miner welder, heading motorperson, erecting operator, mucking machine operator, nozzle person, rodperson, safety miner, shaft & tunnel, steel & rodperson, mole nipper, concrete worker, form erector (wood, steel and all accessories), cement finisher (this type of work only), top signal person, bottom person (when heading is 50' from shaft), burner, shield operator and TBM operator

GROUP 2: Change house attendant, powder watchperson

GROUP 3: Hazardous waste work within the ""HOT"" zone

PAIN0011-005 06/01/2020

PAINTER

Brush and Roller............$ 35.62 22.55

Epoxy, Tanks, Towers, Swing Stage & Structural

Steel.......................$ 37.62 22.55

Spray, Sand & Water

Blasting....................$ 38.62 22.55

Taper.......................$ 36.37 22.55

Wall Coverer................$ 36.12 22.55

PAIN0011-006 06/01/2020

GLAZIER..........................$ 39.18 22.55

SWING STAGE: $1.00 per hour additional.

PAID HOLIDAYS: Labor Day & Christmas Day.

PAIN0011-011 06/01/2020

Painter (Bridge Work)...........$ 52.25 22.55

PAIN0035-008 06/01/2011

Sign Painter.....................$ 24.79 13.72

PLAS0040-001 06/03/2019

CEMENT MASON/CONCRETE FINISHER...$ 36.00 27.15

FOOTNOTE: Cement Mason: Work on free swinging scaffolds under

3 planks width and which is 20 or more feet above ground and any offset structure: $.30 per hour additional.

PLAS0040-002 07/01/2019

CEMENT MASON/CONCRETE FINISHER...$ 32.85 22.20

PLAS0040-003 07/01/2019

PLASTERER........................$ 37.55 27.50

PLUM0051-002 08/31/2020

Plumbers and Pipefitters.........$ 44.69 31.20

ROOF0033-004 12/01/2020

ROOFER...........................$ 39.40 28.06

SFRI0669-001 01/01/2021

SPRINKLER FITTER.................$ 45.92 26.60

SHEE0017-002 12/01/2020

Sheet Metal Worker...............$ 38.58 36.73

TEAM0251-001 05/01/2019

TRUCK DRIVER

GROUP 1....................$ 27.96 26.8525+A+B+C

GROUP 2....................$ 27.61 26.8525+A+B+C

GROUP 3....................$ 27.66 26.8525+A+B+C

GROUP 4....................$ 27.71 26.8525+A+B+C

GROUP 5....................$ 27.81 26.8525+A+B+C

GROUP 6....................$ 28.21 26.8525+A+B+C

GROUP 7....................$ 28.41 26.8525+A+B+C

GROUP 8....................$ 27.91 26.8525+A+B+C

GROUP 9....................$ 28.16 26.8525+A+B+C

GROUP 10....................$ 27.96 26.8525+A+B+C

A. Paid Holidays: New Year's Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day and Christmas Day, plus

Presidents' Day, Columbus Day, Veteran's Day & V-J Day, providing the employee has worked at least one day in the calendar week in which the holiday falls.

B. Employee who has been on the payroll for 1 year or more but less than 5 years and has worked 150 Days during the last year of employment shall receive 1 week's paid vacation; 5 to 10 years - 2 weeks' paid vacation; 10 or more years - 3 week's paid vacation.

C. Employees on the seniority list shall be paid a one hundred dollar ($100.00) bonus for every four hundred (400) hours worked, up to a maximum of five hundred dollars

($500.00)

All drivers working on a defined hazard material job site shall be paid a premium of $2.00 per hour over applicable rate.

TRUCK DRIVER CLASSIFICATIONS

GROUP 1: Pick-up trucks, station wagons, & panel trucks

GROUP 2: Two-axle on low beds

GROUP 3: Two-axle dump truck

GROUP 4: Three-axle dump truck

GROUP 5: Four- and five-axle equipment

GROUP 6: Low-bed or boom trailer.

GROUP 7: Trailers when used on a double hook up (pulling 2 trailers)

GROUP 8: Special earth-moving equipment, under 35 tons

GROUP 9: Special earth-moving equipment, 35 tons or over

GROUP 10: Tractor trailer

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or

""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

ATTACHMENT C

PRE-PROPOSAL INQUIRY (PPI) FORM

See attached Pre-Proposal Inquiry Form Labeled ‘Pre-Proposal Inquiry Form’

ATTACHMENT D

PRICE PROPOSAL FORM

REV February 24, 2021

REV March 6, 2021

REV March 19, 2021

DOCUMENT 00 22 13.00 20

SUPPLEMENTARY INSTRUCTIONS TO OFFERORS

02/14

PART 1 GENERAL

1.0 PROJECT

Basis of Bid for shall be the construction work in accordance with WON

1637267 NWC B3 MAHAN HALL INTERIOR AND EXTERIOR REPAIRS.

This contract will be solicited as Base Bid, Options, to provide

Construction Services. A description of the base bid and options is contained herewith under WON 1637267 NWC B3 MAHAN HALL INTERIOR AND EXTERIOR

REPAIRS.

1.1 CONTRACT LINE ITEMS

The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.

Provide the Contract Line Item (CLIN) lump sum price for the following items:

BASE BID ITEM 0001

Basis of Bid for Item CLIN 0001 shall be all construction work as noted in the scope of work for Base Bid – Items listed as CLIN 0001aa through 0001x.

CLIN 0001 - BASE BID PRICE- Price includes the following:

CLIN DESCRIPTION – BASE BID TOTAL PRICE FOR

CLIN 0001

0001aa Scope of Work is to inventory, catalogue, prepare, pack, transport, store, return transport, and reinstall the existing

Naval Historical Collection currently located at B3 Mahan Hall Naval War

College. The existing collection must be relocated during the entire construction duration. The historical collection must be relocated prior to start of any demolition and reinstalled upon construction completion.

CLIN DESCRIPTION – BASE BID TOTAL PRICE FOR CLIN

0001a All interior Hazard Materials abatement and disposal work all floors, entire scope of work for Hazardous Materials, excluding work noted in options

0001b All interior demolition and new work layout plan revisions, including new egress corridors in stack area, excluding work noted in options

0001c All interior finishes, for new work and repair work, noted for the entire building, excluding work noted in options

0001d All interior woodwork/casework/wood trim finishes for new work and repair work, noted for the entire building, excluding work noted in options

0001e

All interior structural work noted for existing 1964 stack area, columns and stack work

0001f

All demolition mechanical work, including all exterior work as required to support mechanical scope, excluding work noted in options

0001g All new work general mechanical scope, including all TABS, Controls work, and

Acceptance, and including all exterior work as required to support mechanical scope, 0001h All new work for first floor mechanical scope, including all exterior work as required to support mechanical scope

0001i All new work for stacks area - attic mechanical scope, including all exterior work as required to support mechanical scope

0001j All new work for stacks area - floors 1, 1.5, 2, 2.5 (total 4 floors) mechanical scope, including all exterior work as required to support mechanical scope

0001k All demolition work noted for electrical, including lighting, conduit/wire, electric panels, excluding work noted in options

0001l All new work noted for electrical – lighting, including exterior lighting, 0001m All new work noted for electrical – lighting controls, including exterior lighting controls

CLIN DESCRIPTION TOTAL PRICE FOR CLIN

0001n All new work noted for electrical - General

Branch - new wiring in existing conduit, 0001o All new work noted for electrical - General

Branch – new wiring in new conduit, 0001p All new work noted for electrical - General

Branch – new wiremold / new wire lighting, 0001q -All new work noted for electrical – power distribution, excluding work noted in options

0001r -All new work noted for electrical - power to electrical and mechanical equipment, 0001s -All new work noted for fire suppression system, including testing/Government acceptance, excluding work noted in options

0001t -All new work noted for new fire suppression line to building, including testing/Government acceptance, excluding work noted in options

0001u -All new work noted for Fire Detection &

Alarm Systems, including testing/Government

0001v -All new work noted for electronic safety and security, including testing/Government

0001w - All work noted for existing furniture to be relocated, moved and transported by the contractor, to a building within 10 miles of

Mahan Hall(items to be determined upon contract award with NWC)

CLIN DESCRIPTION TOTAL PRICE FOR

0001x The Contractor shall file, obtain, and pay all required fees, $400, for second

Application for Storm water Construction

Permit and Water Quality Certification, provide and install one test pit within the boundaries of the proposed subsurface retention system, provide a Report of

Findings, as accepted by NWC, NAVFAC CM and NAVFAC Environmental Department, must repair (fill test pit and resod) the test pit area in accordance with requirements as noted in NAVAL Station Newport Soil

Management Plan.

0001 TOTAL COSTS FOR BASE BID WORK NOTED FOR

OPTION 1 ITEM 0002

Basis of Bid for Option 1 for Item CLIN 0002 shall be all construction work as noted in the scope of work to complete Third Floor for Option 1 – Items listed as CLIN 0002a through 0002o.

0002a -All new work for exterior repairs -masonry repointing, & all granite repair/replacement, flashing repairs/replacement, masonry repairs/replacement and other Misc. Repairs;

excluding exterior façade cleaning

0002b All interior Hazard Materials abatement and disposal work for new work layout plan revisions for toilet rooms

0002c All interior demolition and new work layout plan revisions, and interior finishes for new toilet rooms

0002d All interior door replacement and door hardware replacement

0002e All demolition plumbing work, including all exterior work as required to support plumbing scope

0002f All new work for plumbing - Water

Distribution, piping and insulation

0002g All new work for plumbing - sanitary sewer

0002h All new work for plumbing – water heaters, equipment, and fixtures

0002i All new work plumbing – gas piping and testing

0002j All new work for electrical – emergency power for Emergency Generator for Fire Pump fed from Pringle Hall

0002k All demolition and new work noted for telecommunications

0002l All demolition and new work noted for site/civil work, including ledge work as noted in dwg C-111, and subsurface retention system and revise design for subsurface retention system as noted in Amendment dated

3/19/2021, for new construction of elevator, and connector addition, new drainage, and new utilities

0002m All work noted for the construction of new elevator shaft: including existing building demolition, structural shoring/strengthening of existing building, construction of new elevator shaft and override, elevator cab and associated structure/fitting/equipment, elevator machine room equipment, and all required elevator testing and Government acceptance

0002n All work noted for new mechanical, electrical – power and lighting, life safety, plumbing at new addition, including all testing and acceptance, TABS, Controls work, and Government acceptance for new elevator and connector addition

0002o All new work noted for construction of new connector addition, including interior finishes

0002 TOTAL COSTS FOR OPTION 1 WORK NOTED FOR CLIN

OPTION 2 ITEM 0003

Basis of Bid for Option 2 for Item CLIN 0003 shall be all construction work as noted in the scope of work to complete Underground AHU Chilled Water

Routing for Option 2 – Items listed as CLIN 0003a through 0003i.

CLIN 0003 – OPTION 2 PRICE- Price includes the following:

0003a All demolition and new work for replacement flat roofs and replace roof railings

0003b All demolition and new work for repair and replacement windows

0003c All new work for mechanical shade at Reading

Room

0003d All new work to refinish decorative scagliola at columns and fireplaces

0003e All new work for electrical item - poke-thru devices at floor outlets within at Reading

Room in existing historical flooring and all wall devices at historical finish plaster walls

0003f All new work for electrical item - Power

Distribution Add Alternate Feeding Poke thru devices at floor outlets within at Reading

Room in existing historical flooring and all wall devices at historical finish plaster walls

0003g All new work for electrical/life safety -mass notification

0003h All new work for repairs to existing skylights

0003i All new work for exterior masonry façade cleaning

0003 TOTAL COSTS FOR OPTION 2 WORK NOTED FOR CLIN

Grand Total for Entire Project: Base Bid, Option 1, Option 2:

CLIN TOTAL

TOTAL COSTS FOR BASE BID, OPTION 1 AND

OPTION 2

TOTAL PRICE FOR CLIN

0001, 0002, 0003

Proposals on Options must be held for 180 days.

Contract Completion date is 630 calendar days from date of award. Contractor must submit planned schedule with proposal of the work for review.

Basis of Bid for each option item shall be the addition of the full scope of work complete to the Base Bid. If any or all Options are exercised, the contract completion date remains the same.

Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation, not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001. In accordance with FAR

52.217-5 Evaluation of Options, evaluation of Options will not obligate the

Government to exercise the Option(s).

No construction work will take place during August 30, 2021 thru September

30, 2021 or August 30, 2023 thru September 30, 2023 during ISS- International

Seapower Symposium at Naval Station Newport.

-- End of Document --

ATTACHMENT E

SITE VISIT INFORMATION

See attached PDF Files labeled as followed:

1. Attachment E- Site Visit Procedures

2. Attachment E- SECNAV Form 5512-NSNPT- Dec 2019

3. Attachment E- CUSFF_NAVNORTH COVID-19 Screening Questionnairev2020.07.16

4. Attachment E- CO Vetting Memo

5. Attachment E- Verification of Mode of Transportation Form

6. Attachment E - SECNAV FORM 5512 EXAMPLE

ATTACHMENT F

Site Visit Log

See…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .