Building 1 Renovation Work Order #19-0037 Camp Lejeune, Jacksonville, NC
SECTION 26 36 23.00 20
AUTOMATIC TRANSFER SWITCHES
04/06
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
NETA ATS (2017; Errata 2017) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;
TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;
TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;
TIA 17-11; TIA 17-12; TIA 17-13; TIA
17-14; TIA 17-15; TIA 17-16; TIA 17-17 )
National Electrical Code
UNDERWRITERS LABORATORIES (UL)
UL 1008 (2014) Transfer Switch Equipment
UL 508 (2018) UL Standard for Safety Industrial Control Equipment
1.2 RELATED REQUIREMENTS
Section 26 00 00 BASIC ELECTRICAL MATERIALS AND METHODS, and Section 26 08 00 APPARATUS INSPECTION AND TESTING, apply to this section, with the additions and modifications specified herein.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00.05 20
CONSTRUCTION SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Automatic Transfer Switch Drawings ; G
SD-03 Product Data
Automatic Transfer Switches ; G
SECTION 26 36 23.00 20 Page 1
SD-06 Test Reports
Acceptance Checks and Tests
Functional Acceptance Tests
SD-07 Certificates
Proof of Listing
SD-10 Operation and Maintenance Data
Automatic Transfer Switches , Data Package 5; G
Submit in accordance with Section 01 78 23 OPERATION AND
MAINTENANCE DATA.
1.4 QUALITY ASSURANCE
1.4.1 Proof of Listing
Submit proof of listing by UL 1008 .
1.4.2 Automatic Transfer Switch Drawings
Drawings shall include outline, arrangement, and detail drawings. Detail drawings shall include manufacturer's name and catalog number, electrical ratings, total system transfer statement, reduced normal supply voltage at which transfer to the alternate supply is initiated, transfer delay times, short-circuit current rating, wiring diagram, description of interconnections, testing instructions, acceptable conductor type for terminals, tightening torque for each wire connector, and other required UL 1008 markings.
PART 2 PRODUCTS
2.1 AUTOMATIC TRANSFER SWITCHES
Provide four-pole, automatic transfer switches for use in emergency systems in accordance with UL 1008 . Each automatic transfer switch shall be rated for total system transfer and have the current and voltage ratings as indicated. The rating of the switch shall be adequate for withstanding the effects of the indicated RMS symmetrical fault current when protected by the indicated overcurrent device without contact welding. The switch operating mechanism shall be electrically operated from the source to which it is transferring, shall have quick-make, quick-break, load break contacts, and shall be mechanically held in both positions. Non-fire pump service transfer switches shall have manual operating means provided for maintenance and servicing accessible only by opening the enclosure. The manual operating means shall affect the opening and closing of the switch contacts at the same rate of speed as that caused by the automatic operation of the switch. The switch enclosure shall comply with UL 508 , NEMA Type 1 (if interior) and 4X (if exterior) , and shall be equipped with an equipment ground lug. Provide 1 extra lug per phase and neutral on the generator side to tie in a load bank test breaker.
SECTION 26 36 23.00 20 Page 2
2.1.1 Automatic Transfer Switch Controls
2.1.1.1 Controls for Utility-Generator Automatic Transfer Switch
Provide all necessary controls to start the generator set upon loss of the normal (utility) source, transfer the load to the generator set upon reaching rated voltage and frequency, re-transfer the load when the normal (utility) source returns, and stop the generator set.
The switch shall include the following control features.
a. Three-phase normal source voltage sensing circuit with adjustable dropout, 75-93 percent of nominal, and pickup, 85-100 percent of nominal.
b. Engine starting control contacts with adjustable commit-to-start delay circuit, 0.5-6.0 seconds.
c. Voltage/frequency sensing circuit, set for 80 percent of nominal, for enabling load transfer to emergency source.
d. Re-transfer to normal source time delay, adjustable 1-30 minutes.
e. Programmable exerciser to allow automatic starting of the generator set and subsequent load transfer. Exercise periods shall be selectable for 1 to 24 hours per day for 0 to 7 days a week.
2.1.2 Front Panel Devices
Provide devices mounted on cabinet front consisting of:
a. Mode selector switch with the following positions and associated functions;
1. TEST - Simulates loss of normal/preferred source system operation.
2. NORMAL - Transfers system to normal/preferred source bypassing re-transfer time delay.
b. Lamps for indicating connected source and normal/preferred source is available.
c. Auxiliary contacts for indicating connected source and normal/preferred source available.
PART 3 EXECUTION
3.1 INSTALLATION
Installation shall conform to the requirements of NFPA 70 and manufacturer's recommendation.
3.2 PREREQUISITES FOR FUNCTIONAL ACCEPTANCE TESTING
Completion of the following requirements is mandatory prior to scheduling functional acceptance tests for the automatic transfer switch.
SECTION 26 36 23.00 20 Page 3
3.2.1 Performance of Acceptance Checks and tests
Complete as specified in paragraph entitled "Acceptance Checks and Tests". The Acceptance Checks and Tests shall be accomplished by the Testing organization as described in Section 26 08 00 APPARATUS INSPECTION
AND TESTING.
3.2.2 Manufacturers O&M Information
The manufacturers O&M information required by the paragraph entitled "SD-10 Operation and Maintenance Data", shall have been submitted to and approved by the Contracting Officer.
3.2.3 Test Equipment
All test equipment and instruments shall be on hand prior to scheduling field tests, or subject to Contracting Officer's approval, evidence shall be provided to show that arrangements have been made to have the necessary equipment and instruments on site prior to field testing.
3.3 FIELD QUALITY CONTROL
Give Contracting Officer 15 days notice of dates and times scheduled for tests which require the presence of the Contracting Officer. The Contracting Officer will coordinate with the using activity and schedule a time that will eliminate or minimize interruptions and interference with the activity operations. The contractor shall be responsible for costs associated with conducting tests outside of normal working hours and with incorporating special arrangements and procedures, including temporary power conditions. The contractor shall provide labor, equipment, apparatus, including test load, and consumables required for the specified tests. Calibration of all measuring devices and indicating devices shall be certified. The test load shall be a cataloged product in accordance with Section 26 00 00 BASIC ELECTRICAL MATERIALS AND METHODS. Perform the following field tests in accordance with the manufacturer's recommendations and include the following visual and mechanical inspections and electrical tests, performed in accordance with NETA ATS.
3.3.1 Automatic Transfer Switch Acceptance Checks and Tests
a. Visual and Mechanical Inspection
1. Compare equipment nameplate data with specifications and approved shop drawings.
2. Inspect physical and mechanical condition.
3. Confirm correct application of manufacturer's recommended lubricants.
4. Verify that manual transfer warnings are attached and visible.
5. Verify tightness of all control connections.
6. Verify tightness of accessible bolted connections by calibrated torque-wrench method. Thermographic survey is not required.
7. Perform manual transfer operation.
SECTION 26 36 23.00 20 Page 4
8. Verify positive mechanical interlocking between normal and alternate sources.
b. Electrical Tests
1. Measure contact-resistance.
2. Perform insulation-resistance on each pole, phase-to-phase and phase-to-ground with switch closed, and across each open pole for one minute. Perform tests in both source positions.
3. Verify settings and operations of control devices.
4. Calibrate and set all relays and timers.
3.3.2 Functional Acceptance Tests
Functional Acceptance Tests shall be coordinated with Section 26 32 13 SINGLE OPERATION GENERATOR SETS and shall include simulating power failure and demonstrating the following operations for each automatic transfer switch. Contractor shall show by demonstration in service that the automatic transfer switches are in good operating condition, and function not less than five times.
a. Perform automatic transfer tests:
1. Simulate loss of normal/preferred power.
2. Return to normal/preferred power.
3. Simulate loss of emergency power.
4. Simulate all forms of single-phase conditions.
b. Verify correct operation and timing of the following functions:
1. Normal source voltage-sensing relays.
2. Engine start sequence.
3. Time delay upon transfer.
4. Alternate source voltage-sensing relays.
5. Automatic transfer operation.
6. Interlocks and limit switch function.
7. Time delay and retransfer upon normal power restoration.
-- End of Section --
SECTION 26 36 23.00 20 Page 5
| 26 36 23.00 20 - AUTOMATIC TRANSFER SWITCHES |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 RELATED REQUIREMENTS |
| 1.3 SUBMITTALS |
| 1.4 QUALITY ASSURANCE |
| 1.4.1 Proof of Listing |
| 1.4.2 Automatic Transfer Switch Drawings |
| PART 2 PRODUCTS |
| 2.1 AUTOMATIC TRANSFER SWITCHES |
| 2.1.1 Automatic Transfer Switch Controls |
| 2.1.1.1 Controls for Utility-Generator Automatic Transfer Switch |
2.1.2 Front Panel Devices
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.2 PREREQUISITES FOR FUNCTIONAL ACCEPTANCE TESTING |
| 3.2.1 Performance of Acceptance Checks and tests |
| 3.2.2 Manufacturers O&M Information |
| 3.2.3 Test Equipment |
| 3.3 FIELD QUALITY CONTROL |
| 3.3.1 Automatic Transfer Switch Acceptance Checks and Tests |