This flyer announces an industry day webinar for a military construction project to fabricate and install two new caisson gates at the Multi-Mission Dry Dock #1 at the Portsmouth Naval Shipyard in Kittery, Maine. The Naval Facilities Engineering Command is seeking contractors experienced with steel caisson gates and structures to participate in the webinar on August 11, 2020 to receive project updates, ask questions, and provide feedback. The project scope involves caisson fabrication including pumps, valves, piping, controls, lighting, electrical connections and testing prior to delivery and installation. The estimated cost range is $25-100 million and anticipated award will be in the second or third quarter of fiscal year 2021. Contractors are invited to pre-register for the webinar and individual breakout sessions by August 6, 2020 and submit any questions or comments by email to the specified contracting specialist.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Caisson Industry Day for FY21 MILCON

P-381 – Multi-Mission Dry Dock #1

Portsmouth Naval Shipyard, Kittery, ME

When: Tuesday, August 11, 2020 0900-1030 EST

Where: Webinar Event, details to be provided upon registration.

Who: Shipyards and other marine/industrial contractors (general and specialty) with appropriate experience with construction repair, and/or modification to relocatable steel caisson gates/structures, including those designed to retain tidally-influenced water.

What: Naval Facilities Engineering Command (NAVFAC) invites contractors to receive updates and learn, ask questions, and provide feedback—in both group and one-on-one settings—regarding the proposed Military

Construction Project (MILCON) located at the Portsmouth Naval Shipyard in Kittery, ME. NAVFAC is currently developing the design of the project for FY21 execution, in support of NAVSEA’s submarine maintenance mission at Dry Dock #1.

Project Description: The fabrication, delivery, and installation support of two new caisson gates to be supplied as part of the MILCON P-381 Multi-Mission Dry Dock #1 project.

Project Scope: Construction methods that will be required as part of this project include:

Steel caisson fabrication including installation of pumps, valves, piping, controls, lighting and electrical service, shore power connections, heating, ventilation, and humidity control.

Builder’s trials to test the caissons prior to delivery.

Delivery and testing of the caisson at the Portsmouth Naval Shipyard.

Project Cost Range: $25M - $100M Anticipated Project Award: Q2/Q3 FY21

Caisson Industry Day for FY21 MILCON

P-381 – Multi-Mission Dry Dock #1

Portsmouth Naval Shipyard, Kittery, ME

Webinar Agenda (Pre-registration required):

0900 - 0905 General Introductions

0905 - 0915 Opening Remarks

0915 - 1000 Project Presentation

1000 - 1030 Question and Answer

Individual Contractor Breakout Sessions (Pre-registration required):

45-minute one-on-one sessions available after 1300 on 11 August 2020 and 12 August 2020.

Contractors are invited to participate in one-on-one telecoms with the NAVFAC/Stantec design team to provide feedback on the project.

Contractor can designate discussions as confidential as desired.

Slots available on first-come, first-served basis.

Comment Submission:

Contractors are invited to submit questions and/or comments via email to Brittany Cristelli, Contract

Specialist, at Brittany.Cristelli@Navy.mil.

The comment period will close 15 days after the Industry Day.

The webinar interface will allow contractors to ask questions throughout the webinar with responses provided to all participants at the end of the webinar event.

All webinar questions and responses will be posted publicly via the beta.SAM website.

Other Pertinent Information:

Caisson drawings will be provided at a later date via a beta.SAM posting to facilitate advance contractor review and preparation for the Industry Day.

Registration Information:

Pre-registration for both the webinar event and breakout sessions are required. Provide company name, physical address, email address(es), POC, and telephone number(s) to Brittany Cristelli

(Brittany.Cristelli@Navy.mil), Contract Specialist, no later than 6 August 2020.

mailto:Brittany.Cristelli@Navy.mil mailto:Brittany.Cristelli@Navy.mil

File details come from the government source that posted it. Updated .