Attachment H - Price Proposal Form.docx
DOCX document 22 KB Posted
- Solicitation number
- N4008520R0063
About this file
This price proposal form requests pricing for a design-bid-build project to construct a permanent flood wall and perform related work at Naval Station Norfolk in Virginia. The contractor will receive a lump sum payment for construction of the flood wall, modifications to existing dry docks, and installation of removable capstans on new foundations. The proposal form also requests unit pricing for potential additional work including disposal of unsatisfactory soils up to 500 parts per million of petroleum hydrocarbons and demolition/removal of unexpected debris. Award will be made to the total price for the base work and all potential additional work items. All prices must be included in the proposal for it to be considered.
View the file
Other files
Show 40 more
Latest 50 of 60 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| DBB, P653 Dry Dock Flood Protection Improvements | N40085-20-R-0063 | |
| Norfolk Naval Shipyard, Portsmouth, VA | Solicitation |
ATTACHMENT H - PRICE PROPOSAL FORM
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
CLIN 0001 – BASE PRICE. Price includes the following:
CLIN 0001A. Price for all work, complete, in accordance with the drawings and specifications.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0001A
| 0001A |
| MILCON P-653, excluding CLIN 0001B, 0001C, 0001D, and 0001E |
CLIN 0001B. Price for disposal of unsatisfactory soil that is classified as non-hazardous with Total Petroleum Hydrocarbons (TPH) levels up to 100 mg/kg and debris (i.e. pieces of concrete, asphalt, timber, abandoned utilities, etc.) smaller than 0.5 cubic yards that is encountered within planned excavations (i.e. utilities, foundations) necessary to complete the contract work and replacement with imported off-site select material for backfill or bedding material, as directed by the Contracting Officer, complete in place. Unsatisfactory Material is defined as material that does not conform to the Satisfactory Material requirements in Section 31 23 00.00 20, Paragraph 2.1.1. Imported Select Material shall meet the requirements of Section 31 23 00.00 20, Paragraph 2.1.4. Imported Bedding Material shall meet the requirements of Section 31 23 00.00 20, Paragraph 2.3. Unsatisfactory Material disposal determinations shall be approved by the Contracting Officer. Disposal of excavated materials shall be at a licensed, permitted disposal facility. The quantity of material removed shall be determined based on approved truck scale measurement and the quantity will be approved by the Contracting Officer. Work shall be performed in accordance with drawings and specifications and in accordance with the following schedule:
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001B (UNIT PRICE X NO. UNITS) |
| 0001B |
| Disposal of unsatisfactory, non-hazardous soil with Total Petroleum Hydrocarbons (TPH) levels up to 100 mg/kg and debris (i.e. pieces of concrete, asphalt, timber, abandoned utilities, etc.) smaller than 0.5 cubic yards that is encountered within planned excavations (i.e. utilities, foundations) at a non-hazardous disposal facility and replacement with imported off-site select material for backfill or bedding stone |
| Tons (Truck Scale Measure) |
CLIN 0001C. Price for disposal of unsatisfactory soil that is classified as non-hazardous, but is contaminated with Total Petroleum Hydrocarbons (TPH) between 100 mg/kg and 500 mg/kg that is encountered within planned excavations (i.e. utilities, foundations) necessary to complete the work. Unsatisfactory Material is defined as material that does not conform to the Satisfactory Material requirements in Section 31 23 00.00 20, Paragraph 2.1.1. Unsatisfactory Material disposal determinations shall be approved by the Contracting Officer. Disposal of excavated materials shall be at a licensed, permitted disposal facility.
The unit price shall only include additional costs above and beyond the costs for removal, handling, stockpiling, testing and disposal of uncontaminated soils included in CLIN 0001A. The quantity of material removed shall be determined based on certified truck scale measurements and the quantity will be approved by the Contracting Officer. Work shall be performed in accordance with drawings and specifications and in accordance with the following schedule:
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001C (UNIT PRICE X NO. UNITS) |
| 0001C |
| Disposal of unsatisfactory, non-hazardous, petroleum contaminated soils in lieu of uncontaminated soils with Total Petroleum Hydrocarbons between 100 mg/kg and 500 mg/kg that is encountered within planned excavations (i.e. utilities, foundations) |
| Tons (Truck Scale Measure) |
5,000
CLIN 0001D. Price for disposal of unsatisfactory soil that is classified as hazardous waste that is encountered within planned excavations (i.e. utilities, foundations) necessary to complete the work. Unsatisfactory Material is defined as material that does not conform to the Satisfactory Material requirements in Section 31 23 00.00 20, Paragraph 2.1.1. Unsatisfactory Material disposal determinations shall be approved by the Contracting Officer. Disposal of excavated materials shall be at a RCRA Subtitle C permitted facility.
The unit price shall only include additional costs above and beyond the costs for removal, handling, stockpiling, testing and disposal of uncontaminated soils included in CLIN 0001A. The quantity of material removed shall be determined based on certified truck scale measurements and the quantity will be approved by the Contracting Officer. Work shall be performed in accordance with drawings and specifications and in accordance with the following schedule:
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001D (UNIT PRICE X NO. UNITS) |
| 0001D |
| Disposal of hazardous, unsuitable soils encountered within planned excavations (i.e. utilities, foundations) in lieu of uncontaminated soils |
| Tons (Truck Scale Measure) |
CLIN 0001E. Price for demolition, removal, and disposal of debris larger than 0.5 cubic yards (i.e. abandoned foundations, utility structures, timber piles, etc.) encountered within planned excavations (i.e. utilities, foundations) or encountered at planned pile locations that is not indicated on the plans. The unit price shall include demolition, removal, stockpiling, handling, transportation, and disposal at a licensed, permitted disposal facility.
The quantity of material removed shall be determined based on certified truck scale measurements and the quantity will be approved by the Contracting Officer. Work shall be performed in accordance with drawings and specifications and in accordance with the following schedule:
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001E (UNIT PRICE X NO. UNITS) |
| 0001E |
| Demolition, removal, and disposal of debris larger than 0.5 cubic yards (i.e. abandoned foundations, utility structures, timber piles, etc.) encountered within planned excavations (i.e. utilities, foundations) or encountered at planned pile locations that is not indicated on the Demolition Plans |
| Tons (Truck Scale Measure) |
TOTAL PRICE FOR CLIN 0001 (0001A, 0001B, 0001C, 0001D, AND 0001E)
1.2 GENERAL BID NOTES
a. Award will be made on the total sum of Contract Line Items 0001A through 0001E.
b. For bid items where unit prices are indicated as required, bidders shall enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If a bidder provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
c. Failure to enter a price for any CLIN will be result in a proposal being rejected as unacceptable.
d. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic and option requirements. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Document --