About this file

This document contains specifications for pad-mounted distribution transformers and details for an indefinite delivery/indefinite quantity multiple award construction contract opportunity. The specifications provide requirements for dead-front construction, loop-feed capability with six bushings, load break switches, spare conduits, secondary voltage and current limits, winding configuration, and surge protection. The construction contract is a total small business set-aside for design-build and design-bid-build projects at the Naval Security Group Activity Crane in Indiana and the Glendora Test Facility in Sullivan, Indiana. The contract will have an indefinite quantity for minor construction, renovation, and repair projects over multiple years.

View the file

Other files

File Type Posted
Amendment 0004.pdf PDF
AMI Metering Overview.pdf PDF
21R0071 Amendment 0003.pdf PDF
PRE_PROPOSAL _CONFERENCE_21R0071.pdf PDF
Site_Visit_Sign_in_21R0071.pdf PDF
21R0071 Amendment 0002.pdf PDF
PW6197.pdf PDF
Access_Instructions_Daily_Passess.pdf PDF
21R0071 Amendment 0001.pdf PDF
SECNAV_ 5512_1.pdf PDF
NSACRANEINST 8020.1E Explosives Safety Program at NSA Crane.pdf PDF
N4008521R0071.pdf PDF
Updated Building Equipment Form (EOMSI).xlsx XLSX spreadsheet
HUM_Basis of Design_Cut Sheet.doc DOC document
COVID-19 ML Ltr to Contractors 3-27-20.pdf PDF
Attachment C - PPI Log Template.xlsx XLSX spreadsheet
Transmitter Purchase and HERO Analysis Request FORM CR-1024-SA-SOP-08020-000004_1 29MAY2019.pdf PDF
MINOR MACC 2021 submittal register.xls XLS spreadsheet
Attachment B - Past Performance Questionnaire.docx DOCX document
Attachment D - Price Proposal Form (Seed Project).docx DOCX document
HVAC Technician Refrigerant Forms.pdf PDF
3259-DRAWING SET.pdf PDF
5512-47 DBIDS BADGE APPLICATION RECORD V 3.pdf PDF
eOMSI_Bldg 3259.xlsx XLSX spreadsheet
Contractor_SOW_NSWC BLDG 3259 MH60 AVIONICS WEAPON DEPOT REPAIR LAB.pdf PDF
Attachment A - Construction and Design Experience Project Data Sheet.docx DOCX document
Minor_MACC_ 2021_FINAL.pdf PDF
HUM_installation manual.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3-5 PAD-MOUNTED DISTRIBUTION TRANSFORMERS. (UFC 3-550-01)

3-5.2 Configuration.

Use dead-front construction for pad-mounted transformers unless not available within system parameters. Use pad-mounted transformers, separately protected with vacuum fault interrupter equipped switches for 34.5 kV systems. Three-phase pad-mounted transformers must be loop-feed capable with 6 bushings. Provide two-position, oil-immersed, load break switches that are appropriate for the application. If the transformer might be used as part of a loop-feed design, provide three switches to permit closed transition loop feed and sectionalizing. If the transformer will be installed at the end of a radial supply with no intention of future loop feed capability, provide a single on-off switch. Provide a spare conduit in the high voltage section extending 5 ft (1.5 m) out from the transformer pad.

3-5.3 Size and Secondary Voltage.

Do not use pad-mounted transformers with secondary currents exceeding 3,000 amperes because of the size and quantity of secondary conductors. Transformers rated above 1,000 kVA serving 208Y/120 volt loads and above 2,500 kVA serving 480Y/277 volt loads must be in a secondary unit substation configuration. UFC 3-550-01 1 September, 2016 9 Minimize double transformations to reduce energy consumption and to minimize items of equipment. Provide two oil-filled pad-mounted transformers in lieu of one 480Y/277 volt service if the required 208Y/120 volt load using dry-type transformers exceeds 40 percent of the 480 volt service transformer capability. Connect equipment at the highest available voltage to minimize the capital cost and energy losses of transformation equipment.

3-5.4 Winding Configuration.

Provide delta-wye connections for three phase systems.

3-5.5 Surge Protection.

Provide bushing-mounted elbow type arresters at the ends of all radials and in normally open locations in loops. Provide arresters for all voltage levels above 5 kV.

File details come from the government source that posted it. Updated .