Attachment G - Small Business Participation and Commitment Strategy.docx

DOCX document 27 KB Posted

Attached to
Design-Bid-Build, P653 Dry Dock Flood Protection Improvements
Solicitation number
N4008520R0063
Issued by

About this file

This document is a small business participation and commitment strategy template for the Design-Bid-Build, P653 Dry Dock Flood Protection Improvements project at Norfolk Naval Shipyard in Portsmouth, Virginia. The project scope involves constructing a permanent flood wall to protect four dry docks, associated facilities and infrastructure from flooding from the Elizabeth River. Specific work includes modifying caisson gunwales on two dry docks, building caisson seat extensions on three dry docks, and replacing existing capstans with removable capstans on new foundations. The template requires offerors to provide estimated subcontracting dollars and percentages to small, small disadvantaged, women-owned, HUBZone, veteran-owned, service-disabled veteran-owned, and AbilityOne small businesses. It includes tables to summarize participation goals by business type for the base year and any options. Supplemental narratives may address joint venture details and strategies to enhance small business involvement and capabilities.

View the file

Other files

File Type Posted
Amendment 0006.pdf PDF
AMD 0005 DWG2.pdf PDF
Amendment 0005.pdf PDF
AMD 0005 DWG1.pdf PDF
NNSY Map.pdf PDF
20R0063 Site Visit Log.docx DOCX document
20R0063 Amendment 0004.pdf PDF
20R0063 Amendment 0003.pdf PDF
1588810Amend0002-dwg-2of2 (S-E).pdf PDF
1588810Amend0002-dwg-1of2 (G-C).pdf PDF
20R0063 Amendment 0002.pdf PDF
20R0063 Amendment 0001.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
1588810-SPC-03of24-App A02.pdf PDF
1588810-SPC-05of24-App A04.pdf PDF
1588810-SPC-21of24-App F3.pdf PDF
1588810-DWG-05of14 (SURVEY).pdf PDF
1588810-SPC-12of24-App A11.pdf PDF
Attachment B - SECNAV_5512_1_11787-One Day Past Request.pdf PDF
1588810-DWG-12of14 (CU2).pdf PDF
1588810-SPC-23of24-App F5.pdf PDF
Attachment J - CVS-CIA Blank Spreadsheet.xlsx XLSX spreadsheet
1588810-DWG-14of14 (ARCH-ELEC).pdf PDF
1588810-SPC-02of24-App A01.pdf PDF
1588810-SPC-20of24-App F2.pdf PDF
1588810-DWG-09of14 (CS2).pdf PDF
1588810-SPC-11of24-App A10.pdf PDF
1588810-SPC-16of24-App C.pdf PDF
1588810-DWG-03of14 (GEOTECH1).pdf PDF
1588810-DWG-08of14 (CS1).pdf PDF
1588810-SPC-09of24-App A08.pdf PDF
1588810-SPC-04of24-App A03.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
1588810-SPC-15of24-App B.pdf PDF
1588810-SPC-07of24-App A06.pdf PDF
1588810-SPC-18of24-App E.pdf PDF
1588810-SPC-24of24-App F6.pdf PDF
1588810-DWG-06of14 (C_CD).pdf PDF
1588810-DWG-11of14 (CU1).pdf PDF
1588810-SPC-06of24-App A05.pdf PDF
1588810-SPC-22of24-App F4.pdf PDF
1588810-DWG-04of14 (GEOTECH2).pdf PDF
1588810-DWG-02of14 (GEN2).pdf PDF
Attachment H - Price Proposal Form.docx DOCX document
1588810-DWG-13of14 (STR).pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
1588810-SPC-14of24-App A13.pdf PDF
Attachment I - ODP Form.xls XLS spreadsheet
Attachment F - Small Business Subcontracting Record.docx DOCX document
1588810-SPC-01of24.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DBB, P653 Dry Dock Flood Protection ImprovementsN40085-20-R-0063
Norfolk Naval Shipyard, Portsmouth, VASource Selection Plan

ATTACHMENT G

SMALL BUSINESS PARTICIPATION AND COMMITMENT STRATEGY

(OFFEROR’S NAME)

(ADDRESS)

Solicitation or Contract Number (Title of the Project) (Location) (Date Prepared)

INSERT INTRODUCTION/EXECUTIVE SUMMARY (Up to 2 pages maximum)

SMALL BUSINESS PARTICIPATION AND COMMITMENT STRATEGY – (Base and Option Years)

1. Estimated value of all planned subcontracting$________________
____% of contract
2. Estimated value of all work to be self-performed$________________
____% of contract
3. Total value of the proposal (sum of 1. and 2. above)$________________
100% of contract

4. Subcontracts for products and services to be awarded under this project.

a. Self-Performed Work:

TYPE OF SERVICE/PRODUCT $ VALUE OF WORK

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) ________________%

If the offeror is a small business, the Government will add self-performed work to the appropriate category(ies) in c. (1) through c. (6) below to calculate overall small business participation rates.

b. Other Than Small (OTS) Business Subcontracts**

NAME OF COMPANY* TYPE OF SERVICE/PRODUCT $ VALUE OF SUBCONTRACT

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) ________________%

c. Small Business (SB) Subcontracts

NAME OF COMPANY* TYPE OF SERVICE/PRODUCT $ VALUE OF SUBCONTRACT

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) ______________%

(1) SMALL DISADVANTAGED BUSINESSES: (SDB)

NAME OF COMPANY* TYPE OF SERVICE/PRODUCT $ VALUE OF SUBCONTRACT

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) ______________%

(2) WOMEN-OWNED SMALL BUSINESSES: (WOSB)

NAME OF COMPANY* TYPE OF SERVICE/PRODUCT $ VALUE OF SUBCONTRACT

TOTAL: $_______________
PERCENTAGE OF CONTRACT VALUE (line 3) ______________%

(3) HISTORICALLY UNDERUTILIZED BUSINESS ZONE (HUBZone) CONCERN:

NAME OF COMPANY* TYPE OF SERVICES $ VALUE OF SUBCONTRACT

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) ______________%

(4) VETERAN OWNED SMALL BUSINESS: (VOSB)

NAME OF COMPANY* TYPE OF SERVICES $ VALUE OF SUBCONTRACT

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) ______________%

(5) SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS: (SDVOSB)

NAME OF COMPANY* TYPE OF SERVICES $ VALUE OF SUBCONTRACT

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) ______________%

(6) ABILITYONE PROGRAM ORGANIZATIONS

NAME OF ORG* TYPE OF SERVICES $ VALUE OF SUBCONTRACT

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) ______________%

* For each company/organization listed, describe the nature of commitment to subcontract and whether or not it is legally binding. If unknown/to be determined, so indicate.

** Include any subcontracts to Historically Black Colleges and Universities/Minority Institutions (HBCU/MI) in the OTS Business listing.

NOTES:

1. The dollar sum of lines 4.b and 4.c (excluding (1)-(6)) must equal line 1.

2. Lines 4.c. (1) through 4.c. (6) identify various subcategories of small businesses. Subcontracts to companies that qualify in multiple categories must be reported under each category. For example: A $100,000 subcontract to ABC, a woman-owned, small disadvantaged business that is also a certified HUBZone concern, will be reported as $100,000 on line 4.c., SB, line 4.c. (1), SDB, line 4.c. (2), WOSB and line 4.c.(3), HUBZone concern.

3. Subcontracts to qualified nonprofit agencies participating in the AbilityOne Program are considered small business subcontracts for the purposes of this strategy and any associated small business subcontracting plan.

DBB, P653 Dry Dock Flood Protection ImprovementsN40085-20-R-0063
Norfolk Naval Shipyard, Portsmouth, VASource Selection Plan
DBB, P653 Dry Dock Flood Protection ImprovementsN40085-20-R-0063
Norfolk Naval Shipyard, Portsmouth, VASource Selection Plan

INSERT SUPPLEMENTAL NARRATIVES (limited to five pages) TO ADDRESS JOINT VENTURE PARTICULARS AND OTHER STRATEGY ELEMENTS SUCH AS THE NATURE OF COMMITMENTS/AGREEMENTS COVERING POST AWARD ROLES, SPECIFIC INITIATIVES AND TOOLS TO ENHANCE SMALL BUSINESS PARTICIPATION AND CAPABILITIES AND HOW SMALL BUSINESS PARTICIPATION RATES WERE DETERMINED.

CONTRACT LEVEL PERFORMANCE SUMMARY

This document summarizes participation (total contract performance, including self performance and subcontracted efforts) by type of business entity in terms of both dollar value and percentage of total contract value.

Base

Option 1

Option 2

TOTAL

DOLLARS

Total contract value

OTS Business*

SB*

SDB

WOSB

HUBZone SB

VOSB

SDVOSB

ABILITYONE

PERCENTAGES (of total contract value)

OTS Business*

SB*

OTSB + SB

100
%
100
%
100
%
100
%

SDB

WOSB

HUBZone SB

VOSB

SDVOSB

ABILITYONE

Include additional option years if applicable

* The sums of the “OTS Business” and “SB” dollars lines (excluding subcategories) must equal the associated dollar values on the “Total dollar value of this contract” line. The sum of “OTS Business” and “SB” percentage lines (again, excluding subcategories) must equal 100% and represent all work to be performed under the contract.

File details come from the government source that posted it. Updated .