Amendment 0005.pdf

PDF 371 KB Posted

Attached to
Design-Bid-Build, P653 Dry Dock Flood Protection Improvements
Solicitation number
N4008520R0063
Issued by

About this file

This solicitation requests proposals for a design-bid-build construction project. The scope of work includes constructing a permanent flood wall to protect four dry docks, associated facilities and infrastructure at Norfolk Naval Shipyard from flooding. The flood wall will be a cast-in-place reinforced concrete wall supported by subsurface grout injection. The project will also modify two existing dry dock caisson gunwales, construct caisson seat extensions for three dry docks, and replace existing capstans. The Navy seeks a firm-fixed price contract and will evaluate proposals based on price, experience, safety, past performance, and small business utilization. Offerors must submit proposals by June 16, 2020. The Navy intends to award without discussions by October 14, 2020 and issue notice to proceed prior to the first phase starting on October 6, 2020.

View the file

Other files

File Type Posted
Amendment 0006.pdf PDF
AMD 0005 DWG2.pdf PDF
AMD 0005 DWG1.pdf PDF
NNSY Map.pdf PDF
20R0063 Site Visit Log.docx DOCX document
20R0063 Amendment 0004.pdf PDF
20R0063 Amendment 0003.pdf PDF
1588810Amend0002-dwg-2of2 (S-E).pdf PDF
1588810Amend0002-dwg-1of2 (G-C).pdf PDF
20R0063 Amendment 0002.pdf PDF
20R0063 Amendment 0001.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
1588810-SPC-03of24-App A02.pdf PDF
1588810-SPC-05of24-App A04.pdf PDF
1588810-SPC-21of24-App F3.pdf PDF
1588810-DWG-05of14 (SURVEY).pdf PDF
1588810-SPC-12of24-App A11.pdf PDF
Attachment B - SECNAV_5512_1_11787-One Day Past Request.pdf PDF
1588810-DWG-12of14 (CU2).pdf PDF
1588810-SPC-23of24-App F5.pdf PDF
Attachment J - CVS-CIA Blank Spreadsheet.xlsx XLSX spreadsheet
1588810-DWG-14of14 (ARCH-ELEC).pdf PDF
1588810-SPC-02of24-App A01.pdf PDF
1588810-SPC-20of24-App F2.pdf PDF
1588810-DWG-09of14 (CS2).pdf PDF
1588810-SPC-11of24-App A10.pdf PDF
1588810-SPC-16of24-App C.pdf PDF
Attachment G - Small Business Participation and Commitment Strategy.docx DOCX document
1588810-DWG-03of14 (GEOTECH1).pdf PDF
1588810-DWG-08of14 (CS1).pdf PDF
1588810-SPC-09of24-App A08.pdf PDF
1588810-SPC-04of24-App A03.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
1588810-SPC-15of24-App B.pdf PDF
1588810-SPC-07of24-App A06.pdf PDF
1588810-SPC-18of24-App E.pdf PDF
1588810-SPC-24of24-App F6.pdf PDF
1588810-DWG-06of14 (C_CD).pdf PDF
1588810-DWG-11of14 (CU1).pdf PDF
1588810-SPC-06of24-App A05.pdf PDF
1588810-SPC-22of24-App F4.pdf PDF
1588810-DWG-04of14 (GEOTECH2).pdf PDF
1588810-DWG-02of14 (GEN2).pdf PDF
Attachment H - Price Proposal Form.docx DOCX document
1588810-DWG-13of14 (STR).pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
1588810-SPC-14of24-App A13.pdf PDF
Attachment I - ODP Form.xls XLS spreadsheet
Attachment F - Small Business Subcontracting Record.docx DOCX document
1588810-SPC-01of24.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

DESIGN-BID-BUILD, P653 DRY DOCK FLOOD PROTECTION IMPROVEMENTS, NORFOLK, NAVAL SHIPYARD, PORTSMOUTH, VA

SEE SF 30 BLOCK 14 CONTINUATION PAGE

Contract POC: Rachel Honecker; rachel.honecker@navy.mil; 757-341-1652

1. CONTRACT ID CODE PAGE OF PAGES

J 1 58

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Jun-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008520R0063

X 9B. DATED (SEE ITEM 11)

16-Apr-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Jun-2020

CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008520R0063

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0005

The purpose of this Amendment is to provide the following:

1. PPI responses.

2. Updated Proposal Submission Instructions.

3. Revised drawings.

Reference Question Response

Page Section Paragraph

1 Page 37-38 of 54

Solicitation Based on tight scheduling time frames for each phase and high liquidated damages for the work phases included in the contract documents,(5 of 12 at $75,000/calendar day) the financial risk associated with this project is high.

For example, a project of this size takes at least a minimum of 2-3 months for adminstrative & safety related submittals prior to starting construction due to the required 20 working days for Government review/approval allowed in the specifications. Similar to all projects bid this time of the year, the project will be awarded at the end of September. If the contractor is unable to start the project until the end of the 2020 calendar year on the first phase of work, we will be limited to only 3-4 months out of the alloted 6 months to execute the first phase of work. In addition, this does not account for any potential delay of:

long lead procurement items (flood gates), weather days, and government holidays. Additionally, a delay in the first phase of work affects all subsequent phases.

UPDATED REPONSE: See revisions to the Milestones and Liquidated values. Dates are planned to work around Dry Dock and Berth Projects, as well as other construction projects within NNSY. If the contractor needs to plan to work 2 or 3 shifts, or weekends during the begining of the project, or any phases to complete the dates, it's their responsbility. The intent of the early start is to incentavise the contractor to start work as soon as possible. LD's have been removed from Phase 1, but time period and LD's remain for Phase 2.

Please re-evaluate and provide your detailed schedule for each phase of work because at this time, it is uncertain any phase can be properly accomplished within the specified time frames. In addition, please reconsider the current use of specific timelines for all 12 phases and eliminating liquidated damages for each specific phase.

2 Page 37-38 of 54

Solicitation Please consider allowing the contractor to work in multiple areas at once. This gives the contractor (and their respective subcontractors) the flexibility to share resources between the different phases and does not limit them to single areas. Any flexibility that can be provided will lower the bid price and the overall project becomes more manageable. We suggest: Eliminating the phased liquidated damages and have definitive timelines for the work around the dry docks/waterfront but allow the other phases to be fill in work with no definitive time lines.

See revisions to the Milestones and Liquidated values. The phasing is planned around Dry Dock and Berth Projects, as well as other construction projects within NNSY. The phasing is also spaced out to minimize the contractor work areas to become excessive and impact NNSY activities.

3 Page 37-38 of 54

Solicitation Due to the inherent risk associated with this project's phase work approach, and the tight timelines and substantial liquidated damages associated with 5 of 12 of them, we request 3 additional weeks to prepare our proposals and bidding package.

Please see Amendment 0002.

4 Page 37-38 of 54

Solicitation Why are the liquidated damages for Phases 4-8 $75,000 per calendar day delay? This seems high. As you know, the liquidated damaged values should be reflective of the actual potential damages the Navy could incur due to this delay. In accordance with published Naval Facilities Acquistion Standards (NFAS), has

See revisions to the Milestones and Liquidated values. These are estimated cost in damages to the NAVY, if the work is not completed by those dates.

this analysis been accomplished and approved by the Echelon II/IV Chief of the Contracting Office (CCO)?

5 Page 8 of

Solicitation Due to the rare occurrence of $20M construction contracts related to this type of work in the past 10 years, since this overall solicitation has 12 separate smaller phases, (in an effort to promote more qualified competition), please consider reducing the relevant construction projects to a minimum of $15M or greater construction costs within the past 15 years.

Please see Amendment 0002.

6 Page 1 of

Solicitation Due to the tight timelines for the phases work and and substantial liquidated damages, please consider reducing the bid acceptance period of 120 days to 60 days.

Bid acceptance period remains unchanged.

7 Is it possible for the caissons to be taken out of Norfolk Naval Shipyard, to an off site facility, to be repaired in accordance with the design documents?

UPDATED RESPONSE: See revisions to the Milestones and Liquidated values. There are two time slots for Phase 6.

From 3APR21 to 3OCT21 the contractor can remove the Caisson #3 to an offsite location to be worked on. The contractor needs to complete the wing walls and flood wall work from STA 9+05 to STA 10+95 by 3OCT21. Caisson #3 needs to be installed for government inspection by 16SEP21. Any remaining work on only the flood wall can be completed in the second window of time 19JUL22 to

28NOV22.

8 14 of 54 4 4.1 Is this site visit mandatory for all bidding contractors to attend?

The site visit is not mandatory.

However, this will be the only government sponsored site visit for this project.

9 14 of 54 4 4.1 Does the site visit include walking into Controlled Industrial Area’s that we will need to request access via CVS-CIA spreadsheet? Or is Controlled Access something we DO NOT need to request for this site visit?

The site visit includes walking into the Controlled Industrial Area. The request is needed for CIA access.

10 SWBS- 37 622 d.1 This section includes, but is not limited to NEW fiberglass reinforced plastic (FRP) grating, and its framing for ballast tank sump grating, stair landings and catwalks. Is it the intention to replace ?

Please see Amendment 0002.

11 14 4.1 SECNAV

5512/1 (Attachment B)

Electronic Form SECNAV 5512/1 (Attachment B) Box 28 Word Days does not allow for multiple selections ( "T" for May 19 and "W" May 20 RAIN DATE). Please clarify how Bidder should make the two day selection on the form.

Use May 19.

12 14 4.1 ODP Form (Attachment I)

Please clarify what information Bidder should insert on Columns N through T on ODP Form (Attachment I), if any.

Leave these columns blank.

13 14 4.1 CVS-CIA

Blank Spreadsheet (Attachment J)

Please clarify what information Bidder should insert on Column N (VISA/PASSPORT) on CVS-CIA Blank Spreadsheet (Attachment J)

Column N is to list whether you have visa or passport and column O is for the number.

14 14 4.1 CVS-CIA

Blank Spreadsheet (Attachment J)

Please confirm Date of Visit to be inserted on column A on CVS-CIA Blank Spreadsheet (Attachment J).

Current pre-filled out date is 1/1/2019.

This form is for one year badge.

15 G-101 Note 2 Dwg Sht G-101 Note 2 states Phase 1 starts September 2020 and phasing schedule in RFP states Phase start as October 6, 2020. Please confirm which is correct.

Schedule in RFP governs.

Drawing revision forthcoming.

16 37 52.211-11 (b) Phasing schedule allows for early completion of Phases 1,2,3,9,10,11 & 12 and early start of subsequent phases. Please confirm that the acceptance date of subsequent Phases stays the same.

Yes, acceptance date of subsequent phases stays the same.

17 Solicitation

3.3 In section 3.3, (1) Factor 1, Experience, it states “Projects submitted for the offeror shall be completed within the past ten (10) years from the date of issuance of this RFP.” Due to the limited amount of similar types of projects completed in the past ten (10) years, will the Government consider changing this requirement to the following language to increase the breadth of submitted project experience: “Projects submitted for the offeror shall meet one of the following requirements in relationship to recent experience

1. Completed project within in the past ten (10) years from the date of issuance of the RFP or;

2. Current project under construction that shall be at least 75% complete by the date of issuance of the RFP.”

Please see Amendment 0002.

18 Drawing G-

Drawing G-106 Phase 6 notes to base bids for ongoing submarine repairs in Drydock 3 starting in September 2022. The liquidated damages schedule notes that Phase 6 starts on July 19, 2022. This only leaves less than 6 weeks complete caisson rework and other associated work.

This timeframe is not feasible. Please revise the timeframes to provide adequate time to complete this work

There is a separate window for the upgrade of caisson #3 and raising the wing walls at DD3 caisson seat. (3 April 2021 - 3 October 2021) The intent of phase 6 is to build and tie-in new flood wall to newly raised wing walls at caisson seat. The two phases should allow enough time to finish all caisson, caisson wing wall and new flood wall work without impacting ship avaliability work in DD3.

19 8 of 54 Solicitation Factor 1, Experience

1. The Solicitation Submittal Requirement for Factor 1 Experience requires that projects submitted for the offeror shall be completed within the past (10) years from the date of issuance of this RFP. Please consider changing the requirement to the project shall be completed within the past (20) years.

Please see Amendment 0002.

21 33 00700 Can NAVFAC provide any clarity how they will address the contract execution of this project relative to the current COVID-19 outbreak in relationship to Guidelines and Orders that currently exist at the shipyard or potentially be modified due to this ongoing unprecedented event;

particularly working within tight and restricted barricaded areas? Is NAVFAC considering to adjust any current contract language during this pandemic relative schedule and/or cost relief?

Contract language remains unchanged.

22 37 52.211-11 (b) Phase 1 duration in Amendment 0001 was lengthened to 235 calendar days and the duration for Phase 2 was shortened to 57 calendar days. Please confirm this is the intent and that the Government requires Phase 2 to be completed within this time frame at a rate 10.70 lf per calendar day while all other phases are required to be performed at an average rate of 3.83 lf per calendar day . This duration doesn’t seem reasonable or consistent when compared to the other durations on the project.

Please see Amendment 0002.

23 37 52.211-11 (b) The phasing schedule shows Phase 10 ending at station 31+15 and plan sheet G-111 shows 32+15. Please confirm which is correct.

UPDATE: See Amendment

24 37 52.211-11 (b) The phasing schedule shows Phase 1 ending at station 47+10 and Phase starting at 46+50. Please confirm which is correct.

UPDATE: See Amendment

25 37 52.211-11 (b) The phasing schedule shows Phase 8 ending at station 21+20 and Phase 9 starting at 21+00. Please confirm which is correct.

UPDATE: See Amendment

26 Can the Navy furnish a detailed construction schedule per phase?

This could be beneficial to help estimate the project. There remains a scheduling concern regarding the tight timlines to perform some of these phases of work with the multitude of government approved submittals and outages that will be required for this project that are required to allow the government at least 20 working days for review of submittals and at least 28 days for processing utility outages.

The work has been planned around the requirements of NNSY. The governemnt recommends applying for outages, surveying existing conditions and other items well in advance of the Div 1 timelines.

27 SWBS It is our understanding that Dry Dock #3 will have a boat in it (as a part of Phase 6) when the caisson is supposed to be removed, taken off-site, and repaired. Please confirm the schedule when Caisson #3 is required to be repaired off-site.

See revisions to the Milestones and Liquidated values. There are two time slots for Phase 6.

From 3APR21 to 3OCT21 the contractor can remove the Caisson #3 to an offsite location be worked on. The contractor needs to complete the wing walls and flood wall work from STA 9+05 to STA 10+95 by 3OCT21. Caisson #3 needs to be installed for government inspection by 16SEP21. Any remaining work on only the flood wall can can be completed in the second window of time 19JUL22 to

28NOV22.

28 34 Solicitation 52.228-5 FAR 52.228-5 is included in this solicitation, but there are no insurance requirements or minimum limits listed. Please clarify the Minimum Insurance Requirements for this project.

Refer to spec section 01 30

00.00 22, Part 1, 1.4 Minimum Insurance Requirements.

29 14/54 4.1 1 Are photos available of the work area for those estimators that are not able to travel due to government restrictions in place brought on by the Novel Coronavirus?

We have a limited number of pictures that have been approved for publication.

However, the pictures are outdated and shall not be used.

Recommend bidders use

Google Earth to zoom in and view the site.

30 16/54 4.2.3 1 Due to the local and regional travel restrictions as well as health and safety measures how is the contractor to submit their bid?

See Amendment 0005

31 16/54 4.2.3 1 May the contractor submit their bids electronically, similarly to the bids that were received for the recent bid at Camp Lejeune?

See Amendment 0005

32 16/54 4.2.3 1 If electronic bid is not allowed, may contractor allowed to meet a NAVFAC representative outside the secured perimeter to submit the bid, Similar to the Dry Dock 4 Bid?

See Amendment 0005

33 1 01 11 00 1.2.1.i Line 1.2.1.i notes "Remove terracotta duct banks and provide with split casing conduit and concrete encasement." Split casing conduit is normally used when existing wires must not be maintained rather than removed and replaced. If this will require the existing ductbanks will have to be removed by hand demolition in small pieces rather than larger sections. Can the existing wiring be removed and replaced?

Refer to the manhole survey (Appendix F1) for the labeling of wires. In most cases, the conductors are not specifically identified. It will be extremely difficult for anyone in the Government to identify all conductors (power and/or comm); therefore the wires will be protected by the split casings and the duct will be encased in concrete. No wires will be removed/replaced.

34 1 01 11 00 1.2.1.i Please confirm the existing duct banks are not to be considered a contaminated or hazardous material.

With the duct bank being required to be demolished by hand will all the contaminated and hazardous requirements for removal be required such as the use of a licensed contractor performing that work, tenting the work and all the appropriate personal protective equipment?

The existing ductbanks are either vitreous clay ducts or fibrous ducts; both encased in concrete. The fibrous material is not a hazardous material and is a non-conductive fiber (wood) mixed with coal tar.

The duct bank can be demolished without special requirements.

35 1 01 11 00 1.2.1.i The hand demotion and special handling of the duct banks will have a major impact on the schedule in each phase, please allow the duct bank work to be completed prior Phase work beginning.

special handling is not required.

36 6 32 17 23 3.2 Within this paragraph it notes to "Allow new pavement surfaces to cure for a period of not less than 21 days before application of (pavement) marking materials. Please confirm the completion of the final striping in

Contractor should plan to use Thermoplastic. Thermoplastic is to be required for all traffic markings. Thermoplastic Alkyd pavement markings may be applied directly after paving each Phase does not have to be done by the Acceptance Date and is not subject to the noted Liquidated Damages.

operations provided all other conditions in specification section 32 17 23 paragraph 3.2 are met.

37 7 32 10 00.00

3.2.7 Within this paragraph it notes to

"Allow bituminous pavement to cure for at least 21 days before paint is applied." Please confirm the completion of the final striping in each Phase does not have to be done by the Acceptance Date and is not subject to the noted Liquidated Damages.

Contractor should plan to use Thermoplastic. Thermoplastic is to be required for all traffic markings. Thermoplastic Alkyd pavement markings may be applied directly after paving operations provided all other conditions in specification section 32 17 23 paragraph 3.2 are met.

38 1 Solicitation Block 13 A Additional time is requested due to the strict schedule requirements, high liquidated damages and technical planning required to prepare this bid.

It would be in the best interest of the government to all this extra time for bidders to prepare a thorough bid.

We request an additional two weeks to prepare our proposal.

Please see Amendment 0002.

39 SF-30 Block 14 Continuation

Per amendment 0001, first PPI response, it is allowed for phase 1 and phase 2 to “overlap”. Is it the government's intent to allow phase 1 and phase 2 to run concurrently and maintain each phase respective completion date milestone? if so, will there be a duration constraint on phase 2, as currently the phase constraint is 57 days. Also, should the phase 1 'Phasing-Comment' language be revised to address the allowable "overlap" work. Please clarify.

40 37 52.211-11 (b) Prospective bidder is extremely concerned with the significant Liquidated Damages contained in section 52.211-12 assigned to the various phases of this project. The damages assigned to phase 4 through 7, appear to be unprecedented when considering the potential compounding and stacking effect (Compounded LD’s could be as high as $11,250,000.00 per month just for Phases 4 through 8) of large LD’s for this project size, scope and aggressive interim phasing durations. Following are some key challenges that further shift significant schedule risk to the prime contractor which amplify the concern even further:

1. Impacts arising from the Coronavirus, especially the supply chain impacts that have impacted the industry thus far along with the social distancing requirement that present themselves in the confined small interim work phases inherent to this project.

2. Modifications of ship work required to Dry Dock Caissons 1 and 3, has raised some significant concerns from Shipyards citing that the short interim phase durations where caisson work occurs present significant challenges to shipyard availability and operations coupled with large LD’s that shipyards will not support. These conditions present concerning schedule issues and a significant transfer of risk to prospective prime bidders who rely on the shipyards availability and acceptance of prime contract flow down terms since the prime contractors have no way to remedy these delays.

3. The completion of site investigations, shop drawings and submittals for this project is significantly impacted by the inherent phasing plan which affects the prospective bidder’s ability to perform investigations and submittals early in the project for all phases, and effectively reduces the working time in each phase.

Prospective bidder requests

Liquidated Damages have been revised due to changed conditions at NNSY. Item 1 Response: Understood, but this contract makes it the responsibility of the contractor to work thru those challenges.

Item 2 Response: See revisions ot the Milestones and Liquidated values. Item 3 Response: Investigation work, exisiting conditions documentation will be allowed to take place in advance of the actual phased work to advance the work successfully. See revisions to the Milestones and Liquidated values.

NAVFAC consider the following to allow to mitigate significant risk transfer to prospective bidder:

A. Reduce the significant LD’s in the interim phases 4 through 8.

B. Allow bidders to work in select multiple locations at once with access and coordination provisions for shipyard operations and other contracts.

C. Consider allowing some of the shipwork modifications to caissons in place which may support longer overall durations.

41 37 52.211-11 (b) Can NAVFAC provide more clarity/definition to the phase '240 Linear Foot Construction Work Area Limit' when working within a phase?

Does this mean that all construction must be fully complete for any 240' section within any given phase? Or is the intent not to have, say, an open trench greater than 240' for any given phase?

See revisions to the Milestones and Liquidated values. The 240 LF Construction Work Area Limit was emphasized to help the contractor manage safety requirements, and damage to subgrade. Per the specifications the contractor is responsible for these items.

The government has removed this requirement. If the contractor does not demonstrate good practices, non-compliances are written, then they will be at risk for the requirement to be enforced. It is acceptable for the contractor to pave and pavement mark the project in one mobilization, as long as it is compelted before the milestone date.

42 1 Solicitation 13 Due to the complex nature of this project will the Navy extend the current bid date by 2 weeks?

Please see Amendment 0002.

43 CS 113,

CS110

On Sheet CS113, Work Note #23 is identified as a concrete curb. On CS110, Work Note #23 is identified as a 12' Tall ATFP (CIA) Swing Gate. Please confirm which is correct

Both are correct. Work Notes on each drawing are independent of other drawings.

44 CS 111,

CS110

On Sheet CS111, Work Note #22 is identified as Parking Stall, 4" White Striping. on CS110 Work Note #22 is identified as "Provide Attendant Booth and Associated Site Work" .

Please confirm which is correct.

Both are correct. Work Notes on each drawing are independent of other drawings.

45 C-003 1 On sheet C-003 note 1 under Project Descriptions states the following, " as this shipyard is over 200 years old, there are extensive utilities already in place, and in order to construct the flood wall, the existing utilities must be cased. Small runs of sanitary sewer and storm drainage piping will be replaced in their exact location matching existing size and capacity."

Please provide the size, type and number of utilities that need to be cased in addition to the runs of Sanitary Sewer and Storm Drainage Piping that are identified on the plans.

Bid per contract documents

46 16 Solicitation 4.3 Please consider extending the deadline for PPI's along with the proposal due date two weeks

Please see Amendment 0002.

47 C-003 1 Do existing utilities need to be cased if they are below the bottom the cutoff wall? ie. Not exposed at all during excavation

Utilities requiring casing are indicated on the contract drawings

48 C-004 1 Do existing utilities need to be cased if they are within the cutoff wall limits, other than new Sanitary Sewer and Storm Drainage Piping?

Utilities requiring casing are indicated on the contract drawings

49 C-005 1 Are the existing ductbanks encased in concrete?

Bid per contract documents

50 1 35 41 20 1.1 Cutoff walls beneath existing structures to remain in place and beneath deep utility crossings not scheduled for reconstruction must be constructed using jet grouted columns

- is it acceptable to use Cast in place concrete, in lieu please explain why.

Bid per contract documents

51 8 01 14 00.0 22 1.5.6 / 1.5.7 We have determined that work outside of regular working hours will be required on a consistent basis.

Please confirm that it will be acceptable to work 2 or more shifts per day and 7 days per week.

Yes, it is acceptable. Follow the notification process outlined in the specification

52 Are the new duct banks to be cased per Note 1 on drawing C-001?

Concrete encased ductbanks do not require casings

53 Are the existing ductbanks encased in concrete, if not, what material are they encased with? What materials are the existing ducts and ductbanks constructed of?

Bid per contract documents

54 CU401 DETAIL C1 (AND OTHERS)

INDICATE CONNECTION OF THE

PROPOSED 8' PIPE TO THE

EXISTING PIPE WITH A

"FLEXIBLE COUPLING WITH SS

BAND CLAMPS". HOWEVER,

VALVE VAULT NOTE 3

INDICATES THAT "ALL PIPING

OUTSIDE VALVE VAULTS MUST

HAVE RESTRAINED

MECHANICAL JOINTS.

ADDITIONALLY, DWG. CU501

DET. C1 NOTE 1 INDICATES

JOINTS INSIDE OF CASING PIE

AND ONE JOINT BEYOND EACH

END MUST BE RESTRAINED MJ.

SINCE ALMOST ALL PIPES ON

THE PROJECT HAVE ONLY ONE

JOINT OUTSIDE THE CASING,

CAN THE FLEXIBLE RUBBER

SST CLAMPED COUPLING BE

USED ON SANT. & STORM LINES

OR MUST THESE CONNECTIONS

BE RESTRAINED PER NOTE 3

AND THE CASING DETAIL? IF

SO, PLEASE PROVIDE

INFORMATION ON THE

DESIRED METHOD OF HOW TO

MAKE A RESTRAINED JOINT

FROM DUCTILE TO CLAY PIPE.

See Amendment 005

55 CU401 VALVE VAULT NOTE 7

INDICATES CONSTRUCTION

DETAILS ARE SHOWN ON DWG.

CU501 BUT NO VAULT IS

SHOWN ON THAT

DWG..SHOULD THIS NOTE READ

DWG SS520 & 521?

See Amendment 005

56 CU401 DETAIL C1 INDICATES A

CASING PIPE END SEAL INSIDE

VAULT. THE CASING DETAIL

ON DWG. CU501/C1 INDICATES

LINK SEALS ARE REQUIRED

FOR CLOSURE AT THE ENDS OF

THE CASING PIPE. ARE BOTH

REQUIRED INSIDE THE SS

VAULTS OR ONLY THE LINK

SEAL?

See Amendment 005

57 CU101 AT STATIONS 2+44,2+48 & 2+52

NEW CASING PIPES ARE

CALLED OUT, BUT NO NEW PIPE

IS CALLED OUT. THIS LACK OF

NEW PIPE CALL OUT OCCURS

SEVERAL PLACES ON THE

PLANS.. ARE THESE PIPES TO BE

REPLACED OR ARE THESE THE

LOCATION WHERE SPLIT

CASINGS ONLY ARE REQUIRED?

ONLY STA. 2+44 SHOWS SOME

EXISTING 6" W AT THAT

LOCATION. THE PIPE AT STA.

2+52 APPEARS TO BE UGCA BUT

NO SIZE IS EVIDENT AND WE

HAVE NO SPECIFICATION FOR

UGCA. IF THESE PIPES ARE TO

BE REPLACED PLEASE ADIVSE

THE

SIZES/TYPES/SPECIFCATIONS. IF

NOT, PLEASE PROVIDE THE

SIZES FOR BID PURPOSES SO

THE CORRECT CASING CAN BE

QUOTED.

If only casing is called out with no piping, it is a casing to be installed on an existing pipe.

See CS profiles for sizes of pipes. No UGCA work is included in the project; only installing casing on existing

UGCA

58 CU101 AT STA. 4+58 THERE IS A CALL

OUT FOR 15" DIP BEING

CONNECTED TO VALVE VAULT

#4. 15" DIP IS CALLED OUT IN

SEVERAL OTHER LOCATIONS

ON THE PROJECT. SINCE 15" DIP

IS NOT MANUFACTURED, IS 16"

DIP WITH TRANSITION SST

BANDED FLEXIBLE RUBBER

COUPLINGS AN ACCEPTABLE

ALTERNATIVE? PLEASE NOTE

THAT THERE ARE NO 15"

RESTRAINED JOINT COUPLING

MADE FOR DIP TO CLAY

TRANSITIONS.

Contractor may use 16" DIP where 15" DIP is indicated.

Dissimilar material connections are outlined in specification 33 40 00

59 CU101 THERE IS A WORK NODE #5 FOR

CASING IN GRID D-1

INDICATING 15'0" ,BUT IS

POINTING PLAN NW AWAY

FROM THE FLOOD PROTECTION

WALL. IS THIS IN ERROR OR

SHOULD IT BE INCLUDED IN

THE BID PRICE? IFSO, WHAT

SIZE SHOULD IT BE?

60 CU101 WHAT SIZE/TYPE PIPE IS

REQUIRED AT APPROX. 7+47?

This is existing crossing to be cased. See CS102 profile

61 CU101 WHAT SIZE/TYPE PIPE IS

REQUIRED AT APPROX. 7+50?

This is existing crossing to be cased. See CS102 profile

62 CU101 WHAT SIZE/TYPE PIPE IS

REQUIRED AT APPROX. 8+85?

This is existing crossing to be cased. See CS102 profile

63 CU101 WHAT SIZE/TYPE PIPE IS

REQUIRED AT APPROX. 8+92?

This is existing crossing to be cased. See CS102 profile

64 CU101 WHAT SIZE/TYPE ARE THE

THREE (3) PIPES REQUIRED AT

APPROX. 9+00?

These are existing crossing to be cased. See CS102 profile

65 CU101 A 10" STORM DRAIN IS SHOWN

ENTERING VAULT #7 BUT NO

NEW PIPE IS SHOWN. THIS PIPE

IS ALSO SHOWN ON CU405.. IS

THE CONTRACTOR REQUIRED

TO REPLACE A SECTION OF

THIS PIPE OR POUR THE

STRUCTURE AROUND THE PIPE?

Contractor may pour structure around the existing pipe.

66 CU102 WHAT SIZE/TYPE ARE THE FIVE

(5) PIPES REQUIRED AT

APPROX. 11+52,11+54,

11+55,11+57&11+58

See profile on CS103 for pipe sizes

67 CU406 THE 30" STORM DRAIN SHOWN

ENTERING/EXITING VAULT #8

IS NOT SHOWN AS NEW. IS THE

CONTRACTOR REQUIRED TO

REPLACE A SECTION OF THESE

PIPES OR POUR THE

STRUCTURE AROUND THE PIPE?

Construct structure around existing pipe.

68 SS520 DWG. SS 520 DETAIL C2

APPEARS TO SHOWN A TYPICAL

SS VALVE VAULT. THIS DETAIL

SHOWS A DISMANTLING JOINT

AT THE VALVE CONNECTION

POINT THAT IS NOT SHOWN ON

THE VAULT SPECIFIC DWGS.

ARE DISMANTLING JOINTS

REQUIRED?

Dismantling joints are required at sewer valves, as indicated

69 CU102 DWG. WORK NOTE #13 REFERS

TO GUARD POST DETAIL B-2 ON

CU504 HOWEVER THERE IS NO

INFORMATION ON THE GUARD

POST IN THIS DETAIL. WHAT

SIZE/TYPE PIPE IS REQUIRED

FOR THE GUARD POSTS?

See detail A3 on CS501 for guard post

70 CU102 THERE IS A WORK NODE #5 ON

DWG. CU102 GRID B-4 THAT IS

POINTING TO APPROX. STA.

19+28. HOWEVER, THIS IS NOT

SHOWN ON DWG CU103. IS THIS

NOTE IN ERRO OR IS CASING

REQUIRED?

See Amendment 005

71 CU103 WHAT SIZE/TYPE PIPE IS

REQUIRED AT APPROX. 19+55?

This is existing pipe to be cased. See profile on CS105 for pipe sizes

72 CU103 WHAT SIZE/TYPE PIPE IS

REQUIRED AT APPROX. 26+73 ?

This is existing pipe to be cased. See profile on CS106 for pipe sizes

73 CU104 WHAT SIZE/TYPE PIPE IS

REQUIRED AT APPROX. 30+23?

This is existing pipe to be cased. See profile on CS107 for pipe sizes

74 CU104 WHAT SIZE/TYPE PIPE IS

REQUIRED AT APPROX. 33+07?

This is existing pipe to be cased. See profile on CS108 for pipe sizes

75 CU104 WHAT SIZE/TYPE PIPE IS

REQUIRED AT APPROX. 33+83?

This is existing pipe to be cased. See profile on CS108 for pipe sizes

76 CU105 AT APPROX. STA. 38+57 VAULT

#20 THE WORK NODES FOR THE

15" PIPE REPLACEMENT VARIES

SIGNIFICANTLY FROM THE

VAULT DETAIL ON DWG CU419.

DWG. CU105 SHOWS 21' COMING

OUR EACH SIDE OF THE VAULT,

WHEREAS CU419 SHOWS 11' &

9". WHICH IS CORRECT?

See Amendment 005

77 CU105 DWG CU105 INDICATES THE SD

PIPE AT Sta. 39+50 IS NEW 18"

DIP. HOWEVER, DWG CU420

SHOWS THE PIPE AT RCP.

WHICH IS CORRECT?

See Amendment 005

78 CU105 DWG CU105 INDICATES THE SD

FROM APPROX. STA. 42+26 TO

YD5 AND THEN TO VAULT 24 IS

TO BE NEW 12" DIP. HOWEVER,

DWG CU423 SHOWS THIS PIPE

AS 10". WHICH IS CORRECT?

79 CU105 DWG CU105 INDICATES THE SD

FROM VAULT 24 TO MH1 AS 12"

DIP. HOWEVER, DWG CU423

SHOWS THIS PIPE TO BE 10".

WHICH IS CORRECT?

See Amendment 005

80 CU105 WHAT SIZE/TYPE PIPE IS

REQUIRED AT APPROX. 42+40?

This is existing pipe to be cased. See profile on CS110 for pipe size

81 CU105 WHAT SIZE/TYPE PIPE IS

REQUIRED BETWEEN YD6 &

VAULT 26?

See Amendment 005

82 CU105 WHAT SIZE/TYPE PIPE IS

REQUIRED AT APPROX. 45+84?

See Amendment 005

83 CU105 DWG CU105 SHOWS A

STRAIGHT RUN OF CASING PIPE

AROUND A 10" CA LINE. DWG

CU426 DET. A1 SHOWS THIS CA

LINE TURNING 2EA 45 BENDS

UNDER THE FLOOD WALL.

WHICH IS CORRECT?

TYPICALLY NO BENDS FOR

SPLIT CASING PIPING ARE

MANUFACTURED. IF DWG.

CU426 DET. A1, CAN THIS LINE

BE TAKEN OUT OF SERVICE

AND STRAIGHTENED?

Bid per contract documents.

84 CU105 DWG CU105 SHOWS NO 6" U.D.

PIPE FROM STA. 44+00 TO

APPROX. 45+00. IS IT

REQUIRED?. IT IS SHOWN ON

CU424 & 425.

Underdrain not required from STA 44+00 to Approx 45+50

85 CU106 DWG CU106 INDICATES THE SS

AT APPROX. STA. 49+47 IS TO BE

NEW 6". HOWEVER, DWG CU428

SHOWS NEW 4" DIP. WHICH IS

CORRECT?

See amendment 005

86 V106 DWG V106 APPEARS TO SHOW

TWO (2) STEAM LINES

CROSSING THE WALL PATH AT

APPROX. STA. 49+27 & 49+35.

ONLY THE ONE AT STA. 49+27 IS

SHOWN TO RECEIVE CASING

ON DWG CU106. SHOULD

CASING BE ANTICIPATED FOR

THE LINE AT 49+35?

Bid per contract documents.

87 CU106 DWG. CU106 SHOWS A LINE AT

APPROX. STA. 49+33 COMING

FROM NEW YD9 BUT NO OTHER

INFORMATION IS GIVEN. IS

THIS LINE A PIPE TO BE

CASED/REPLACED?

Bid per contract documents.

88 CU106 DWG. CU106 SHOWS TWO (2) 8"

WATERLINES AT APPROX. 50+92

CROSSING THE FLOOD WALL

BUT SHOW NO NEW WORK TO

BE DONE. SHOULD THESE LINE

BE CASED?

See amendment 005

89 CU106 DWG. CU106 SHOWS SEVERAL

LINES BETWEEN STA. 51+41 &

55+60 CROSSING THE FLOOD

WALL, BUT NO NEW WORK IS

SHOWN. SHOULD THESE LINES

BE CASED? IF SO, WHAT

SIZE/TYPE PIPE SHOULD BE

ESTIMATED FOR BID

PURPOSES?

Bid per contract documents.

See CS112 for additonal information

90 CU106 ACCORDING TO THE

MANUFACTURER THERE IS NO

SOLUTION FOR UTILIZING LINK

SEALS BWTWEEN 2" DIP AND

12" CASING. IS IT ACCEPTABLE

TO INCREASE THE 2" TO 4" PIPE

AND USE APPROPRIATE

REDUCERS TO CONNECT TO

EXISTING 2" PIPE?

This would be acceptable

91 CU106 WHAT SIZE/TYPE PIPE IS

REQUIRED AT APPROX. 55+48?

This is existing crossing to be cased. See CS112 profile

92 CU106 WHAT SIZE/TYPE PIPE IS

REQUIRED AT APPROX. 55+61?

This is existing crossing to be cased. See CS112 profile

93 CU107 DWG CU107 SHOWS CASING AT

STA. 56+16 ,56+30 AND 56+52

FOR AN 8" W & 6" W LINES,

HOWEVER THERE ARE NO NEW

WORK CALL OUTS FOR THESE.

IS CASING TO BE INSTALLED AT

THESE LOCATIONS?

These are existing crossings to be cased. See CS113 profile

94 CU107 DWG CU107 SHOWS THE

CASING PIPE AT STA. 59+31 TO

BE 11'0" IN LENGTH. HOWEVER,

DWG. CU434 SHOWS THIS

CASING AS 12.3'. WHICH IS

CORRECT?

See Amendment 005

95 CU107 DWG. CU107 SHOWS A LINE

LABELED "10+48" AND THERE

APPEARS TO BE CALL OUT

INDICATING "CONNECT TO

EXISTING SSMH". WHAT

SIZE/TYPE OF LINE IS THIS.

ALSO, IT APPEARS THIS LINE

CONTINUES THROUGH THE MH

AND RUNS OFF THE PAGE, BUT

IT DOES NOT SHOW UP ON THE

ADJOINING DWG CU101. WHAT

IS THIS LINE?

96 CU502 33 1 00.00 2.1.2.3 DWG. CU502 DET. B2 IS A NEW

FIRE HYDRANT DETAIL AND

REFERENCED SPECIFICATION IS

FOR A NEW FIRE HYDRANT.

WERE DO THESE

SPECIFICATIONS APPLY AS WE

ONLY SEE AN EXISTING

HYDRANT TO BE RELOCATED

ON DWG. CU104.STA. 30+20?

Bid per contract documents

97 CU502 WHERE DOES DETAIIL B3 ON

DWG CU502 APPLY? WE FIND

NO REFERENCES ON THE PLANS

TO THIS DETAIL.

See CS104

98 CU501 DETAIL C1 ON THIS DWG.

REQUIERS THE CASING FOR 36"

RCP TO BE 60".THERE IS NO

SOLUTION FOR SEALING THE

VOID BETWEEN THE O.D. OF 36"

RCP AND THE I.D. OF 60" STEEL

CASING. WOULD 54" WITH A

WALL THICKNESS OF .312 BE

ACCEPTABLE?

See amendment 005

99 CU510 WHERE DOES DETAIL A3

APPLY? WE FIND NO PIPES

GOING THROUGH THE FLOOD

WALL SHOWN ON THE PLANS.

See profile view of wall on CS drawings 101-113

100 35 59 30 The contract drawings show (3) new Capstan’s foundations. Spec Section 35 59 30 calls for only (1) removable type Capstan to be provided. Please verify that only (1) is required and the location where it is to be installed.

See Amendment 005

101 16 of 54 4 4.3 The solicitation states that all pre-proposal inquiries must be submitted no later than 14 days prior to the proposal due date. The pre-proposal conference and site visit is scheduled on the same day that the pre-proposal inquiries are due. We respectfully request that the government extends the pre-proposal inquiries due date as well as the proposal due date to allow for enough time for questions to be asked and to allow enough time for the contractors to prepare our proposals and bidding package.

102 8 of 54 3.3 The solicitation states that projects to be submitted with our proposal shall be completed within the past ten (10) years from the date of issuance of this RFP. Please clarify if these projects can be substantially complete, or are these projects required to be 100% complete.

Please see Amendment 0002.

103 26 Amendment

See Page 26, Stations Column, Phase 1; What is the intent of adding, or clarify the purpose for, “And Station 10 to 12+61”? The stationing is for work in Phase 6 that has specific dates listed to start and complete the work.

Sheet G-101 has two areas of work. 2C and 2B. Phase 6 is a different work area.

104 27 Amendment

See Page 27, Phasing Comments column, Phase 8; What is the purpose of “ Contractor will be allowed to start Phase 9 early”? The Phase 9 start and completion dates are listed well before the completion of Phase 8.

See Amendment 005

105 27 Amendment

See Page 27 Phases 9-12; The number of days provided in the Duration Calendar Days column are not correct. E.g. the difference between 1/24/22 and 7/23/21 totals 185 vs 152. Same issue for next three Phases.

See Amendment 0005

106 1 35 41 20 1.1 The specifications state, Cutoff walls beneath existing structures to remain in place and beneath deep utility crossings not scheduled for reconstruction must be constructed using jet grouted columns. Please specify the depth of the existing utility crossings that will require Jet Grouting.

Existing structures and utilities are indicated on the profiles shown on Sheets CS101 through CS113.

107 9 03 30 00 1.6.2.3 Will the contractor be required to install expansion and contraction joints for sections of the Cutoff Wall that are Cast In Place? Please clarify.

No, the cutoff wall Section 35 41 20, only referes to CIP concrete for mix design, and waterstops

108 9 03 30 00 1.6.2.3 Will water stop be required between construction joints for Cast In Place Concrete Cutoff Wall sections?

No waterstop is required between construction joints in the cutoff wall. Waterstops are required at the interface between the cutoff wall and floodwall per C1/SS311.

109 9 31 23 00 3.1.2.2 The Dewatering specification under Excavation and Fill requires the water level in an open excavation to be at least two feet below the working level. Does this requirement apply to Cast In Place Concrete Cutoff Wall?

Section 35 41 20 Paragraph

3.14.1 permits the use tremie placed concrete.

110 40 SWBS 631a The SWBS specification, section 631a “General” state to “Prepare and provide corrosion preventing and cosmetic coatings for the attachments of the entire Caisson, except as otherwise specified in this section.”

Please clarify this statement. Is the contractor required to paint the entire Caisson exterior or only repair coatings on areas disturbed during refurbishment activities?

The Contractor is only required to repair coatings on areas distrubed during refurbishment activitires.

111 37 SWBS 622d.1 The SWBS specifications section 622d.1 “Summary” states “This Section includes, but is not limited to, new fiberglass reinforced plastic (FRP) grating, and its framing for ballast tank sump grating, stair landings, and catwalks.” Is the intent of this note to replace all framing, grating, stair landing and catwalks for the ballast tank as well as the new platforms on the weather deck?

See Amendment 005

112 39 SWBS 631 We have assumed the interior paint within the operations deck will be damaged due to welding of the new components. Please provide paint specifications for the operations deck repair.

Match Existing, for purpose of bid consider the following system.

Surface Prep: NearWhite Metal Blast (NACE-2/SSPC-SP-10) Primer: One coat MIL-PRF- 23236 (non-high solids), Gray color, 3-5 MILS DFT Final Coats: Two coats MIL- PRF-24596, White color, 10-12

MILS DFT

113 6 03 30 00 1.2.f Mass Concrete is defined as any concrete system that approaches a maximum temperature of 158 degrees F within the first 72 hours of placement. In addition, it includes all concrete elements with a section thickness of 3 feet or more regardless of temperature.” Please provide mass concrete specifications.

If mass concrete is required follow provisions in ACI 207.1R "Guide to Mass Concrete" which will require the submittal of a "Mass Concrete Temperature Control Plan" to the Contracting Officer.

114 6 03 30 00 1.2.f Please define what concrete elements on the project will require Mass Concrete considerations.

No cast-in-place concrete elements should require mass concrete considerations.

There does not seem to be a specificaiton for the Slide Gates in the valve vaults. Will a specification be added?

See section 33 40 00

116 SWBS-8 70 b Perform and submit the results of an inclining experiment as the basis of the contractors responsibiility in determining the values of displacement, vertical center of gravity, list and trim of the Saisson at its design displacement, supplemented by the weight control program and amount of permanent concrete ballast, if nessary, to establish the required lightship draft and minimun GM at the lightship condition. How much permanent concrete ballast is expected to be added?

No additional ballast concrete is anticipated. Transverse metacentric height (GMT) is shown on sheets SA601 and

SA602.

117 CU Sheets In reviewing construction and pavement demolition limits, these limits are not adaquate due to the conditions and nature of the underground work required as part of this project. Will additional pavement removal and replacement beyond the limits shown on the plans be paid as a change condition? Also,will the limits of construction be able to be increased in order to complete the work?

Project limits are indended to maintain a tight, linear work area. Pavement demoltion and repair limits are set with this in mind. Refer to 31 23 00.00 22 for sheeting and shoring requirements where needed by contractor to acomplish construction.

118 333000 1.3 There is not enough information provided in the specifications or on the plans to be able to identify the flows that will require bypass pumping, and the existing system configuration in order to determine how many temporary bypass pump setups will need to be installed to maintain the operations of the Shipyard. In order to provide an accurate bid, please provide more information for bypass pumping of the existing sanitary sewer system that will be required in order to complete the work for this project.

See Amendment 005

119 334000 1.3 There is not enough information provided in the specifications or on the plans to be able to identify the flows that will require bypass pumping, and the existing system configuration in order to determine how many temporary bypass pump setups will need to be installed to maintain the operations of the Shipyard. In order to provide an accurate bid, please provide more information for bypass pumping of the existing storm drain system that will be required in order to complete the work for this project.

120 312300.002 2.3 Please clarify backfill requirements for casing located beneath the flood wall footing. Per the last sentence of this specification it requires CLSM from the bottom of the cutoff wall to the bottom of the casing excavation.

Does this apply to all utilities within the floodwall footprint regardless of utility elevation? If this is meant to apply only to utilities located below the bottom of the cuttoff wall, this conflicts with detail A1/CU502 which requires "low permability fill" from top of bedding to 1'-0" above the bottom of the cutoff wall. Please clarify.

See Amendment 005

121 CU Sheets The CU 400 series of drawings requires valve vaults to be constructed on existing lines or connected to existing lines, and these lines are required to be cutoff flush with the valve vault wall. This will not be possible on existing lines.

Please revise to allow existing lines to protrude into the vault.

Existing pipes may extend into the vaults as long as they do not interfere with operation of valves or gates controlling flow through the vault.

122 33 40 00 Storm Drainage Utilities does not call for any type of field testing of the valve vaults or slide gates. Please confirm that visual inspection of the work is the only requirement

See Amendment 005

123 35 2014, 35 20 16.33, 35 20 16.59

Spec Sections 35 20 14, 35 20 16.33 and 35 20 16.59 for the different types of flood wall gates and stoplogs require that 10% of gates be tested per manufactures instructions. After consulting with one of the manufacturers, they stated that their normal field inspection of the installation and operation was suffice for their certification of gate installation. Since it is unlikely that we will actually have a major flood event after the gates are installed, will the contractor be required to build a temporary water containment barrier at the gates selected for testing. If this

The contractor will be required to build a temporary water containment barrier at the selected gates for testing.

Selected gates for testing must be approved by the Contracting officer. Intent is that minimum 10% of each gate type be tested.

is required, will (1) test for each type of gate (total of 3) be sufficient for the 10% test requirement since there are (27) total gates/stoplogs on the project.

124 9 of 54 00100 (1) Factor 1, Experience

Can you define "Navy Shipyard Controlled Industrial Area (CIA)?"

Would this specific designation only apply to the controlled areas at Norfolk Naval Shipyard, Pearl Harbor Naval Shipyard, Portsmouth Naval Shipyard, and Puget Sound Naval Shipyard? Would the secure area at Huntington Ingalls Industries in Newport News or other similar secure facilities be considered comparable?

The CIA is defined by the area inside the red line on the attachment :"NNSY Map.pdf".

Yes this area requires a second level of clearance as defined by specification 01 14 00.00 22- Work Restrictions, and other guidance.

125 CS and CU Sheets

There are several locations where the CS100 series sheets and the CU100 series sheets do not correlate. The CS100 series shows some existing utilities crossing through the cutoff wall or below the cutoff wall referencing a detail for casing to be installed, but no casing is shown to be installed on the utility on the CU100 series sheets with the note 5 callout..

Examples on the CS100 sheets include CATV at 0+20 (CS101), 8" storm at 14+60 (CS104), 4" sewer at 17+00 (CS104) etc....Please advise which drawings should govern in determining the utilities that require a casing to be installed.

Bid per contract documents

126 CU501 A1 This detail references "waterstop around the circumference of casing pipe or conc ductbank" located in the cutoff wall. Please provide information on the type of waterstop that will be required in this detail.

Section 03 30 00 Subpart

2.2.2.4 Hydrophilic Waterstop

127 CU Sheets All utility lines to be replaced beneath the floodwall will be connecting to existing utilities. Confirm that pressure or leakage testing will not be required on these short replacement sections as it is not possible to test these once they are connected to the exisitng line.

Pipes connecting to existing pipes will not require leakage testing

128 15000.0022 Confirm that the Occupational Safety, Health and Environment Office Shipyard Utility System Impact Statement provided in this section will not be required for each disruption to the storm or sanitary system needed to replace the existing utilities as part of this project. Also confirm that the "verification dye test" referenced on this form will not be performed.

The form and notification for the dye test will be required per the spec. We may not perform the dye test every time.

129 CS Sheets Please confirm waterstop is not required between the cutoff wall and new structures, existing crane girders, existing railroad girders, and existing duct banks unless specifically indicated on the plans. The bottom of structures and ductbanks will not be exposed or are in-accessible.

130 Amendment

Amendment 1 noted that the Phase 1 completion date was changed to May 29, 2021 based on a question regarding the submittal approvals required prior to the start of work and the volume of work included in phase

1. The phasing table provided in Amendment 2 does not indicate the revised date and shows a phase 1 completion date of March 29, 2021 matching the original solicitation.

Which date is the correct completion date for Phase 1?

See Amendment 005

131 CS506 Detail A1 ATFP Barrier and Fence Details:

Does the fence fabric need to be continuous across adjacent…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .