Design-Bid-Build, Repair B3 Mahan Hall, Naval War College, Naval Station Newport, Newport, RI
Solicitation number
N4008521R0164
Issued by

View the file

Other files

File Type Posted
N4008521R0164Rev5.pdf PDF
N4008521R0164 Amendment 0008.pdf PDF
Attachment R - MEI 2016-2018 Package and Parts Catalog.pdf PDF
Attachment P - 074213 METAL WALL PANELS.pdf PDF
Attachment U - DOR Basis of Design.pdf PDF
Attachment S - United Drilling Review_Mahan Hall.pdf PDF
Attachment T - Inside Air Drilling Double Sided Info Sheet.pdf PDF
N4008521R0164 Amendment 0007.pdf PDF
Attachment Q - Elevator Disconnect.pdf PDF
N4008521R0164Rev4.pdf PDF
Attachment M - Door Hardware Revisions.pdf PDF
Attachment L - 01 32 17.00 20 NAS rev 3_30_2021Mahan.pdf PDF
Attachment O - Second Site Visit Log.pdf PDF
Attachment N - Amendments Acknowledged.pdf PDF
N4008521R0164Rev3.pdf PDF
Attachment A_Revised - CIVIL COMBINED.pdf PDF
Attachment A_Revised - FIRE PROTECTION COMBINED.pdf PDF
Attachment A_Revised - MECHANICAL COMBINED.pdf PDF
Attachment A_Revised - STRUCTURE COMBINED.pdf PDF
Attachment A_Revised - PLUMBING COMBINED.pdf PDF
N4008521R0164 Amendment 0005.pdf PDF
Attachment K - Updated Base Access Requirements.pdf PDF
Attachment A_Revised - HAZMAT COMBINED.pdf PDF
Attachment A_Revised - LIFE SAFETY COMBINED.pdf PDF
Attachment A_Revised - ELECTRICAL COMBINED.pdf PDF
Attachment A_Revised - 201130_Mahan_Specifications.pdf PDF
Attachment A_Revised - ARCHITECTURE COMBINED.pdf PDF
Attachment A_Revised - FIRE ALARM COMBINED.pdf PDF
Attachment J - Added SOW_Ridem Permit_Test Pit_ Retention.pdf PDF
N4008521R0164 Amendment 0004.pdf PDF
Attachment I-Site Visit Attendee Form.xlsx XLSX spreadsheet
N4008521R0164Rev2.pdf PDF
Attachment G-SOW Mahan Hall Archives.pdf PDF
N4008521R0164 Amendment 0003.pdf PDF
Attachment H - Contractor Laydown Area.pdf PDF
Attachment E - SECNAV FORM 5512 EXAMPLE.PDF PDF
Attachment F-Site Visit Log.pdf PDF
N4008521R0164 Amendment 0002.pdf PDF
Attachment E - Verification of Mode of Transportation Form.xlsx XLSX spreadsheet
N4008521R0164Rev1.pdf PDF
N4008521R0164 Amendment 0001.pdf PDF
Attachment C- Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
Attachment A- A-300s.pdf PDF
Attachment A- I-100s.pdf PDF
Attachment E- SECNAV Form 5512-NSNPT- Dec 2019.pdf PDF
Attachment A- A-400s.pdf PDF
Attachment A- AD-100s.pdf PDF
Attachment A- A-200s.pdf PDF
Attachment E- CO Vetting Memo.pdf PDF
Attachment A- FIRE PROTECTION COMBINED.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.

NO.

PROJECT NO. (If applicable)

0006 04/01/2021

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK, VA 23511

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

N40085-21-R-0164

9B. DATED (SEE ITEM 11)

02/12/2021

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

N4008521R0164 Design-Bid-Build, Repair B3 Mahan Hall, Naval War College, Naval Station Newport, Newport, RI

SEE SF 30 BLOCK 14 CONTINUATION PAGE

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

SECTION SF30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

AMENDMENT 0006

The purpose of this amendment is to:

1. Revise the Proposal Due Date

2. Revise Specification Section 01 32 17.00 20

3. Revise DOOR Hardware Drawings and Specifications

4. Revise the Price Proposal Form of the RFP

5. Provide Amendments Acknowledged Sheet

6. Provide Second Site Visit Log

7. Provide Responses to Pre-Proposal Inquiries (PPIs)

All PPI’s are hereby answered. All other terms and conditions remain unchanged.

1. Revise the Proposal Due Date

The proposal due date has been extended from 2 p.m. EST, Tuesday, 06 April 2021 to 2 p.m. EST, MONDAY, 12 April

2021.

2. Revise Specification Section 01 32 17.00 20

See Attachment L - 01 32 17.00 20 NAS rev 3_30_2021Mahan

3. Revise DOOR Hardware Drawings and Specifications

See Attachment M - Door Hardware Revisions

4. Revise the Price Proposal Form of the RFP

See Attachment N4008521R0164Rev4 (revisions are highlighted).

5. Provide Amendments Acknowledged Sheet

See Attachment N - Amendments Acknowledged

In lieu of signing and submitting each individual amendment (SF30), offerors may choose to submit via the Amendments

Acknowledged sheet, provided as Attachment N - Amendments Acknowledged.

6. Provide Second Site Visit Log

See Attachment O – Second Site Visit Log

7. Provide Responses to PPIs #32-69

32 03/17/21 105613

Is the scope of work for this section limited to

Archive room M10Aas indicated by work note

#4?

The scope of work is defined by demolition note D9 as noted in multiple locations. Scope of work includes reinstallation of existing stored shelving.

33 03/17/21 A-203,A-

Please provide specifications for the

Composite Metal Siding panels as shown on the exterior elevations and Wall sections.

Wall Section EWA-1 requires a rainscreen metal panel product;

smooth surface, Kynar finish, concealed fastener aluminum composite panel (ACM) assembly ;

two sheets of smooth .020” aluminum thermobonded to a solid, fire retardant core.

34 03/17/21 B1/A-

Please provide specifications for the Wire

Mesh Partition and gate indicated on A-605.

Replace reference to wiremesh partition wall type F1A.U with

G3A.U. Door # M32C to be 3068 wood door in HM frame.with hardware set #06, storeroom function. Refer to Attachment M -

Door Hardware Revisions provided in Amendment 0006. Refer to door hardware sets as noted in Door

Hardware specification 08710. For all existing doors scheduled to remain and scheduled to receive new hardware per Hardware

Schedule (annotated “as required”), Contractor to provide an existing field survey of existing hardware and coordinate new hardware function and finish on existing doors.

35 03/17/21 AD-100

Please verify that NWC is resposible for the removal of the existing furniture to a facility within a 10 mile radius of the project site and the contracctor is to transport, clean and reinstall the furniture.

See Attachment

N4008521R0164Rev4, Price

Proposal Form, provided in

Amendment 0006. CLIN C001w -

All work noted for existing furniture to be relocated, moved and transported by the contractor, to a building within 10 miles of

Mahan Hall (items to be determined upon contract award with NWC)

36 03/17/21 The solicitation does not contain Attachment

D, Bid Form. Please Provide.

See Attachment

N4008521R0164Rev4, Price

Proposal Form provided in

Amendment 0006.

37 03/18/21 Spec 02 85 00

Mold Locations and Quantities were not included with the project manual nor identified on the drawings. Please provide Description, Locations and Quantities for the basis of the

Bid Scope of Work.

Specific areas of mold contamination have not been reported but may be uncovered during the demolition process. See

Section 02 85 00; Para 1.3.1; sub-para n." Coordinate removal of mold containing materials with other demolition hazards. Ensure such concerns as asbestos containing materials (ACM) and lead containing paints, or other hazardous materials are cross coordinated and that properly trained and licensed personnel will be engaged in the work."

38 03/18/21 Amendment 3

Amendment 3 added to the scope archiving of their collection (inventory, cataloguing, packing, transporting, storage and return back to building). For insurance, what is the value of the collection? What specific insurance requirements are there?

See Attachment

N4008521R0164Rev4, Price

Proposal Form, provided in

Amendment 0006. CLIN 0001aa -

$550,000

39 03/18/21 Spec 10 56 13

Please clarify if shelving is to be mounted on the existing columns or if shelving is to be static shelving sections? Based on spec and limited documentation we would not be able to provide any type on pricing for this scope.

See Attachment G - SOW Mahan

Hall Archives provided in

Amendment 0003 for Archival

NHC, furniture and equipment

Scope Of Work

40 03/18/21 Spec 10 56 14

If on columns a 48W section is not available.

We have meet with customer prior and had shelves made up to confirm fit into column slots. We did have 3 measurements for this application

See Attachment G - SOW Mahan

Hall Archives provided in

Amendment 0003 for Archival

NHC, furniture and equipment

Scope Of Work for Archival NHC, furniture and equipment Scope Of

Work

41 03/18/21 Spec 10 56 14 Is there any detail or floorplan showing shelving?

See Attachment G - SOW Mahan

Hall Archives provided in

Amendment 0003 for Archival

NHC, furniture and equipment

Scope Of Work for Archival NHC, furniture and equipment Scope Of

Work

42 03/18/21 Spec 10 56 14

If static sections. Are there drawers included on these standalone sections? What is exact height?How many openings per section

See Attachment G - SOW Mahan

Hall Archives provided in

Amendment 0003 for Archival

NHC, furniture and equipment

Scope Of Work for Archival NHC, furniture and equipment Scope Of

Work

43 03/18/21 Dwg H-

Window caulk and glaze is called for removal-

Are these units being removed and disposed or restored in place? Please advise.

Refer to exterior elevation drawings A201 and A202 and window detail drawing A523 for scope of window removal/replacement or window restoration in place.

44 03/18/21

1,500 LF of various subsurface steam and drainage pipes listed on H 100, coordinate with C-111 - Only 100 LF of transite drainage pipe is identified on C-111. How much material are we removing? Please advise

Quantity of pipe to be removed is as indicated in drawing C-111.

45 03/18/21

Bottom right corner of H-100 lists items as containing lead paint and no quantities- is this for informational purposes or will some of this be impacted by construction and require removal? If so we need quantities. Please advise

In addition to LBP areas of work listed on H-100, if lead is disturbed the contractor must take steps to abate. See Section 028300 paragraph 1.3.1. LBP encountered must be mitigated via Hazmat protocols.

46 03/23/21 FA-501 Bid Item 1U

Base Bid Item 1U is listed as fire detection and alarm systems while Clin3G is listed as mass notification, however, contract drawings show this as a combination system with combination devices and does not differentiate between the two systems. Please mark up Drawing FA-

501, to show what work is base bid and what work shall be part of Option #2.

All work shown on FA-501 is included as Base Bid.

47 03/23/21 Dwg

EP601

Bid Option 3

Drawing EP601 shows work to be under Bid

Option #3. Reviewing the projects Bid

Proposal Form, there is no Bid Option #3.

Please review and confirm that this work is to be under 2J of the Bid Form.

See Attachment

N4008521R0164Rev4, Price

Proposal Form, provided in

Amendment 0006, CLIN 0002j

48 03/23/21 Bid Proposal

Bid Proposal 20 lists breaking out pricing for the construction of new connector addition, however, contract electrical drawings are not clear to what this work includes. Please clarify.

Connector includes Corridor M16, Ramp M15 and Elevator Machine

Rm M17. Provide two (2) fixture type LS1E for Ramp M15 (not shown on CD).

49 03/23/21

DWG E-

Item 10

Contract Drawing E-002, Item #10, under general demolition notes, states that all demo scope associated with low voltage systems shall be excluded from this contract. However, Bid Option 2K is asking for a price for all demo and new work noted for telecommunication.sPlease clarify. Also, please confirm that the electrical contractor is to provide only back boxes and raceways for these systems, Per Note 1 on the EP Series

Drawings.

Low Voltage Systems are to be demolished. Electrical Contractor is to provide back boxes, conduits and pull strings. Low Voltage

Contractor is to provide wiring and devices.

50 03/23/21 EI 103 Key Note 5

El103.0 Keynote #5 Lists Option #1 to provide fixture type LW5. However, there is not a

Clin# associated for this option. Please provide information as to where to list this price.

See Attachment

N4008521R0164Rev4, Price

Proposal Form, included in CLIN

0003c

51 03/23/21

There are several rooms in this building that will require all four building systems to be installed. Lighting, power, Tele Data, and fire alarm. Following the notes on all these systems contract drawings, lighting circuitry will be exposed and in conduits. Power will be exposed and in wire mold 400 BAC. Tele Data will be exposed in a combination of 2 ¾" W x

1 15/32" T aluminum raceway (wire mold

3000) and 1" EMT. Fire alarm will be in exposed conduit. I see two potential issues with this. #1-This is three different wiring methods which will be quite unsightly when installed together. #2-There is just not going to be enough room for all these exposed raceways, which will cause quite an industrial look to the finish of this building. Please confirm that this is the intent.

Per section 9-18.9.2 of UFC 3-600-

01 all fire alarm conductors must be installed in conduit. Circuitry from other building systems in the same raceway as fire alarm circuits is not allowed. The Contractor shall provide coordination drawing for review and approval by AE, NWC and NAVFAC FPE prior to installation.

52 03/23/21 4 12 24 13 2.1.2

Spec calls for Tensioned Motorized Skylight shade of 144" x 420". Maximum size for that shade is 144" x 240"

Skylight dimension as indicated is correct (144"x420"). A single

Tensioned Motorized Skylight shade is required.

53 03/23/21 FP-100.5 Key Note 1

Fire Protection Key Note 1 on drawing FP-

100.5 states “Connect to Existing 6” Water

Service”. CLIN 0001t on the Price Proposal

Form Attachment D states “All new work noted for new fire suppression line to building…”The drawings do not show a new fire water line to the building. What is the design for the new fire water line? Does the building’s new Fire Protection System connect to the new Fire Water Line to the building or to the existing 6” Water Service? Please advise

See Attachment

N4008521R0164Rev4, Price

Proposal Form, CLIN 0001t -revised - fire protection system to connect to the existing 6" water service in the basement of the building. (PSM).

54 03/24/21 A100.00 Note D4

Remove existing and associated support/backing/framing to the existing masonry/concrete substrate at walls(s) and ceiling, prepare substrate to receive new finishes. Refer toI-series drawings for room finish requirements.” This note appears at rooms: B28, B29A, B29B, B29C, B30, B31, B31A, B32, B32A, B33, B33B and B33C on drawing AD100.5, New Elevator Hoist way and Elevator Lobby/Link-Ramp on drawing

AD300, and at the Reading Room on Drawing

AD102.0. With the exception of the new acoustic plaster ceiling in the Reading Room, please confirm there is no new plaster or plaster patching in the rooms indicated.

Contract demoliton work as indicated should deliver acceptable existing surfaces contract and/or future (as scheudled) interior finishes. Refer to Interior finish Schedule for scheduled finishes.

55 03/25/21

What is/are the existing roof composition assembly/assemblies, for all roof areas indicated to be removed, replaced, repaired, penetrated through? There is a roof core picture in Section 02 82 00 Asbestos

Remediation, which roof area is this? That picture does not provide existing condition details such as thickness, underlayment, tar, etc. Are there additional detailed roof cores where these existing roof areas are being repaired, partially tied into or fully replaced?

Please provide.

Existing assumed low-sloped roof compositions are noted for roof replacement areas on sheet A-521

(Details C1 and D1). Refer to

Detail 1/AE501 and Details 1 and

3/AE508 for existing slate roofing assembly. These details show (from top to bottom): Slate shingles, felt underlayment, mod. bit.

underlayment, wood decking).

56 03/25/21

AD100.0,

AD100.5,

AD102.0,

AD300

Demolition Note D4, Drawing A100.0 states to

“Remove existing and associated support/backing/framing to the existing masonry/concrete substrate at walls(s) and ceiling, prepare substrate to receive new finishes. Refer to I-series drawings for room finish requirements.” This note appears at rooms: B28, B29A, B29B, B29C, B30, B31, B31A, B32, B32A, B33, B33B and B33C on drawing AD100.5, New Elevator Hoistway and Elevator Lobby/Link-Ramp on drawing

AD300, and at the Reading Room on Drawing

AD102.0. With the exception of the new acoustic plaster ceiling in the Reading Room, please confirm there is no new plaster or plaster patching in the rooms indicated.

Indicated B-Series rooms do not require new plaster or Plaster patching, however this does not exclude required patching for scheduled finishes. Refer to Finish

Schedule and Drawings A-410, A-

411, and A-412 for locations where plaster repair/replacement scope has been identified.

57 03/25/21 S-301

The floor-to-floor height is only 7’-5 ½” there needs to be at least 8’-6” minimum floor-to-floor in order to achieve ADA compliance on a single-side opening elevator. If the floor plan could be reconfigured to accommodate for a front and back opening elevator, you could stagger the openings and configure hoistway equipment to accommodate for the existing floor heights. We have attached an example of an elevator that could be used that would eliminate the need for a machine room and free up space to move the elevator shaft to the new addition area. Several manufacturers make this type of machine roomless above ground jack style elvator configuration. Please advise if the design could be re-worked to enable the contractors to provide pricing.

The basis of design is as indicated in solicitation contract documents

58 03/25/21

Can the proposal due date be extended to allow the elevator companies time to price the project after design changes are made? They have informed us they would need three weeks after receiving responses/design changes.

The basis of design is as indicated in solicitation contract documents.

Proposal due date is extended to 12

April 2021.

59 03/25/21

Within the courtyard, there appears to be

"trenches' that take runoff water away from the facility. Where does this water go?

The question is unclear. Cannot provide a response. The question does not reference a drawing, or specification, or existing note, or new scope of work note to clarify.

Refer to Civil drawings for location of existing Mechanical Courtyard and location of existing concrete gutters.

60 03/25/21

We see electrical equipment on the façade and surrounding areas of the facility. Will these be able to be shut down while façade cleaning is taking place?

The contractor needs to coordinate with NWC to protect any equipment during cleaning of facade. The contractor need to follow spec section 015719 regarding temporary environmental controls.

61 03/25/21 Is there attic stock of granite for the facility, if not, where should we look to procure some?

No attic stock available. The granite is Milford Pink Granite, which is available through Fletcher

Granite in Westford, MA.

62 03/25/21 M-002 230130.41

Specification section 230130.41 is included for duct cleaning. Note 20 on M-002 states to clean all existing to remain ductwork, inspect, seal leaks and repair damages to ductwork and insulation. The drawings do not provide enough information to adequately scope or price this work and could result in a significant amount of additional work. Also, does this statement mean that the existing duct must be

Duct Leak Tested, and if so, what pressure is expected to be tested at? Again this open-ended scope item could entail a significant amount of work without detailed scope. AHU-

E2 and Rotunda FCU ductwork to remain would be of primary concern.

Duct cleaning and testing to be limited to AHU-E2 and Rotunda

FCUs.

63 03/25/21 232113.00 20

Spec 232113.00 20 par 2.1.1 and 2.1.5.2 lists type K copper for hot water heating pipe and not type L. Please confirm this is the intent.

Note that 236426 par 2.3.1 specifies type L copper for chilled water piping aboveground.

Type L copper can be used.

64 03/25/21

Neither Spec 232113.00 20 nor 236426 appear to allow the use of Victaulic steel fittings or steel press fittings. Much of the work is in very tight areas in crawlspaces and attics which make welding extremely difficult.

Victaulic and steel press fittings not acceptable.

65 03/25/21

Neither Spec 232113.0 20 nor 236426 list copper press fittings as acceptable as is typical, however would Navy consider use of press fittings in this project with extremely limited access to certain areas of piping.

Copper press fitting is not acceptable.

66 03/25/21

Specific FAR clause for Buy American act is not found. Please confirm which FAR clause and version of BAA is applicable (52.225-11 or 52.225-9 or other)

Refer to FAR 52.225-9 and 52.225-

67 03/25/21

230700 does not appear to list insulation thickness for steam or condensate piping and only appears to allow cellular glass insulation which is not typical.

Fiberglass Jacket insulation should be used. 1.5" thick on 1.5" dia and smaller. 2" thick on greater than

1.5" dia.

68 03/25/21

230700 does not appear to list insulation thickness for air conditioning condensate piping and only appears to allow cellular glass insulation which is not typical.

1/2" thick Fiberglass insulation with ASJ (All Service Jacket)

69 4/1/21

The most recent amendment requires the Prime

Contractor to inventory and barcode the entire collection of the Naval Historical Collection

(NHC) into one database compatible with the

NHC's data management system

ArchivesSpace. Once inventoried, we must relocate all of the NHC to a NARA approved commercial storage facility located within a 3-hour driving distance of the Naval War

College. Based on the 3-hour driving distance, the only qualified firm we have found is Iron

Mountain, located at 76 Halcyon Dr. Bristol, CT 06010. After speaking with Iron Mountain, they will not provide pricing or even budgetary numbers to anyone but the documents' actual owners. Please advise on this issue.

See Attachment

N4008521R0164Rev4, Price

Proposal Form provided in

Amendment 0006, CLIN 0001aa -

$550,000 allowance for this scope of work.