N4008521R0164 Amendment 0007.pdf
PDF 143 KB Posted
- Attached to
- Design-Bid-Build, Repair B3 Mahan Hall, Naval War College, Naval Station Newport, Newport, RI
- Solicitation number
- N4008521R0164
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.
NO.
PROJECT NO. (If applicable)
0007 04/05/2021
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK, VA 23511
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
N40085-21-R-0164
9B. DATED (SEE ITEM 11)
02/12/2021
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
N4008521R0164 Design-Bid-Build, Repair B3 Mahan Hall, Naval War College, Naval Station Newport, Newport, RI
SEE SF 30 BLOCK 14 CONTINUATION PAGE
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
SECTION SF30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
AMENDMENT 0007
The purpose of this amendment is to:
1. Provide Addition of Specification Section 07 42 13 for Metal Wall Panels
2. Provide Basis of Design cut sheets from Elevator Manufacturer and Elevator Control Switch
3. Provide Basis of Design cut sheet/plan from United Drilling Company
4. Provide DOR Basis of Design
5. Provide Revised Response to Pre-Proposal Inquiry #33
All PPI’s are hereby answered. All other terms and conditions remain unchanged.
1. Provide Addition of Specification Section 07 42 13 for Metal Wall Panels
See Attachment P - 074213 METAL WALL PANELS
2. Provide Basis of Design cut sheets from Elevator Manufacturer and Elevator Control Switch
See Attachment Q - Elevator Disconnect
See Attachment R - MEI 2016-2018 Package and Parts Catalog
*Note: Attached information was used for the Basis of Design to meet current specifications and requirements, offerors are not required to use this company.
3. Provide Basis of Design cut sheet/plan from United Drilling Company
See Attachment S - United Drilling Review_Mahan Hall
See Attachment T - Inside Air Drilling Double Sided Info Sheet
*Note: Attached information was used for the Basis of Design to meet current specifications and requirements, offerors are not required to use this company.
4. Provide DOR Basis of Design
See Attachment U - DOR Basis of Design
5. Provide Revised Response to PPI #33
33 03/17/21 A-203, A-311
Please provide specifications for the
Composite Metal Siding panelsas shown on the exterior elevations and Wall sections.
REVISED - Wall Section EWA-1 requires a rainscreen metal panel product; smooth surface, Kynar finish, concealed fastener aluminum composite panel (ACM) assembly ;
two sheets of smooth .020” aluminum thermobonded to a solid, fire retardant core.
Please see Attachment P - 074213 METAL
WALL PANELS for Addition of Specification
SECTION 07 42 13
(End of Summary of Changes)
File details come from the government source that posted it. Updated .