MINOR MACC 2021 submittal register.xls
XLS spreadsheet 74 KB Posted
- Solicitation number
- N4008521R0071
About this file
This document outlines a submittal register for an indefinite delivery/indefinite quantity multiple award construction contract for minor construction, renovation, and repair projects at two Department of the Navy facilities. The register lists over 130 preconstruction, product, test, certification, and closeout submittals required under the contract, including quality control plans, safety plans, schedules, shop drawings, test and inspection reports, equipment data, warranties and as-built documentation. Submittals address work types such as general construction, hazardous material abatement, and plumbing. The solicitation is set aside for small businesses and seeks contractors to perform various construction projects under task orders at the Naval Security Agency Crane facility in Indiana and the Glendora Test Facility in Sullivan, Indiana.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MINOR MACC
| TITLE: | Submittal register for Sections applicable to most Task orders. Add to as required by the Task Order | SUBMITTAL REGISTER | ||||||||||||||||||
| JOB NAME: | 2021 Minor MACC | |||||||||||||||||||
| LOCATION: | NSA Crane, Glendora, and potential reserve sites | |||||||||||||||||||
| CONTRACT NO: | ||||||||||||||||||||
| CONTRACTOR: | ||||||||||||||||||||
| CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |||
| Line | Activity # | Transmittal # | Specification Section | SD # | Submittal Description | Item Submitted | Paragraph # | Classification: GOVT or A/E Reviewer | Submit | Approval Needed By | Material Needed By | Action Code | Date Of Action | Date FWD to APPR / Auth Date RCD From CONTR | Date FWD To Other Revwr | Date RCD From Other Reviewer | Action Code | Date Of Action | Mailed To CONTR/ Date RCD From APPR Authority | Remarks |
| 1 | 01 20 00 | 1 | Preconstruction Submittals | Schedule of Prices | 1.3 | G | ||||||||||||||
| 2 | 01 30 00 | 1 | Preconstruction Submittals | PRE-START PICTURES | 1.9 | |||||||||||||||
| 3 | 01 30 00 | 1 | Preconstruction Submittals | Progress and Completion Pictures | 1.9 | If required by Task order | ||||||||||||||
| 4 | 01 30 00 | 1 | Preconstruction Submittals | Performance Assessment Plan (PAP) | 1.19 | DB only | ||||||||||||||
| 5 | 01 30 00 | 1 | Preconstruction Submittals | List Of Contact Personnel | 1.3 | |||||||||||||||
| 6 | 01 30 00 | 1 | Preconstruction Submittals | Certificates Of Insurance | 1.1 | G | ||||||||||||||
| 7 | 01 30 00 | 1 | Preconstruction Submittals | Statement of Acknowledgement Form SF 1413 | 1.15 | G | ||||||||||||||
| 8 | 01 30 00 | 1 | Preconstruction Submittals | Surety Bond | 1.15 | G | ||||||||||||||
| 9 | 01 31 19.05 20 | 1 | Preconstruction Submittals | Design Submittal Packaging | 1.3.2 | G | ||||||||||||||
| 10 | 01 31 19.05 20 | 1 | Preconstruction Submittals | Design Baseline Schedule | 1.3.2 | G | ||||||||||||||
| 11 | 01 31 19.05 20 | 1 | Preconstruction Submittals | Construction Baseline Schedule | 1.3.2 | G | ||||||||||||||
| 12 | 01 31 19.05 20 | 1 | Preconstruction Submittals | Performance Assessment Plan (PAP) | 1.3.7 | G | ||||||||||||||
| 13 | 01 31 19.05 20 | 1 | Preconstruction Submittals | Design Presentation | 1.3.5 | DB only | ||||||||||||||
| 14 | 01 31 23.13 20 | 1 | Preconstruction Submittals | List of Contractor's Personnel | 1.4.2 | G | ||||||||||||||
| 15 | 01 32 16.00 20 | 1 | Preconstruction Submittals | Baseline Construction Schedule | 1.2 | G | ||||||||||||||
| 16 | 01 32 16.00 20 | 1 | Preconstruction Submittals | Baseline Design Schedule | 1.2 | G | DB only | |||||||||||||
| 17 | 01 32 16.00 20 | 7 | Certificates | Monthly Updates | 1.4 | |||||||||||||||
| 18 | 01 33 00.05 20 | 1 | Preconstruction Submittals | Submittal Register | 1.3.1 | G | ||||||||||||||
| 19 | 01 33 10.05 20 | 1 | Preconstruction Submittals | Submittal Register | 1.6.5 | G | ||||||||||||||
| 20 | 01 33 10.05 20 | 5 | Design Data | Design Drawings | 1.8 | G | DB only | |||||||||||||
| 21 | 01 33 10.05 20 | 5 | Design Data | Specifications | 1.9 | G | DB only | |||||||||||||
| 22 | 01 33 10.05 20 | 5 | Design Data | Basis of Design | 1.1 | G | If required by Task order | |||||||||||||
| 23 | 01 33 10.05 20 | 5 | Design Data | Design Submittals | 2.1 | G | DB only | |||||||||||||
| 24 | 01 33 10.05 20 | 5 | Design Data | Notice Of Intent | 1.7 | G | If required by Task order | |||||||||||||
| 25 | 01 33 10.05 20 | 5 | Design Data | Historic Preservation and Planning Commission Submission | 1.10.3 | G | If required by Task order | |||||||||||||
| 26 | 01 33 10.05 20 | 5 | Design Data | DD Form 1354 Draft | 1.11.3 | G | If required by Task order | |||||||||||||
| 27 | 01 33 10.05 20 | 11 | Closeout Submittals | Record Documents | 1.11 | G | ||||||||||||||
| 28 | 01 35 26 | 1 | Preconstruction Submittals | Design ACCIDENT PREVENTION PLAN (APP) | 1.8 | DB only | ||||||||||||||
| 29 | 01 35 26 | 1 | Preconstruction Submittals | ACCIDENT PREVENTION PLAN | 1.8.1 | G | ||||||||||||||
| 30 | 01 35 26 | 1 | Preconstruction Submittals | Addendum to ACCIDENT PREVENTION PLAN | 1.8.2 | G | ||||||||||||||
| 31 | Not used | |||||||||||||||||||
| 32 | 01 35 26 | 1 | Preconstruction Submittals | Dive Operations Plan | 1.18 | G | If required by Task order | |||||||||||||
| 33 | 01 35 26 | 6 | Test Reports | Monthly Exposure Reports | 1.4 | |||||||||||||||
| 34 | 01 35 26 | 6 | Test Reports | Notifications and Reports | 1.13 | |||||||||||||||
| 35 | 01 35 26 | 6 | Test Reports | Accident Reports | 1.13.2 | G | ||||||||||||||
| 36 | 01 35 26 | 6 | Test Reports | LHE Inspection Reports | 1.13.3 | |||||||||||||||
| 37 | 01 35 26 | 7 | Certificates | Contractor Safety Self-Evaluation Checklist | 1.5 | |||||||||||||||
| 38 | 01 35 26 | 7 | Certificates | Crane Operators/Riggers | 1.7.1.4 | |||||||||||||||
| 39 | 01 35 26 | 7 | Certificates | Standard Lift Plan | 1.8.4.2 | G | ||||||||||||||
| 40 | 01 35 26 | 7 | Certificates | Critical Lift Plan | 1.8.4.3 | G | ||||||||||||||
| 41 | 01 35 26 | 7 | Certificates | Activity Hazard Analysis (AHA) | 1.9 | G | ||||||||||||||
| 42 | 01 35 26 | 7 | Certificates | Confined Space Entry Permit | 1.10.1 | |||||||||||||||
| 43 | 01 35 26 | 7 | Certificates | Certificate of Compliance | 1.13.5 | |||||||||||||||
| 44 | 01 35 26 | 7 | Certificates | Third Party Certification of Floating Cranes and Barge-Mounted Mobile Cranes | 1.13.4 | If required by Task order | ||||||||||||||
| 45 | 01 35 26 | 7 | Certificates | License Certificates | 1.16 | |||||||||||||||
| 46 | 01 35 26 | 7 | Certificates | Radiography Operation Planning Work Sheet | 1.16.1 | G | ||||||||||||||
| 47 | 01 35 26 | 7 | Certificates | Portable Gauge Operations Planning Worksheet | 1.16.1 | G | ||||||||||||||
| 48 | 01 35 26 | 7 | Certificates | Naval Architecture Analysis | 1.8.4.4 | G | If required by Task order | |||||||||||||
| 49 | 01 45 00.10 20 | 1 | Preconstruction Submittals | QC Plan | 1.6 | G | ||||||||||||||
| 50 | 01 57 19 | 1 | Preconstruction Submittals | Preconstruction Survey | 1.6.1 | |||||||||||||||
| 51 | 01 57 19 | 1 | Preconstruction Submittals | Solid Waste Management Permit | 1.1 | G | ||||||||||||||
| 52 | 01 57 19 | 1 | Preconstruction Submittals | Regulatory Notifications | 1.6.2 | G | ||||||||||||||
| 53 | 01 57 19 | 1 | Preconstruction Submittals | Environmental Protection Plan | 1.7 | G | ||||||||||||||
| 54 | 01 57 19 | 1 | Preconstruction Submittals | Stormwater Pollution Prevention Plan | 3.2.1 | G | If required by Task order | |||||||||||||
| 55 | 01 57 19 | 1 | Preconstruction Submittals | Stormwater Notice of Intent | 3.2.1 | G | If required by Task order | |||||||||||||
| 56 | 01 57 19 | 1 | Preconstruction Submittals | Dirt and Dust Control Plan | 1.7.9.1 | G | If required by Task order | |||||||||||||
| 57 | 01 57 19 | 1 | Preconstruction Submittals | Employee Training Records | 1.6.5 | G | ||||||||||||||
| 58 | 01 57 19 | 1 | Preconstruction Submittals | Environmental Manager Qualifications | 1.6.4 | G | ||||||||||||||
| 59 | 01 57 19 | 6 | Test Reports | Inspection Reports | 3.2.1.1 | |||||||||||||||
| 60 | 01 57 19 | 6 | Test Reports | Monthly Solid Waste Disposal Report | 1.10.1 | G | ||||||||||||||
| 61 | 01 57 19 | 7 | Certificates | Employee Training Records | 1.6.5 | G | ||||||||||||||
| 62 | 01 57 19 | 7 | Certificates | ECATTS Certificate Of Completion | 1.4.1.2 | G | ||||||||||||||
| 63 | 01 57 19 | 7 | Certificates | EPA Clean Air Section 608 Certification; universal | 3.5.6 | |||||||||||||||
| 64 | 01 57 19 | 11 | Closeout Submittals | Stormwater Pollution Prevention Plan Compliance Notebook | 3.2.1.2 | G | If required by Task order | |||||||||||||
| 65 | 01 57 19 | 11 | Closeout Submittals | Stormwater Notice of Termination | 3.2.1.3 | G | If required by Task order | |||||||||||||
| 66 | 01 57 19 | 11 | Closeout Submittals | Waste Determination Documentation | 3.7.1 | G | ||||||||||||||
| 67 | 01 57 19 | 11 | Closeout Submittals | Disposal Documentation for Hazardous and Regulated Waste | 3.7.3.6 | G | ||||||||||||||
| 68 | 01 57 19 | 11 | Closeout Submittals | Assembled Employee Training Records | 1.6.5 | G | ||||||||||||||
| 69 | 01 57 19 | 11 | Closeout Submittals | Solid Waste Management Permit | 1.1 | G | ||||||||||||||
| 70 | 01 57 19 | 11 | Closeout Submittals | Project Solid Waste Disposal Documentation Report | 3.7.2.1 | G | ||||||||||||||
| 71 | 01 57 19 | 11 | Closeout Submittals | Contractor Hazardous Material Inventory Log | 3.8.1 | G | ||||||||||||||
| 72 | 01 57 19 | 11 | Closeout Submittals | Hazardous Waste/Debris Management | 3.7.3.1 | G | ||||||||||||||
| 73 | 01 57 19 | 11 | Closeout Submittals | Regulatory Notifications | 1.6.2 | G | ||||||||||||||
| 74 | 01 57 19 | 11 | Closeout Submittals | Sales Documentation | 3.7.2.1 | G | ||||||||||||||
| 75 | 01 57 19 | 11 | Closeout Submittals | Nonhazardous Solid Waste Diversion Report | 3.6.2 | G | ||||||||||||||
| 76 | 01 74 19 | 1 | Preconstruction Submittals | Construction Waste Management Plan | 1.7 | G | ||||||||||||||
| 77 | 01 74 19 | 11 | Closeout Submittals | Final Construction Waste Diversion Report | 1.9 | |||||||||||||||
| 78 | 01 78 00 | 3 | Product Data | Warranty Management Plan | 1.6.1 | G | If required by Task order | |||||||||||||
| 79 | 01 78 00 | 3 | Product Data | Warranty Tags | 1.6.3 | |||||||||||||||
| 80 | 01 78 00 | 3 | Product Data | Final Cleaning | 3.5 | |||||||||||||||
| 81 | 01 78 00 | 3 | Product Data | Spare Parts Data | 1.5 | |||||||||||||||
| 82 | 01 78 00 | 7 | Certificates | Asbestos Free Materials | 3.4 | G | ||||||||||||||
| 83 | 01 78 00 | 8 | Manufacturer’s Instructions | Instructions | 1.6.1 | |||||||||||||||
| 84 | 01 78 00 | 10 | Operation and Maintenance Data | Operation and Maintenance Manuals | 3.3 | G | ||||||||||||||
| 85 | 01 78 00 | 11 | Closeout Submittals | As-Built Record of Equipment and Materials | 1.6.1 | G | ||||||||||||||
| 86 | 01 78 00 | 11 | Closeout Submittals | Record Drawings | 3.2 | G | ||||||||||||||
| 87 | 01 78 23 | 10 | Operation and Maintenance Data | Training Plan | 3.1.1 | G | ||||||||||||||
| 88 | 01 78 23 | 10 | Operation and Maintenance Data | Training Outline | 3.1.3 | G | ||||||||||||||
| 89 | 01 78 23 | 10 | Operation and Maintenance Data | Training Content | 3.1.2 | G | ||||||||||||||
| 90 | 01 78 23 | 11 | Closeout Submittals | Validation of Training Completion | 3.1.5 | G | ||||||||||||||
| 91 | 01 78 24.00 20 | 11 | Closeout Submittals | eOMSI, Progress Submittal | 1.4.1 | G | ||||||||||||||
| 92 | 01 78 24.00 20 | 11 | Closeout Submittals | eOMSI, Prefinal Submittal | 1.4.2 | G | ||||||||||||||
| 93 | 01 78 24.00 20 | 11 | Closeout Submittals | eOMSI, Final Submittal | 1.4.3 | G | ||||||||||||||
| 94 | 02 41 00 | 1 | Preconstruction Submittals | Demolition Plan | 1.2.2 | G | If required by Task order | |||||||||||||
| 95 | 02 41 00 | 1 | Preconstruction Submittals | Existing Conditions | 1.1 | |||||||||||||||
| 96 | 02 41 00 | 7 | Certificates | Notification | 1.7 | G | ||||||||||||||
| 97 | 02 41 00 | 11 | Closeout Submittals | Receipts | 3.3.4 | |||||||||||||||
| 98 | 02 82 00 | 1 | Preconstruction Submittals | CFM Calculations | 3.2.9.1 | G | Task orders with Asbestos remediation | |||||||||||||
| 99 | 02 82 00 | 1 | Preconstruction Submittals | Asbestos Hazard Abatement Plan | 1.3.1 | G | ||||||||||||||
| 100 | 02 82 00 | 1 | Preconstruction Submittals | Asbestos Hazard Abatement Plan | 1.3.10 | G | ||||||||||||||
| 101 | 02 82 00 | 3 | Product Data | Amended Water | 1.2.2 | G | ||||||||||||||
| 102 | 02 82 00 | 3 | Product Data | Safety Data Sheets | 1.3.9 | G | ||||||||||||||
| 103 | 02 82 00 | 3 | Product Data | Respirators | 3.1.2.1 | G | ||||||||||||||
| 104 | 02 82 00 | 3 | Product Data | Local Exhaust Equipment | 3.1.7 | G | ||||||||||||||
| 105 | 02 82 00 | 3 | Product Data | Pressure Differential Automatic Recording Instrument | 3.1.7 | G | ||||||||||||||
| 106 | 02 82 00 | 3 | Product Data | Glovebags | 3.1.10 | G | ||||||||||||||
| 107 | 02 82 00 | 6 | Test Reports | Air Sampling Results | 1.5.5 | G | ||||||||||||||
| 108 | 02 82 00 | 6 | Test Reports | Pressure Differential Recordings for Local Exhaust System | 1.5.6 | G | ||||||||||||||
| 109 | 02 82 00 | 6 | Test Reports | Encapsulation Test Patches | 3.2.12.2 | G | ||||||||||||||
| 110 | 02 82 00 | 6 | Test Reports | Clearance Sampling | 3.2.14.5 | G | ||||||||||||||
| 111 | 02 82 00 | 6 | Test Reports | Asbestos Waste Manifest | 3.3.3.2 | G | ||||||||||||||
| 112 | 02 82 00 | 7 | Certificates | Employee Training | 1.3.4 | G | ||||||||||||||
| 113 | 02 82 00 | 7 | Certificates | Respiratory Protection Program | 1.3.7 | G | ||||||||||||||
| 114 | 02 82 00 | 7 | Certificates | Testing Laboratory | 1.3.11 | G | ||||||||||||||
| 115 | 02 82 00 | 7 | Certificates | Landfill Approval | 1.3.12 | G | ||||||||||||||
| 116 | 02 82 00 | 7 | Certificates | Delivery Tickets | 1.3.12 | G | ||||||||||||||
| 117 | 02 82 00 | 7 | Certificates | Waste Shipment Records | 1.3.12 | G | ||||||||||||||
| 118 | 02 82 00 | 7 | Certificates | Transporter Certification | 1.3.13 | G | ||||||||||||||
| 119 | 02 82 00 | 7 | Certificates | Medical Certification | 1.3.14 | G | ||||||||||||||
| 120 | 02 82 00 | 7 | Certificates | Qualitative Fit Test Form | 1.3.7.1 | G | ||||||||||||||
| 121 | 02 82 00 | 7 | Certificates | Private Qualified Person Documentation | 1.5.1 | G | ||||||||||||||
| 122 | 02 82 00 | 7 | Certificates | Designated Competent Person Resume | 1.5.2 | G | ||||||||||||||
| 123 | 02 82 00 | 7 | Certificates | Worker's License | 1.5.3 | G | ||||||||||||||
| 124 | 02 82 00 | 7 | Certificates | Contractor's License | 1.5.4 | G | ||||||||||||||
| 125 | 02 82 00 | 7 | Certificates | Federal, State or Local Citations on Previous Projects | 1.5.7 | G | ||||||||||||||
| 126 | 02 82 00 | 7 | Certificates | Chemical Encapsulants | 2.1 | G | ||||||||||||||
| 127 | 02 82 00 | 7 | Certificates | Equipment Used to Contain Airborne Asbestos Fibers | 3.1 | G | ||||||||||||||
| 128 | 02 82 00 | 7 | Certificates | Water Filtration Equipment | 3.1.3.3 | G | ||||||||||||||
| 129 | 02 82 00 | 7 | Certificates | HEPA Vacuums | 3.1.8 | G | ||||||||||||||
| 130 | 02 82 00 | 7 | Certificates | Ventilation Systems | 3.1.8 | G | ||||||||||||||
| 131 | 02 82 00 | 7 | Certificates | IDEM Notification | 1.3.5 | |||||||||||||||
| 132 | 02 82 00 | 11 | Closeout Submittals | Permits and Licenses | 1.3.5 | G | ||||||||||||||
| 133 | 02 82 00 | 11 | Closeout Submittals | Respirator Program Records | 1.3.7.1 | G | ||||||||||||||
| 134 | 02 82 00 | 11 | Closeout Submittals | Rental Equipment | 1.7.1 | G | ||||||||||||||
| 135 | 02 82 00 | 11 | Closeout Submittals | Manometer Records | 3.2.9.1 | |||||||||||||||
| 136 | 02 83 00 | 1 | Preconstruction Submittals | Competent Person | 1.5.1.1 | G | Task orders with lead/lead based paint remediations | |||||||||||||
| 137 | 02 83 00 | 1 | Preconstruction Submittals | Training Certification | 1.5.1.2 | G | ||||||||||||||
| 138 | 02 83 00 | 1 | Preconstruction Submittals | Respiratory Protection Program | 1.5.2.6 | G | ||||||||||||||
| 139 | 02 83 00 | 1 | Preconstruction Submittals | Occupational and Environmental Assessment Data Report | 1.5.2.3 | G | ||||||||||||||
| 140 | 02 83 00 | 1 | Preconstruction Submittals | Medical Examinations | 1.5.2.4 | G | ||||||||||||||
| 141 | 02 83 00 | 1 | Preconstruction Submittals | Lead, Cadmium, Chromium Waste Management Plan | 1.5.2.8 | G | ||||||||||||||
| 142 | 02 83 00 | 1 | Preconstruction Submittals | Occupant Protection Plan | 1.5.4 | G | ||||||||||||||
| 143 | 02 83 00 | 1 | Preconstruction Submittals | Lead, Cadmium, Chromium Compliance Plan | 1.5.2.2 | G | ||||||||||||||
| 144 | 02 83 00 | 1 | Preconstruction Submittals | Lead, Cadmium, Chromium Compliance Plan | 3.1.1.6 | G | ||||||||||||||
| 145 | 02 83 00 | 1 | Preconstruction Submittals | Initial Sample Results | 3.4.1.1 | G | ||||||||||||||
| 146 | 02 83 00 | 1 | Preconstruction Submittals | Written Evidence of TSD Approval | 3.5.2.1 | G | ||||||||||||||
| 147 | 02 83 00 | 1 | Preconstruction Submittals | Rental Equipment Notification | 1.6.3 | |||||||||||||||
| 148 | 02 83 00 | 3 | Product Data | Respirators | 1.6.1 | G | ||||||||||||||
| 149 | 02 83 00 | 3 | Product Data | Vacuum Filters | 1.6.4 | G | ||||||||||||||
| 150 | 02 83 00 | 3 | Product Data | Negative Air Pressure System | 1.6.7 | G | ||||||||||||||
| 151 | 02 83 00 | 3 | Product Data | Materials and Equipment | 2.1 | G | ||||||||||||||
| 152 | 02 83 00 | 3 | Product Data | Expendable Supplies | 2.1.1 | G | ||||||||||||||
| 153 | 02 83 00 | 3 | Product Data | Local Exhaust Equipment | 3.1.1.5 | G | ||||||||||||||
| 154 | 02 83 00 | 3 | Product Data | Pressure Differential Automatic Recording Instrument | 3.1.1.5 | G | ||||||||||||||
| 155 | 02 83 00 | 3 | Product Data | Pressure Differential Log | 3.1.1.6 | G | ||||||||||||||
| 156 | 02 83 00 | 3 | Product Data | Neutralizers For Chemical Paint Strippers | 2.1.1.7 | |||||||||||||||
| 157 | 02 83 00 | 3 | Product Data | SDS Sheets For Chemical Paint Strippers | 2.1.1.6 | |||||||||||||||
| 158 | 02 83 00 | 6 | Test Reports | Sampling and Analysis | 1.3.3 | G | ||||||||||||||
| 159 | 02 83 00 | 6 | Test Reports | Occupational and Environmental Assessment Data Report | 1.5.2.3 | G | ||||||||||||||
| 160 | 02 83 00 | 6 | Test Reports | Sampling Results | 1.5.2.3 | G | ||||||||||||||
| 161 | 02 83 00 | 6 | Test Reports | Pressure Differential Recordings For Local Exhaust System | 1.5.3 | G | ||||||||||||||
| 162 | 02 83 00 | 7 | Certificates | Testing Laboratory | 1.5.1.3 | G | ||||||||||||||
| 163 | 02 83 00 | 7 | Certificates | Clearance Certification | 3.5.1.1 | G | ||||||||||||||
| 164 | 02 84 33 | 7 | Certificates | Training certification | 1.7.1 | Task orders with PCB remediations | ||||||||||||||
| 165 | 02 84 33 | 7 | Certificates | Qualifications of CIH | 1.7.2 | |||||||||||||||
| 166 | 02 84 33 | 7 | Certificates | PCB Removal Work Plan | 1.7.3 | |||||||||||||||
| 167 | 02 84 33 | 7 | Certificates | PCB Disposal Plan | 1.7.4 | |||||||||||||||
| 168 | 02 84 33 | 7 | Certificates | Notification | 1.7.5 | |||||||||||||||
| 169 | 02 84 33 | 7 | Certificates | Transporter Certification | 3.8 | |||||||||||||||
| 170 | 02 84 33 | 7 | Certificates | Certification of Decontamination | 3.5.4 | |||||||||||||||
| 171 | 02 84 33 | 7 | Certificates | Post Cleanup Sampling | 3.5.5 | |||||||||||||||
| 172 | 02 84 33 | 7 | Certificates | Certificate of Disposal | 3.8.1 | |||||||||||||||
| 173 | 03 30 00 | 1 | Preconstruction Submittals | Quality Control Personnel Certifications | 1.6.4 | G | If concrete required by Task order. If not, disregard this section | |||||||||||||
| 174 | 03 30 00 | 1 | Preconstruction Submittals | Maturity Method Data | 3.3.9 | |||||||||||||||
| 175 | 03 30 00 | 2 | Shop Drawings | Reinforcing Steel | 1.6.2.1 | G | ||||||||||||||
| 176 | 03 30 00 | 3 | Product Data | Vapor Retarder | 2.4.4 | |||||||||||||||
| 177 | 03 30 00 | 3 | Product Data | Concrete Curing Materials | 2.4.1 | |||||||||||||||
| 178 | 03 30 00 | 3 | Product Data | Admixtures | 2.3.4 | |||||||||||||||
| 179 | 03 30 00 | 3 | Product Data | Waterstops | 2.2.2 | |||||||||||||||
| 180 | 03 30 00 | 3 | Product Data | Pumping Concrete | 1.6.3.1 | |||||||||||||||
| 181 | 03 30 00 | 3 | Product Data | Curing Compound | 2.4.1 | |||||||||||||||
| 182 | 03 30 00 | 5 | Design Data | Concrete Mix Design | 1.6.1.1 | G | ||||||||||||||
| 183 | 03 30 00 | 6 | Test Reports | Compressive Strength Tests | 3.13.2.3 | G | ||||||||||||||
| 184 | 03 30 00 | 6 | Test Reports | Air Content | 3.13.2.4 | |||||||||||||||
| 185 | 03 30 00 | 6 | Test Reports | Tolerance Report | 3.10.2.1 | |||||||||||||||
| 186 | 03 30 00 | 7 | Certificates | Safety Data Sheets | 1.6.3.2 | |||||||||||||||
| 187 | 22 00 00 | 3 | Product Data | Fixtures | 2.4 | If plumbing work/fixtures required by Task order. If not, disregard this section | ||||||||||||||
| 188 | 22 00 00 | 3 | Product Data | Flush Valve Water Closets | 2.4.2 | G | ||||||||||||||
| 189 | 22 00 00 | 3 | Product Data | Flush Valve Urinals | 2.4.3 | G | ||||||||||||||
| 190 | 22 00 00 | 3 | Product Data | Flush Tank Water Closets | 2.4.4 | G | ||||||||||||||
| 191 | 22 00 00 | 3 | Product Data | Wall Hung Lavatories | 2.4.5 | G | ||||||||||||||
| 192 | 22 00 00 | 3 | Product Data | Countertop Lavatories | 2.4.6 | G | ||||||||||||||
| 193 | 22 00 00 | 3 | Product Data | Kitchen Sinks | 2.4.7 | G | ||||||||||||||
| 194 | 22 00 00 | 3 | Product Data | Service Sinks | 2.4.8 | G | ||||||||||||||
| 195 | 22 00 00 | 3 | Product Data | Drinking-Water Coolers | 2.4.9 | G | ||||||||||||||
| 196 | 22 00 00 | 3 | Product Data | Energy Star Label for Electric Water Cooler | 2.4.9 | G | ||||||||||||||
| 197 | 22 00 00 | 3 | Product Data | Pumps | 2.9 | G | ||||||||||||||
| 198 | 22 00 00 | 3 | Product Data | Backflow Prevention Assemblies | 3.7.1.1 | G | ||||||||||||||
| 199 | 22 00 00 | 3 | Product Data | Lavatory Faucets | 2.4.6 | G | ||||||||||||||
| 200 | 22 00 00 | 6 | Test Reports | Tests, Flushing and Disinfection | 3.7 | |||||||||||||||
| 201 | 22 00 00 | 6 | Test Reports | Test of Backflow Prevention Assemblies | 3.7.1.1 | G | ||||||||||||||
| 202 | 22 00 00 | 7 | Certificates | Materials and Equipment | 1.3 | |||||||||||||||
| 203 | 22 00 00 | 10 | Operation and Maintenance Data | Plumbing System | 3.7.1 | G | ||||||||||||||
| 3/29/21 12:06 |