About this file

This document includes an attachment template for construction and design experience project data sheets, along with details of an indefinite delivery/indefinite quantity multiple award construction contract opportunity. The Navy is soliciting proposals for design-build and design-bid-build projects involving minor construction, renovation, and repair at the NSA Crane facility in Indiana and the Glendora Test Facility in Sullivan, Indiana. Offerors must complete the attachment template to provide descriptions of up to five relevant past construction projects and up to five relevant past design projects as evidence of experience. The contract is set aside for small businesses and involves an indefinite delivery/indefinite quantity task order approach for an unknown level of construction and design services over the life of the multiple award contracts. The Navy will make awards to multiple qualified contractors.

View the file

Other files

File Type Posted
Amendment 0004.pdf PDF
AMI Metering Overview.pdf PDF
21R0071 Amendment 0003.pdf PDF
3259_Transformer Specifications.pdf PDF
PRE_PROPOSAL _CONFERENCE_21R0071.pdf PDF
Site_Visit_Sign_in_21R0071.pdf PDF
21R0071 Amendment 0002.pdf PDF
PW6197.pdf PDF
Access_Instructions_Daily_Passess.pdf PDF
21R0071 Amendment 0001.pdf PDF
SECNAV_ 5512_1.pdf PDF
NSACRANEINST 8020.1E Explosives Safety Program at NSA Crane.pdf PDF
N4008521R0071.pdf PDF
Updated Building Equipment Form (EOMSI).xlsx XLSX spreadsheet
HUM_Basis of Design_Cut Sheet.doc DOC document
COVID-19 ML Ltr to Contractors 3-27-20.pdf PDF
Attachment C - PPI Log Template.xlsx XLSX spreadsheet
Transmitter Purchase and HERO Analysis Request FORM CR-1024-SA-SOP-08020-000004_1 29MAY2019.pdf PDF
MINOR MACC 2021 submittal register.xls XLS spreadsheet
Attachment B - Past Performance Questionnaire.docx DOCX document
Attachment D - Price Proposal Form (Seed Project).docx DOCX document
HVAC Technician Refrigerant Forms.pdf PDF
3259-DRAWING SET.pdf PDF
5512-47 DBIDS BADGE APPLICATION RECORD V 3.pdf PDF
eOMSI_Bldg 3259.xlsx XLSX spreadsheet
Contractor_SOW_NSWC BLDG 3259 MH60 AVIONICS WEAPON DEPOT REPAIR LAB.pdf PDF
Minor_MACC_ 2021_FINAL.pdf PDF
HUM_installation manual.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT A

CONSTRUCTION AND DESIGN EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5

|_| DES #1 |_| DES #2 |_| DES #3 |_| DES #4 |_| DES #5

1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)

Firm Name:

Address:

Phone Number:

DUNS Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

Design Completion Date (mm/dd/yy):

5. Type of work:

|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply) |_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):

Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.

9. Provide a detailed description of what work your firm self-performed on this project:

10. Other Information:

File details come from the government source that posted it. Updated .