1588810-DWG-08of14 (CS1).pdf

PDF 14 MB Posted

Attached to
Design-Bid-Build, P653 Dry Dock Flood Protection Improvements
Solicitation number
N4008520R0063
Issued by

About this file

This solicitation is for design-build flood protection improvements at Naval Station Norfolk. The Navy seeks to construct a permanent flood wall and modify existing dry dock caissons and infrastructure to protect against flooding from the Elizabeth River. The flood wall will be cast-in-place reinforced concrete supported on soil treated with subsurface grout injection. Modifications include extending existing dry dock caisson gunwales and constructing new caisson seats for Dry Docks 1, 2, and 3. The solicitation also requires removing existing capstans and constructing new removable capstans on foundations. The Naval Facilities Engineering Command is the contracting agency. The anticipated award date is not provided.

View the file

Other files

File Type Posted
Amendment 0006.pdf PDF
AMD 0005 DWG2.pdf PDF
Amendment 0005.pdf PDF
AMD 0005 DWG1.pdf PDF
NNSY Map.pdf PDF
20R0063 Site Visit Log.docx DOCX document
20R0063 Amendment 0004.pdf PDF
20R0063 Amendment 0003.pdf PDF
1588810Amend0002-dwg-2of2 (S-E).pdf PDF
1588810Amend0002-dwg-1of2 (G-C).pdf PDF
20R0063 Amendment 0002.pdf PDF
20R0063 Amendment 0001.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
1588810-SPC-03of24-App A02.pdf PDF
1588810-SPC-05of24-App A04.pdf PDF
1588810-SPC-21of24-App F3.pdf PDF
1588810-DWG-05of14 (SURVEY).pdf PDF
1588810-SPC-12of24-App A11.pdf PDF
Attachment B - SECNAV_5512_1_11787-One Day Past Request.pdf PDF
1588810-DWG-12of14 (CU2).pdf PDF
1588810-SPC-23of24-App F5.pdf PDF
Attachment J - CVS-CIA Blank Spreadsheet.xlsx XLSX spreadsheet
1588810-DWG-14of14 (ARCH-ELEC).pdf PDF
1588810-SPC-02of24-App A01.pdf PDF
1588810-SPC-20of24-App F2.pdf PDF
1588810-DWG-09of14 (CS2).pdf PDF
1588810-SPC-11of24-App A10.pdf PDF
1588810-SPC-16of24-App C.pdf PDF
Attachment G - Small Business Participation and Commitment Strategy.docx DOCX document
1588810-DWG-03of14 (GEOTECH1).pdf PDF
1588810-SPC-09of24-App A08.pdf PDF
1588810-SPC-04of24-App A03.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
1588810-SPC-15of24-App B.pdf PDF
1588810-SPC-07of24-App A06.pdf PDF
1588810-SPC-18of24-App E.pdf PDF
1588810-SPC-24of24-App F6.pdf PDF
1588810-DWG-06of14 (C_CD).pdf PDF
1588810-DWG-11of14 (CU1).pdf PDF
1588810-SPC-06of24-App A05.pdf PDF
1588810-SPC-22of24-App F4.pdf PDF
1588810-DWG-04of14 (GEOTECH2).pdf PDF
1588810-DWG-02of14 (GEN2).pdf PDF
Attachment H - Price Proposal Form.docx DOCX document
1588810-DWG-13of14 (STR).pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
1588810-SPC-14of24-App A13.pdf PDF
Attachment I - ODP Form.xls XLS spreadsheet
Attachment F - Small Business Subcontracting Record.docx DOCX document
1588810-SPC-01of24.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EL

EV

AT

IO

N (F

T)

EL

EV

AT

IO

N (F

T)

STATION

0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80 3+00 3+20 3+40 3+60 3+80 4+00 4+20 4+40 4+60

X

XXXXXXXXXX

EL

EV

AT

IO

N (F

T)

EL

EV

AT

IO

N (F

T)

STATION

0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80 3+00 3+20 3+40 3+60 3+80 4+00 4+20 4+40 4+60

EXISTING

GRADE

TOP OF WALL

EL = 106.0

TOP OF FOOTING

EL = 99.5

BOTTOM OF CUTOFF WALL

EL = 92.50

FENCING

EXISTING

GROUND

(E) GRANITE BLOCKS

DRY DOCK 1

CAISSONC3

SS502

FLOODGATE

FOUNDATION

BOTTOM OF

CUTOFF WALL

EL = 94.00

TOP OF FOOTING

EL = 99.50

BOTTOM OF CUTOFF

WALL EL = 94.00

FOOTING AND CUTOFF

WALL MUST EXTEND

TO GRANITE BLOCKS

27 12" STORM 27 4" FRESH WATER 27 8" SEWER 27 12" STORM

274" WATER

2710" SALTWATER

276" AIR

27 12" STORM

2715" STORM

4FG01 4FG02

(E) CRANE RAIL

GIRDERS

A1

SS401

DD1 NORTH SIDE

COPING LEVEL

BOTTOM OF

FOOTING

A1

SS402

DD1 SOUTH SIDE

COPING LEVEL

27 18" FOR FUTURE

PIPE, PLUG ENDS

TOP OF FENCE

FABRIC EL = 114.0

31 CATV

0+00

1+00

2+00

3+00

4+00

+0

C2

SC101

DRY DOCK 1

CAISSON

PI STA 2+86.67

PI STA 0+00.00

PI STA 3+27.38

PI STA 4+46.21

DRY DOCK 1

(E) CRANE RAIL

(E) GRANITE BLOCKS

(E) CRANE RAIL

GIRDERS

(E) GRANITE BLOCKS

(E) CRANE RAIL

4FG02

FLOOD WALL

FOOTING

4FG01

PI STA 3+53.81

PI STA 4+25.95

FG01 GATE

STORAGE

1 PI STA 4+36.75

PI STA 3+34.12

PI STA 3+56.06

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

P -6

D

R Y

D O

C K

F

LO

O D

P

R O

TE

C

TI

O

N

IM

P R

O V

E M

E N

TS

NO

RF

OL

K

NA

VA

L

SH

IP

YA

RD

PO

RT

SM

OU

TH

, V A

1588810

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

CI

C

OR

E

- H

AM

PT

ON

R

OA

DS

NA

VA

L

ST

AT

IO

N

NO

RF

OL

K

- N

OR

FO

LK

, V

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

FI

LE

N

AM

E:

Q

:\N

OR

\1

-0

8\ ca dd

Ac tiv e\ _P

-6

\D

RY

DP

3-

0-

CS

1.

dw g

L

AY

OU

T

NA

M

E:

C

IV

IL

S

IT

E

AN

D

AT

FP

P

LA

N

AN

D

PR

OF

IL

E

- A

RE

A

P

LO

TT

ED

: F rid ay

, F eb ru ar y 2 1,

- 6

:3 8p m U

SE

R:

tt ho m ps on

DRAWFORM REVISION: 12 APRIL 2018

P

S

N

RRO F E S S I O N A L E N G I N E E R

T A

T

E O F M A R Y

L A

N

DW

I L

L IA M WHEATON

O . 2 4 6 2 8 E G I S T E R E D

W.

PLAN

NORTH

SCALE: 1" = 20'

CIVIL SITE AND ATFP PLAN - AREA 101

NOTES:

WORK NOTES: 1. PAVEMENT REPAIR EXTENTS.

2. AT/FP FENCING ON FLOOD WALL, SEE

3. CONCRETE FLOOD WALL, SEE FOR TYPE.

4. FLOOD GATE, SEE CALLOUTS FOR ID, SEE

5. 12' AT/FP (CIA) FENCE, SEE

6.-7. NOT USED ON THIS SHEET.

8. ACCESS STAIRS.

9.-25. NOT USED ON THIS SHEET.

26. CLEAT.

27. UTILITY CROSSING THROUGH CUTOFF WALL, SEE

28.-30. NOT USED ON THIS SHEET.

31. UTILITY THROUGH FOOTING, SEE

32.-33. NOT USED ON THIS SHEET.

1. SEE "S" SHEETS FOR CONCRETE FLOOD WALL TYPES, CAPSTANS AND

CAISSON COPINGS.

2. SEE "E" SHEETS FOR ELECTRICAL UTILITY WORK.

3. SEE CS601 FOR FLOOD WALL ALIGNMENT TABLE.

4. SEE CU101 FOR UTILITY WORK.

5. CONTRACTOR MUST VERIFY ALL UTILITY CROSSING ELEVATIONS

PRIOR TO FLOOD WALL CONSTRUCTION. NOTIFY CONTRACTING

OFFICER OF DISCREPANCIES AND ADJUST FOOTING ELEVATION TO

AVOID UTILITY CROSSINGS WITH CONTRACTING OFFICER APPROVAL.

HORIZONTAL SCALE: 1" = 20'

CIVIL SITE AND ATFP PROFILE - AREA 101A1 VERTICAL SCALE: 1" = 4'

DAVIS AVENUE

C

AI

SS

O

N

MHMH

MH

MHMH

MH

MH

MH

BARGE SLIP

WHARF C

BE

R

TH

BERTH 24

PIER 3

DRYDOCK 4

BARGE SLIP

BERTH 20

SOUTHERN BRANCH

ELIZABETH RIVER

WHARF C

ES

ES

ES

DRYDOCK 4

DAVIS AVENUE

H

IT

C H

C O

C K

ST

R

EE

T

ES

ES

SOUTHERN BRANCH

OF THE

ELIZABETH RIVER

SOUTHERN BRANCH

OF THE ELIZABETH RIVER

DRYDOCK 2

B E

R

TH

BE

R

TH

ES

ES

ES

TRUXTON STREET

RENSHAW

AVENUE

BR

O

W N

A

VE

N U

E

CREIG

HTON

STREET

1-ST

BL

ES ES

ES

ES

ES

ES

ES

ES

ES

1-ST-BL

ES

ES

SINCLARE AVENUE

MAYO AVENUE

MAYO AVENUE

BERRIEN STREET

BLDG 401

ES

ES

ARMISTEAD

AVENUE

ES

BE

R

TH

ESES

ES

ES

ES

ES

ES

ES

3-ST-BR 2-ST-BR

1-ST-BL

ES

ES

ES

ES

ES

ES

ES

ES

ES

CREIGHTON STREET

CREIG

HTON STREET

1-ST-BL

RENSHAW

AVENUE

BERRIEN STREET

HUGHES STREET

STORAGE

MCKEEVER AVENUE

ES

BLDG 275

ES

ES

ES

PORTSMOUTH BOULEVARD

FOURTH STREET

BERRIEN STREET

BREESE

STREET

MAYO

AVENUE

PORTSMOUTH BOULEVARD

STIFF-LEGGEDDERRICK CRANE

M140 WEST

M140 EAST

STORAGE

TRAININGBASE

ENCLOSURE

STORAGEENCLOSURE

REN

SH

AW

A

VE

BREESE ST.

SI

NCLA

IR

A

VE

.BERRIEN STREET

MAY

O A

VE

BERRIEN STREET

FOURTH STREET GATE

BR

O

W N

A

VE

REN

SH

AW

CREIGHTON ST.

AVE.

BERRIEN ST.

CREIGHTON ST.

B R

O W

N A

V E

BERRIEN ST.

ROW

AN

A

VE

CREIGHTON ST.

SI

NCLA

IR

MAY

O A

VE

.BERRIEN ST.

STEVENS

ARMIS

TE

AD A

VE.

CREIGHTON ST.

TRUXTON STREET

BR

O

W N

A

VE

REN

SH

AW

A

VE

W H

AR

F

- C

BL

D G

N

O

H

IT

C H

C O

C K

ST

BL

D

G

SU

B

"O

BL

D

G

BLDG. NO. 193

DAVIS AVE.

SUB "OC"

Caisson Seat Caisson Seat

BERTH NO. 20

EDGE OF WHARF

DD 1

STEVENS ST.

BR

O

W N

A

VE

RENSHAW

AVE.

SINCLAIR AVE.BERRIEN ST.

DD 3

DD 4

KEY PLAN

DD 2

105106

NN

MATCH LINE STA 4+60

(SEE SHEET CS102)

40'10'0 20'

B1

CS505

C3

CS506

A3

CS503

STA 0+00 (SEE

ALIGNMENT START @

SHEET CS113 FOR

ALIGNM

ENT END)

C1

CS401

A1

SS401

A1

SS402 A3

SS312

WMS/IAS

DLB

EJA

DSN

SEL TSL WWW

12809310

CI

VI

L

SI

TE

A

ND

A

TF

P

PL

AN

A

ND

P

RO

FI

LE

AR

EA

CS101

AS NOTED

A1

CU501

40'0 20'HORIZONTAL SCALE 0 4' 8'VERTICAL SCALE

C4

SS313

EXISTING

GRADE

TOP OF WALL

EL = 106.0

TOP OF FOOTING

EL = 99.50

BOTTOM OF

FOOTING

BOTTOM OF

CUTOFF WALL

EL = 94.00

TOP OF WALL

EL = 106.0

TOP OF FOOTING

EL = 99.50

BOTTOM OF

FOOTING

BOTTOM OF CUTOFF

WALL EL = 85.00

(E) ABANDONED

DISCHARGE CULVERT

(E) CRANE GIRDERS

DRY DOCK 2

CAISSON

(E) 4X4 DUCT BANK

BOTTOM OF

CUTOFF WALL

EL = 94.00

C1

SS502

FLOODGATE

FOUNDATION

C1

SS502

FLOODGATE

FOUNDATION

TOP OF FOOTING

EL = 99.50

27 18" STORM

2710" SALTWATER

276" FRESH WATER

27 12" SALTWATER

27 6" FRESH WATER

274" SEWER

274" STEAM

272.5" AIR

A3

CU402

VALVE

VAULT 6

4 FG04 C3

SS502

FLOODGATE

FOUNDATION4FG05

A1

SS403

DD3 NORTH SIDE

COPING LEVEL

4FG03

C1

SS502

FLOODGATE

FOUNDATION

4 FG02

(E) SHEET PILE WALL

SEE NOTE 5

ST

A

8+

ST

A

8+

32(E) 2X3 DUCT BANK

CUTOFF WALL MUST

EXTEND TO BELOW

GRADE CONCRETE WALL

FOOTING AND CUTOFF WALL MUST

EXTEND TO CONNECT TO DRY DOCK

2 FLOOD WALL STUBS. PROVIDE

WATER STOP SIMILAR TO C1/S004

32 (E) ELEC DUCT BANK

A4

SS313

27(E) 3X3 DUCT BANK

EL

EV

AT

IO

N (F

T)

EL

EV

AT

IO

N (F

T)

STATION

4+60 4+80 5+00 5+20 5+40 5+60 5+80 6+00 6+20 6+40 6+60 6+80 7+00 7+20 7+40 7+60 7+80 8+00 8+20 8+40 8+60 8+80 9+00 9+20

5+00

6+00

7+

8+00

9+00

PI STA 5+16.30

PI STA 6+95.82

PI STA 7+02.77 PI STA 7+37.52

PI STA 7+60.45

PI STA 8+28.52

PI STA 8+52.72

PI STA 8+91.10

DRY DOCK 2

(E) CRANE RAIL

DRY DOCK 2

CAISSON

FLOOD WALL FOOTING

4 FG03 4FG05

4 FG02

4 FG04

11CAPSTAN 5

CAPSTAN 7, SEE

A4/SS505 FOR DRILLED

SHAFT FOUNDATION 11CAPSTAN 8

PI STA 5+56.38

PI STA 6+90.17

FG04 GATE

STORAGE

FG05 GATE

STORAGE

PI STA 8+94.61

PI STA 9+12.49

PI STA 5+48.40

PI STA 7+13.19

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

P -6

D

R Y

D O

C K

F

LO

O

TE

C

TI

O

N

IM

P R

O V

E M

E N

TS

NO

RF

OL

K

NA

VA

L

SH

IP

YA

RD

PO

RT

SM

OU

TH

, V A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

CI

C

OR

E

- H

AM

PT

ON

R

OA

DS

NA

VA

L

ST

AT

IO

N

NO

RF

OL

K

- N

OR

FO

LK

CHIEF ENG/ARCH

FIRE PROTECTION

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

FI

LE

N

AM

E:

Q

:\N

OR

\1

-0

8\ ca dd

Ac tiv e\ _P

-6

\D

RY

DP

3-

0-

CS

2.

dw g

L

AY

OU

T

NA

M

E:

C

IV

IL

S

IT

E

AN

D

AT

FP

P

LA

N

AN

D

PR

OF

IL

E

- A

RE

A

P

LO

TT

ED

: F rid ay

, F eb ru ar y 2 1,

- 6

:3 9p m U

SE

R:

tt ho m ps on

DRAWFORM REVISION: 12 APRIL 2018

P

S

N

RRO F E S S I O N A L E N G I N E E R

T A

T

E O F M A R Y

L A

N

DW

I L

L IA M WHEATON

O . 2 4 6 2 8 E G I S T E R E D

W.

PLAN

NORTH

SCALE: 1" = 20'

CIVIL SITE AND ATFP PLAN - AREA 102

HORIZONTAL SCALE:1" = 20'

CIVIL SITE AND ATFP PROFILE - AREA 102A1 VERTICAL SCALE: 1" = 4'

DAVIS AVENUE

C

AI

SS

O

N

MHMH

MH

MHMH

MH

MH

MH

BARGE SLIP

WHARF C

BE

R

TH

BERTH 24

PIER 3

DRYDOCK 4

BARGE SLIP

BERTH 20

SOUTHERN BRANCH

ELIZABETH RIVER

WHARF C

ES

ES

ES

DRYDOCK 4

DAVIS AVENUE

H

IT

C H

C O

C K

ST

R

EE

T

ES

ES

SOUTHERN BRANCH

OF THE

ELIZABETH RIVER

SOUTHERN BRANCH

OF THE ELIZABETH RIVER

DRYDOCK 2

B E

R

TH

BE

R

TH

ES

ES

ES

TRUXTON STREET

RENSHAW

AVENUE

BR

O

W N

A

VE

N U

E

CREIG

HTON

STREET

1-ST

BL

ES ES

ES

ES

ES

ES

ES

ES

ES

1-ST-BL

ES

ES

SINCLARE AVENUE

MAYO AVENUE

M

AYO AVENUE

BERRIEN STREET

BLDG 401

ES

ES

ARMISTEAD

AVENUE

ES

BE

R

TH

ESES

ES

ES

ES

ES

ES

ES

3-ST-BR 2-ST-BR

1-ST-BL

ES

ES

ES

ES

ES

ES

ES

ES

ES

CREIGHTON STREET

CREIG

HTON STREET

1-ST-BL

RENSHAW

AVENUE

BERRIEN STREET

HUGHES STREET

STORAGE

MCKEEVER AVENUE

ES

BLDG 275

ES

ES

ES

PORTSMOUTH BOULEVARD

FOURTH STREET

BERRIEN STREET

BREESE

STREET

MAYO

AVENUE

PORTSMOUTH BOULEVARD

STIFF-LEGGEDDERRICK CRANE

M140 WEST

M140 EAST

STORAGE

TRAININGBASE

ENCLOSURE

STORAGEENCLOSURE

REN

SH

AW

A

VE

BREESE ST.

SI

NCLA

IR

A

VE

.BERRIEN STREET

MAY

O A

VE

BERRIEN STREET

FOURTH STREET GATE

BR

O

W N

A

VE

REN

SH

AW

CREIGHTON ST.

AV

E.

BERRIEN ST.

CREIGHTON ST.

B R

O W

N A

V E

BERRIEN ST.

ROW

AN

A

VE

CREIGHTON ST.

SI

NCLA

IR

MAY

O A

VE

.BERRIEN ST.

STEVENS

ARMIS

TE

AD A

VE.

CREIGHTON ST.

TRUXTON STREET

BR

O

W N

A

VE

REN

SH

AW

A

VE

W H

AR

F

- C

BL

D G

N

O

H

IT

C H

C O

C K

ST

BL

D

G

SU

B

"O

BL

D

G

BLDG. NO. 193

DAVIS AVE.

SUB "OC"

Caisson Seat

Caisson Seat

BERTH NO. 20

EDGE OF WHARF

DD 1

STEVENS ST.

BR

O

W N

A

VE

RENSHAW

AVE.

SINCLAIR AVE.BERRIEN ST.

DD 3

DD 4

KEY PLAN

DD 2

105106

NN

MATCH LINE STA 9+20

(SEE SHEET CS103)MATCH LINE STA 4+60

(SEE SHEET CS101)

40'10'0 20'

NOTES:

1. PAVEMENT REPAIR EXTENTS.

2. NOT USED ON THIS SHEET.

3. CONCRETE FLOOD WALL, SEE FOR TYPE.

4. FLOOD GATE, SEE CALLOUTS FOR ID, SEE

5.-10.NOT USED ON THIS SHEET.

11. RELOCATABLE CAPSTAN.

12.-10. NOT USED ON THIS SHEET.

26. CLEAT.

27. UTILITY CROSSING THROUGH CUTOFF WALL, SEE

28.-31. NOT USED ON THIS SHEET.

32. DUCT BANK CROSSING THROUGH FOOTING, SEE

33. NOT USED ON THIS SHEET.

C2

CS401

B1

CS401

A1

SS402

A1

SS403

A4

SS505

C1

SS504

WORK NOTES:

1. SEE "S" SHEETS FOR CONCRETE FLOOD WALL TYPES, CAPSTANS AND

CAISSON COPINGS.

2. SEE "E" SHEETS FOR ELECTRICAL UTILITY WORK.

3. SEE CS601 FOR FLOOD WALL ALIGNMENT TABLE.

4. SEE CU101 FOR UTILITY WORK.

5. FROM STA 8+28 TO STA 8+95, CONSTRUCT FLOOD WALL FOOTING ON

TOP OF (E) SHEET PILE WALL. NO CUTOFF AT SHEET PILE WALL.

6. CONTRACTOR TO VERIFY ALL UTILITY CROSSING ELEVATIONS PRIOR

TO FLOOD WALL CONSTRUCTION. NOTIFY CONTRACTING OFFICER OF

DISCREPANCIES AND ADJUST FOOTING ELEVATION TO AVOID UTILITY

CROSSINGS WITH APPROVAL OF CONTRACTING OFFICER.

A3

CS503

A3

EJA

DSN

SEL TSL WWW

12809311

CI

VI

L

SI

TE

A

ND

A

TF

P

PL

AN

A

ND

P

RO

FI

LE

AR

EA

CS102

AS NOTED

A1

CU501

40'0 20'HORIZONTAL SCALE 0 4' 8'VERTICAL SCALE

B4

AT

IO

N (F

T)

EL

EV

AT

IO

N (F

T)

STATION

9+20 9+40 9+60 9+80 10+00 10+20 10+40 10+60 10+80 11+00 11+20 11+40 11+60 11+80 12+00 12+20 12+40 12+60 12+80 13+00 13+20 13+40 13+60 13+80 14+00

TOP OF WALL

EL = 106.0

TOP OF FOOTING

EL = 100.50

BOTTOM OF

FOOTING

BOTTOM OF

CUTOFF WALL

EL = 94.50

EXISTING

GRADE

TOP OF UTILITY

TRENCH

(E) DRY DOCK 6 AND 7

CONCRETE FOUNDATION(E) DRY DOCK 6 AND 7

CONCRETE FOUNDATION

DRY DOCK 3

CAISSON

BOTTOM OF

CUTOFF WALL

EL = 93.00

C1

SS502

FLOODGATE

FOUNDATION

(E) ELEC

DUCT BANK

(E) ELEC

DUCT BANK

CUTOFF WALL MUST

EXTEND TO BELOW

GRADE CONC WALL

274" FRESH WATER

2712" SALTWATER

27 4" AIR

27 6" SEWER

27 3" STEAM

4 FG06

A1

SS403

DD3 NORTH SIDE

COPING LEVEL

A1

SS404

DD3 SOUTH SIDE

COPING LEVEL

CUTOFF WALL

MUST EXTEND TO BELOW

GRADE CONCRETE

(E) 30" STORM (E) 18" STORM (E) 18" STORM

(E) DRY DOCK

3 STRUCTURE

(E) DRY DOCK

3 STRUCTURE

4FG06

(E) UTILITY TRENCH

DRY DOCK 3

PI STA 10+95.65

PI STA 11+06.17

PI STA 11+44.05

PI STA 11+48.28

PI STA 11+61.78

PI STA 11+69.94

PI STA 11+82.26

PI STA 13+72.89

9+00 10+00

+0

12+00 13+00

+0

FLOOD WALL FOOTING

A1

SC101

DRY DOCK 3

CAISSON

PI STA 10+73.19

PI STA 10+58.34

PI STA 9+40.46

PI STA 9+25.33

PI STA 11+82.12

PI STA 12+82.24

PI STA 12+76.24

PI STA 12+71.65

PI STA 12+86.82

PI STA 9+39.76

PI STA 10+58.29

PI STA 10+82.59

FG06 GATE STORAGE

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

P -6

D

R Y

D O

C K

F

LO

O

TE

C

TI

O

N

IM

P R

O V

E M

E N

TS

NO

RF

OL

K

NA

VA

L

SH

IP

YA

RD

PO

RT

SM

OU

TH

, V A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

CI

C

OR

E

- H

AM

PT

ON

R

OA

DS

NA

VA

L

ST

AT

IO

N

NO

RF

OL

K

- N

OR

FO

LK

CHIEF ENG/ARCH

FIRE PROTECTION

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

FI

LE

N

AM

E:

Q

:\N

OR

\1

-0

8\ ca dd

Ac tiv e\ _P

-6

\D

RY

DP

3-

0-

CS

3.

dw g

L

AY

OU

T

NA

M

E:

C

IV

IL

S

IT

E

AN

D

AT

FP

P

LA

N

AN

D

PR

OF

IL

E

- A

RE

A

P

LO

TT

ED

: F rid ay

, F eb ru ar y 2 1,

- 6

:3 9p m U

SE

R:

tt ho m ps on

DRAWFORM REVISION: 12 APRIL 2018

P

S

N

RRO F E S S I O N A L E N G I N E E R

T A

T

E O F M A R Y

L A

N

DW

I L

L IA M WHEATON

O . 2 4 6 2 8 E G I S T E R E D

W.

PLAN

NORTH

SCALE: 1" = 20'

CIVIL SITE AND ATFP PLAN - AREA 103

HORIZONTAL SCALE: 1" = 20'

CIVIL SITE AND ATFP PROFILE - AREA 103A1 VERTICAL SCALE: 1" = 4'

DAVIS AVENUE

C

AI

SS

O

N

MHMH

MH

MHMH

MH

MH

MH

BARGE SLIP

WHARF C

BE

R

TH

BERTH 24

PIER 3

DRYDOCK 4

BARGE SLIP

BERTH 20

SOUTHERN BRANCH

ELIZABETH RIVER

WHARF C

ES

ES

ES

DRYDOCK 4

DAVIS AVENUE

H

IT

C H

C O

C K

ST

R

EE

T

ES

ES

SOUTHERN BRANCH

OF THE

ELIZABETH RIVER

SOUTHERN BRANCH

OF THE ELIZABETH RIVER

DRYDOCK 2

B E

R

TH

BE

R

TH

ES

ES

ES

TRUXTON STREET

RENSHAW

AVENUE

BR

O

W N

A

VE

N U

E

CREIG

HTON

STREET

1-ST

BL

ES ES

ES

ES

ES

ES

ES

ES

ES

1-ST-BL

ES

ES

SINCLARE AVENUE

MAYO AVENUE

MAYO AVENUE

BERRIEN STREET

BLDG 401

ES

ES

ARMISTEAD

AVENUE

ES

BE

R

TH

ESES

ES

ES

ES

ES

ES

ES

3-ST-BR 2-ST-BR

1-ST-BL

ES

ES

ES

ES

ES

ES

ES

ES

ES

CREIGHTON STREET

CREIG

HTON STREET

1-ST-BL

RENSHAW

AVENUE

BERRIEN STREET

HUGHES STREET

STORAGE

MCKEEVER AVENUE

ES

BLDG 275

ES

ES

ES

PORTSMOUTH BOULEVARD

FOURTH STREET

BERRIEN STREET

BREESE

STREET

MAYO

AVENUE

PORTSMOUTH BOULEVARD

STIFF-LEGGEDDERRICK CRANE

M140 WEST

M140 EAST

STORAGE

TRAININGBASE

ENCLOSURE

STORAGEENCLOSURE

REN

SH

AW

A

VE

BREESE ST.

SI

NCLA

IR

A

VE

.BERRIEN STREET

MAY

O A

VE

BERRIEN STREET

FOURTH STREET GATE

BR

O

W N

A

VE

REN

SH

AW

CREIGHTON ST.

AVE.

BERRIEN ST.

CREIGHTON ST.

B R

O W

N A

V E

BERRIEN ST.

ROW

AN

A

VE

CREIGHTON ST.

SI

NCLA

IR

MAY

O A

VE

.BERRIEN ST.

STEVENS

ARMIS

TE

AD A

VE.

CREIGHTON ST.

TRUXTON STREET

BR

O

W N

A

VE

REN

SH

AW

A

VE

W H

AR

F

- C

BL

D G

N

O

H

IT

C H

C O

C K

ST

BL

D

G

SU

B

"O

BL

D

G

BLDG. NO. 193

DAVIS AVE.

SUB "OC"

Caisson Seat Caisson Seat

BERTH NO. 20

EDGE OF WHARF

DD 1

STEVENS ST.

BR

O

W N

A

VE

RENSHAW

AVE.

SINCLAIR AVE.BERRIEN ST.

DD 3

DD 4

KEY PLAN

DD 2

105106

NN

MATCH LINE STA 9+20

(SEE SHEET CS102)

M

AT

CH

L

IN

E

ST

A

+0

(S

EE

S

HE

ET

C S1

40'10'0 20'

A3

CS501

NOTES:

WORK NOTES:

1. PAVEMENT REPAIR EXTENTS.

2. NOT USED ON THIS SHEET.

3. CONCRETE FLOOD WALL, SEE FOR TYPE.

4. FLOOD GATE, SEE CALLOUTS FOR ID, SEE

5.-7. NOT USED ON THIS SHEET.

8. ACCESS STAIRS, SEE

9.-11.NOT USED ON THIS SHEET.

12. GUARD POST

13.-25. NOT USED ON THIS SHEET.

26. CLEAT

27. UTILITY CROSSING THROUGH CUTOFF WALL, SEE

28. SEE FOR WEEP HOLES.

29.-33. NOT USED ON THIS SHEET.

1. SEE "S" SHEETS FOR CONCRETE FLOOD WALL TYPES, CAPSTANS AND

CAISSON COPINGS.

2. SEE "E" SHEETS FOR ELECTRICAL UTILITY WORK.

3. SEE CS601 FOR FLOOD WALL ALIGNMENT TABLE.

4. SEE CU102 FOR UTILITY WORK.

5. CONTRACTOR MUST VERIFY ALL UTILITY CROSSING ELEVATIONS

PRIOR TO FLOOD WALL CONSTRUCTION. NOTIFY CONTRACTING

OFFICER OF DISCREPANCIES AND ADJUST FOOTING ELEVATION TO

AVOID UTILITY CROSSINGS WITH CONTRACTING OFFICER APPROVAL.

A3

CS503

B3

CS401

A1

SS404

A1

SS403

A3

SS312

B1

SS501

EJA

DSN

SEL TSL WWW

12809312

CI

VI

L

SI

TE

A

ND

A

TF

P

PL

AN

A

ND

P

RO

FI

LE

AR

EA

CS103

AS NOTED

A1

CU501

40'0 20'HORIZONTAL SCALE 0 4' 8'VERTICAL SCALE

SS311

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

CHK

SEAL

A/E INFO

OF

EPROJECT NO.:

P -6

D

R Y

D O

C K

F

LO

O

TE

C

TI

O

N

IM

P R

O V

E M

E N

TS

1588810

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 12 APRIL 2018

NN

40'10'0 20'

12809313

CS104

AS NOTED

40'0 20' 0 4' 8'

AT

IO

N (F

T)

EL

EV

AT

IO

N (F

T)

STATION

18+70 18+80 19+00 19+20 19+40 19+60 19+80 20+00 20+20 20+40 20+60 20+80 21+00 21+20 21+40 21+60 21+80 22+00 22+20 22+40 22+60 22+80 23+00 23+20 23+40

TOP OF WALL

ELEV = 106.0

FG09

TOP OF FOOTING

ELEV = 101.25

BOTTOM OF FOOTING

BOTTOM OF

CUTOFF WALL

ELEV = 95.00

FG10 FG11

EXISTING GRADE

(E) SHIP WAY #1 FOUNDATION

SEE DEMOLITION PLANS

TOP OF FOOTING

ELEV = 101.00TOP OF FOOTING

ELEV = 100.50

(E) ELEC DUCT BANK (E) ELEC DUCT BANK

TOP OF FOOTING

ELEV = 101.00

TOP OF FOOTING

ELEV = 101.00

TOP OF FOOTING

ELEV = 101.00

276" FRESH WATER

2712" SALTWATER

2924" STORM 2936" STORM

278" SEWER

32(E) ELEC DUCT BANK

+0

19+00

20+00

21+00

22+00

+0

PI STA 18+74.62

PI STA 18+81.70

PI STA 20+14.23

PI STA 20+31.50

PI STA 21+60.92

PI STA 21+89.84

PI STA 22+74.00

PI STA 22+80.00

PI STA 22+83.54

PI STA 21+42.63

MATCH LINE STA 23+40

(SEE SHEET CS106)

MATCH LINE STA 18+70

(SEE SHEET CS104)

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

P -6

D

R Y

D O

C K

F

LO

O

TE

C

TI

O

N

IM

P R

O V

E M

E N

TS

NO

RF

OL

K

NA

VA

L

SH

IP

YA

RD

PO

RT

SM

OU

TH

, V A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

CI

C

OR

E

- H

AM

PT

ON

R

OA

DS

NA

VA

L

ST

AT

IO

N

NO

RF

OL

K

- N

OR

FO

LK

CHIEF ENG/ARCH

FIRE PROTECTION

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

FI

LE

N

AM

E:

Q

:\N

OR

\1

-0

8\ ca dd

Ac tiv e\ _P

-6

\D

RY

DP

3-

0-

CS

5.

dw g

L

AY

OU

T

NA

M

E:

C

IV

IL

S

IT

E

AN

D

AT

FP

P

LA

N

AN

D

PR

OF

IL

E

- A

RE

A

P

LO

TT

ED

: F rid ay

, F eb ru ar y 2 1,

- 6

:4 0p m U

SE

R:

tt ho m ps on

DRAWFORM REVISION: 12 APRIL 2018

P

S

N

RRO F E S S I O N A L E N G I N E E R

T A

T

E O F M A R Y

L A

N

DW

I L

L IA M WHEATON

O . 2 4 6 2 8 E G I S T E R E D

W.

PLAN

NORTH

SCALE: 1" = 20'

CIVIL SITE AND ATFP PLAN - AREA 105

HORIZONTAL SCALE: 1" = 20'

CIVIL SITE AND ATFP PROFILE - AREA 105A1 VERTICAL SCALE: 1" = 4'

DAVIS AVENUE

C

AI

SS

O

N

MHMH

MH

MHMH

MH

MH

MH

BARGE SLIP

WHARF C

BE

R

TH

BERTH 24

PIER 3

DRYDOCK 4

BARGE SLIP

BERTH 20

SOUTHERN BRANCH

ELIZABETH RIVER

WHARF C

ES

ES

ES

DRYDOCK 4

DAVIS AVENUE

H

IT

C H

C O

C K

ST

R

EE

T

ES

ES

SOUTHERN BRANCH

OF THE

ELIZABETH RIVER

SOUTHERN BRANCH

OF THE ELIZABETH RIVER

DRYDOCK 2

B E

R

TH

BE

R

TH

ES

ES

ES

TRUXTON STREET

RENSHAW

AVENUE

BR

O

W N

A

VE

N U

E

CREIG

HTON

STREET

1-ST

BL

ES ES

ES

ES

ES

ES

ES

ES

ES

1-ST-BL

ES

ES

SINCLARE AVENUE

MAYO AVENUE

MAYO AVENUE

BERRIEN STREET

BLDG 401

ES

ES

ARMISTEAD

AVENUE

ES

BE

R

TH

ESES

ES

ES

ES

ES

ES

ES

3-ST-BR 2-ST-BR

1-ST-BL

ES

ES

ES

ES

ES

ES

ES

ES

ES

CREIGHTON STREET

CREIG

HTON STREET

1-ST-BL

RENSHAW

AVENUE

BERRIEN STREET

HUGHES STREET

STORAGE

MCKEEVER AVENUE

ES

BLDG 275

ES

ES

ES

PORTSMOUTH BOULEVARD

FOURTH STREET

BERRIEN STREET

BREESE

STREET

MAYO

AVENUE

PORTSMOUTH BOULEVARD

STIFF-LEGGEDDERRICK CRANE

M140 WEST

M140 EAST

STORAGE

TRAININGBASE

ENCLOSURE

STORAGEENCLOSURE

REN

SH

AW

A

VE

BREESE ST.

SI

NCLA

IR

A

VE

.BERRIEN STREET

MAY

O A

VE

BERRIEN STREET

FOURTH STREET GATE

BR

O

W N

A

VE

REN

SH

AW

CREIGHTON ST.

AVE.

BERRIEN ST.

CREIGHTON ST.

B R

O W

N A

V E

BERRIEN ST.

ROW

AN

A

VE

CREIGHTON ST.

SI

NCLA

IR

MAY

O A

VE

.BERRIEN ST.

STEVENS

ARMIS

TE

AD A

VE.

CREIGHTON ST.

TRUXTON STREET

BR

O

W N

A

VE

REN

SH

AW

A

VE

W H

AR

F

- C

BL

D G

N

O

H

IT

C H

C O

C K

ST

BL

D

G

SU

B

"O

BL

D

G

BLDG. NO. 193

DAVIS AVE.

SUB "OC"

Caisson Seat Caisson Seat

BERTH NO. 20

EDGE OF WHARF

DD 1

STEVENS ST.

BR

O

W N

A

VE

RENSHAW

AVE.

SINCLAIR AVE.BERRIEN ST.

DD 3

DD 4

KEY PLAN

DD 2

105106

NN

40'10'0 20'

NOTES:

WORK NOTES:

1. PAVEMENT REPAIR EXTENTS.

2. NOT USED ON THIS SHEET.

3. CONCRETE FLOOD WALL, SEE FOR TYPE.

4. FLOOD GATE, SEE CALLOUTS FOR ID, SEE

5.-26.NOT USED ON THIS SHEET.

27. UTILITY CROSSING THROUGH CUTOFF WALL, SEE

28. NOT USED ON THIS SHEET.

29. UTILITY CROSSING UNDER CUTOFF WALL, SEE

30.-31. NOT USED ON THIS SHEET.

32. DUCT BANK CROSSING THROUGH FOOTING, SEE

33. NOT USED ON THIS SHEET.

1. SEE "S" SHEETS FOR CONCRETE FLOOD WALL TYPES, CAPSTANS AND

CAISSON COPINGS.

2. SEE "E" SHEETS FOR ELECTRICAL UTILITY WORK.

3. SEE CS601 FOR FLOOD WALL ALIGNMENT TABLE.

4. SEE CU103 FOR UTILITY WORK.

5. CONTRACTOR MUST VERIFY ALL UTILITY CROSSING ELEVATIONS

PRIOR TO FLOOD WALL CONSTRUCTION. NOTIFY CONTRACTING

OFFICER OF DISCREPANCIES AND ADJUST FOOTING ELEVATION TO

AVOID UTILITY CROSSINGS WITH CONTRACTING OFFICER APPROVAL.

A3

CS503

(E) CRANE RAIL

4FG09

4FG11

4FG10

FLOOD WALL

FOOTING

A3

CS401

C1

CS402

C2

CS402

C1

SS502C1

SS502

C1

SS502

EJA

DSN

SEL TSL WWW

12809314

CI

VI

L

SI

TE

A

ND

A

TF

P

PL

AN

A

ND

P

RO

FI

LE

AR

EA

CS105

AS NOTED

FG09 GATE

STORAGE

FG10 GATE

STORAGE

40'0 20'HORIZONTAL SCALE 0 4' 8'VERTICAL SCALE

A1

CU501

A1

CU502

B4

0.00%0.00%

EV

AT

IO

N (F

T)

EL

EV

AT

IO

N (F

T)

STATION

23+40 23+60 23+80 24+00 24+20 24+40 24+60 24+80 25+00 25+20 25+40 25+60 25+80 26+00 26+20 26+40 26+60 26+80 27+00 27+20 27+40 27+60 27+80

TOP OF WALL

ELEV = 106.0

TOP OF FOOTING

ELEV = 101.00

BOTTOM OF FOOTING

BOTTOM OF

CUTOFF WALL

ELEV = 96.00

EXISTING GRADE

(E) SHIP WAY #1 FOUNDATION

SEE DEMOLITION PLANS (E) SHIP WAY #1 FOUNDATION

SEE DEMOLITION PLANS (E) SHIP WAY #1 FOUNDATION

SEE DEMOLITION PLANS

(E) SHIP WAY #1 FOUNDATION

SEE DEMOLITION PLANS

(E) SHIP WAY #1 FOUNDATION

SEE DEMOLITION PLANS

BOTTOM OF

CUTOFF WALL

ELEV = 90.00

TOP OF FOOTING

ELEV = 101.25

(E) ELEC DUCT BANK

BOTTOM OF

CUTOFF WALL

ELEV = 95.00

(E) COMM DUCT BANK

278" SEWER

276" SEWER

273" FRESH WATER

VALVE VAULT

(ADJACENT TO

WALL)

24+00 25+00 26+00 27+00 28+00

PI STA 25+45.25

PI STA 25+55.15

PI STA 25+73.15 PI STA 25+83.05

M

AT

CH

L

IN

E

ST

A

+8

(S

EE

S

HE

ET

C S1

M

AT

CH

L

IN

E

ST

A

+4

(S

EE

S

HE

ET

C S1

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

P -6

D

R Y

D O

C K

F

LO

O

TE

C

TI

O

N

IM

P R

O V

E M

E N

TS

NO

RF

OL

K

NA

VA

L

SH

IP

YA

RD

PO

RT

SM

OU

TH

, V A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

CI

C

OR

E

- H

AM

PT

ON

R

OA

DS

NA

VA

L

ST

AT

IO

N

NO

RF

OL

K

- N

OR

FO

LK

CHIEF ENG/ARCH

FIRE PROTECTION

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

FI

LE

N

AM

E:

Q

:\N

OR

\1

-0

8\ ca dd

Ac tiv e\ _P

-6

\D

RY

DP

3-

0-

CS

6.

dw g

L

AY

OU

T

NA

M

E:

C

IV

IL

S

IT

E

AN

D

AT

FP

P

LA

N

AN

D

PR

OF

IL

E

- A

RE

A

P

LO

TT

ED

: F rid ay

, F eb ru ar y 2 1,

- 6

:4 0p m U

SE

R:

tt ho m ps on

DRAWFORM REVISION: 12 APRIL 2018

P

S

N

RRO F E S S I O N A L E N G I N E E R

T A

T

E O F M A R Y

L A

N

DW

I L

L IA M WHEATON

O . 2 4 6 2 8 E G I S T E R E D

W.

PLAN

NORTH

SCALE: 1" = 20'

CIVIL SITE AND ATFP PLAN - AREA 106

HORIZONTAL SCALE: 1" = 20'

CIVIL SITE AND ATFP PROFILE - AREA 106A1 VERTICAL SCALE: 1" = 4'

DAVIS AVENUE

C

AI

SS

O

N

MHMH

MH

MHMH

MH

MH

MH

BARGE SLIP

WHARF C

BE

R

TH

BERTH 24

PIER 3

DRYDOCK 4

BARGE SLIP

BERTH 20

SOUTHERN BRANCH

ELIZABETH RIVER

WHARF C

ES

ES

ES

DRYDOCK 4

DAVIS AVENUE

H

IT

C H

C O

C K

ST

R

EE

T

ES

ES

SOUTHERN BRANCH

OF THE

ELIZABETH RIVER

SOUTHERN BRANCH

OF THE ELIZABETH RIVER

DRYDOCK 2

B E

R

TH

BE

R

TH

ES

ES

ES

TRUXTON STREET

RENSHAW

AVENUE

BR

O

W N

A

VE

N U

E

CREIG

HTON

STREET

1-ST

BL

ES ES

ES

ES

ES

ES

ES

ES

ES

1-ST-BL

ES

ES

SINCLARE AVENUE

MAYO AVENUE

MAYO AVENUE

BERRIEN STREET

BLDG 401

ES

ES

ARMISTEAD

AVENUE

ES

BE

R

TH

ESES

ES

ES

ES

ES

ES

ES

3-ST-BR 2-ST-BR

1-ST-BL

ES

ES

ES

ES

ES

ES

ES

ES

ES

CREIGHTON STREET

CREIG

HTON STREET

1-ST-BL

RENSHAW

AVENUE

BERRIEN STREET

HUGHES STREET

STORAGE

MCKEEVER AVENUE

ES

BLDG 275

ES

ES

ES

PORTSMOUTH BOULEVARD

FOURTH STREET

BERRIEN STREET

BREESE

STREET

MAYO

AVENUE

PORTSMOUTH BOULEVARD

STIFF-LEGGEDDERRICK CRANE

M140 WEST

M140 EAST

STORAGE

TRAININGBASE

ENCLOSURE

STORAGEENCLOSURE

REN

SH

AW

A

VE

BREESE ST.

SI

NCLA

IR

A

VE

.BERRIEN STREET

MAY

O A

VE

BERRIEN STREET

FOURTH STREET GATE

BR

O

W N

A

VE

REN

SH

AW

CREIGHTON ST.

AVE.

BERRIEN ST.

CREIGHTON ST.

B R

O W

N A

V E

BERRIEN ST.

ROW

AN

A

VE

CREIGHTON ST.

SI

NCLA

IR

MAY

O A

VE

.BERRIEN ST.

STEVENS

ARMIS

TE

AD A

VE.

CREIGHTON ST.

TRUXTON STREET

BR

O

W N

A

VE

REN

SH

AW

A

VE

W H

AR

F

- C

BL

D G

N

O

H

IT

C H

C O

C K

ST

BL

D

G

SU

B

"O

BL

D

G

BLDG. NO. 193

DAVIS AVE.

SUB "OC"

Caisson Seat Caisson Seat

BERTH NO. 20

EDGE OF WHARF

DD 1

STEVENS ST.

BR

O

W N

A

VE

RENSHAW

AVE.

SINCLAIR AVE.BERRIEN ST.

DD 3

DD 4

KEY PLAN

DD 2

105106

NN

40'10'0 20'

NOTES:

WORK NOTES:

1. PAVEMENT REPAIR EXTENTS.

2. NOT USED ON THIS SHEET.

3. CONCRETE FLOOD WALL, SEE FOR TYPE.

4.-12. NOT USED ON THIS SHEET

13. REPLACE RAILROAD TRACK, SEE CS511.

14.-26. NOT USED ON THIS SHEET.

27. UTILITY CROSSING THROUGH CUTOFF WALL, SEE

28.-33. NOT USED ON THIS SHEET.

1. SEE "S" SHEETS FOR CONCRETE FLOOD WALL TYPES, CAPSTANS AND

CAISSON COPINGS.

2. SEE "E" SHEETS FOR ELECTRICAL UTILITY WORK.

3. SEE CS601 FOR FLOOD WALL ALIGNMENT TABLE.

4. SEE CU103 FOR UTILITY WORK.

5. CONTRACTOR MUST VERIFY ALL UTILITY CROSSING ELEVATIONS

PRIOR TO FLOOD WALL CONSTRUCTION. NOTIFY CONTRACTING

OFFICER OF DISCREPANCIES AND ADJUST FOOTING ELEVATION TO

AVOID UTILITY CROSSINGS WITH CONTRACTING OFFICER APPROVAL.

(E) RAILROAD TRACKS

EJA

DSN

SEL TSL WWW

12809315

CI

VI

L

SI

TE

A

ND

A

TF

P

PL

AN

A

ND

P

RO

FI

LE

AR

EA

CS106

AS NOTED

(E) RAILROAD TRACK STOPS

40'0 20'HORIZONTAL SCALE 0 4' 8'VERTICAL SCALE

A1

CU501

FLOOD WALL FOOTING

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

CHK

SEAL

A/E INFO

OF

EPROJECT NO.:

P -6

D

R Y

D O

C K

F

LO

O

TE

C

TI

O

N

IM

P R

O V

E M

E N

TS

1588810

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

DRAWFORM REVISION: 12 APRIL 2018

NN

40'10'0 20'

12809316

CS107

AS NOTED

40'0 20' 0 4' 8'

TOP OF WALL

ELEV = 106.0

FG15

TOP OF FOOTING

ELEV = 102.00

BOTTOM OF FOOTING

BOTTOM OF

CUTOFF WALL

ELEV = 96.00

EXISTING GRADE

FG16 FG17 FG18

ELEC

CONDUITS

TOP OF FOOTING

ELEV = 101.75

BOTTOM OF

CUTOFF WALL

ELEV = 94.00

31 8" FRESH WATER

29 4" SEWER

2710" FRESH WATER

EL

EV

AT

IO

N (F

T)

EL

EV

AT

IO

N (F

T)

STATION

32+60 32+80 33+00 33+20 33+40 33+60 33+80 34+00 34+20 34+40 34+60 34+80 35+00 35+20 35+40 35+60 35+80 36+00 36+20 36+40 36+60 36+80 37+00 37+20 37+40

274" GAS2712" SALTWATER

29 12" SEWER

276" FRESH WATER

27 1" CONDENSATE

29 12" SEWER

32 ELECTRICAL

DUCT BANK 2712" SALTWATER

32 (E) ELECTRICAL

DUCT BANK

32(E) ELECTRICAL

DUCT BANK

27 6" FRESH WATER

33+00

34+00

+0

36+00

37+00

PI STA 33+54.64

PI STA 33+41.81

PI STA 34+81.15

PI STA 35+18.05

PI STA 37+12.01

PI STA 37+36.96

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

P -6

D

R Y

D O

C K

F

LO

O

TE

C

TI

O

N

IM

P R

O V

E M

E N

TS

NO

RF

OL

K

NA

VA

L

SH

IP

YA

RD

PO

RT

SM

OU

TH

, V A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

CI

C

OR

E

- H

AM

PT

ON

R

OA

DS

NA

VA

L

ST

AT

IO

N

NO

RF

OL

K

- N

OR

FO

LK

CHIEF ENG/ARCH

FIRE PROTECTION

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

FI

LE

N

AM

E:

Q

:\N

OR

\1

-0

8\ ca dd

Ac tiv e\ _P

-6

\D

RY

DP

3-

0-

CS

8.

dw g

L

AY

OU

T

NA

M

E:

C

IV

IL

S

IT

E

AN

D

AT

FP

P

LA

N

AN

D

PR

OF

IL

E

- A

RE

A

P

LO

TT

ED

: F rid ay

, F eb ru ar y 2 1,

- 6

:4 1p m U

SE

R:

tt ho m ps on

DRAWFORM REVISION: 12 APRIL 2018

P

S

N

RRO F E S S I O N A L E N G I N E E R

T A

T

E O F M A R Y

L A

N

DW

I L

L IA M WHEATON

O . 2 4 6 2 8 E G I S T E R E D

W.

PLAN

NORTH

SCALE: 1" = 20'

CIVIL SITE AND ATFP PLAN - AREA 108

HORIZONTAL SCALE: 1" = 20'

CIVIL SITE AND ATFP PROFILE - AREA 108A1 VERTICAL SCALE: 1" = 4'

DAVIS AVENUE

C

AI

SS

O

N

MHMH

MH

MHMH

MH

MH

MH

BARGE SLIP

WHARF C

BE

R

TH

BERTH 24

PIER 3

DRYDOCK 4

BARGE SLIP

BERTH 20

SOUTHERN BRANCH

ELIZABETH RIVER

WHARF C

ES

ES

ES

DRYDOCK 4

DAVIS AVENUE

H

IT

C H

C O

C K

ST

R

EE

T

ES

ES

SOUTHERN BRANCH

OF THE

ELIZABETH RIVER

SOUTHERN BRANCH

OF THE ELIZABETH RIVER

DRYDOCK 2

B E

R

TH

BE

R

TH

ES

ES

ES

TRUXTON STREET

RENSHAW

AVENUE

BR

O

W N

A

VE

N U

E

CREIG

HTON

STREET

1-ST

BL

ES ES

ES

ES

ES

ES

ES

ES

ES

1-ST-BL

ES

ES

SINCLARE AVENUE

MAYO AVENUE

MAYO AVENUE

BERRIEN STREET

BLDG 401

ES

ES

ARMISTEAD

AVENUE

ES

BE

R

TH

ESES

ES

ES

ES

ES

ES

ES

3-ST-BR 2-ST-BR

1-ST-BL

ES

ES

ES

ES

ES

ES

ES

ES

ES

CREIGHTON STREET

CREIG

HTON STREET

1-ST-BL

RENSHAW

AVENUE

BERRIEN STREET

HUGHES STREET

STORAGE

MCKEEVER AVENUE

ES

BLDG 275

ES

ES

ES

PORTSMOUTH BOULEVARD

FOURTH STREET

BERRIEN STREET

BREESE

STREET

MAYO

AVENUE

PORTSMOUTH BOULEVARD

STIFF-LEGGEDDERRICK CRANE

M140 WEST

M140 EAST

STORAGE

TRAININGBASE

ENCLOSURE

STORAGEENCLOSURE

REN

SH

AW

A

VE

BREESE ST.

SI

NCLA

IR

A

VE

.BERRIEN STREET

MAY

O A

VE

BERRIEN STREET

FOURTH STREET GATE

BR

O

W N

A

VE

REN

SH

AW

CREIGHTON ST.

AV

E.

BERRIEN ST.

CREIGHTON ST.

B R

O W

N A

V E

BERRIEN ST.

ROW

AN

A

VE

CREIGHTON ST.

SI

NCLA

IR

MAY

O A

VE

.BERRIEN ST.

STEVENS

ARMIS

TE

AD A

VE.

CREIGHTON ST.

TRUXTON STREET

BR

O

W N

A

VE

REN

SH

AW

A

VE

W H

AR

F

- C

BL

D G

N

O

H

IT

C H

C O

C K

ST

BL

D

G

SU

B

"O

BL

D

G

BLDG. NO. 193

DAVIS AVE.

SUB "OC"

Caisson Seat

Caisson Seat

BERTH NO. 20

EDGE OF WHARF

DD 1

STEVENS ST.

BR

O

W N

A

VE

RENSHAW

AVE.

SINCLAIR AVE.BERRIEN ST.

DD 3

DD 4

KEY PLAN

DD 2

105106

NN

MAT

CH LI

NE S

TA

+6

(SE

E S

HEE

T C

S1

MATCH LINE STA 37+40

(SEE SHEET CS109)

40'10'0 20'

NOTES:

WORK NOTES:

1. PAVEMENT REPAIR EXTENTS.

2. NOT USED ON THIS SHEET.

3. CONCRETE FLOOD WALL, SEE FOR TYPE.

4. FLOOD GATE, SEE CALLOUTS FOR ID, SEE

5.-15. NOT USED ON THIS SHEET.

16. 4' CHAIN LINK FENCE, SEE CALL OUT FOR LENGTH.

17.-26. NOT USED ON THIS SHEET.

27. UTILITY CROSSING THROUGH CUTOFF, SEE

28. NOT USED ON THIS SHEET.

29. UTILITY CROSSING UNDER CUTOFF, SEE

30. NOT USED ON THIS SHEET.

31. UTILITY THROUGH FOOTING, SEE

32. DUCT BANK CROSSING THROUGH FOOTING, SEE

33. NOT USED ON THIS SHEET.

1. SEE "S" SHEETS FOR CONCRETE FLOOD WALL TYPES, CAPSTANS AND

CAISSON COPINGS.

2. SEE "E" SHEETS FOR ELECTRICAL UTILITY WORK.

3. SEE CS601 FOR FLOOD WALL ALIGNMENT TABLE.

4. SEE CU104 FOR UTILITY WORK.

5. CONTRACTOR MUST VERIFY ALL UTILITY CROSSING ELEVATIONS

PRIOR TO FLOOD WALL CONSTRUCTION. NOTIFY CONTRACTING

OFFICER OF DISCREPANCIES AND ADJUST FOOTING ELEVATION TO

AVOID UTILITY CROSSINGS WITH CONTRACTING OFFICER APPROVAL.

A1

CS402

A3

CS402

C1

CS403

(E) RAILROAD TRACKS

4 FG15

4 FG17

168.2 LF

4FG16

FLOOD WALL

FOOTING

4FG18

C1

SS502 A1

CS511

C1

SS502

EJA

DSN

SEL TSL WWW

12809317

CI

VI

L

SI

TE

A

ND

A

TF

P

PL

AN

A

ND

P

RO

FI

LE

AR

EA

CS108

AS NOTED

A3

SS312

A3

CS503

A1

CU501

40'0 20'HORIZONTAL SCALE 0 4' 8'VERTICAL SCALE

A1

CU502

C4

SS313

B4

SS313

A3

SS502

A1

CU418 VALVE VAULT 19

FG17 GATE STORAGE

FG16 GATE STORAGE

CIVIL SITE - 1 OF 2
CS101 CIVIL SITE AND ATFP PLAN AND PROFILE - AREA 101
CS102 CIVIL SITE AND ATFP PLAN AND PROFILE - AREA 102
CS103 CIVIL SITE AND ATFP PLAN AND PROFILE - AREA 103
CS104 CIVIL SITE AND ATFP PLAN AND PROFILE - AREA 104
CS105 CIVIL SITE AND ATFP PLAN AND PROFILE - AREA 105
CS106 CIVIL SITE AND ATFP PLAN AND PROFILE - AREA 106
CS107 CIVIL SITE AND ATFP PLAN AND PROFILE - AREA 107
CS108 CIVIL SITE AND ATFP PLAN AND PROFILE - AREA 108

2020-02-23T23:54:32-0500

2020-02-23T23:55:00-0500

2020-02-23T23:55:00-0500

2020-02-23T23:55:00-0500

2020-02-23T23:55:01-0500

2020-02-23T23:55:01-0500

2020-02-23T23:55:04-0500

2020-02-23T23:55:04-0500

2020-02-23T23:55:37-0500

2020-02-23T23:56:12-0500

2020-02-23T23:56:12-0500

2020-02-23T23:56:12-0500

2020-02-23T23:56:12-0500

2020-02-23T23:56:12-0500

2020-02-23T23:56:13-0500

2020-02-23T23:56:13-0500

2020-02-25T18:13:48-0500

2020-02-25T18:14:11-0500

2020-02-25T18:14:12-0500

2020-02-25T18:14:13-0500

2020-02-25T18:14:14-0500

2020-02-25T18:14:14-0500

2020-02-25T18:14:15-0500

2020-02-25T18:14:17-0500

2020-02-27T09:14:07-0500

2020-02-27T09:14:19-0500

2020-02-27T09:14:20-0500

2020-02-27T09:14:21-0500

2020-02-27T09:14:22-0500

2020-02-27T09:14:23-0500

2020-02-27T09:14:24-0500

2020-02-27T09:14:25-0500

2020-02-28T11:26:06-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-02-28T11:26:45-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-02-28T11:27:59-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-02-28T11:28:33-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-02-28T11:29:05-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-02-28T11:29:32-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-02-28T11:30:17-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-02-28T11:31:28-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-02-28T11:34:42-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-02-28T11:34:56-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-02-28T11:34:58-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-02-28T11:34:59-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-02-28T11:35:00-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-02-28T11:35:01-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-02-28T11:35:02-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2020-02-28T11:35:04-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.

File details come from the government source that posted it. Updated .