2019_IndustryDay_Drawings_Part1a.pdf

PDF 5 MB Posted

Attached to
P-381, MULTI-MISSION DRY DOCK #1, PORTSMOUTH NAVAL SHIPYARD, KITTERY, MAINE
Solicitation number
N4008520R0021
Issued by

About this file

This document package provides preliminary drawings and specifications for an Industry Day event for the P-381 Multi-Mission Dry Dock #1 project at Portsmouth Naval Shipyard in Kittery, Maine. The drawings cover general site plans, geotechnical information, structural, mechanical, electrical, and civil details for the project. The federal solicitation is for the Industry Day event to inform potential offerors about the project requirements and scope prior to release of a solicitation for construction of the dry dock. The Navy seeks input from industry on different construction approaches and schedules for the project. The Industry Day will take place on an unspecified date. Additional details will be provided in a forthcoming solicitation to be released by the Naval Facilities Engineering Command.

Drawings Part 1(a)

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contents Rendering and General Drawings 3-4 Geotechnical Drawings 5-12 Structural Drawings: General Arrangement 13-19 Structural Drawings: Connection to Existing Pumpwell 20-21 Structural Drawings: Precast Float-In Monoliths Scheme 22-24 Structural Drawings: Precast Wall Block Scheme 25-28 Structural Drawings: In-the-Dry Scheme 29-32 Mechanical Drawings 33-35 Electrical Drawings 36-37 Pump Station Drawings 38-40 Utility Building Drawings 41-44 Caisson Drawings 44-48 Prison Point and Henderson Point Drawings 49-52

NOTE: THE INFORMATION PROVIDED IS PRELIMINARY AND IS SUBJECT TO CHANGE.

1 PROVIDE CATCH BASIN.

2 PROVIDE DROP INLET.

3 PROVIDE 12" RCP.

4 PROVIDE 8" PVC PIPE.

5 PROVIDE (5) SCUPPERS IN CURB BETWEEN CLEATS

ALONG SOUTH CLOSURE WALL (NORTH). SEE DETAIL ON

SS502.

6 PROVIDE (18) SCUPPERS IN CURB BETWEEN CLEATS

ALONG SOUTH CLOSURE WALL (SOUTH). SEE DETAIL ON

SS502.

1 PROVIDE CATCH BASIN.

2 PROVIDE DROP INLET.

3 PROVIDE 12" RCP.

4 PROVIDE 15" RCP.

5 PROVIDE 18" RCP.

6 RETAIN EXISTING CATCH BASIN.

7 PROVIDE DRAIN MANHOLE (4'-0" DIA.).

8 PROVIDE 8" PVC PIPE.

9 PROVIDE DRAIN MANHOLE (3'-0" X 5'-0" RECT.). SEE

DETAIL ON CS501.

KEYNOTES:

KEYNOTES:

10 PROVIDE 2" PVC PIPE FROM LC-17 SUMP PUMP.

BERTH 11B

BERTH 2B

BERTH 2A

DRY DOCK NO. 1E

DRY DOCK NO. 1N

DRY DOCK NO. 1W

15 15

SOUTH CLOSURE WALL

310 EN

TR

AN

C

E

STR

U C

TU

R

E

506'-4"

'-0

'-0

'-0

'-0

'-0

'-0

7'

-6

0'

-0

63'-0"

PLAN

NORTH

GENERAL PLAN

SCALE: 1" = 50'

1" = 50' 50' 0 50' 100'

MAJOR WORK ITEMS:

PUMP WELL

CENTER WALL

CRANE RAILS

36" STORM DRAIN OUTFALL

LAND-BASED BATCH PLANT

EXISTING BUILDING 92 ELECTRICAL YARD - CONTAINS

12-OUTLET HOTEL SERVICE (SHORE POWER), TRANSPORTABLE

SUBSTATION, VOLTAGE REGULATOR, BUILDING SECTIONLIZERS

CAISSONS (2)

DRY DOCK NO. 1N ENTRANCE STRUCTURE

NORTH DOCKWALL

SOUTH DOCKWALL

UTILITY BUILDING

DRILLED SHAFTS

PUMP STATION OUTLET

WHEELER LAYDOWN AREA

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

FI

LE

N

AM

E:

U

:\1

\1

6.

0_ sh ar ed _b im \c iv il_

3d \6

.2 .1

_c iv il\ G

G

EN

ER

AL

P

LA

N .d w g

L

AY

O U

T N

AM

E:

G

G

EN

ER

AL

P

LA

N

P

LO

TT

ED

: T ue sd ay

, S ep te m be r 2

4,

- 3 :0

1p m

U

SE

R : m ca ra m ag no

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

DES DRW

SY

M

D

AT

E

AP

PR

CHK

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

M

ID

-A

TL

AN

TI

C

CI

C

OR

E

NA

VA

L S

TA

TI

ON

, N

OR

FO

LK

V

IR

GI

NI

A

PM/DM

BRANCH MANAGER

CHIEF ENGINEER

FIRE PROTECTION

DRAWFORM REVISION: 10 OCTOBER 2014

CHECK GRAPHIC SCALE BEFORE USING

KI

TT

ER

Y, M

AI

N E

P-

- M

U

LT

I-M

IS

SI

O

N D

R Y

D O

C K

#1

PO

R

TS

M

O U

TH

N

AV

AL

S H

IP

YA

R D

N40085-17-D-5004

N O

T

FO

R C

O N

S

TR

U C

TI

O

N

P R

E L

IM

IN

A

R Y

XX

XX

XX

XX/XX/XX

1604959

GRAPHIC SCALE

5 BURLINGTON WOODS

BURLINGTON, MA 01803

XXX

G101

G

EN

ER

AL

P

LA

N

VOLTAGE REGULATOR BUILDINGS

13.2 KV PAD MOUNTED SWITCHES

GENERATOR LOAD BANKS

LOAD HOUSE TRANSFER ENCLOSURE

1.5 MW GENERATORS

TRANSPORTABLE SUBSTATION

ISO TRANSFORMERS

PIDC

16-OUTLET HOTEL SERVICE (SHORE POWER)

GeoTech

01_20190820_geotech_industry day_excavation_all schemes.pdf
BE101
20190917_IndustryDay_SampleDwgs_STR Precast Float-In Monoliths.pdf
SP201
Sheets
SP201 - PRECAST DRY DOCK MONOLITH TYPE A1 - CONCRETE
SP232
Sheets
SP232 - PRECAST CONCRETE SLAB - TYPE B
MS100 - ASW OVERALL PLAN.pdf
Sheets
MS100 - ASW OVERALL PLAN
M-304 - CENTER WALL TUNNEL SECTIONS.pdf
Sheets
M-304 - CENTER WALL TUNNEL SECTIONS
PSM101 - PUMP STATION - PIPING PLANS.pdf
Sheets
PSM101 - PUMP STATION - PIPING PLANS
PSM-301 - PUMP STATION SECTIONS.pdf
Sheets
PSM-301 - PUMP STATION SECTIONS
UBMP101 - UTILITY BUILDING PIPING PLANS.pdf
Sheets
UBMP101 - UTILITY BUILDING - PIPING PLANS
UBM301 - UTILITY BUILDING SECTIONS.pdf
Sheets
UBM301 - UTILITY BUILDING - SECTIONS
UBM401 - UTILITY BUILDING - ISOMETRICS
UBMP101 - UTILITY BUILDING - PIPING PLANS
UBM401 - UTILITY BUILDING ISOMETRICS.pdf
Sheets
UBM301 - UTILITY BUILDING - SECTIONS
UBM401 - UTILITY BUILDING - ISOMETRICS
UBMP101 - UTILITY BUILDING - PIPING PLANS
20190924_Civilworks IndustryDay_Dwgs.pdf
Sheets and Views
G101 GENERAL PLAN
P-381_Industry_Day_PDFs_Elec_09-25-2019.pdf
DRYD SWTR-1604959-E_jonathan.metzger - Sheet - ES101 - PLAN - DD1N AND CENTERWALL - WEST
Sheets
ES101 - PLAN - DD1N AND CENTERWALL - WEST
ES102 - PLAN - DD1N AND CENTERWALL - EAST
ES103 - PLAN - DD1E - NORTH
ES104 - PLAN - DD1W - WEST
ES111 - ELECTRICAL OVERALL SITE PLAN
DRYD SWTR-1604959-E_jonathan.metzger - Sheet - ES102 - PLAN - DD1N AND CENTERWALL - EAST
Sheets
ES101 - PLAN - DD1N AND CENTERWALL - WEST
ES102 - PLAN - DD1N AND CENTERWALL - EAST
ES103 - PLAN - DD1E - NORTH
ES104 - PLAN - DD1W - WEST
ES111 - ELECTRICAL OVERALL SITE PLAN
DRYD SWTR-1604959-E_jonathan.metzger - Sheet - ES103 - PLAN - DD1E - NORTH
Sheets
ES101 - PLAN - DD1N AND CENTERWALL - WEST
ES102 - PLAN - DD1N AND CENTERWALL - EAST
ES103 - PLAN - DD1E - NORTH
ES104 - PLAN - DD1W - WEST
ES111 - ELECTRICAL OVERALL SITE PLAN
DRYD SWTR-1604959-E_jonathan.metzger - Sheet - ES104 - PLAN - DD1W - WEST
Sheets
ES101 - PLAN - DD1N AND CENTERWALL - WEST
ES102 - PLAN - DD1N AND CENTERWALL - EAST
ES103 - PLAN - DD1E - NORTH
ES104 - PLAN - DD1W - WEST
ES111 - ELECTRICAL OVERALL SITE PLAN
DRYD SWTR-1604959-E_jonathan.metzger - Sheet - ES111 - ELECTRICAL OVERALL SITE PLAN
Sheets
ES101 - PLAN - DD1N AND CENTERWALL - WEST
ES102 - PLAN - DD1N AND CENTERWALL - EAST
ES103 - PLAN - DD1E - NORTH
ES104 - PLAN - DD1W - WEST
ES111 - ELECTRICAL OVERALL SITE PLAN
Mechanical Industry Day Set.pdf
M-304 - CENTER WALL TUNNEL SECTIONS
Sheets
M-304 - CENTER WALL TUNNEL SECTIONS
MS100 - ASW OVERALL PLAN
Sheets
MS100 - ASW OVERALL PLAN
MT100 - HIGH PRESSURE STEAM OVERALL PLAN
MW100 - WHEELER OVERALL PLAN
PA100 - HIGH PRESSURE AIR OVERALL PLAN
PC100 - COMPRESSED AIR OVERALL PLAN
PF100 - FRESH WATER OVERALL PLAN
PN100 - NITROGEN OVERALL PLAN
PP100 - PURE WATER OVERALL PLAN
PR100 - SANITARY SEWER OVERALL PLAN
MT100 - HIGH PRESSURE STEAM OVERALL PLAN
Sheets
MS100 - ASW OVERALL PLAN
MT100 - HIGH PRESSURE STEAM OVERALL PLAN
MW100 - WHEELER OVERALL PLAN
PA100 - HIGH PRESSURE AIR OVERALL PLAN
PC100 - COMPRESSED AIR OVERALL PLAN
PF100 - FRESH WATER OVERALL PLAN
PN100 - NITROGEN OVERALL PLAN
PP100 - PURE WATER OVERALL PLAN
PR100 - SANITARY SEWER OVERALL PLAN
PA100 - HIGH PRESSURE AIR OVERALL PLAN
Sheets
MS100 - ASW OVERALL PLAN
MT100 - HIGH PRESSURE STEAM OVERALL PLAN
MW100 - WHEELER OVERALL PLAN
PA100 - HIGH PRESSURE AIR OVERALL PLAN
PC100 - COMPRESSED AIR OVERALL PLAN
PF100 - FRESH WATER OVERALL PLAN
PN100 - NITROGEN OVERALL PLAN
PP100 - PURE WATER OVERALL PLAN
PR100 - SANITARY SEWER OVERALL PLAN
PC100 - COMPRESSED AIR OVERALL PLAN
Sheets
MS100 - ASW OVERALL PLAN
MT100 - HIGH PRESSURE STEAM OVERALL PLAN
MW100 - WHEELER OVERALL PLAN
PA100 - HIGH PRESSURE AIR OVERALL PLAN
PC100 - COMPRESSED AIR OVERALL PLAN
PF100 - FRESH WATER OVERALL PLAN
PN100 - NITROGEN OVERALL PLAN
PP100 - PURE WATER OVERALL PLAN
PR100 - SANITARY SEWER OVERALL PLAN
PF100 - FRESH WATER OVERALL PLAN
Sheets
MS100 - ASW OVERALL PLAN
MT100 - HIGH PRESSURE STEAM OVERALL PLAN
MW100 - WHEELER OVERALL PLAN
PA100 - HIGH PRESSURE AIR OVERALL PLAN
PC100 - COMPRESSED AIR OVERALL PLAN
PF100 - FRESH WATER OVERALL PLAN
PN100 - NITROGEN OVERALL PLAN
PP100 - PURE WATER OVERALL PLAN
PR100 - SANITARY SEWER OVERALL PLAN
PN100 - NITROGEN OVERALL PLAN
Sheets
MS100 - ASW OVERALL PLAN
MT100 - HIGH PRESSURE STEAM OVERALL PLAN
MW100 - WHEELER OVERALL PLAN
PA100 - HIGH PRESSURE AIR OVERALL PLAN
PC100 - COMPRESSED AIR OVERALL PLAN
PF100 - FRESH WATER OVERALL PLAN
PN100 - NITROGEN OVERALL PLAN
PP100 - PURE WATER OVERALL PLAN
PR100 - SANITARY SEWER OVERALL PLAN
PP100 - PURE WATER OVERALL PLAN
Sheets
MS100 - ASW OVERALL PLAN
MT100 - HIGH PRESSURE STEAM OVERALL PLAN
MW100 - WHEELER OVERALL PLAN
PA100 - HIGH PRESSURE AIR OVERALL PLAN
PC100 - COMPRESSED AIR OVERALL PLAN
PF100 - FRESH WATER OVERALL PLAN
PN100 - NITROGEN OVERALL PLAN
PP100 - PURE WATER OVERALL PLAN
PR100 - SANITARY SEWER OVERALL PLAN
PR100 - SANITARY SEWER OVERALL PLAN
Sheets
MS100 - ASW OVERALL PLAN
MT100 - HIGH PRESSURE STEAM OVERALL PLAN
MW100 - WHEELER OVERALL PLAN
PA100 - HIGH PRESSURE AIR OVERALL PLAN
PC100 - COMPRESSED AIR OVERALL PLAN
PF100 - FRESH WATER OVERALL PLAN
PN100 - NITROGEN OVERALL PLAN
PP100 - PURE WATER OVERALL PLAN
PR100 - SANITARY SEWER OVERALL PLAN
PSM101 - PUMP STATION - PIPING PLANS
Sheets
PSM101 - PUMP STATION - PIPING PLANS
PSM-301 - PUMP STATION SECTIONS
Sheets
PSM-301 - PUMP STATION SECTIONS
UBM301 - UTILITY BUILDING SECTIONS
Sheets
UBM301 - UTILITY BUILDING - SECTIONS
UBM401 - UTILITY BUILDING - ISOMETRICS
UBMP101 - UTILITY BUILDING - PIPING PLANS
UBM401 - UTILITY BUILDING ISOMETRICS
Sheets
UBM301 - UTILITY BUILDING - SECTIONS
UBM401 - UTILITY BUILDING - ISOMETRICS
UBMP101 - UTILITY BUILDING - PIPING PLANS
UBMP101 - UTILITY BUILDING PIPING PLANS
Sheets
UBMP101 - UTILITY BUILDING - PIPING PLANS
SW202.pdf
Sheets
SW202 - CONNECTION TO EXISTING PUMPWELL - CONCRETE - PLANS SHEET 2 OF 3
SW203.pdf
Sheets
SW203 - CONNECTION TO EXISTING PUMPWELL - CONCRETE - PLANS SHEET 3 OF 3
SW202.pdf
Sheets
SW202 - CONNECTION TO EXISTING PUMPWELL - CONCRETE - PLANS SHEET 2 OF 3
SW202.pdf
Sheets
SW202 - CONNECTION TO EXISTING PUMPWELL - CONCRETE - PLANS SHEET 2 OF 3
SW203.pdf
Sheets
SW203 - CONNECTION TO EXISTING PUMPWELL - CONCRETE - PLANS SHEET 3 OF 3

File details come from the government source that posted it. Updated .