PART 6 ATTACHMENT D4_BLDG 1 ASBESTOS LEAD REPORT REVISED.pdf

PDF 6 MB Posted

Attached to
Design Build Renovation Building 1
Solicitation number
N4008520R4033
Issued by

View the file

Other files

File Type Posted
19-0037 PART 3 BLDG 1 RENOVATION REVISED V4.pdf PDF
19-0037 PART 4 BLDG 1 RENOVATION REVISED V3.pdf PDF
Amnd 0007 20R4033 FINAL.pdf PDF
Amnd 0006 20R4033 FINAL.pdf PDF
19-0037 PART 4 BLDG 1 RENOVATION REVISED V2.pdf PDF
19-0037 PART 3 BLDG 1 RENOVATION REVISED V3.pdf PDF
19-0037 BLDG 1 RENO - EXISTING TRANSFORMER.jpg JPG image
Building 11 Asbestos and LBP Assessment.pdf PDF
19-0037 ElectricalPolicies 2020_v20200504.pdf PDF
19-0037 BLDG 1 RENO - OSP.pdf PDF
19-0037 BLDG 1 AND BLDG 11 - OSP AND PATHWAY REQUIREMENTS.pdf PDF
19-0037 PART 3 BLDG 1 RENOVATION REVISED V2.pdf PDF
Amnd 0005 20R4033 FINAL.pdf PDF
19-0037 Building 1 Roof.pdf PDF
19-0037 BLDG 1 RENO - QUAD TRLR SITE.png PNG image
PART 6 ATTACHMENT A1_19-0037 Building 1 A110 Revised.pdf PDF
33 71 02 REVISED.pdf PDF
19-0037 PART 3 BLDG 1 RENOVATION REVISED.pdf PDF
SUBMITTAL REGISTER REVISED.pdf PDF
PART 6 ATTACHMENT A1_19-0037 Building 1 A102 Revised.pdf PDF
26 20 00 REVISED.pdf PDF
23 81 28.10 22.pdf PDF
19-0037 PART 4 BLDG 1 RENOVATION REVISED.pdf PDF
DESIGN SUBMITTAL SCHEDULE REVISED.pdf PDF
PART 6 ATTACHMENT A6_BLDG 1 COMMON AREA REQUIREMENTS REVISED.pdf PDF
23 09 23.13 REVISED.pdf PDF
22 00 00 REVISED.pdf PDF
26 51 00.00 22 REVISED.pdf PDF
Amnd 0004 20R4033 FINAL.pdf PDF
33 71 01 REVISED.pdf PDF
23 05 93 REVISED.pdf PDF
23 73 33 REVISED.pdf PDF
19-0037 SITE PLAN - BUILDINGS.pdf PDF
26 36 23.00 20 REVISED.pdf PDF
26 32 13 REVISED.pdf PDF
PART 6 ATTACHMENT A1_19-0037 Building 1 A104 Revised.pdf PDF
Amnd 0003 20R4033 FINAL.pdf PDF
Amnd 0002 20R4033 FINAL.pdf PDF
Amnd 0001 20R4033 FINAL.pdf PDF
PART 6 ATTACHMENT G6_76-0760 BLDG 11.pdf PDF
PART 6 ATTACHMENT G4_P-1449B BLDG 1 ENERGY EFFICIENCY IMPROVEMENTS.pdf PDF
PART 6 ATTACHMENT L_MCBCL MECH DESIGN GUIDE 7.17.pdf PDF
19-0037 PART 2.pdf PDF
PART 6 ATTACHMENT D6_APPENDIX D BLDG INFO CHECKLIST.pdf PDF
PART 6 ATTACHMENT G2_86-9513 BLDG 1 RENOVATION.pdf PDF
PART 6 ATTACHMENT G12_12-0091 BLDG 13 HVAC IMPROVEMENTS.pdf PDF
PART 6 ATTACHMENT F1_G-3-5 PRELIMINARY FURNITURE INVENTORY.pdf PDF
19-0037 PART 4.pdf PDF
PART 6 ATTACHMENT G3_06-0100 BLDG 1 EOC ADDITION.pdf PDF
PART 6 ATTACHMENT G9_07-0103 BLDG 11 NEW HVAC.pdf PDF
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS AND LEAD-BASED PAINT

ASSESSMENT

BUILDING 1 - BASE HEADQUARTERS

MCB CAMP LEJEUNE

December 20, 2019

Mr. Brian Wodecki Environmental Chemical Corporation 1102 Elizabeth Street, Suite A Jacksonville, North Carolina 28540

ECS Project No. 49:9247

Reference: Updated Asbestos and Lead-Based Paint Assessment, Building 1 - Base Headquarters, Hadnot Point, North Carolina

Dear Mr. Wodecki:

ECS Southeast, LLP (ECS), was contracted by Environmental Chemical Corporation (ECC), on behalf of the Public Works Department, to complete an asbestos and lead-based paint assessment at Building 1 - Base Headquarters under Hazmat Sampling RFP Number 19-0065. This report summarizes our observations, analytical results, findings, and recommendations related to the work performed. The work described in this report was performed by ECS in general accordance with the Scope of Services described in the Professional Services Subcontract (ECS.PSS GCC.5720.464) and the terms and conditions of the agreement authorizing those services.

ECS appreciates this opportunity to provide Environmental Chemical Corporation with our services. If we can be of further assistance to you, please do not hesitate to contact us.

Sincerely, ECS Southeast, LLP

Tina Stewart, REM Lindsey Lucas, REM Senior Project Manager Environmental Principal tstewart@ecslimited.com llucas1@ecslimited.com 336-856-7150 864-987-1810

EXECUTIVE SUMMARY

The subject property is improved with an approximately 40,912 square foot, two-story building referred to as Building 1 - Base Headquarters. Building finishes observed on the interior and exterior of the building appeared to consist of a concrete slab with floor tile, carpet, and associated mastics;

the wall systems consist of plaster, drywall wallboard, and concrete masonry unit (CMU) block; and the ceiling systems consist of a drop ceiling with multiple types of acoustical ceiling tiles and plaster above the drop ceiling. At the time of our assessment, the subject building was occupied.

The purpose of the survey was to determine if asbestos-containing materials (ACMs) and lead-based paints (LBPs) are present in the interior of the building. The original assessment was performed within accessible areas of the interior of the subject building (excluding attics and crawlspaces). The exterior of the building (including roof systems) was not assessed as part of the original Scope of Work (SOW); however, the most recent site visit included limited follow-up sampling for lead paint on the exterior of the building.

Based on the laboratory analysis of the bulk samples collected during the original assessment, asbestos was detected in the samples collected by ECS and analyzed from the building. ECS was not requested to collect bulk samples from the exterior of the structure. The following materials were reported to contain asbestos:

• Glue Pucks in the Media Room in Room 125;

• Mastic below 12" Cream Floor Tile w/ Brown Streaks in Room 245;

• Multiple Layers of Black Floor Tile and Mastic in Corridors and various Offices (Under Carpet);

and,

• Brown 9" Floor Tile in the First Floor Offices (Under Carpet).

Based on the laboratory analysis of the paint chip samples analyzed, lead-based paint as defined by the U.S. EPA was not identified in the samples collected from the interior of the building. Additional paint chip samples were collected from the most prominent painted surfaces on the exterior of the building on November 12, 2019. Based on the laboratory analysis of the paint chip samples analyzed, lead-based paint as defined by the U.S. EPA was not identified in the samples collected from the exterior of the building.

Recommendations regarding removal and disposal of ACMs and trace amounts of lead reported in coatings, glazing and surfaces can be found in Section 5.0 of this report.

Previous asbestos reports performed by others identified asbestos containing Pipe Insulation in the attic and throughout in pipe penetrations; Sealant in the basement mechanical room; 9" Black Floor Tile and Mastic throughout under carpet; 9" Brown Floor Tile in the first floor offices; 12" Acoustical Tile and Adhesive above drop ceilings; Residual Mastic in carpeted areas; Floor Tile and Adhesive Debris on the northwest wing; 12" Beige w/ Olive Floor Tile and Mastic in the basement and main stairwells; and Gasket materials on steam pits. These materials should be considered and treated as asbestos containing materials if present.

The executive summary is an integral portion of this report, however, ECS recommends the report be read in its entirety.

Building 1 - Base Headquarters

ECS Project # 49:9247

PAGETABLE OF CONTENTS

1.0 SITE DESCRIPTION

2.0 PURPOSE

3.0 METHODOLOGY

3.1 Asbestos-Containing Materials

3.2 Lead in Paint and Surface Coatings

4.0 RESULTS

4.1 Asbestos-Containing Materials

4.2 Suspect or Assumed Asbestos-Containing Materials

4.3 Lead in Paint and Surface Coatings

5.0 RECOMMENDATIONS AND REGULATORY REQUIREMENTS

5.1 Asbestos-Containing Materials

5.2 Lead in Paint and Surface Coatings

6.0 LIMITATIONS

Building 1 - Base

TABLE OF APPENDICES

Appendix I: Figures

Appendix II: Site Photographs

Appendix III: Asbestos Bulk Sample Results

Appendix IV: Lead Laboratory Analytical Results

Appendix V: Certifications/Licenses

Appendix VI: Previous Reports

Building 1 - Base

1.0 SITE DESCRIPTION

The subject property is improved with an approximately 40,912 square foot, two-story building referred to as Building 1 - Base Headquarters. Building finishes observed on the interior and exterior of the building appeared to consist of a concrete slab with floor tile, carpet, and associated mastics;

the wall systems consist of plaster, drywall wallboard, and concrete masonry unit (CMU) block; and the ceiling systems consist of a drop ceiling with multiple types of acoustical ceiling tiles and plaster above the drop ceiling. At the time of our assessment, the subject building was occupied.

2.0 PURPOSE

The purpose of the Updated Asbestos and Lead-Based Paint Assessment was to identify asbestos-containing materials (ACM) and lead-based paint (LBP) which may require special handling and/or disposal if removed during construction activities. The identification of ACMs may require trained labor, regulated work practices, and special disposal. The identification of LBP or other lead hazards may require disclosure to contractors and monitoring of lead exposure for Occupational Safety and Health Administration (OSHA) purposes.

3.0 METHODOLOGY

ECS performed the authorized Scope of Services in general accordance with our proposal, standard industry practice(s) and methods specified by regulation(s) for the identification of ACMs and LBPs.

3.1 Asbestos-Containing Materials

For assessment purposes, the EPA NESHAP requirements for asbestos assessments prior to renovation or demolition were recommended for this assessment. Renovation or demolition is defined under NESHAP as the removal of a load-bearing structure or member. Asbestos Containing Materials (ACM) are referred to by the Federal OSHA regulations as a material which is >1% asbestos while Asbestos Containing Building Materials (ACBM) are considered by the AHERA/ASHARA regulations a term for materials containing >1% asbestos. On the basis of requirements under NESHAP and North Carolina Asbestos Hazard Management Program (AHMP), administered by Health Hazards Control Unit (HHCU), for renovation activities, ECS conducted a limited assessment for potential ACMs. The ACM assessment was limited in that ECS did not conduct demolition such as jack/sledge hammering or cutting through walls, ceilings, floors, or structural members to expose potentially concealed materials, and that the scope of work did not include sampling of roofs, attics, crawlspaces or exterior building materials.

The tasks associated with the asbestos assessment included:

1. ECS began by interviewing the site contacts to learn available information regarding the past history of the site, including ages of materials, past renovations, maintenance, etc.

2. ECS entered the building and began identifying the homogenous areas. Homogeneous areas are defined as sections of building materials appearing to have been installed in the same general time period, and are of uniform color and texture. Once homogeneous areas were identified, ECS collected samples of the materials suspected to contain asbestos in general accordance with AHERA, NESHAP

Building 1 - Base Headquarters and State of North Carolina regulations. Specifically, samples were collected from random locations of each homogeneous area. The number of samples collected from each homogeneous area varied by material type.

3. The number of samples collected was determined using the following criteria:

• Thermal Insulation Materials (piping, breeching, boiler insulation, etc.) - A minimum of three

(3) samples will be collected. Only one (1) sample will be collected from patch areas that are less than 6 square or linear feet in size.

• Surfacing Materials (plaster, fireproofing, etc.) – A minimum of seven (7) samples will be collected for areas greater than 5,000 square feet; five (5) samples collected for areas greater than 1,000 square feet, but less than 5,000 square feet; and three (3) samples collected for areas less than 1,000 square feet.

• Miscellaneous Materials (flooring, adhesives, roofing, wallboard, etc.) – A minimum of two (2) samples are required.

4. Samples collected at the site were delivered to a laboratory that has been accredited by the National Voluntary Laboratory Accreditation Program (NVLAP) for testing by polarized light microscopy (PLM). A chain of custody was maintained with the samples.

5. This non-invasive assessment did not include destructive measures to look in chases, above fixed ceilings, behind permanent or attached fixtures, behind walls, etc. Materials located below carpeting corners, behind removable exterior siding and behind removable fixtures were sampled if accessible during the time of the assessment. Suspect materials observed in inaccessible areas will have to be assumed positive or be evaluated at the time of discovery.

6. If one sample of a material from a homogeneous area is reported to contain greater than 1% asbestos, then by EPA definition, it is characterized as asbestos-containing material.

The non-destructive asbestos assessment was performed by asbestos inspectors who have received EPA accredited training and are licensed by North Carolina. Mr. Thomas Barnes (NC Inspector #12983), Ms. Lindsey Lucas (NC Inspector #12480), Mr. Matthew Wilbanks (NC Inspector #13165) and Mr. Kurt Gauthier performed the initial assessment on May 14, 2019. Ms. Amy DeSaix (NC Inspector #12107) and Ms. Erin Warren returned to the site on May 21, 2019 to collect samples from mechanical rooms, which were inaccessible during the initial site visit. Samples of suspect ACMs were collected utilizing hand tools and placed into individual, labeled plastic bags. Unique bulk suspect ACM samples were submitted to SAI inGreensboro, North Carolina for analysis via Polarized Light Microscopy (PLM) in accordance with current EPA-600 methodology. Materials consisting of additional layers were analyzed separately. SAI is listed as an accredited laboratory by the National Voluntary Laboratory Accreditation Plan (NVLAP) managed by the National Institute of Standards and Technology (NIST) for bulk sample analysis by currently approved EPA methodology by PLM.

During the survey, ECS attempted to identify suspect ACMs in readily accessible areas. However, due to the destructive means required to identify some materials, certain areas were deemed inaccessible (i.e. behind walls or sub grade materials) and were not surveyed for suspect ACMs. Unidentified suspect ACMs may be located in these and/or other inaccessible areas.

Building 1 - Base Headquarters

Samples were collected in general accordance with EPA Standard 40 CFR 763 Subpart E, Asbestos Hazard Emergency Response Act (AHERA) and OSHA Standard 29 CFR 1926.1101 Inspection Protocol.

Multiple samples of each unique material were submitted. Samples were analyzed using “Positive Stop” methodology. If one sample of a homogeneous material was reported to contain asbestos, the remaining samples of that material were not analyzed. EPA regulations stipulate that if one sample contains asbestos the entire quantity of that material contains asbestos, regardless of additional analysis.

3.2 Lead in Paint and Surface Coatings

Paint chip samples were collected from various painted surfaces within the building during the original assessment on May 14, 2019. Additional paint chip samples were collected from various painted surfaces on the exterior of the building on November 12, 2019. ECS was directed by the client to collect a predetermined number of samples from the the most prominent painted surfaces on the exterior of the building. The samples were bagged and delivered to SAI in Greensboro, North Carolina for analysis for lead concentration (% by weight) using Flame Atomic Absorption Spectroscopy.

A chain of custody was maintained with the samples. SAI participates in the American Industrial Hygiene Association’s (AIHA) Environmental Lead Proficiency Analytical Testing (ELPAT) Program. The sampling was conducted utilizing the U.S. EPA definition of LBP. Under this definition, painted surfaces which contain lead in concentrations equal to or greater than 0.5% of lead percent by weight are classified as coated with LBP. Paints with concentrations of lead detectable that are less than 0.5% concentration of lead percent by weight are considered lead-containing paints (LCP). Activities which disturb lead-containing paints and/or glazing (while not lead-based paints by the U.S. EPA definition) are regulated by OSHA (29 CFR 1926.62).

Because the current or proposed use of the property is not residential or child-occupied, the scope of the LBP assessment was not conducted in accordance with HUD Chapter 7 requirements.

4.0 RESULTS

The following is a summary of laboratory results, findings and observations.

4.1 Asbestos-Containing Materials

In total, 98 bulk samples from 39 homogeneous areas were submitted to the laboratory of which 127 layers were analyzed. ECS was not requested to collect suspect ACMs from the exterior of this structure.

An Asbestos-Containing Material (ACM) is defined as any material containing more than one percent (>1%) asbestos as determined using the method specified in Appendix A, Subpart F, 40 CFR Part 763, Section 1, PLM. Materials are categorized by the U.S. EPA in the following categories:

• Friable ACMs are defined as any ACM that, when dry, can be crumbled, pulverized or reduced to powder by hand pressure. Non-friable ACMs are defined as any ACM that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.

• Category I non-friable ACM are listed as following: packings, gaskets, resilient floor coverings, and asphalt roofing products containing more than one percent (>1%) asbestos.

Building 1 - Base Headquarters

• Category II non-friable ACM are listed as any material, excluding Category I non-friable ACM, containing more than one percent (>1%) asbestos.

Regulated Asbestos Containing Materials (RACM) are friable ACM or non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading or has crumbled, been pulverized, or reduced to powder in the course of renovation and/or demolition operations.

SAI submitted signed final laboratory reports to ECS on May 24, 2019. Eight of the bulk samples submitted for analysis were reported to contain asbestos in detectable concentrations. These materials are summarized below.

Summary of Asbestos-Containing Materials Identified

Sample ID Location

Material Description

Analytical Results Category

Estimated Quantity

1-09-01, Media Room in Room 125

Glue Pucks 6% Chrysotile

Category II Non-Friable

525 Square Feet (Quantity based on previous reports)

1-22-01, Room 245 12" Cream Floor Tile with Brown Streaks and Mastic

Floor Tile - None Detected Mastic - 5% Chrysotile

Category I Non-Friable

250 Square Feet

1-34-01, Throughout First & Second Floors below Carpet

Black Floor Tile (Two Layers) and Mastic

Thick Tile - 6% Chrysotile Mixed Mastics - 3% Chrysotile Thin Tile - 2% Chrysotile

Category I Non-Friable

5,220 Square Feet (Quantity based on previous reports)

1-36-01, First Floor Offices below Carpet

9" Floor Tile Floor Tile - 3% Mastic - None Detected

Category I Non-Friable

1,750 Square Feet (Quantity based on previous reports)

*Quantities listed above are estimates and should be field verified by contractor.

Building 1 - Base Headquarters

4.2 Suspect or Assumed Asbestos-Containing Materials

Due to the inaccessibility or the destructive means that asbestos sampling requires, additional suspect ACMs may remain within the building hidden behind inaccessible areas that include, but are not limited to, fire doors, sub-grade walls, structural members, topping slabs, sub-grade sealants, flooring located below underlayments, areas behind exterior walls, pipe trenches, and subsurface utilities, etc. These areas were deemed inaccessible and were not assessed.

Exterior materials, crawlspaces, attics and steam tunnels were also not assessed during this assessment and should be assumed to contain asbestos.

Previous asbestos reports performed by others identified asbestos containing Pipe Insulation in the attic and throughout in pipe penetrations; Sealant in the basement mechanical room; 9" Black Floor Tile and Mastic throughout under carpet; 9" Brown Floor Tile in the first floor offices; 12" Acoustical Tile and Adhesive above drop ceilings; Residual Mastic in carpeted areas; Floor Tile and Adhesive Debris on the northwest wing; 12" Beige w/ Olive Floor Tile and Mastic in the basement and main stairwells; and Gasket materials in steam pits. These materials should be considered and treated as asbestos containing materials if present.

If these materials are discovered during construction activities, they should be presumed to contain asbestos and be treated as ACMs or be sampled immediately upon discovery and prior to disturbance for asbestos content by a certified asbestos inspector in accordance with 29 CFR 1926.1101.

4.3 Lead in Paint and Surface Coatings

SAI submitted a signed laboratory report to ECS on May 17, 2019. Lead-Based Paint (LBP) was not detected equal to or greater than 0.5% lead concentration by weight in the samples collected and analyzed from the interior of the structure. However, detectable (trace) concentrations of lead were reported in the samples submitted for analysis.

SAI submitted a signed final laboratory report to ECS on November 15, 2019. Lead-Based Paint (LBP) was not detected equal to or greater than 0.5% lead concentration by weight in the samples collected and analyzed from the exterior of the structure. However, detectable (trace) concentrations of lead were reported in the samples submitted for analysis.

The sampling location maps, site photographs, asbestos bulk sample results, and lead laboratory analytical results are located in Appendix I, II, III, and IV, respectively.

5.0 RECOMMENDATIONS AND REGULATORY REQUIREMENTS

Based on our understanding of the purpose of the Updated Asbestos and Lead-Based Paint Assessment, the results of laboratory analysis, and our findings and observations, ECS presents the following recommendations.

Building 1 - Base Headquarters

5.1 Asbestos-Containing Materials

Federal, state, and local regulations require asbestos-containing materials, identified as ACM, be removed prior to disturbance by demolition operations. Please refer to Section 4.1 for a complete list of building materials that were reported positive for asbestos and to Section 4.2 for materials that were assumed to contain asbestos. ECS recommends where a material type has been identified as asbestos containing that other materials with similar color, texture, age and size throughout the building’s interior and exterior be assumed to contain asbestos.

ECS recommends that a project specification be prepared to delineate and quantify known and suspect hazardous and regulated materials in the buildings and to outline proper procedures for the abatement. This will help protect the owner’s liability in better defining the scope of work and contractors’ roles and responsibilities in the abatement process and holding the contractor accountable for the performance of the project. The specification typically defines the Contractor’s scope of work and outline requirements and procedures that must be followed for the project. The intent of the specification is to give performance requirements for the Contractor so that the project can be completed safely and in compliance with applicable federal and state regulations. Typically, the specification document serves as part of the site owner’s contract with the contractor.

If ACMs are to be removed, it is recommended that an industrial hygienist monitor the project.

This involves collecting air samples from within and outside abatement work areas to monitor the asbestos abatement contractor’s work practices over the course of the project. The industrial hygienist should evaluate if the asbestos abatement work is in accordance with project specifications, U.S. EPA regulation 40 CFR Part 61-National Emission Standards for Hazardous Air Pollutants Subpart M: National Emission Standard for Asbestos, and U.S. Occupational Safety and Health Administration (OSHA) regulation 29 CFR 1926.1101 – Asbestos in Construction. The industrial hygienist should assess each work area to monitor the removal of ACMs. Only after the industrial hygienist has determined the identified ACMs have been removed should final clearance air samples be collected (if necessary).

Suspect ACMs not observed due to inaccessibility or not sampled due to the destructive means that sampling would require may also be encountered during construction activities. At the time of the assessment, only limited destructive means were used to locate or sample suspect ACMs; therefore, additional suspect ACMs may remain within inaccessible areas that include, but are not limited to, fire doors, sub-grade walls, structural members, topping slabs, exterior areas, sub-grade sealants, flooring located below underlayments, vapor barriers, pipe trenches and other subsurface utilities, etc. If additional suspect ACMs are uncovered which were not accessible during this assessment, it is recommended that these materials either be assumed to contain asbestos or be sampled prior to disturbance upon discovery for asbestos content by an asbestos inspector in accordance with 29 CFR 1926.1101.

Follow OSHA asbestos regulations during demolition and/or renovation activities at the subject property of the subject property. You should be aware that stringent requirements are imposed upon anyone renovating or demolishing a structure in which ACM will be disturbed. This work must be performed in accordance with OSHA asbestos regulations, 29 CFR 1910 & 1926, and NESHAP asbestos regulations 40 CFR 61, subpart M. North Carolina regulations require the accreditation of personnel who work in the asbestos field and notification and permitting fees for asbestos removal projects.

Building 1 - Base Headquarters

There is a 10 working day notification period required prior to abatement of asbestos in a facility.

Failure to take proper precautions and actions to protect human health and the environment can result in penalties, danger to personnel, and construction delays.

Previous asbestos reports performed by others identified asbestos containing Pipe Insulation in the attic and throughout in pipe penetrations; Sealant in the basement mechanical room; 9" Black Floor Tile and Mastic throughout under carpet; 9" Brown Floor Tile in the first floor offices; 12" Acoustical Tile and Adhesive above drop ceilings; Residual Mastic in carpeted areas; Floor Tile and Adhesive Debris on the northwest wing; 12" Beige w/ Olive Floor Tile and Mastic in the basement and main stairwells; and Gasket materials on steam pits. These materials should be considered and treated as asbestos containing materials if present.

5.2 Lead in Paint and Surface Coatings

Based on the findings of this report, lead-based paint, as defined by the U.S. EPA, was not identified in samples collected. However, lead-containing paint was identified in all of the paint types sampled for this project.

The presence of lead is a concern primarily when conditions exist where it may be inhaled or ingested. Regardless of the analytical results of a material, all painted and/or glazed surfaces may still contain concentrations of lead in the paint, which when disturbed, may generate lead dust greater than the Permissible Exposure Limit (PEL) of 50 micrograms per cubic millimeter (ug/m3) as an 8-hour Time Weighted Average (TWA) established by the OSHA “Lead Exposure in Construction Rule (29 CFR 1926.62).”

The OSHA standard gives no guidance on acceptable levels of lead in paint at which no exposure to airborne lead (above the action level) would be expected. Rather, OSHA defines airborne concentrations, and references specific types of work practices and operations from which a lead hazard may be generated (reference 29 CFR 1926.62, section d). Environmental and personnel monitoring should be conducted during any removal/demolition process (as appropriate) to verify that actual personal exposures are below the Permissible Exposure Limit (PEL) of 50 micrograms per cubic millimeter (µg/m3) as an 8-hour Time Weighted Average (TWA). Under OSHA requirements, the contractor performing renovation work will be required to conduct this monitoring and follow applicable requirements under 29 CFR 1926.62 if disturbing lead-containing paint.

6.0 LIMITATIONS

The conclusions and recommendations presented within this report are based upon a reasonable level of assessment within normal bounds and standards of professional practice for a site in this particular geographic setting. ECS is not responsible or liable for the discovery and elimination of hazards that may potentially cause damage, accidents, or injuries.

The observations, conclusions, and recommendations pertaining to environmental conditions at the subject site are necessarily limited to conditions observed, and/or materials reviewed at the time this study was undertaken. No warranty, expressed or implied, is made with regard to the conclusions

Building 1 - Base Headquarters and recommendations presented within this report. This report is provided for the exclusive use of the client. This report is not intended to be used or relied upon in connection with other projects or by other unidentified third parties without the written consent of ECS and the client.

Our recommendations are in part based on federal, state, and local regulations and guidelines. ECS does not assume the responsibility of the person(s) in charge of the site, or otherwise undertake responsibility for reporting to any local, state, or federal public agencies, any conditions at the site that may present a potential danger to public health, safety, or the environment. Under this scope of services, ECS assumes no responsibility regarding any response actions initiated as a result of these findings. General compliance with regulations and response actions are the sole responsibility of the Client and/or person(s) in charge and should be conducted in accordance with local, state, and/or federal requirements.

Building 1 - Base Headquarters

Appendix I: Figures

LEGEND

1-#-# SAMPLE NUMBER

ASBESTOS NOT DETECTED

ASBESTOS POSITIVE

TRACE ASBESTOS (<1%)

FIGURE 1 – FIRST FLOOR

ASBESTOS SAMPLE LOCATION MAP

BUILDING 1 – BASE HEADQUARTERS

HADNOT POINT, ONSLOW COUNTY, NC

ECS PROJECT NO. 49-9247

Asbestos-Containing Materials were identified in previous reports and may be located in areas inaccessible by ECS at the time of this assessment;

please refer to previous reports for results and sample locations.

MR5-1,2

MR4-1,2

35-01, 02

04-01

03-01 02-01, 02 10-01, 02

01-01, 02

04-02

05-01

05-02

06-01, 02

08-01

08-02

09-01, 02

11-01, 02

12-01, 02

13-01, 02

14-01

14-02

14-03 14-04

15-01, 02

17-01

17-02

17-06

17-07

18-01, 02

21-01, 02 21-03, 04 24-02

30-02, 03 30-01

31-01

31-02 36-01, 02

Sample sets 26 & 27 are not noted on Figures as they were duplicates and not analyzed by the laboratory.

FIGURE 2 – SECOND FLOOR

Asbestos-Containing Materials were identified in previous reports and may be located in areas inaccessible by ECS at the time of this assessment;

MR1-1

MR2-1

MR1-2,3

MR2-2

MR3-1,2

03-02

07-01, 02

14-06 14-05 14-07

16-01, 02

17-03

17-04 17-05

19-01, 02

20-01, 02, 03

21-05

22-01, 02

23-01, 02

25-01, 02

34-02

34-01

Sample sets 26 & 27 are not noted on Figures as they were duplicates and not

FIGURE 3 – BASEMENT

Asbestos-Containing Materials were identified in previous reports and may be located in areas inaccessible by ECS at the time of this assessment;

24-01 28-01, 02 29-01, 02 32-01, 02

33-01 33-02

Sample sets 26 & 27 are not noted on Figures as they were duplicates and not

FIGURE 4 – FIRST FLOOR

PAINT CHIP SAMPLE LOCATION MAP

LBP1-#-# SAMPLE NUMBER

LEAD-BASED PAINT (≥0.5% BY WEIGHT)

LEAD-CONTAINING PAINT (<0.5% BY WEIGHT)

8-01

8-02 2-02

5-01

1-01, 02

6-01

4-01

7-02

5-02

2-01

LBP-14

LBP-12

LBP-13

FIGURE 5 – SECOND FLOOR

7-01

3-01,02 6-02

4-02 10-01,02 11-01,02

9-01,02

FIGURE 6 – BASEMENT

No paint chip samples were collected on the basement floor.

Appendix II: Site Photographs

1 - View of the exterior of the subject building, Building 1 - Base Headquarters

2 - View of Black Floor Tile and Mastic (ACM Sample 01)

Building 1 - Base

3 - View of Drywall and Joint Compound (ACM Sample 02) and Blue on Drywall (LBP Sample 01)

4 - View of Square Pattern Ceiling Tiles (ACM Sample 04)

Building 1 - Base

5 - View of Textured Ceiling Tile (ACM Sample 05)

6 - View of Pinhole Fissure Ceiling Tiles (ACM Sample 06)

Building 1 - Base

7 - View of Glue Pucks (ACM Sample 09 - Asbestos Containing) and 1' Spline Ceiling Tiles (ACM Sample 10)

8 - View of Carpet Mastic (ACM Sample 11)

Building 1 - Base

9 - View of White HVAC Mastic (ACM Sample 12)

10 - View of Tan Duct Mastic (ACM Sample 16)

Building 1 - Base

11 - View of Wall Texture (ACM Sample 17)

12 - View of Wall Texture (ACM Sample 17)

Building 1 - Base

13 - View of CMU Block Filler (ACM Sample 21)

14 - View of TSI End Mud (ACM Sample 20)

Building 1 - Base

15 - View of TSI End Mud (ACM Sample 20)

16 - View of 12" Cream Floor Tile w/Brown Streaks and Black Mastic (ACM Sample 22 - Asbestos Containing)

Building 1 - Base

17 - View of Peach Stair Tread (ACM Sample 24)

18 - View of Residual Black Mastic (ACM Sample 25)

Building 1 - Base

19 - View of Cream Floor Tile w/ Brown Streaks (ACM Sample 28)

20 - View of 3' Peach Linoleum Squares (ACM Sample 31)

Building 1 - Base

21 - View of Drywall Ceiling Tile (ACM Sample 33)

22 - View of Black Floor Tile (Multiple Layers) and Mastic (ACM Sample 34 - Asbestos Containing)

Building 1 - Base

23 - View of Black Floor Tile (Multiple Layers) and Mastic (ACM Sample 34 - Asbestos Containing)

24 - View of Cream on CMU Block (LBP Sample 02)

Building 1 - Base

25 - View of Beige on Drywall (LBP Sample 03)

26 - View of Brown on Metal (LBP Sample 05)

Building 1 - Base

27 - View of Black on Metal (LBP Sample 06)

28 - View of Black on Metal (LBP Sample 06)

Building 1 - Base

29 - View of Beige/White on Ductwork (LBP Sample 09)

30 - View of Beige/Black on Pipe (LBP Sample 10)

Building 1 - Base

31 - View of Beige/Blue on Brick (LBP Sample 11)

Building 1 - Base

Appendix III: Asbestos Bulk Sample Results

Bulk Asbestos Analysis By Polarized Light Microscopy

EPA Method: 600/R-93/116 and 40 CFR, Part 763, Subpart E, App.E

Camp Lejeune Building 1 Mechanical RoomProject:

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos Fibrous

Components Non-Fibrous Components

Attributes

Treatment

Alex SayreAttn:Customer: ECS Southeast, LLP 1812-D Center Park Drive Charlotte, NC 28217

Analysis ID: 71913722_PLM

Date Reported: 5/23/2019

Date Received: 5/22/2019

Lab Order ID: 71913722

None Detected

MR1-1

TSI Fiberglass Wrap with mud White Fibrous Homogeneous

Dissolved71913722PLM_1

Cellulose Other 80% 20%

None Detected

MR1-2 - A

TSI Fiberglass Wrap with mud mud

White Non Fibrous Homogeneous

Dissolved71913722PLM_2

Other 100%

None Detected

MR1-2 - B

TSI Fiberglass Wrap with mud insulation

Yellow Fibrous Homogeneous

Teased, Dissolved71913722PLM_12

Fiber Glass Other 98% 2%

None Detected

MR1-3

TSI Fiberglass Wrap with mud White Non Fibrous Homogeneous

Dissolved71913722PLM_3

Cellulose Fiber Glass

Other 40% 10%

50%

None Detected

MR2-1

Vibration Dampener Black Non Fibrous Homogeneous

Dissolved71913722PLM_4

Cellulose Other 10% 90%

None Detected

MR2-2

Vibration Dampener Black, Brown Non Fibrous Homogeneous

Dissolved71913722PLM_5

Fiber Glass Other 10% 90%

None Detected

MR3-1

Fire Stop Red Non Fibrous Homogeneous

Ashed, Dissolved71913722PLM_6

Fiber Glass Other 5% 95%

None Detected

MR3-2

Fire Stop Red Non Fibrous Homogeneous

Ashed, Dissolved71913722PLM_7

Fiber Glass Other 5% 95%

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogeneous soil samples be conducted by TEM for confirmation of “None Detected” by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program. Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Approved SignatoryAnalyst

Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

Philip Szabo (12)

P-F-002 r15 1/16/2021

Bulk Asbestos Analysis

EPA Method: 600/R-93/116 and 40 CFR, Part 763, Subpart E, App.E

Camp Lejeune Building 1 Mechanical RoomProject:

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos Fibrous

Components Non-Fibrous Components

Attributes

Treatment

Alex SayreAttn:Customer: ECS Southeast, LLP 1812-D Center Park Drive Charlotte, NC 28217

Analysis ID: 71913722_PLM

Date Reported: 5/23/2019

Date Received: 5/22/2019

Lab Order ID: 71913722

None Detected

MR4-1

Grey Duct Mastic Gray Non Fibrous Homogeneous

Ashed, Dissolved71913722PLM_8

Other 100%

None Detected

MR4-2

Grey Duct Mastic Gray Non Fibrous Homogeneous

Ashed, Dissolved71913722PLM_9

Other 100%

None Detected

MR5-1

White Duct Mastic White Non Fibrous Homogeneous

Ashed, Dissolved71913722PLM_10

Other 100%

None Detected

MR5-2

White Duct Mastic White Non Fibrous Homogeneous

Ashed, Dissolved71913722PLM_11

Other 100%

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogeneous soil samples be conducted by TEM for confirmation of “None Detected” by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program. Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Approved SignatoryAnalyst

Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

Philip Szabo (12) f!ample Ntim6er,,,J

MR1-1

MR1-2

MR1;-3

MR2-1

MR2-2

MR3-1

MR3-2

MR4-1

MR4-2

MR5-1

MR5-2

ECS Southeast, LLP Alex Sayre 1812 Center Park Drive, Suite D Charlotte, NC 28217

704.577.3256 (cell)

704.378.9013 (office) Asayre@ecslimited.com

Camp Lejeune Building 1 Mechanical Room Composite Drywall/Joint Compound Positive Stop on all sample sets 49-9247 5/21/19

PLM (Positive Stop) 24-hours

-Jlocallon Mechanical Room Mechanical Room Mechanical Room Mechanical Room Mechanical Room Mechanical Room Mechanical Room Mechanical Room Mechanical Room Mechanical Room Mechanical Room

Relinquished By: Amy C. DeSaix

Sample Oesc;riptlon TSI Fiberglass Wrap with mud TSI Fiberglass Wrap with mud TSI Fiberglass Wrap with mud Vibration Dampener Vibration Dampener Fire Stop Fire Stop Grey Duct Mastic Grey Duct Mastic White Duct Mastic White Duct Mastic

1 (/~l~/LL

4604' Dundas Drive iGre.iiutsbt,ro/f.lo,2;J4ov,, rl'hci},e: ~36.292.3;888

Fax: 336.292.3111:3 Ema,il: lab@sailab.Jom

Estlpmte<1Q1(ant1ty: J

Accepted

Re\ected d if/ d' ~~ ed!,f&~

EPA Method: 600/R-93/116 and 40 CFR, Part 763, Subpart E, App.E

Camp Lejeune Building 1Project:

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos Fibrous

Components Non-Fibrous Components

Attributes

Treatment

Alex SayreAttn:Customer: ECS Southeast, LLP 1812-D Center Park Drive Charlotte, NC 28217

Analysis ID: 71912923_PLM

Date Amended: 5/24/2019

Date Reported: 5/16/2019

Date Received: 5/15/2019

Lab Order ID: 71912923

None Detected1-01-01 - A Black floor tile and mastic floor tile

Black Non Fibrous Homogeneous

Dissolved71912923PLM_1

Other100%

None Detected1-01-01 - B Black floor tile and mastic mastic

Yellow Non Fibrous Homogeneous

Dissolved71912923PLM_88

Other100%

None Detected1-01-02 - A Black floor tile and mastic floor tile

Black Non Fibrous Homogeneous

Dissolved71912923PLM_2

Other100%

None Detected1-01-02 - B Black floor tile and mastic mastic

Yellow Non Fibrous Homogeneous

Dissolved71912923PLM_89

Other100%

None Detected1-02-01 - A Blue floor tile and mastic floor tile

Blue Non Fibrous Homogeneous

Dissolved71912923PLM_3

Other100%

None Detected1-02-01 - B Blue floor tile and mastic mastic

Yellow Non Fibrous Homogeneous

Dissolved71912923PLM_90

Other100%

None Detected1-02-02 - A Blue floor tile and mastic floor tile

Blue Non Fibrous Homogeneous

Dissolved71912923PLM_4

Other100%

None Detected1-02-02 - B Blue floor tile and mastic mastic

Yellow Non Fibrous Homogeneous

Dissolved71912923PLM_91

Other100%

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogeneous soil samples be conducted by TEM for confirmation of “None Detected” by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program. Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Approved SignatoryAnalyst

Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

Byron Stroble (121)

App.E

Camp Lejeune Building 1Project:

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos Fibrous

Components Non-Fibrous Components

Attributes

Treatment

Alex SayreAttn:Customer: ECS Southeast, LLP 1812-D Center Park Drive Charlotte, NC 28217

Analysis ID: 71912923_PLM

Date Amended: 5/24/2019

Date Reported: 5/16/2019

Date Received: 5/15/2019

Lab Order ID: 71912923

None Detected1-03-01 Drywall and joint compound drywall: none detect; joint compnd: none detect

Brown, White Non Fibrous Heterogeneous

Teased71912923PLM_5

Cellulose Other10% 90%

None Detected1-03-02 Drywall and joint compound drywall: none detect; joint compnd: none detect

Brown, White Non Fibrous Heterogeneous

Teased71912923PLM_6

Cellulose Other10% 90%

None Detected1-04-01 2'x2' square pattern ceiling tile Gray Fibrous Homogeneous

Teased, Ashed71912923PLM_7

Mineral Wool Cellulose Other

70% 20% 10%

None Detected1-04-02 2'x2' square pattern ceiling tile Gray Fibrous Homogeneous

Teased, Ashed71912923PLM_8

Mineral Wool Cellulose Other

70% 20% 10%

None Detected1-05-01 2'x2' textured ceiling tile Tan Fibrous Homogeneous

Teased, Ashed71912923PLM_9

Mineral Wool Cellulose Other

70% 20% 10%

None Detected1-05-02 2'x2' textured ceiling tile Gray Fibrous Homogeneous

Teased, Ashed71912923PLM_10

Mineral Wool Cellulose Other

70% 20% 10%

None Detected1-06-01 2'x2' pinhole fissure ceiling tile

Gray Fibrous Homogeneous

Teased, Ashed71912923PLM_11

Cellulose Mineral Wool Other

45% 45% 10%

None Detected1-06-02 2'x2' pinhole fissure ceiling tile

Gray Fibrous Homogeneous

Teased, Ashed71912923PLM_12

Cellulose Mineral Wool Other

45% 45% 10%

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogeneous soil samples be conducted by TEM for confirmation of “None Detected” by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program. Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Approved SignatoryAnalyst

Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

App.E

Camp Lejeune Building 1Project:

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos Fibrous

Components Non-Fibrous Components

Attributes

Treatment

Alex SayreAttn:Customer: ECS Southeast, LLP 1812-D Center Park Drive Charlotte, NC 28217

Analysis ID: 71912923_PLM

Date Amended: 5/24/2019

Date Reported: 5/16/2019

Date Received: 5/15/2019

Lab Order ID: 71912923

None Detected1-07-01 Red fire caulking Red Non Fibrous Homogeneous

Dissolved71912923PLM_13

Other100%

None Detected1-07-02 Red fire caulking Red Non Fibrous Homogeneous

Dissolved71912923PLM_14

Other100%

None Detected1-08-01 - A 3" black cove base and mastic cove base

Black Non Fibrous Homogeneous

Ashed71912923PLM_15

Other100%

None Detected1-08-01 - B 3" black cove base and mastic mastic

Tan Non Fibrous Homogeneous

Dissolved71912923PLM_92

Other100%

None Detected1-08-02 - A 3" black cove base and mastic cove base

Black Non Fibrous Homogeneous

Ashed71912923PLM_16

Other100%

None Detected1-08-02 - B 3" black cove base and mastic mastic

Tan Non Fibrous Homogeneous

Dissolved71912923PLM_93

Other100%

6% Chrysotile 1-09-01 Glue pucks

Brown Non Fibrous Homogeneous

Dissolved71912923PLM_17

Other94%

Not Analyzed1-09-02 Glue pucks

71912923PLM_18

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogeneous soil samples be conducted by TEM for confirmation of “None Detected” by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program. Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Approved SignatoryAnalyst

Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

App.E

Camp Lejeune Building 1Project:

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos Fibrous

Components Non-Fibrous Components

Attributes

Treatment

Alex SayreAttn:Customer: ECS Southeast, LLP 1812-D Center Park Drive Charlotte, NC 28217

Analysis ID: 71912923_PLM

Date Amended: 5/24/2019

Date Reported: 5/16/2019

Date Received: 5/15/2019

Lab Order ID: 71912923

None Detected1-10-01 1'x1' spline ceiling tile Brown Fibrous Homogeneous

Teased71912923PLM_19

Cellulose Other90% 10%

None Detected1-10-02 1'x1' spline ceiling tile Brown Fibrous Homogeneous

Teased71912923PLM_20

Cellulose Other90% 10%

None Detected1-11-01 Carpet mastic yellow and black

Black, Yellow Non Fibrous Heterogeneous

Dissolved71912923PLM_21

Other100%

None Detected1-11-02 Carpet mastic yellow and black

Black, Yellow Non Fibrous Heterogeneous

Dissolved71912923PLM_22

Other100%

None Detected1-12-01 White HVAC mastic White, Beige Non Fibrous Heterogeneous

Dissolved71912923PLM_23

Cellulose Other40% 60%

None Detected1-12-02 White HVAC mastic White, Beige Non Fibrous Heterogeneous

Dissolved71912923PLM_24

Cellulose Other40% 60%

None Detected1-13-01 1'x1' lightwight concrete ceiling tiles on plaster drop ceiling

Gray Non Fibrous Homogeneous

Crushed71912923PLM_25

Other100%

None Detected1-13-02 1'x1' lightwight concrete ceiling tiles on plaster drop ceiling

Gray Non Fibrous Homogeneous

Crushed71912923PLM_26

Other100%

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogeneous soil samples be conducted by TEM for confirmation of “None Detected” by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program. Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Approved SignatoryAnalyst

Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

App.E

Camp Lejeune Building 1Project:

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos Fibrous

Components Non-Fibrous Components

Attributes

Treatment

Alex SayreAttn:Customer: ECS Southeast, LLP 1812-D Center Park Drive Charlotte, NC 28217

Analysis ID: 71912923_PLM

Date Amended: 5/24/2019

Date Reported: 5/16/2019

Date Received: 5/15/2019

Lab Order ID: 71912923

None Detected1-14-01 Plaster ceiling under 1'x1' CT single layer

Gray Non Fibrous Homogeneous

Crushed71912923PLM_27

Other100%

None Detected1-14-02 Plaster ceiling under 1'x1' CT single layer

Gray Non Fibrous Homogeneous

Crushed71912923PLM_28

Other100%

None Detected1-14-03 Plaster ceiling under 1'x1' CT single layer

Gray Non Fibrous Homogeneous

Crushed71912923PLM_29

Other100%

None Detected1-14-04 - A Plaster ceiling under 1'x1' CT single layer

Gray Non Fibrous Homogeneous

Crushed71912923PLM_30

Other100%

None Detected1-14-04 - B Plaster ceiling under 1'x1' CT mastic

Brown Non Fibrous Homogeneous

Dissolved71912923PLM_94

Other100%

None Detected1-14-05 - A Plaster ceiling under 1'x1' CT finish

White Non Fibrous Homogeneous

Teased71912923PLM_31

Other100%

None Detected1-14-05 - B Plaster ceiling under 1'x1' CT base

Gray Non Fibrous Homogeneous

Crushed71912923PLM_95

Other100%

None Detected1-14-06 - A Plaster ceiling under 1'x1' CT finish

White Non Fibrous Homogeneous

Teased71912923PLM_32

Other100%

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogeneous soil samples be conducted by TEM for confirmation of “None Detected” by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program. Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Approved SignatoryAnalyst

Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

App.E

Camp Lejeune Building 1Project:

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos Fibrous

Components Non-Fibrous Components

Attributes

Treatment

Alex SayreAttn:Customer: ECS Southeast, LLP 1812-D Center Park Drive Charlotte, NC 28217

Analysis ID: 71912923_PLM

Date Amended: 5/24/2019

Date Reported: 5/16/2019

Date Received: 5/15/2019

Lab Order ID: 71912923

None Detected1-14-06 - B Plaster ceiling under 1'x1' CT base

Gray Non Fibrous Homogeneous

Crushed71912923PLM_96

Other100%

None Detected1-14-07 Plaster ceiling under 1'x1' CT single layer

Gray Non Fibrous Homogeneous

Crushed71912923PLM_33

Other100%

None Detected1-15-01 Puck mastic on plaster Brown Non Fibrous Homogeneous

Dissolved71912923PLM_34

Other100%

None Detected1-15-02 Puck mastic on plaster Brown Non Fibrous Homogeneous

Dissolved71912923PLM_35

Other100%

None Detected1-16-01 HVAC duct Yellow, Beige Non Fibrous Heterogeneous

Dissolved71912923PLM_36

Cellulose Other10% 90%

None Detected1-16-02 HVAC duct Yellow, Beige Non Fibrous Heterogeneous

Dissolved71912923PLM_37

Cellulose Other10% 90%

None Detected1-17-01 Texture wall throughout White Non Fibrous Homogeneous

Teased71912923PLM_38

Other100%

None Detected1-17-02 Texture wall throughout White Non Fibrous Homogeneous

Teased71912923PLM_39

Other100%

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogeneous soil samples be conducted by TEM for confirmation of “None Detected” by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program. Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Approved SignatoryAnalyst

Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

App.E

Camp Lejeune Building 1Project:

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos Fibrous

Components Non-Fibrous Components

Attributes

Treatment