This solicitation is for design-build construction services for Dry Dock Flood Protection Improvements at Norfolk Naval Shipyard. The selected contractor will construct a permanent flood wall of cast-in-place reinforced concrete around Dry Docks 1 through 4 to protect against flooding from the Elizabeth River. Additional scope includes modifying caisson gunwales and constructing caisson seat extensions for several dry docks as well as removing and replacing dry dock capstans. The Naval Facilities Engineering Command is the contracting agency. The solicitation number is N4008520R0063 and responses are due on the date specified in the solicitation.
View the file
Other files
Show 40 more
Latest 50 of 60 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRY DOCK 4
DRY DOCK 3
DRY DOCK 2
DRY DOCK 1
RENSHAW AVENUE
HI
TC
HC
OC
K
ST
RE
ET
SINCLAIR AVENUE
ARMISTEAD AVENUE
BERRIEN STREET
BE
RT
H
BE
RT
H
BE
RT
H
BERTH 15
BERTH 16
BERTH 18
BERTH 19
BERTH 20
BERTH 17
STEVEN'S STREET
FL
OO
D
EB
B
SO
UT
HE
RN
B
RA
NC
H
OF
T
HE
EL
IZ
AB
ET
H
RI
VE
R
FL
OO
D
EB
B
SO
UT
HE
RN
B
RA
NC
H
OF
T
HE
EL
IZ
AB
ET
H
RI
VE
R
MAYO AVENUE
0+00 1+00
2+00
3+00
4+
5+
6+
7+00
8+
9+
+0
11+00
+0
+0
14+00
+0
+0
+0
18+00
+0
+0
+0
+0
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
+0
+0
35+00
36+00
37+00
+0
39+00
+0
41+00
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00 52+00
53+00
54+00
55+00 56+00 57+00 58+00 59+00
12+
10+00
11+00 12+00
DAVIS AVENUE
JONES STREET
HUGHES STREET
BR
OW
N
AV
EN
UE
BUILDING 62
BUILDING 61
BUILDING 23
BUILDING 1505
BUILDING 277
BUILDING 163
BUILDING 235
BUILDING 1733BUILDING 1735
BUILDING 261
+0
11+00
+0
+0
14+00
+0
+0
PHASE 7: (BERTH 17 TO DRY DOCK 4)
STA 12+00 - STA 15+00
WORK LIMITS NOTES
1. ONGOING PROJECTS WITHIN THE SMALL DOCKS AREA (NOT IN THIS
CONTRACT) CONTRACTOR WILL NOT ACCESS THESE AREAS AT
ANYTIME WITHOUT WRITTEN PERMISSION FROM THE CONTRACTING
OFFICER.
2. WORK INCLUDED IN THIS PHASE FROM NOVEMBER 2022 TO
FEBRUARY 2023:
A. PROVIDE CONCRETE FLOOD WALL, FLOOD GATE AND UTILITY
WORK.
3. CONTRACTOR'S BID WILL BE BASED ON ONGOING SUBMARINE
REPAIRS IN DRY DOCK 4 FROM OCTOBER 2022 TO JUNE 2024.*
4. CONTRACTOR'S BID WILL BE BASED ON ONGOING SUBMARINE
REPAIRS IN DRY DOCKS 2 AND 3 DURING THIS PHASE.
5. CONTRACTOR SHALL SCHEDULE WORK FOR PHASE SEVEN (7), TO
TAKE PLACE BETWEEN 29NOV2022 THRU AND INCLUDING 27FEB2023.
CONTRACTOR'S CAN WORK ENTIRE PHASE, THERE IS NO TRENCH
LIMIT. LIQUIDATED DAMAGES COULD BE ASSESSED FOR THIS PHASE
STARTING 28FEB2023.
* ALL DATES FOR SUBMARINE AVAILABILITIES ARE TENTATIVE.
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -6
D
R Y
D O
C K
F
LO
O D
P
R O
TE
C
TI
O
N
IM
P R
O V
E M
E N
TS
NO
RF
OL
K
NA
VA
L
SH
IP
YA
RD
PO
RT
SM
OU
TH
, V A
1588810
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
CI
C
OR
E
- H
AM
PT
ON
R
OA
DS
NA
VA
L
ST
AT
IO
N
NO
RF
OL
K
- N
OR
FO
LK
, V
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
FI
LE
N
AM
E:
Q
:\N
OR
\1
-0
8\ ca dd
Ac tiv e\ _P
-6
\D
RY
DP
3-
0- G-
7.
dw g
L
AY
OU
T
NA
M
E:
W
OR
K
LI
M
IT
S
- P
HA
SI
NG
P
LA
N
P
LO
TT
ED
: T hu rs da y, Fe br ua ry
0,
- 7 :4
7a m
U
SE
R:
tt ho m ps on
DRAWFORM REVISION: 12 APRIL 2018
P
S
N
RRO F E S S I O N A L E N G I N E E R
T A
T
E O F M A R Y
L A
N
DW
I L
L IA M WHEATON
O . 2 4 6 2 8 E G I S T E R E D
W.
2A
CONTRACT WORK AREAS IN CURRENT
PHASE, SEE COORDINATION NOTE
LEGEND
BERTH 16
BERTH 18
BERTH 19
BERTH 17
DRY DOCK 4
PLAN
NORTH
SCALE: 1" = 120'
WORK LIMITS - PHASING PLAN 7
PLAN
NORTH
SCALE: 1" = 60'
PHASE 7 WORK AREA
WMS/IAS
DLB
EJA
DSN
SEL TSL WWW
12809262
W
OR
K
LI
M
IT
S
- P
HA
SI
NG
P
LA
N
G-107
AS NOTED
240'0 120' 120'0 60'
DRY DOCK 2
DRY DOCK 1
RENSHAW AVENUE
HI
TC
HC
OC
K
ST
RE
ET
SINCLAIR AVENUE
ARMISTEAD AVENUE
BERRIEN STREET
BE
RT
H
BE
RT
H
BE
RT
H
BERTH 15
BERTH 16
BERTH 18
BERTH 19
BERTH 20
BERTH 17
STEVEN'S STREET
FL
OO
D
EB
B
SO
UT
HE
RN
B
RA
NC
H
OF
T
HE
EL
IZ
AB
ET
H
RI
VE
R
FL
OO
D
EB
B
SO
UT
HE
RN
B
RA
NC
H
OF
T
HE
EL
IZ
AB
ET
H
RI
VE
R
MAYO AVENUE
0+00 1+00
2+00
3+00
4+
5+
6+
7+00
8+
9+
+0
11+00
+0
+0
14+00
+0
+0
+0
18+00
+0
+0
+0
+0
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
+0
+0
35+00
36+00
37+00
+0
39+00
+0
41+00
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00 52+00
53+00
54+00
55+00 56+00 57+00 58+00 59+00
12+
10+00
11+00 12+00
DRY DOCK 4
DAVIS AVENUE
JONES STREET
HUGHES STREET
BR
OW
N
AV
EN
UE
BUILDING 62
BUILDING 61
BUILDING 23
BUILDING 1505
BUILDING 277
BUILDING 163
BUILDING 235
BUILDING 1733BUILDING 1735
BUILDING 261
+0
+0
18+00
+0
+0
+0
+0
23+00
24+00
PHASE 8: (DRY DOCK 4 TO
BUILDING 1733)
STA 17+00 - STA 21+20
WORK LIMITS NOTES
1. WORK INCLUDED IN THIS PHASE FROM FEBRUARY 2023 TO MAY 2023:
A. PROVIDE CONCRETE FLOOD WALL, FLOOD GATES AND UTILITY
WORK.
2. CONTRACTOR'S BID WILL BE BASED ON ONGOING SUBMARINE
REPAIRS IN DRY DOCK 4 FROM OCTOBER 2022 TO JUNE 2024.*
3. CONTRACTOR'S BID WILL BE BASED ON ONGOING SUBMARINE
REPAIRS IN DRY DOCKS 2 AND 3 DURING THIS PHASE.
4. CONTRACTOR SHALL SCHEDULE WORK FOR PHASE EIGHT (8), TO
TAKE PLACE BETWEEN 28FEB2023 THRU AND INCLUDING 29MAY2023.
CONTRACTOR'S CAN WORK ENTIRE PHASE, THERE IS NO TRENCH
LIMIT. LIQUIDATED DAMAGES COULD BE ASSESSED FOR THIS PHASE
STARTING 30MAY2023.
* ALL DATES FOR SUBMARINE AVAILABILITIES ARE TENTATIVE.
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -6
D
R Y
D O
C K
F
LO
O
TE
C
TI
O
N
IM
P R
O V
E M
E N
TS
NO
RF
OL
K
NA
VA
L
SH
IP
YA
RD
PO
RT
SM
OU
TH
, V A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
CI
C
OR
E
- H
AM
PT
ON
R
OA
DS
NA
VA
L
ST
AT
IO
N
NO
RF
OL
K
- N
OR
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
FI
LE
N
AM
E:
Q
:\N
OR
\1
-0
8\ ca dd
Ac tiv e\ _P
-6
\D
RY
DP
3-
0- G-
8.
dw g
L
AY
OU
T
NA
M
E:
W
OR
K
LI
M
IT
S
- P
HA
SI
NG
P
LA
N
P
LO
TT
ED
: T hu rs da y, Fe br ua ry
0,
- 7 :4
8a m
U
SE
R:
tt ho m ps on
DRAWFORM REVISION: 12 APRIL 2018
P
S
N
RRO F E S S I O N A L E N G I N E E R
T A
T
E O F M A R Y
L A
N
DW
I L
L IA M WHEATON
O . 2 4 6 2 8 E G I S T E R E D
W.
1A
1A
CONTRACT WORK AREAS IN CURRENT
PHASE, SEE COORDINATION NOTE
LEGEND
BERTH 20
BUILDING 1733
BUILDING 261
PLAN
NORTH
SCALE: 1" = 120'
WORK LIMITS - PHASING PLAN 8
PLAN
NORTH
SCALE: 1" = 60'
PHASE 8 WORK AREA
EJA
DSN
SEL TSL WWW
12809263
W
OR
K
LI
M
IT
S
- P
HA
SI
NG
P
LA
N
G-108
DRY DOCK 1
RENSHAW AVENUE
HI
TC
HC
OC
K
ST
RE
ET
SINCLAIR AVENUE
ARMISTEAD AVENUE
BERRIEN STREET
BE
RT
H
BE
RT
H
BE
RT
H
BERTH 15
BERTH 16
BERTH 18
BERTH 19
BERTH 20
BERTH 17
STEVEN'S STREET
FL
OO
D
EB
B
SO
UT
HE
RN
B
RA
NC
H
OF
T
HE
EL
IZ
AB
ET
H
RI
VE
R
FL
OO
D
EB
B
SO
UT
HE
RN
B
RA
NC
H
OF
T
HE
EL
IZ
AB
ET
H
RI
VE
R
MAYO AVENUE
0+00 1+00
2+00
3+00
4+
5+
6+
7+00
8+
9+
+0
11+00
+0
+0
14+00
+0
+0
+0
18+00
+0
+0
+0
+0
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
+0
+0
35+00
36+00
37+00
+0
39+00
+0
41+00
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00 52+00
53+00
54+00
55+00 56+00 57+00 58+00 59+00
12+
10+00
11+00 12+00
DRY DOCK 4
DAVIS AVENUE
JONES STREET
HUGHES STREET
BR
OW
N
AV
EN
UE
BUILDING 62
BUILDING 61
BUILDING 23
BUILDING 1505
BUILDING 277
BUILDING 163
BUILDING 235
BUILDING 1733BUILDING 1735
BUILDING 261
+0
+0
+0
+0
23+00
24+00
25+00
26+00
27+00
28+00
PHASE 9: (BUILDING 1733 TO
BUILDING P-527)
STA 21+00 - STA 27+10
WORK LIMITS NOTES
1. WORK INCLUDED IN THIS PHASE FROM NOVEMBER 2021 TO APRIL
2022:
A. PROVIDE CONCRETE FLOOD WALL, FLOOD GATES AND UTILITY
WORK.
2. CONTRACTOR'S BID WILL BE BASED ON ONGOING SUBMARINE
REPAIRS IN DRY DOCKS 2, 3 AND 4 DURING THIS PHASE.
3. CONTRACTOR SHALL SCHEDULE WORK FOR PHASE NINE (9), TO TAKE
PLACE BETWEEN 23NOV2021 THRU AND INCLUDING 24APR2022.
CONTRACTOR'S WORK IS LIMITED TO 240 LINEAR FEET AT A TIME.
LIQUIDATED DAMAGES COULD BE ASSESSED FOR THIS PHASE
STARTING 25APR2022. IF EARLY COMPLETION, CONTRACTOR
ALLOWED TO START PHASE TEN (10).
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -6
D
R Y
D O
C K
F
LO
O
TE
C
TI
O
N
IM
P R
O V
E M
E N
TS
NO
RF
OL
K
NA
VA
L
SH
IP
YA
RD
PO
RT
SM
OU
TH
, V A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
CI
C
OR
E
- H
AM
PT
ON
R
OA
DS
NA
VA
L
ST
AT
IO
N
NO
RF
OL
K
- N
OR
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
FI
LE
N
AM
E:
Q
:\N
OR
\1
-0
8\ ca dd
Ac tiv e\ _P
-6
\D
RY
DP
3-
0- G-
9.
dw g
L
AY
OU
T
NA
M
E:
W
OR
K
LI
M
IT
S
- P
HA
SI
NG
P
LA
N
P
LO
TT
ED
: T hu rs da y, Fe br ua ry
0,
- 7 :4
8a m
U
SE
R:
tt ho m ps on
DRAWFORM REVISION: 12 APRIL 2018
P
S
N
RRO F E S S I O N A L E N G I N E E R
T A
T
E O F M A R Y
L A
N
DW
I L
L IA M WHEATON
O . 2 4 6 2 8 E G I S T E R E D
W.
1A
CONTRACT WORK AREAS IN CURRENT
PHASE, SEE COORDINATION NOTE
LEGEND
DAVIS AVENUE
BUILDING 1733
BUILDING 1735
PLAN
NORTH
SCALE: 1" = 120'
WORK LIMITS - PHASING PLAN 9
PLAN
NORTH
PHASE 9 WORK AREA
EJA
DSN
SEL TSL WWW
12809264
W
OR
K
LI
M
IT
S
- P
HA
SI
NG
P
LA
N
G-109
DRY DOCK 1
RENSHAW AVENUE
HI
TC
HC
OC
K
ST
RE
ET
SINCLAIR AVENUE
ARMISTEAD AVENUE
BERRIEN STREET
BE
RT
H
BE
RT
H
BE
RT
H
BERTH 15
BERTH 16
BERTH 18
BERTH 19
BERTH 20
BERTH 17
STEVEN'S STREET
FL
OO
D
EB
B
SO
UT
HE
RN
B
RA
NC
H
OF
T
HE
EL
IZ
AB
ET
H
RI
VE
R
FL
OO
D
EB
B
SO
UT
HE
RN
B
RA
NC
H
OF
T
HE
EL
IZ
AB
ET
H
RI
VE
R
MAYO AVENUE
0+00 1+00
2+00
3+00
4+
5+
6+
7+00
8+
9+
+0
11+00
+0
+0
14+00
+0
+0
+0
18+00
+0
+0
+0
+0
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
+0
+0
35+00
36+00
37+00
+0
39+00
+0
41+00
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00 52+00
53+00
54+00
55+00 56+00 57+00 58+00 59+00
12+
10+00
11+00 12+00
DAVIS AVENUE
JONES STREET
HUGHES STREET
BR
OW
N
AV
EN
UE
BUILDING 62
BUILDING 61
BUILDING 23
BUILDING 1505
BUILDING 277
BUILDING 163
BUILDING 235
BUILDING 1733BUILDING 1735
BUILDING 261
DRY DOCK 4
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
+0
+0
PHASE 10: (BUILDING P-527 TO
BUILDING 235)
STA 27+10 - STA 32+15
WORK LIMITS NOTES
1. WORK INCLUDED IN THIS PHASE FROM APRIL 2022 TO AUGUST 2022:
A. PROVIDE CONCRETE FLOOD WALL, FLOOD GATES AND UTILITY
WORK.
2. CONTRACTOR'S BID WILL BE BASED ON ONGOING SUBMARINE
REPAIRS IN DRY DOCKS 2, 3 AND 4 DURING THIS PHASE.
3. CONTRACTOR SHALL SCHEDULE WORK FOR PHASE TEN (10), TO TAKE
PLACE BETWEEN 25APR2022 THRU AND INCLUDING 28AUG2022.
CONTRACTOR'S WORK IS LIMITED TO 240 LINEAR FEET AT A TIME.
LIQUIDATED DAMAGES COULD BE ASSESSED FOR THIS PHASE
STARTING 29AUG2022. IF EARLY COMPLETION, CONTRACTOR
ALLOWED TO START PHASE ELEVEN (11).
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -6
D
R Y
D O
C K
F
LO
O
TE
C
TI
O
N
IM
P R
O V
E M
E N
TS
NO
RF
OL
K
NA
VA
L
SH
IP
YA
RD
PO
RT
SM
OU
TH
, V A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
CI
C
OR
E
- H
AM
PT
ON
R
OA
DS
NA
VA
L
ST
AT
IO
N
NO
RF
OL
K
- N
OR
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
FI
LE
N
AM
E:
Q
:\N
OR
\1
-0
8\ ca dd
Ac tiv e\ _P
-6
\D
RY
DP
3-
0- G-
0.
dw g
L
AY
OU
T
NA
M
E:
W
OR
K
LI
M
IT
S
- P
HA
SI
NG
P
LA
N
P
LO
TT
ED
: T hu rs da y, Fe br ua ry
0,
- 7 :4
8a m
U
SE
R:
tt ho m ps on
DRAWFORM REVISION: 12 APRIL 2018
P
S
N
RRO F E S S I O N A L E N G I N E E R
T A
T
E O F M A R Y
L A
N
DW
I L
L IA M WHEATON
O . 2 4 6 2 8 E G I S T E R E D
W.
1A
CONTRACT WORK AREAS IN CURRENT
PHASE, SEE COORDINATION NOTE
LEGEND
HI
TC
HC
OC
K
ST
RE
ET
DAVIS AVENUE
BUILDING 235
BUILDING 1735
BUILDING 261
PLAN
NORTH
SCALE: 1" = 120'
WORK LIMITS - PHASING PLAN 10
PLAN
NORTH
PHASE 10 WORK AREA
EJA
DSN
SEL TSL WWW
12809265
W
OR
K
LI
M
IT
S
- P
HA
SI
NG
P
LA
N
G-110
DRY DOCK 2
DRY DOCK 1
RENSHAW AVENUE
HI
TC
HC
OC
K
ST
RE
ET
SINCLAIR AVENUE
ARMISTEAD AVENUE
BERRIEN STREET
BE
RT
H
BE
RT
H
BE
RT
H
BERTH 15
BERTH 16
BERTH 18
BERTH 19
BERTH 20
BERTH 17
STEVEN'S STREET
FL
OO
D
EB
B
SO
UT
HE
RN
B
RA
NC
H
OF
T
HE
EL
IZ
AB
ET
H
RI
VE
R
FL
OO
D
EB
B
SO
UT
HE
RN
B
RA
NC
H
OF
T
HE
EL
IZ
AB
ET
H
RI
VE
R
MAYO AVENUE
0+00 1+00
2+00
3+00
4+
5+
6+
7+00
8+
9+
+0
11+00
+0
+0
14+00
+0
+0
+0
18+00
+0
+0
+0
+0
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
+0
+0
35+00
36+00
37+00
+0
39+00
+0
41+00
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00 52+00
53+00
54+00
55+00 56+00 57+00 58+00 59+00
12+
10+00
11+00 12+00
DAVIS AVENUE
JONES STREET
HUGHES STREET
BR
OW
N
AV
EN
UE
BUILDING 62
BUILDING 61
BUILDING 23
BUILDING 1505
BUILDING 277
BUILDING 163
BUILDING 235
BUILDING 1733BUILDING 1735
BUILDING 261
28+
29+00
30+00
31+00
32+00
+0
+0
35+00 36+00
37+00
PHASE 11: (BUILDING 235 TO
DRY DOCK 4)
STA 32+15 - STA 36+10
WORK LIMITS NOTES
1. WORK INCLUDED IN THIS PHASE FROM AUGUST 2022 TO DECEMBER
2022:
A. PROVIDE CONCRETE FLOOD WALL, FLOOD GATES AND UTILITY
WORK.
2. CONTRACTOR'S BID WILL BE BASED ON ONGOING SUBMARINE
REPAIRS IN DRY DOCKS 3 AND 4 DURING THIS PHASE.
3. CONTRACTOR'S BID WILL BE BASED ON SUBMARINE REPAIRS IN DRY
DOCK 2 STARTING JANUARY 2024.
4. CONTRACTOR SHALL SCHEDULE WORK FOR PHASE ELEVEN (11), TO
TAKE PLACE BETWEEN 29AUG2022 THRU AND INCLUDING 6DEC2022.
CONTRACTOR'S WORK IS LIMITED TO 240 LINEAR FEET AT A TIME.
LIQUIDATED DAMAGES COULD BE ASSESSED FOR THIS PHASE
STARTING 7DEC2022. IF EARLY COMPLETION, CONTRACTOR ALLOWED
TO START PHASE TWELVE (12).
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -6
D
R Y
D O
C K
F
LO
O
TE
C
TI
O
N
IM
P R
O V
E M
E N
TS
NO
RF
OL
K
NA
VA
L
SH
IP
YA
RD
PO
RT
SM
OU
TH
, V A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
CI
C
OR
E
- H
AM
PT
ON
R
OA
DS
NA
VA
L
ST
AT
IO
N
NO
RF
OL
K
- N
OR
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
FI
LE
N
AM
E:
Q
:\N
OR
\1
-0
8\ ca dd
Ac tiv e\ _P
-6
\D
RY
DP
3-
0- G-
1.
dw g
L
AY
OU
T
NA
M
E:
W
OR
K
LI
M
IT
S
- P
HA
SI
NG
P
LA
N
P
LO
TT
ED
: T hu rs da y, Fe br ua ry
0,
- 7 :4
9a m
U
SE
R:
tt ho m ps on
DRAWFORM REVISION: 12 APRIL 2018
P
S
N
RRO F E S S I O N A L E N G I N E E R
T A
T
E O F M A R Y
L A
N
DW
I L
L IA M WHEATON
O . 2 4 6 2 8 E G I S T E R E D
W.
1A
CONTRACT WORK AREAS IN CURRENT
PHASE, SEE COORDINATION NOTE
LEGEND
HI
TC
HC
OC
K
ST
RE
ET
DAVIS AVENUE
JONES STREET
BUILDING 163
BUILDING 235
BUILDING 1735
BUILDING 261
PLAN
NORTH
SCALE: 1" = 120'
WORK LIMITS - PHASING PLAN 11
PLAN
NORTH
PHASE 11 WORK AREA
EJA
DSN
SEL TSL WWW
12809266
W
OR
K
LI
M
IT
S
- P
HA
SI
NG
P
LA
N
G-111
DRY DOCK 2
DRY DOCK 1
RENSHAW AVENUE
HI
TC
HC
OC
K
ST
RE
ET
SINCLAIR AVENUE
ARMISTEAD AVENUE
BERRIEN STREET
BE
RT
H
BE
RT
H
BE
RT
H
BERTH 15
BERTH 16
BERTH 18
BERTH 19
BERTH 20
BERTH 17
STEVEN'S STREET
FL
OO
D
EB
B
SO
UT
HE
RN
B
RA
NC
H
OF
T
HE
EL
IZ
AB
ET
H
RI
VE
R
FL
OO
D
EB
B
SO
UT
HE
RN
B
RA
NC
H
OF
T
HE
EL
IZ
AB
ET
H
RI
VE
R
MAYO AVENUE
0+00 1+00
2+00
3+00
4+
5+
6+
7+00
8+
9+
+0
11+00
+0
+0
14+00
+0
+0
+0
18+00
+0
+0
+0
+0
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
+0
+0
35+00
36+00
37+00
+0
39+00
+0
41+00
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00 52+00
53+00
54+00
55+00 56+00 57+00 58+00 59+00
12+
10+00
11+00 12+00
DAVIS AVENUE
JONES STREET
HUGHES STREET
BR
OW
N
AV
EN
UE
BUILDING 62
BUILDING 61
BUILDING 23
BUILDING 1505
BUILDING 277
BUILDING 163
BUILDING 235
BUILDING 1733BUILDING 1735
BUILDING 261
35+00
36+00
37+00
+0
39+00
+0
41+00
42+00
43+00
44+00
PHASE 12: (DRY DOCK 4 TO MAYO AVE)
STA 36+10 - STA 42+60
WORK LIMITS NOTES
1. WORK INCLUDED IN THIS PHASE FROM DECEMBER 2022 TO MAY 2023:
A. PROVIDE TEMPORARY ATFP FENCING.
B. PROVIDE CONCRETE FLOOD WALL, FLOOD GATES, UTILITY WORK
AND ATFP FENCING.
2. CONTRACTOR'S BID WILL BE BASED ON ONGOING SUBMARINE
REPAIRS IN DRY DOCKS 2 AND 4 DURING THIS PHASE.
3. CONTRACTOR'S BID WILL BE BASED ON NO VESSEL IN DRY DOCK 3
DURING THIS PHASE.
4. CONTRACTOR SHALL SCHEDULE WORK FOR PHASE TWELVE (12), TO
TAKE PLACE BETWEEN 7DEC2022 THRU AND INCLUDING 15MAY2023.
CONTRACTOR'S WORK IS LIMITED TO 240 LINEAR FEET AT A TIME.
LIQUIDATED DAMAGES COULD BE ASSESSED FOR THIS PHASE
STARTING 16MAY2023.
5. CONTRACTOR MUST PROVIDE TRAFFIC CONTROL IN ACCORDANCE
WITH MUTCD AND VDOT WORK AREA PROTECTION MANUAL ALONG
STEVENS STREET. ONE 20 FOOT LANE OF STEVENS STREET MUST
REMAIN OPEN AT ALL TIMES.
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -6
D
R Y
D O
C K
F
LO
O
TE
C
TI
O
N
IM
P R
O V
E M
E N
TS
NO
RF
OL
K
NA
VA
L
SH
IP
YA
RD
PO
RT
SM
OU
TH
, V A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
CI
C
OR
E
- H
AM
PT
ON
R
OA
DS
NA
VA
L
ST
AT
IO
N
NO
RF
OL
K
- N
OR
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
FI
LE
N
AM
E:
Q
:\N
OR
\1
-0
8\ ca dd
Ac tiv e\ _P
-6
\D
RY
DP
3-
0- G-
2.
dw g
L
AY
OU
T
NA
M
E:
W
OR
K
LI
M
IT
S
- P
HA
SI
NG
P
LA
N
P
LO
TT
ED
: T hu rs da y, Fe br ua ry
0,
- 7 :4
9a m
U
SE
R:
tt ho m ps on
DRAWFORM REVISION: 12 APRIL 2018
P
S
N
RRO F E S S I O N A L E N G I N E E R
T A
T
E O F M A R Y
L A
N
DW
I L
L IA M WHEATON
O . 2 4 6 2 8 E G I S T E R E D
W.
1A
1B
CONTRACT WORK AREAS IN CURRENT
PHASE, SEE COORDINATION NOTE
LEGEND
DRY DOCK 4
ARMISTEAD AVENUE
BERRIEN STREET
JONES STREET
BUILDING 277
BUILDING 163
BUILDING 261
AT/FP NOTES:
(E) C.I.A. FENCING
STEVEN'S STREET
PLAN
NORTH
SCALE: 1" = 120'
WORK LIMITS - PHASING PLAN 12
PLAN
NORTH
PHASE 12 WORK AREA
EJA
DSN
SEL TSL WWW
12809267
W
OR
K
LI
M
IT
S
- P
HA
SI
NG
P
LA
N
G-112
AS NOTED
240'0 120' 240'0 120'
1. TEMPORARY AT/FP FENCING SHALL BE IN PLACE AND APPROVED BY
CONTRACTING OFFICER AND BASE FIRE DEPARTMENT PRIOR TO
DEMOLITION OF ANY EXISTING C.I.A. PERIMETER FENCING. DO NOT
RESTRICT ANY PRIMARY VEHICULAR PASSAGE WAY TO LESS THAN 20'
DURING ANY PORTION OF CONSTRUCTION FOR FIRE TRUCK ACCESS.
ANY PEDESTRIAN FOOT TRAFFIC PATHS IMPACTED BY TEMPORARY
CIA FENCE MUST BE REROUTED AND APPROVED BY THE
CONTRACTING OFFICER.
2. CONSTRUCTION ADJACENT TO C.I.A. FENCING IS PERMITTED WITH
APPROVAL OF CONTRACTING OFFICER. WORK MAY ONLY BE
PERFORMED IN PRESENCE OF CONTRACTING OFFICER OR HIS
AGENT. AT THE END OF EACH WORK DAY, ALL EQUIPMENT AND
MATERIALS MUST BE STORED 10 FEET MINIMUM FROM THE SECURE
C.I.A. FENCING. ANY TRENCHES LOCATED WITHIN 10 FEET OF C.I.A.
FENCING MUST BE COVERED WITH STEEL PLACE OR FILLED AT THE
END OF EACH WORK DAY.
EMH
EMH
1258 522
8321568
174-A
M-45
M- 1 14
893 248
M-32
M-22
M-25 M-
SNACK
1368 1367
212721372
1440 1311
581312
15171518
1515A
5 55
REN
SH
AW
A
WAL
LE
R AV
W
AL
LE
R
AV
AR
MST
EA
D AV
AR
NST
EA
D AV
BERRIEN ST.
STEVENS ST.
PO
RT C
EN
TR
E P
KW
Y/O
LD
M
AY
O AV
BREESE ST.
HUGHES ST.BR
OW
N
AV
TRUXTON ST.
CREIGHTON ST.
REN
SH
AW
AV
BERRIEN ST.
STEVENS ST.
BERRIEN ST.
BERRIEN ST. EXT. HE
NL
EY
A
V.
BE
RRIEN
ST
. E
XT
GR
EE
N
ST
CH
ES
TN
UT
S T.
EF
FI
NG
HA
M
ST
PORTSMOUTH BLVD.
SIMONS DR.
W
ILL
IA
MS
A V.
PENNOCK ST.
MAHONEY ST.
ST
EV
EN
S
ST
PENNOCK ST.
ST
EV
EN
S
ST
PARKINGASPH
PARKING
PARKING
KEMPFF ST.
PA
RK
IN
G
MARSHALL ST.
LEE ST. PARKING
PARKING
PARKING
BRUMBY AV.
HI
TC
HC
OC
K
ST
W
AL
LIN
S
T.
ST
EV
EN
S
ST
SPROWLEY ST.
GR
EE
N
ST
OL
D W
ILL
IA
MS
A
V.
MCLEAN ST.
SK
IN
NE
R
ST
BEATY ST.
EL
IZ
AB
ET
H
ST
.BL
AC
K
LA
NE
COLE
AV. WEAVER ST.
MCCAWLEY ST.
DALE ST.
GAT
E Q
GATE RR-10
GAT
E 1
GA
TE
R R-
GATE RR-8
GATES M&N
GA
TE
'K
GA
TE
GATE
GATE
BL
DG
PI
CN
IC
SUBSTATIONH6&H7
GATE N
GATE F
PIER 6
PIER 5
PORTSMOUTH BLVD. DRY DOCK 4
DRY DOCK 3
DRY DOCK 2
DRY DOCK 1
SINCLAIR AVENUE
MAYO AVENUEARMISTEAD AVENUE
BERRIEN STREET
BERRIEN STREET
BE
RT
H
BE
RT
H
BE
RT
H
BERTH 15
BERTH 16
BERTH 18
BERTH 19
BERTH 20
BERTH 17
STEVEN'S STREET
GATE P
HI
TC
HC
OC
K
ST
RE
ET
PIER 3
RENSHAW AVENUE
PLAN
NORTH
SCALE: 1" = 300'
CONTRACTOR LAYDOWN PLAN
NOTES:
1. CONTRACTOR SHALL PROVIDE APPROPRIATE EROSION CONTROLS
AROUND MATERIAL STOCKPILES LOCATED ANYWHERE ON
GOVERNMENT PROPERTY. SEE DRAWINGS C-003 AND C-004.
2. CONTRACTOR MUST PROVIDE 6 FEET SECURE FENCE AROUND ALL
PORTIONS OF THE STAGING AREA IN USE. FENCING MUST BE IN
ACCORDANCE WITH USACE EM3851-1.
3. AT THE COMPLETION OF CONSTRUCTION, CONTRACTOR MUST
RESTORE ENTIRE STAGING AREA. A MINIMUM OF 1.5" OF EXISTING
ASPHALT SURFACE MUST BE MILLED. AN OVERLAY OF 1.5" OF VDOT
SM9.5A MUST BE INSTALLED OVER THE ENTIRE ASPHALT PORTION OF
THE STAGING AREA. PROVIDE POSITIVE DRAINAGE TO MATCH
EXISTING DRAINAGE PATTERNS. INSTALL PAVEMENT MARKINGS TO
REESTABLISH EXISTING PARKING LOT MARKINGS.
WORK KEYNOTES:
1. PROJECT AREA.
2. CONTRACTOR STAGING AREA.
3. CONTRACTOR ACCESS TO CONTROLLED INDUSTRIAL AREA (CIA).
4. NORFOLK NAVAL SHIPYARD PASS OFFICE.
5. MAIN NORFOLK NAVAL SHIPYARD GATE.
6. CONTRACTOR VEHICLE INSPECTION AREA.
7. FLOOD WALL ALIGNMENT.
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -6
D
R Y
D O
C K
F
LO
O
TE
C
TI
O
N
IM
P R
O V
E M
E N
TS
NO
RF
OL
K
NA
VA
L
SH
IP
YA
RD
PO
RT
SM
OU
TH
, V A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
CI
C
OR
E
- H
AM
PT
ON
R
OA
DS
NA
VA
L
ST
AT
IO
N
NO
RF
OL
K
- N
OR
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
FI
LE
N
AM
E:
Q
:\N
OR
\1
-0
8\ ca dd
Ac tiv e\ _P
-6
\D
RY
DP
3-
0- G-
3.
dw g
L
AY
OU
T
NA
M
E:
C
ON
TR
AC
TO
R
LA
YD
OW
N
PL
AN
P
LO
TT
ED
: T hu rsd ay , F eb ru ar y 2
0,
- 7 :5
0a m
U
SE
R:
tt ho m ps on
DRAWFORM REVISION: 12 APRIL 2018
P
S
N
RRO F E S S I O N A L E N G I N E E R
T A
T
E O F M A R Y
L A
N
DW
I L
L IA M WHEATON
O . 2 4 6 2 8 E G I S T E R E D
W.
600'0 300' 1" = 300'
EJA
DSN
SEL TSL WWW
12809268
CO
NT
RA
CT
OR
L
AY
DO
W N
PL
AN
G-113
AS NOTED
PLAN
NORTH
CONTRACTOR'S STAGING
AREA
A4 G-113
SCALE: 1" = 100'
CONTRACTOR STAGING AREAA4
4 5
SOIL STOCKPILE AREA
| GENERAL - 2 OF 2 |
| G-107 WORK LIMITS - PHASING PLAN 7 |
| G-108 WORK LIMITS - PHASING PLAN 8 |
| G-109 WORK LIMITS - PHASING PLAN 9 |
| G-110 WORK LIMITS - PHASING PLAN 10 |
| G-111 WORK LIMITS - PHASING PLAN 11 |
| G-112 WORK LIMITS - PHASING PLAN 12 |
| G-113 CONTRACTOR LAYDOWN PLAN |
2020-02-23T18:25:57-0500
2020-02-23T18:26:28-0500
2020-02-23T18:26:29-0500
2020-02-23T18:26:29-0500
2020-02-23T18:26:29-0500
2020-02-23T18:26:29-0500
2020-02-23T18:26:29-0500
2020-02-23T18:26:59-0500
2020-02-23T18:27:20-0500
2020-02-23T18:27:20-0500
2020-02-23T18:27:20-0500
2020-02-23T18:27:20-0500
2020-02-23T18:27:20-0500
2020-02-23T18:27:21-0500
2020-02-27T08:58:23-0500
2020-02-27T08:58:38-0500
2020-02-27T08:58:40-0500
2020-02-27T08:58:40-0500
2020-02-27T08:58:41-0500
2020-02-27T08:58:43-0500
2020-02-27T08:58:44-0500
| 2020-02-27T14:40:54-0500 | |
| Chris Jobe |
| 2020-02-27T14:41:16-0500 | |
| Chris Jobe |
| 2020-02-27T14:41:18-0500 | |
| Chris Jobe |
| 2020-02-27T14:41:21-0500 | |
| Chris Jobe |
| 2020-02-27T14:41:23-0500 | |
| Chris Jobe |
| 2020-02-27T14:41:26-0500 | |
| Chris Jobe |
| 2020-02-27T14:41:28-0500 | |
| Chris Jobe |
| 2020-02-28T09:11:50-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-02-28T09:12:16-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-02-28T09:12:31-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-02-28T09:12:32-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-02-28T09:12:55-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-02-28T09:13:13-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-02-28T09:13:33-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-02-28T10:13:45-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-02-28T10:13:59-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-02-28T10:14:27-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-02-28T10:14:28-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-02-28T10:14:29-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-02-28T10:14:30-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-02-28T10:14:31-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
File details come from the government source that posted it. Updated .