This document package provides preliminary drawings and specifications for an Industry Day event for the P-381 Multi-Mission Dry Dock #1 project at Portsmouth Naval Shipyard in Kittery, Maine. The drawings cover general site plans, geotechnical information, structural, mechanical, electrical, and civil details for the project. The federal solicitation is for the Industry Day event to inform potential offerors about the project requirements and scope prior to release of a solicitation for construction of the dry dock. The Navy seeks input from industry on different construction approaches and schedules for the project. The Industry Day will take place on an unspecified date. Additional details will be provided in a forthcoming solicitation to be released by the Naval Facilities Engineering Command.
Drawings Part 1(a)
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contents Rendering and General Drawings 3-4 Geotechnical Drawings 5-12 Structural Drawings: General Arrangement 13-19 Structural Drawings: Connection to Existing Pumpwell 20-21 Structural Drawings: Precast Float-In Monoliths Scheme 22-24 Structural Drawings: Precast Wall Block Scheme 25-28 Structural Drawings: In-the-Dry Scheme 29-32 Mechanical Drawings 33-35 Electrical Drawings 36-37 Pump Station Drawings 38-40 Utility Building Drawings 41-44 Caisson Drawings 44-48 Prison Point and Henderson Point Drawings 49-52
NOTE: THE INFORMATION PROVIDED IS PRELIMINARY AND IS SUBJECT TO CHANGE.
1 PROVIDE CATCH BASIN.
2 PROVIDE DROP INLET.
3 PROVIDE 12" RCP.
4 PROVIDE 8" PVC PIPE.
5 PROVIDE (5) SCUPPERS IN CURB BETWEEN CLEATS
ALONG SOUTH CLOSURE WALL (NORTH). SEE DETAIL ON
SS502.
6 PROVIDE (18) SCUPPERS IN CURB BETWEEN CLEATS
ALONG SOUTH CLOSURE WALL (SOUTH). SEE DETAIL ON
SS502.
1 PROVIDE CATCH BASIN.
2 PROVIDE DROP INLET.
3 PROVIDE 12" RCP.
4 PROVIDE 15" RCP.
5 PROVIDE 18" RCP.
6 RETAIN EXISTING CATCH BASIN.
7 PROVIDE DRAIN MANHOLE (4'-0" DIA.).
8 PROVIDE 8" PVC PIPE.
9 PROVIDE DRAIN MANHOLE (3'-0" X 5'-0" RECT.). SEE
DETAIL ON CS501.
KEYNOTES:
KEYNOTES:
10 PROVIDE 2" PVC PIPE FROM LC-17 SUMP PUMP.
BERTH 11B
BERTH 2B
BERTH 2A
DRY DOCK NO. 1E
DRY DOCK NO. 1N
DRY DOCK NO. 1W
15 15
SOUTH CLOSURE WALL
310 EN
TR
AN
C
E
STR
U C
TU
R
E
506'-4"
'-0
'-0
'-0
'-0
'-0
'-0
7'
-6
0'
-0
63'-0"
PLAN
NORTH
GENERAL PLAN
SCALE: 1" = 50'
1" = 50' 50' 0 50' 100'
MAJOR WORK ITEMS:
PUMP WELL
CENTER WALL
CRANE RAILS
36" STORM DRAIN OUTFALL
LAND-BASED BATCH PLANT
EXISTING BUILDING 92 ELECTRICAL YARD - CONTAINS
12-OUTLET HOTEL SERVICE (SHORE POWER), TRANSPORTABLE
SUBSTATION, VOLTAGE REGULATOR, BUILDING SECTIONLIZERS
CAISSONS (2)
DRY DOCK NO. 1N ENTRANCE STRUCTURE
NORTH DOCKWALL
SOUTH DOCKWALL
UTILITY BUILDING
DRILLED SHAFTS
PUMP STATION OUTLET
WHEELER LAYDOWN AREA
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
FI
LE
N
AM
E:
U
:\1
\1
6.
0_ sh ar ed _b im \c iv il_
3d \6
.2 .1
_c iv il\ G
G
EN
ER
AL
P
LA
N .d w g
L
AY
O U
T N
AM
E:
G
G
EN
ER
AL
P
LA
N
P
LO
TT
ED
: T ue sd ay
, S ep te m be r 2
4,
- 3 :0
1p m
U
SE
R : m ca ra m ag no
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
DES DRW
SY
M
D
AT
E
AP
PR
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
M
ID
-A
TL
AN
TI
C
CI
C
OR
E
NA
VA
L S
TA
TI
ON
, N
OR
FO
LK
V
IR
GI
NI
A
PM/DM
BRANCH MANAGER
CHIEF ENGINEER
FIRE PROTECTION
DRAWFORM REVISION: 10 OCTOBER 2014
CHECK GRAPHIC SCALE BEFORE USING
KI
TT
ER
Y, M
AI
N E
P-
- M
U
LT
I-M
IS
SI
O
N D
R Y
D O
C K
#1
PO
R
TS
M
O U
TH
N
AV
AL
S H
IP
YA
R D
N40085-17-D-5004
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
P R
E L
IM
IN
A
R Y
XX
XX
XX
XX/XX/XX
1604959
GRAPHIC SCALE
5 BURLINGTON WOODS
BURLINGTON, MA 01803
XXX
G101
G
EN
ER
AL
P
LA
N
VOLTAGE REGULATOR BUILDINGS
13.2 KV PAD MOUNTED SWITCHES
GENERATOR LOAD BANKS
LOAD HOUSE TRANSFER ENCLOSURE
1.5 MW GENERATORS
TRANSPORTABLE SUBSTATION
ISO TRANSFORMERS
PIDC
16-OUTLET HOTEL SERVICE (SHORE POWER)
GeoTech
| 01_20190820_geotech_industry day_excavation_all schemes.pdf |
| BE101 |
| 20190917_IndustryDay_SampleDwgs_STR Precast Float-In Monoliths.pdf |
| SP201 |
| Sheets |
| SP201 - PRECAST DRY DOCK MONOLITH TYPE A1 - CONCRETE |
| SP232 |
| Sheets |
| SP232 - PRECAST CONCRETE SLAB - TYPE B |
| MS100 - ASW OVERALL PLAN.pdf |
| Sheets |
| MS100 - ASW OVERALL PLAN |
| M-304 - CENTER WALL TUNNEL SECTIONS.pdf |
| Sheets |
| M-304 - CENTER WALL TUNNEL SECTIONS |
| PSM101 - PUMP STATION - PIPING PLANS.pdf |
| Sheets |
| PSM101 - PUMP STATION - PIPING PLANS |
| PSM-301 - PUMP STATION SECTIONS.pdf |
| Sheets |
| PSM-301 - PUMP STATION SECTIONS |
| UBMP101 - UTILITY BUILDING PIPING PLANS.pdf |
| Sheets |
| UBMP101 - UTILITY BUILDING - PIPING PLANS |
| UBM301 - UTILITY BUILDING SECTIONS.pdf |
| Sheets |
| UBM301 - UTILITY BUILDING - SECTIONS |
| UBM401 - UTILITY BUILDING - ISOMETRICS |
| UBMP101 - UTILITY BUILDING - PIPING PLANS |
| UBM401 - UTILITY BUILDING ISOMETRICS.pdf |
| Sheets |
| UBM301 - UTILITY BUILDING - SECTIONS |
| UBM401 - UTILITY BUILDING - ISOMETRICS |
| UBMP101 - UTILITY BUILDING - PIPING PLANS |
| 20190924_Civilworks IndustryDay_Dwgs.pdf |
| Sheets and Views |
| G101 GENERAL PLAN |
| P-381_Industry_Day_PDFs_Elec_09-25-2019.pdf |
| DRYD SWTR-1604959-E_jonathan.metzger - Sheet - ES101 - PLAN - DD1N AND CENTERWALL - WEST |
| Sheets |
| ES101 - PLAN - DD1N AND CENTERWALL - WEST |
| ES102 - PLAN - DD1N AND CENTERWALL - EAST |
| ES103 - PLAN - DD1E - NORTH |
| ES104 - PLAN - DD1W - WEST |
| ES111 - ELECTRICAL OVERALL SITE PLAN |
| DRYD SWTR-1604959-E_jonathan.metzger - Sheet - ES102 - PLAN - DD1N AND CENTERWALL - EAST |
| Sheets |
| ES101 - PLAN - DD1N AND CENTERWALL - WEST |
| ES102 - PLAN - DD1N AND CENTERWALL - EAST |
| ES103 - PLAN - DD1E - NORTH |
| ES104 - PLAN - DD1W - WEST |
| ES111 - ELECTRICAL OVERALL SITE PLAN |
| DRYD SWTR-1604959-E_jonathan.metzger - Sheet - ES103 - PLAN - DD1E - NORTH |
| Sheets |
| ES101 - PLAN - DD1N AND CENTERWALL - WEST |
| ES102 - PLAN - DD1N AND CENTERWALL - EAST |
| ES103 - PLAN - DD1E - NORTH |
| ES104 - PLAN - DD1W - WEST |
| ES111 - ELECTRICAL OVERALL SITE PLAN |
| DRYD SWTR-1604959-E_jonathan.metzger - Sheet - ES104 - PLAN - DD1W - WEST |
| Sheets |
| ES101 - PLAN - DD1N AND CENTERWALL - WEST |
| ES102 - PLAN - DD1N AND CENTERWALL - EAST |
| ES103 - PLAN - DD1E - NORTH |
| ES104 - PLAN - DD1W - WEST |
| ES111 - ELECTRICAL OVERALL SITE PLAN |
| DRYD SWTR-1604959-E_jonathan.metzger - Sheet - ES111 - ELECTRICAL OVERALL SITE PLAN |
| Sheets |
| ES101 - PLAN - DD1N AND CENTERWALL - WEST |
| ES102 - PLAN - DD1N AND CENTERWALL - EAST |
| ES103 - PLAN - DD1E - NORTH |
| ES104 - PLAN - DD1W - WEST |
| ES111 - ELECTRICAL OVERALL SITE PLAN |
| Mechanical Industry Day Set.pdf |
| M-304 - CENTER WALL TUNNEL SECTIONS |
| Sheets |
| M-304 - CENTER WALL TUNNEL SECTIONS |
| MS100 - ASW OVERALL PLAN |
| Sheets |
| MS100 - ASW OVERALL PLAN |
| MT100 - HIGH PRESSURE STEAM OVERALL PLAN |
| MW100 - WHEELER OVERALL PLAN |
| PA100 - HIGH PRESSURE AIR OVERALL PLAN |
| PC100 - COMPRESSED AIR OVERALL PLAN |
| PF100 - FRESH WATER OVERALL PLAN |
| PN100 - NITROGEN OVERALL PLAN |
| PP100 - PURE WATER OVERALL PLAN |
| PR100 - SANITARY SEWER OVERALL PLAN |
| MT100 - HIGH PRESSURE STEAM OVERALL PLAN |
| Sheets |
| MS100 - ASW OVERALL PLAN |
| MT100 - HIGH PRESSURE STEAM OVERALL PLAN |
| MW100 - WHEELER OVERALL PLAN |
| PA100 - HIGH PRESSURE AIR OVERALL PLAN |
| PC100 - COMPRESSED AIR OVERALL PLAN |
| PF100 - FRESH WATER OVERALL PLAN |
| PN100 - NITROGEN OVERALL PLAN |
| PP100 - PURE WATER OVERALL PLAN |
| PR100 - SANITARY SEWER OVERALL PLAN |
| PA100 - HIGH PRESSURE AIR OVERALL PLAN |
| Sheets |
| MS100 - ASW OVERALL PLAN |
| MT100 - HIGH PRESSURE STEAM OVERALL PLAN |
| MW100 - WHEELER OVERALL PLAN |
| PA100 - HIGH PRESSURE AIR OVERALL PLAN |
| PC100 - COMPRESSED AIR OVERALL PLAN |
| PF100 - FRESH WATER OVERALL PLAN |
| PN100 - NITROGEN OVERALL PLAN |
| PP100 - PURE WATER OVERALL PLAN |
| PR100 - SANITARY SEWER OVERALL PLAN |
| PC100 - COMPRESSED AIR OVERALL PLAN |
| Sheets |
| MS100 - ASW OVERALL PLAN |
| MT100 - HIGH PRESSURE STEAM OVERALL PLAN |
| MW100 - WHEELER OVERALL PLAN |
| PA100 - HIGH PRESSURE AIR OVERALL PLAN |
| PC100 - COMPRESSED AIR OVERALL PLAN |
| PF100 - FRESH WATER OVERALL PLAN |
| PN100 - NITROGEN OVERALL PLAN |
| PP100 - PURE WATER OVERALL PLAN |
| PR100 - SANITARY SEWER OVERALL PLAN |
| PF100 - FRESH WATER OVERALL PLAN |
| Sheets |
| MS100 - ASW OVERALL PLAN |
| MT100 - HIGH PRESSURE STEAM OVERALL PLAN |
| MW100 - WHEELER OVERALL PLAN |
| PA100 - HIGH PRESSURE AIR OVERALL PLAN |
| PC100 - COMPRESSED AIR OVERALL PLAN |
| PF100 - FRESH WATER OVERALL PLAN |
| PN100 - NITROGEN OVERALL PLAN |
| PP100 - PURE WATER OVERALL PLAN |
| PR100 - SANITARY SEWER OVERALL PLAN |
| PN100 - NITROGEN OVERALL PLAN |
| Sheets |
| MS100 - ASW OVERALL PLAN |
| MT100 - HIGH PRESSURE STEAM OVERALL PLAN |
| MW100 - WHEELER OVERALL PLAN |
| PA100 - HIGH PRESSURE AIR OVERALL PLAN |
| PC100 - COMPRESSED AIR OVERALL PLAN |
| PF100 - FRESH WATER OVERALL PLAN |
| PN100 - NITROGEN OVERALL PLAN |
| PP100 - PURE WATER OVERALL PLAN |
| PR100 - SANITARY SEWER OVERALL PLAN |
| PP100 - PURE WATER OVERALL PLAN |
| Sheets |
| MS100 - ASW OVERALL PLAN |
| MT100 - HIGH PRESSURE STEAM OVERALL PLAN |
| MW100 - WHEELER OVERALL PLAN |
| PA100 - HIGH PRESSURE AIR OVERALL PLAN |
| PC100 - COMPRESSED AIR OVERALL PLAN |
| PF100 - FRESH WATER OVERALL PLAN |
| PN100 - NITROGEN OVERALL PLAN |
| PP100 - PURE WATER OVERALL PLAN |
| PR100 - SANITARY SEWER OVERALL PLAN |
| PR100 - SANITARY SEWER OVERALL PLAN |
| Sheets |
| MS100 - ASW OVERALL PLAN |
| MT100 - HIGH PRESSURE STEAM OVERALL PLAN |
| MW100 - WHEELER OVERALL PLAN |
| PA100 - HIGH PRESSURE AIR OVERALL PLAN |
| PC100 - COMPRESSED AIR OVERALL PLAN |
| PF100 - FRESH WATER OVERALL PLAN |
| PN100 - NITROGEN OVERALL PLAN |
| PP100 - PURE WATER OVERALL PLAN |
| PR100 - SANITARY SEWER OVERALL PLAN |
| PSM101 - PUMP STATION - PIPING PLANS |
| Sheets |
| PSM101 - PUMP STATION - PIPING PLANS |
| PSM-301 - PUMP STATION SECTIONS |
| Sheets |
| PSM-301 - PUMP STATION SECTIONS |
| UBM301 - UTILITY BUILDING SECTIONS |
| Sheets |
| UBM301 - UTILITY BUILDING - SECTIONS |
| UBM401 - UTILITY BUILDING - ISOMETRICS |
| UBMP101 - UTILITY BUILDING - PIPING PLANS |
| UBM401 - UTILITY BUILDING ISOMETRICS |
| Sheets |
| UBM301 - UTILITY BUILDING - SECTIONS |
| UBM401 - UTILITY BUILDING - ISOMETRICS |
| UBMP101 - UTILITY BUILDING - PIPING PLANS |
| UBMP101 - UTILITY BUILDING PIPING PLANS |
| Sheets |
| UBMP101 - UTILITY BUILDING - PIPING PLANS |
| SW202.pdf |
| Sheets |
| SW202 - CONNECTION TO EXISTING PUMPWELL - CONCRETE - PLANS SHEET 2 OF 3 |
| SW203.pdf |
| Sheets |
| SW203 - CONNECTION TO EXISTING PUMPWELL - CONCRETE - PLANS SHEET 3 OF 3 |
| SW202.pdf |
| Sheets |
| SW202 - CONNECTION TO EXISTING PUMPWELL - CONCRETE - PLANS SHEET 2 OF 3 |
| SW202.pdf |
| Sheets |
| SW202 - CONNECTION TO EXISTING PUMPWELL - CONCRETE - PLANS SHEET 2 OF 3 |
| SW203.pdf |
| Sheets |
| SW203 - CONNECTION TO EXISTING PUMPWELL - CONCRETE - PLANS SHEET 3 OF 3 |