AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 3
AMENDMENT NO. 0007 05/28/20 1634037
ACQ1
NAVAL FACILITIES ENGINEERING COMMAND,
MID-ATLANTIC
9742 MARYLAND AVENUE
NORFOLK, VA 23511-3095
See Item 6
✘ N4008520R4033
03/18/20
N4008520R4033 Design Build Renovation Building 1
The date and the hour for the receipt of proposals remains 3 June 2020 no later than 2:00 pm
(EDT).
See Continuation Page(s)
19-0037 DB Renovation Building 1 Solicitation N4008520R4033 Marine Corps Base Camp Lejeune, North Carolina Amendment 0007
Block 14. DESCRIPTION OF AMENDMENT (cont.)
A. The following provides a correction to the Government’s previously provided preaward inquiry response:
REFERENCE
Page Section Para.
QUESTION GOVERNMENT RESPONSE
Please confirm that the contractor is responsible for design, procurement and installation of the FF&E for Building 1
Contractor is not responsible for design, procurement and installation of FF&E. Refer to updated Part 3 (V4) and Part 4 (V3). Clarifications on fixed furnishings have been provided.
If the FF&E is the responsibility of the contractor, please provide additional criteria for the furniture for each type of space in the room requirement sheets.
Contractor is not responsible for FF&E. Refer to updated Part 3 (V4) and Part 4 (V3).
Clarifications on fixed furnishings have been provided.
13 Part 3 4.C.2.c. The RFP asked to provide interior design support, procure, and install the FF&E for building 1. Section 6 E10 & E20 refer to a separate FF&E Package that will have the purchase and installation as a separately funded project. Is the contractor to only supply the interior design services in the bid and any procurement and installation services will be part of a separate modification package later?
Refer to updated Part 3 (V4) and Part 4 (V3). Clarifications on fixed furnishings have been provided.
Part 3 Please clarify the SID and FF&E scope of work from both a design and construction standpoint. Part 3 E20 states that "The design and documentation of both [SID and FF&E] will be funded as part of the construction contract. The purchase and installation for the FF&E Package will be funded separately as part of Collateral Equipment."
Refer to updated Part 3 (V4) and Part 4 (V3). Clarifications on fixed furnishings have been provided.
It appears that a GCC Prime contractor may have been involved with the development of the asbestos/lead reports for the buildings. In order to maintain fair competition please clearly define the quantities of material requiring abatement.
Refer to updated Part 3 (V4), Chapter 1 for quantities.
19-0037 DB Renovation Building 1 Solicitation N4008520R4033 Marine Corps Base Camp Lejeune, North Carolina Amendment 0007
B. This amendment incorporates the following updated attachments:
1. 19-0037 PART 3 BLDG 1 RENOVATION REVISED V4
2. 19-0037 PART 4 BLDG 1 RENOVATION REVISED V3
C. All other contract terms and conditions remain unchanged.