1588810-SPC-18of24-App E.pdf

PDF 2 MB Posted

Attached to
Design-Bid-Build, P653 Dry Dock Flood Protection Improvements
Solicitation number
N4008520R0063
Issued by

About this file

This document contains utility test hole logs for the P-653 Dry Dock Flood Protection Improvements project at the Norfolk Naval Shipyard in Portsmouth, Virginia. The logs inventory 19 test holes that were drilled to locate underground utilities including water tunnels, valve vaults, sanitary sewers, electric ducts, telephone structures, water pipes, steam tunnels, pipe tunnels, and salt water lines. The majority of utilities were made of cast iron, cast in place concrete, brick and steel. The project will construct a permanent flood wall to protect four dry docks, associated facilities and infrastructure from flooding by the Elizabeth River. This will involve a cast in place reinforced concrete wall with shallow foundation supported by soil treated with subsurface grout injection. The project will also modify dry dock caisson gunwales, construct caisson seat extensions, and remove and replace dry dock capstans on new foundations.

View the file

Other files

File Type Posted
Amendment 0006.pdf PDF
AMD 0005 DWG2.pdf PDF
Amendment 0005.pdf PDF
AMD 0005 DWG1.pdf PDF
NNSY Map.pdf PDF
20R0063 Site Visit Log.docx DOCX document
20R0063 Amendment 0004.pdf PDF
20R0063 Amendment 0003.pdf PDF
1588810Amend0002-dwg-2of2 (S-E).pdf PDF
1588810Amend0002-dwg-1of2 (G-C).pdf PDF
20R0063 Amendment 0002.pdf PDF
20R0063 Amendment 0001.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
1588810-SPC-03of24-App A02.pdf PDF
1588810-SPC-05of24-App A04.pdf PDF
1588810-SPC-21of24-App F3.pdf PDF
1588810-DWG-05of14 (SURVEY).pdf PDF
1588810-SPC-12of24-App A11.pdf PDF
Attachment B - SECNAV_5512_1_11787-One Day Past Request.pdf PDF
1588810-DWG-12of14 (CU2).pdf PDF
1588810-SPC-23of24-App F5.pdf PDF
Attachment J - CVS-CIA Blank Spreadsheet.xlsx XLSX spreadsheet
1588810-DWG-14of14 (ARCH-ELEC).pdf PDF
1588810-SPC-02of24-App A01.pdf PDF
1588810-SPC-20of24-App F2.pdf PDF
1588810-DWG-09of14 (CS2).pdf PDF
1588810-SPC-11of24-App A10.pdf PDF
1588810-SPC-16of24-App C.pdf PDF
Attachment G - Small Business Participation and Commitment Strategy.docx DOCX document
1588810-DWG-03of14 (GEOTECH1).pdf PDF
1588810-DWG-08of14 (CS1).pdf PDF
1588810-SPC-09of24-App A08.pdf PDF
1588810-SPC-04of24-App A03.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
1588810-SPC-15of24-App B.pdf PDF
1588810-SPC-07of24-App A06.pdf PDF
1588810-SPC-24of24-App F6.pdf PDF
1588810-DWG-06of14 (C_CD).pdf PDF
1588810-DWG-11of14 (CU1).pdf PDF
1588810-SPC-06of24-App A05.pdf PDF
1588810-SPC-22of24-App F4.pdf PDF
1588810-DWG-04of14 (GEOTECH2).pdf PDF
1588810-DWG-02of14 (GEN2).pdf PDF
Attachment H - Price Proposal Form.docx DOCX document
1588810-DWG-13of14 (STR).pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
1588810-SPC-14of24-App A13.pdf PDF
Attachment I - ODP Form.xls XLS spreadsheet
Attachment F - Small Business Subcontracting Record.docx DOCX document
1588810-SPC-01of24.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX ‘E’

Utility Test Hole Logs

P-653 Dry Dock Flood Protection Improvements Norfolk Naval Shipyard, Portsmouth, VA eProject No. 1588810

P-653 Dry Dock Flood Protection Improvements eProject No. 1588810 Norfolk Naval Shipyard, Portsmouth, VA

THIS PAGE INTENTIONALLY LEFT BLANK

TH# REQUESTED UTILITY UTILITY FOUND REMARKS

1 WATER TUNNEL CAST IN PLACE CONCRETE WATER TUNNEL SEE NOTE

2 VALVE VAULT BRICK/STEEL VALVE VAULT SEE NOTE

4 SANITARY SEWER 6" CAST IRON SANITARY SEWER SEE NOTE

5 ELECTRIC DUCT CAST IN PLACE CONCRETE ELECTRIC DUCT SEE NOTE

7 ELECTRIC DUCT CAST IN PLACE CONCRETE ELECTRIC DUCT SEE NOTE

8 TELEPHONE UNKNOWN CONCRETE STRUCTURE SEE NOTE

9 WATER 6" DUCTILE IRON WATER SEE NOTE

10 STEAM TUNNEL UNKNOWN PIPE SEE NOTE

11 STEAM TUNNEL CAST IN PLACE CONCRETE STEAM CAP SEE NOTE

12 STEAM TUNNEL CAST IN PLACE CONCRETE STEAM CAP SEE NOTE

13 ELECTRIC DUCT CAST IN PLACE CONCRETE ELECTRIC DUCT SEE NOTE

14 STEAM TUNNEL CAST IN PLACE CONCRETE STEAM TUNNEL SEE NOTE

15 WATER TUNNEL CAST IN PLACE CONCRETE WATER TUNNEL SEE NOTE

16 ELECTRIC DUCT ELECTRIC DUCT SEE NOTE

17 STEAM TUNNEL CAST IN PLACE CONCRETE STEAM TUNNEL SEE NOTE

18 PIPE TUNNEL PRECAST CONCRETE PIPE TUNNEL SEE NOTE

19 STEAM TUNNEL UNKNOWN STRUCTURE SEE NOTE

TEST HOLE INVENTORY

PROJECT: NNSY DRY DOCK FLOOD PROTECTION TEST HOLES

PROJECT NO.: RV19010

PROJECT MANAGER: RICH SODAN

CLIENT: MOFFATT & NICHOL

DATE: 06-18-19

TH# REQUESTED UTILITY UTILITY FOUND REMARKS

1 WATER TUNNEL CAST IN PLACE CONCRETE WATER TUNNEL SEE NOTE

X1 STEAM TUNNEL (8) 2.5" STL PIPES, SEWER VAULT, WOOD SEE NOTE

2 VALVE VAULT BRICK/STEEL VALVE VAULT SEE NOTE

4 SANITARY SEWER 6" CAST IRON SANITARY SEWER SEE NOTE

5 ELECTRIC DUCT CAST IN PLACE CONCRETE ELECTRIC DUCT SEE NOTE

6A STEAM TUNNEL STEAM TUNNEL, UNK CONCRETE STRUCTURE SEE NOTE

7 ELECTRIC DUCT CAST IN PLACE CONCRETE ELECTRIC DUCT SEE NOTE

8 TELEPHONE UNKNOWN CONCRETE STRUCTURE SEE NOTE

9 WATER 6" DUCTILE IRON WATER SEE NOTE

10 STEAM TUNNEL UNKNOWN PIPE SEE NOTE

11 STEAM TUNNEL CAST IN PLACE CONCRETE STEAM CAP SEE NOTE

12 STEAM TUNNEL CAST IN PLACE CONCRETE STEAM CAP SEE NOTE

13 ELECTRIC DUCT CAST IN PLACE CONCRETE ELECTRIC DUCT SEE NOTE

14 STEAM TUNNEL CAST IN PLACE CONCRETE STEAM TUNNEL SEE NOTE

15 WATER TUNNEL CAST IN PLACE CONCRETE WATER TUNNEL SEE NOTE

16 ELECTRIC DUCT ELECTRIC DUCT SEE NOTE

17 STEAM TUNNEL CAST IN PLACE CONCRETE STEAM TUNNEL SEE NOTE

18 PIPE TUNNEL PRECAST CONCRETE PIPE TUNNEL SEE NOTE

19 STEAM TUNNEL UNKNOWN STRUCTURE SEE NOTE

20 SALT WATER 12" CAST IRON SALT WATER SEE NOTE

TEST HOLE INVENTORY

PROJECT: NNSY DRY DOCK FLOOD PROTECTION TEST HOLES

PROJECT NO.: RV19010

PROJECT MANAGER: RICH SODAN

CLIENT: MOFFATT & NICHOL

DATE: 06-18-19, 08-1-19

"LOCATING A BETTER WAY"

1-800-UNDER IT

APPENDIX 'E' - UTILITY TEST HOLE LOGS
RV19010THInv
RV19010THInv
RV19010TH-1
RV19010TH-2
RV19010TH2-X1
RV19010TH-4
RV19010TH-5
RV19010TH2-6A
RV19010TH-7
RV19010TH-8
RV19010TH-9
RV19010TH-10
RV19010TH-11
RV19010TH-12
RV19010TH-13
RV19010TH-14
RV19010TH-15
RV19010TH-16
RV19010TH-17
RV19010TH-18
RV19010TH-19
RV19010TH2-20

File details come from the government source that posted it. Updated .