Attachment G - Small Business Participation and Commitment Strategy.docx
DOCX document 27 KB Posted
- Solicitation number
- N4008520R0063
About this file
This document is a small business participation and commitment strategy template for the Design-Bid-Build, P653 Dry Dock Flood Protection Improvements project at Norfolk Naval Shipyard in Portsmouth, Virginia. The project scope involves constructing a permanent flood wall to protect four dry docks, associated facilities and infrastructure from flooding from the Elizabeth River. Specific work includes modifying caisson gunwales on two dry docks, building caisson seat extensions on three dry docks, and replacing existing capstans with removable capstans on new foundations. The template requires offerors to provide estimated subcontracting dollars and percentages to small, small disadvantaged, women-owned, HUBZone, veteran-owned, service-disabled veteran-owned, and AbilityOne small businesses. It includes tables to summarize participation goals by business type for the base year and any options. Supplemental narratives may address joint venture details and strategies to enhance small business involvement and capabilities.
View the file
Other files
Show 40 more
Latest 50 of 60 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| DBB, P653 Dry Dock Flood Protection Improvements | N40085-20-R-0063 | |
| Norfolk Naval Shipyard, Portsmouth, VA | Source Selection Plan |
ATTACHMENT G
SMALL BUSINESS PARTICIPATION AND COMMITMENT STRATEGY
(OFFEROR’S NAME)
(ADDRESS)
Solicitation or Contract Number (Title of the Project) (Location) (Date Prepared)
INSERT INTRODUCTION/EXECUTIVE SUMMARY (Up to 2 pages maximum)
SMALL BUSINESS PARTICIPATION AND COMMITMENT STRATEGY – (Base and Option Years)
| 1. Estimated value of all planned subcontracting | $________________ | |
| ____% of contract |
| 2. Estimated value of all work to be self-performed | $________________ | |
| ____% of contract |
| 3. Total value of the proposal (sum of 1. and 2. above) | $________________ | |
| 100% of contract |
4. Subcontracts for products and services to be awarded under this project.
a. Self-Performed Work:
TYPE OF SERVICE/PRODUCT $ VALUE OF WORK
| TOTAL: $________________ | |
| PERCENTAGE OF CONTRACT VALUE (line 3) ________________% |
If the offeror is a small business, the Government will add self-performed work to the appropriate category(ies) in c. (1) through c. (6) below to calculate overall small business participation rates.
b. Other Than Small (OTS) Business Subcontracts**
NAME OF COMPANY* TYPE OF SERVICE/PRODUCT $ VALUE OF SUBCONTRACT
| TOTAL: $________________ | |
| PERCENTAGE OF CONTRACT VALUE (line 3) ________________% |
c. Small Business (SB) Subcontracts
NAME OF COMPANY* TYPE OF SERVICE/PRODUCT $ VALUE OF SUBCONTRACT
| TOTAL: $________________ | |
| PERCENTAGE OF CONTRACT VALUE (line 3) ______________% |
(1) SMALL DISADVANTAGED BUSINESSES: (SDB)
NAME OF COMPANY* TYPE OF SERVICE/PRODUCT $ VALUE OF SUBCONTRACT
| TOTAL: $________________ | |
| PERCENTAGE OF CONTRACT VALUE (line 3) ______________% |
(2) WOMEN-OWNED SMALL BUSINESSES: (WOSB)
NAME OF COMPANY* TYPE OF SERVICE/PRODUCT $ VALUE OF SUBCONTRACT
| TOTAL: $_______________ | |
| PERCENTAGE OF CONTRACT VALUE (line 3) ______________% |
(3) HISTORICALLY UNDERUTILIZED BUSINESS ZONE (HUBZone) CONCERN:
NAME OF COMPANY* TYPE OF SERVICES $ VALUE OF SUBCONTRACT
| TOTAL: $________________ | |
| PERCENTAGE OF CONTRACT VALUE (line 3) ______________% |
(4) VETERAN OWNED SMALL BUSINESS: (VOSB)
NAME OF COMPANY* TYPE OF SERVICES $ VALUE OF SUBCONTRACT
| TOTAL: $________________ | |
| PERCENTAGE OF CONTRACT VALUE (line 3) ______________% |
(5) SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS: (SDVOSB)
NAME OF COMPANY* TYPE OF SERVICES $ VALUE OF SUBCONTRACT
| TOTAL: $________________ | |
| PERCENTAGE OF CONTRACT VALUE (line 3) ______________% |
(6) ABILITYONE PROGRAM ORGANIZATIONS
NAME OF ORG* TYPE OF SERVICES $ VALUE OF SUBCONTRACT
| TOTAL: $________________ | |
| PERCENTAGE OF CONTRACT VALUE (line 3) ______________% |
* For each company/organization listed, describe the nature of commitment to subcontract and whether or not it is legally binding. If unknown/to be determined, so indicate.
** Include any subcontracts to Historically Black Colleges and Universities/Minority Institutions (HBCU/MI) in the OTS Business listing.
NOTES:
1. The dollar sum of lines 4.b and 4.c (excluding (1)-(6)) must equal line 1.
2. Lines 4.c. (1) through 4.c. (6) identify various subcategories of small businesses. Subcontracts to companies that qualify in multiple categories must be reported under each category. For example: A $100,000 subcontract to ABC, a woman-owned, small disadvantaged business that is also a certified HUBZone concern, will be reported as $100,000 on line 4.c., SB, line 4.c. (1), SDB, line 4.c. (2), WOSB and line 4.c.(3), HUBZone concern.
3. Subcontracts to qualified nonprofit agencies participating in the AbilityOne Program are considered small business subcontracts for the purposes of this strategy and any associated small business subcontracting plan.
| DBB, P653 Dry Dock Flood Protection Improvements | N40085-20-R-0063 | |
| Norfolk Naval Shipyard, Portsmouth, VA | Source Selection Plan | |
| DBB, P653 Dry Dock Flood Protection Improvements | N40085-20-R-0063 | |
| Norfolk Naval Shipyard, Portsmouth, VA | Source Selection Plan |
INSERT SUPPLEMENTAL NARRATIVES (limited to five pages) TO ADDRESS JOINT VENTURE PARTICULARS AND OTHER STRATEGY ELEMENTS SUCH AS THE NATURE OF COMMITMENTS/AGREEMENTS COVERING POST AWARD ROLES, SPECIFIC INITIATIVES AND TOOLS TO ENHANCE SMALL BUSINESS PARTICIPATION AND CAPABILITIES AND HOW SMALL BUSINESS PARTICIPATION RATES WERE DETERMINED.
CONTRACT LEVEL PERFORMANCE SUMMARY
This document summarizes participation (total contract performance, including self performance and subcontracted efforts) by type of business entity in terms of both dollar value and percentage of total contract value.
Base
Option 1
Option 2
TOTAL
DOLLARS
Total contract value
OTS Business*
SB*
SDB
WOSB
HUBZone SB
VOSB
SDVOSB
ABILITYONE
PERCENTAGES (of total contract value)
OTS Business*
SB*
OTSB + SB
| 100 |
| % |
| 100 |
| % |
| 100 |
| % |
| 100 |
| % |
SDB
WOSB
HUBZone SB
VOSB
SDVOSB
ABILITYONE
Include additional option years if applicable
* The sums of the “OTS Business” and “SB” dollars lines (excluding subcategories) must equal the associated dollar values on the “Total dollar value of this contract” line. The sum of “OTS Business” and “SB” percentage lines (again, excluding subcategories) must equal 100% and represent all work to be performed under the contract.
File details come from the government source that posted it. Updated .