This document contains plans and drawings related to a federal construction project. The project involves Industry Day activities for the Multi-Mission Dry Dock #1 project at the Portsmouth Naval Shipyard in Kittery, Maine under solicitation number N4008520R0021. The plans and drawings provide details for precast concrete structures, utility buildings, piping, electrical systems, and other aspects of the dry dock construction. Agencies involved include the Department of the Navy and Naval Facilities Engineering Command. The Industry Day activities are intended to inform potential contractors regarding requirements for the dry dock construction project.
Drawings Part 5
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Utility Building
| 20190917_IndustryDay_SampleDwgs_STR Precast Float-In Monoliths.pdf |
| SP201 |
| Sheets |
| SP201 - PRECAST DRY DOCK MONOLITH TYPE A1 - CONCRETE |
| SP232 |
| Sheets |
| SP232 - PRECAST CONCRETE SLAB - TYPE B |
| MS100 - ASW OVERALL PLAN.pdf |
| Sheets |
| MS100 - ASW OVERALL PLAN |
| M-304 - CENTER WALL TUNNEL SECTIONS.pdf |
| Sheets |
| M-304 - CENTER WALL TUNNEL SECTIONS |
| PSM101 - PUMP STATION - PIPING PLANS.pdf |
| Sheets |
| PSM101 - PUMP STATION - PIPING PLANS |
| PSM-301 - PUMP STATION SECTIONS.pdf |
| Sheets |
| PSM-301 - PUMP STATION SECTIONS |
| UBMP101 - UTILITY BUILDING PIPING PLANS.pdf |
| Sheets |
| UBMP101 - UTILITY BUILDING - PIPING PLANS |
| UBM301 - UTILITY BUILDING SECTIONS.pdf |
| Sheets |
| UBM301 - UTILITY BUILDING - SECTIONS |
| UBM401 - UTILITY BUILDING - ISOMETRICS |
| UBMP101 - UTILITY BUILDING - PIPING PLANS |
| UBM401 - UTILITY BUILDING ISOMETRICS.pdf |
| Sheets |
| UBM301 - UTILITY BUILDING - SECTIONS |
| UBM401 - UTILITY BUILDING - ISOMETRICS |
| UBMP101 - UTILITY BUILDING - PIPING PLANS |
| P-381_Industry_Day_PDFs_Elec_09-25-2019.pdf |
| DRYD SWTR-1604959-E_jonathan.metzger - Sheet - ES101 - PLAN - DD1N AND CENTERWALL - WEST |
| Sheets |
| ES101 - PLAN - DD1N AND CENTERWALL - WEST |
| ES102 - PLAN - DD1N AND CENTERWALL - EAST |
| ES103 - PLAN - DD1E - NORTH |
| ES104 - PLAN - DD1W - WEST |
| ES111 - ELECTRICAL OVERALL SITE PLAN |
| DRYD SWTR-1604959-E_jonathan.metzger - Sheet - ES102 - PLAN - DD1N AND CENTERWALL - EAST |
| Sheets |
| ES101 - PLAN - DD1N AND CENTERWALL - WEST |
| ES102 - PLAN - DD1N AND CENTERWALL - EAST |
| ES103 - PLAN - DD1E - NORTH |
| ES104 - PLAN - DD1W - WEST |
| ES111 - ELECTRICAL OVERALL SITE PLAN |
| DRYD SWTR-1604959-E_jonathan.metzger - Sheet - ES103 - PLAN - DD1E - NORTH |
| Sheets |
| ES101 - PLAN - DD1N AND CENTERWALL - WEST |
| ES102 - PLAN - DD1N AND CENTERWALL - EAST |
| ES103 - PLAN - DD1E - NORTH |
| ES104 - PLAN - DD1W - WEST |
| ES111 - ELECTRICAL OVERALL SITE PLAN |
| DRYD SWTR-1604959-E_jonathan.metzger - Sheet - ES104 - PLAN - DD1W - WEST |
| Sheets |
| ES101 - PLAN - DD1N AND CENTERWALL - WEST |
| ES102 - PLAN - DD1N AND CENTERWALL - EAST |
| ES103 - PLAN - DD1E - NORTH |
| ES104 - PLAN - DD1W - WEST |
| ES111 - ELECTRICAL OVERALL SITE PLAN |
| DRYD SWTR-1604959-E_jonathan.metzger - Sheet - ES111 - ELECTRICAL OVERALL SITE PLAN |
| Sheets |
| ES101 - PLAN - DD1N AND CENTERWALL - WEST |
| ES102 - PLAN - DD1N AND CENTERWALL - EAST |
| ES103 - PLAN - DD1E - NORTH |
| ES104 - PLAN - DD1W - WEST |
| ES111 - ELECTRICAL OVERALL SITE PLAN |
| Mechanical Industry Day Set.pdf |
| M-304 - CENTER WALL TUNNEL SECTIONS |
| Sheets |
| M-304 - CENTER WALL TUNNEL SECTIONS |
| MS100 - ASW OVERALL PLAN |
| Sheets |
| MS100 - ASW OVERALL PLAN |
| MT100 - HIGH PRESSURE STEAM OVERALL PLAN |
| MW100 - WHEELER OVERALL PLAN |
| PA100 - HIGH PRESSURE AIR OVERALL PLAN |
| PC100 - COMPRESSED AIR OVERALL PLAN |
| PF100 - FRESH WATER OVERALL PLAN |
| PN100 - NITROGEN OVERALL PLAN |
| PP100 - PURE WATER OVERALL PLAN |
| PR100 - SANITARY SEWER OVERALL PLAN |
| MT100 - HIGH PRESSURE STEAM OVERALL PLAN |
| Sheets |
| MS100 - ASW OVERALL PLAN |
| MT100 - HIGH PRESSURE STEAM OVERALL PLAN |
| MW100 - WHEELER OVERALL PLAN |
| PA100 - HIGH PRESSURE AIR OVERALL PLAN |
| PC100 - COMPRESSED AIR OVERALL PLAN |
| PF100 - FRESH WATER OVERALL PLAN |
| PN100 - NITROGEN OVERALL PLAN |
| PP100 - PURE WATER OVERALL PLAN |
| PR100 - SANITARY SEWER OVERALL PLAN |
| PA100 - HIGH PRESSURE AIR OVERALL PLAN |
| Sheets |
| MS100 - ASW OVERALL PLAN |
| MT100 - HIGH PRESSURE STEAM OVERALL PLAN |
| MW100 - WHEELER OVERALL PLAN |
| PA100 - HIGH PRESSURE AIR OVERALL PLAN |
| PC100 - COMPRESSED AIR OVERALL PLAN |
| PF100 - FRESH WATER OVERALL PLAN |
| PN100 - NITROGEN OVERALL PLAN |
| PP100 - PURE WATER OVERALL PLAN |
| PR100 - SANITARY SEWER OVERALL PLAN |
| PC100 - COMPRESSED AIR OVERALL PLAN |
| Sheets |
| MS100 - ASW OVERALL PLAN |
| MT100 - HIGH PRESSURE STEAM OVERALL PLAN |
| MW100 - WHEELER OVERALL PLAN |
| PA100 - HIGH PRESSURE AIR OVERALL PLAN |
| PC100 - COMPRESSED AIR OVERALL PLAN |
| PF100 - FRESH WATER OVERALL PLAN |
| PN100 - NITROGEN OVERALL PLAN |
| PP100 - PURE WATER OVERALL PLAN |
| PR100 - SANITARY SEWER OVERALL PLAN |
| PF100 - FRESH WATER OVERALL PLAN |
| Sheets |
| MS100 - ASW OVERALL PLAN |
| MT100 - HIGH PRESSURE STEAM OVERALL PLAN |
| MW100 - WHEELER OVERALL PLAN |
| PA100 - HIGH PRESSURE AIR OVERALL PLAN |
| PC100 - COMPRESSED AIR OVERALL PLAN |
| PF100 - FRESH WATER OVERALL PLAN |
| PN100 - NITROGEN OVERALL PLAN |
| PP100 - PURE WATER OVERALL PLAN |
| PR100 - SANITARY SEWER OVERALL PLAN |
| PN100 - NITROGEN OVERALL PLAN |
| Sheets |
| MS100 - ASW OVERALL PLAN |
| MT100 - HIGH PRESSURE STEAM OVERALL PLAN |
| MW100 - WHEELER OVERALL PLAN |
| PA100 - HIGH PRESSURE AIR OVERALL PLAN |
| PC100 - COMPRESSED AIR OVERALL PLAN |
| PF100 - FRESH WATER OVERALL PLAN |
| PN100 - NITROGEN OVERALL PLAN |
| PP100 - PURE WATER OVERALL PLAN |
| PR100 - SANITARY SEWER OVERALL PLAN |
| PP100 - PURE WATER OVERALL PLAN |
| Sheets |
| MS100 - ASW OVERALL PLAN |
| MT100 - HIGH PRESSURE STEAM OVERALL PLAN |
| MW100 - WHEELER OVERALL PLAN |
| PA100 - HIGH PRESSURE AIR OVERALL PLAN |
| PC100 - COMPRESSED AIR OVERALL PLAN |
| PF100 - FRESH WATER OVERALL PLAN |
| PN100 - NITROGEN OVERALL PLAN |
| PP100 - PURE WATER OVERALL PLAN |
| PR100 - SANITARY SEWER OVERALL PLAN |
| PR100 - SANITARY SEWER OVERALL PLAN |
| Sheets |
| MS100 - ASW OVERALL PLAN |
| MT100 - HIGH PRESSURE STEAM OVERALL PLAN |
| MW100 - WHEELER OVERALL PLAN |
| PA100 - HIGH PRESSURE AIR OVERALL PLAN |
| PC100 - COMPRESSED AIR OVERALL PLAN |
| PF100 - FRESH WATER OVERALL PLAN |
| PN100 - NITROGEN OVERALL PLAN |
| PP100 - PURE WATER OVERALL PLAN |
| PR100 - SANITARY SEWER OVERALL PLAN |
| PSM101 - PUMP STATION - PIPING PLANS |
| Sheets |
| PSM101 - PUMP STATION - PIPING PLANS |
| PSM-301 - PUMP STATION SECTIONS |
| Sheets |
| PSM-301 - PUMP STATION SECTIONS |
| UBM301 - UTILITY BUILDING SECTIONS |
| Sheets |
| UBM301 - UTILITY BUILDING - SECTIONS |
| UBM401 - UTILITY BUILDING - ISOMETRICS |
| UBMP101 - UTILITY BUILDING - PIPING PLANS |
| UBM401 - UTILITY BUILDING ISOMETRICS |
| Sheets |
| UBM301 - UTILITY BUILDING - SECTIONS |
| UBM401 - UTILITY BUILDING - ISOMETRICS |
| UBMP101 - UTILITY BUILDING - PIPING PLANS |
| UBMP101 - UTILITY BUILDING PIPING PLANS |
| Sheets |
| UBMP101 - UTILITY BUILDING - PIPING PLANS |
| SW202.pdf |
| Sheets |
| SW202 - CONNECTION TO EXISTING PUMPWELL - CONCRETE - PLANS SHEET 2 OF 3 |
| SW203.pdf |
| Sheets |
| SW203 - CONNECTION TO EXISTING PUMPWELL - CONCRETE - PLANS SHEET 3 OF 3 |
| SW202.pdf |
| Sheets |
| SW202 - CONNECTION TO EXISTING PUMPWELL - CONCRETE - PLANS SHEET 2 OF 3 |
| SW202.pdf |
| Sheets |
| SW202 - CONNECTION TO EXISTING PUMPWELL - CONCRETE - PLANS SHEET 2 OF 3 |
| SW203.pdf |
| Sheets |
| SW203 - CONNECTION TO EXISTING PUMPWELL - CONCRETE - PLANS SHEET 3 OF 3 |