P 381 Industry Day Questions_Handout Updated 20NOV.pdf
PDF 295 KB Posted
- Solicitation number
- N4008520R0021
About this file
This document contains questions from the Navy seeking feedback from industry regarding a proposed dry dock construction project at Portsmouth Naval Shipyard in Kittery, Maine. The Navy is soliciting responses to 16 questions relating to project execution duration, construction obstacles, means and methods to reduce costs, labor challenges, and use of government-owned sites. Specific questions address underwater blasting, explosives offloading, precast construction, specialty contractors, and the potential use of Building 191 for labor housing and office space. Responses are requested by January 10, 2020. The associated federal contract opportunity is for Industry Day for the FY21 MILCON P-381 Multi-Mission Dry Dock #1 project at Portsmouth Naval Shipyard.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Industry Day Questionnaire P-381 Multi-Mission Dry Dock # 1
Updated questions request 20 Nov 2019
As a result of Industry Day on 12 November 2019, the Government has developed the following questions and any responses/feedback may be sent to Contracting Officer, Philip Cole, at philip.j.cole@navy.mil no later than 10 January 2020.
1) Is the estimated four-year project duration executable, and does the project duration significantly influence cost? What is the most cost effective execution duration for a project of this size?
2) Given the provided project technical information, list a few of the major construction obstacles.
3) How can the government help resolve or minimize obstacles to improve constructability?
4) Should other means and methods be considered to reduce cost (i.e. precast, other)?
5) What are the biggest challenges with underwater blasting inside the basin?
6) In order to offload explosives, would you use the front gate or use a barge?
mailto:philip.j.cole@navy.mil
7) Do you believe hiring, maintaining, and housing the project’s labor force will be a significant challenge?
8) What factors would prevent you from bidding this project?
9) Please provide any other feedback, comments, or concerns.
10) Future Industry Day Programs
i) What information could the Government provide to make it easier for your company to bid the project?
ii) Are you interested in a 2nd Industry Day event at the Shipyard in March?
iii) Would it be beneficial to you to have a limited access tour of the project site as part of the March event?
11) Single most challenging construction feature. What is it?
12) Single most challenging construction feature
13) Does your team consider the proposed Government owned Bldg. No.191 for use as housing labor forces/office space a significant cost savings to the project?
14) Does your team consider the proposed Government owned Hendersen Point site as a potential cost savings to the project?
i) Would your team use this site for any of the following: precast construction batch plant, or material storage? Please also list other considerations for this site.
15) Does your team consider the proposed Government owned Prison Laydown site as a potential cost savings to the project?
i) Would your team use this site for any of the following: rock crushing, material storage, or dredge spoil decanting? Please also list other considerations for this site.
16) This work includes several specialty contractor elements (blasting, caisson, rail, drilled shafts, precast, etc).
Do you see these specialty elements as challenge? Which elements are the most challenging to find specialty contractors?