Attachment_E_SB_Part_Commit_Strat.pdf

PDF 236 KB Posted

Attached to
Hurricane Florence Recovery MILCON Package 4
Solicitation number
N4008519R9254
Issued by

About this file

This federal solicitation is seeking proposals for Hurricane Florence Recovery MILCON Package 4 at Marine Corps Base Camp Lejeune in North Carolina. The package includes two military construction projects: constructing a moveable bridge across the Intracoastal Waterway including new approach roads, bridge abutments, guardrail, lighting, asphalt pavement, and demolition of an existing bridge; and replacing a 2,500 linear foot railroad trestle and a 60 linear foot railroad trestle including new trestles, bridge abutments, track ballast, railroad ties, and earthwork and grading. Proposals are due by 7 October 2019 and the contract is anticipated to be awarded by 20 July 2020 for a period of 1,826 calendar days. The solicitation will utilize a two-phase evaluation including technical, past performance, and price factors to select the best value proposal. The NAICS code for this procurement is 237310 and the size standard is $39.5 million.

Attachment E - Small Business Participation Commitment Strategy

View the file

Other files

File Type Posted
Amendment 0017.pdf PDF
Amendment 0016.pdf PDF
TFF Package 4 Price Proposal updated 4-14-20.pdf PDF
Queens Creek Bridge - Pre Demo HAZMAT Survey.pdf PDF
Onslow Beach Bridge - Pre Demo HAZMAT Survey.pdf PDF
White Oak Bridge - Pre Demo HAZMAT Survey.pdf PDF
Amendment 0015.pdf PDF
Amendment 0014.pdf PDF
Amendment 0013.pdf PDF
Updated Attachment H.pdf PDF
Amendment 0012.pdf PDF
Site Visit Log.pdf PDF
Amendment 0011.pdf PDF
CADD FILES ONSLOW AND TRESTLES.zip ZIP file
Amendment_0010.pdf PDF
Amendment_0009.pdf PDF
Site Visit Waiver.pdf PDF
Site Visit Waiver.pdf PDF
Amendment_0008 PDF
Attachment I Price Proposal Form.pdf PDF
Amendment 0007.pdf PDF
Amendment_0006.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
One_Day_Pass_Request.xls XLS spreadsheet
Amendment_0002.pdf PDF
Attachment_C_Con_Des_Exp_Proj_Data__Standard.pdf PDF
Amendment_0001.pdf PDF
Attachment_B_SECNAV_5512.pdf PDF
N4008519R9254.pdf PDF
Attachment_G_Sub_Plan.pdf PDF
Attachment_F_PPQ.pdf PDF
Attachment_C_Con_Des_Exp_Proj_Data__Standard.pdf PDF
Attachment_H_Proposed_Project_Durations.pdf PDF
Attachment_D_SB_Subcontracting_Record.pdf PDF
Attachment_A_-_PPI_Inquiry_Log.xls XLS spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCE SELECTION SENSITIVE INFORMATION

DISCLOSURE LIMITATIONS AS OUTLINED IN FAR 2.101 & 3.104 APPLY

ATTACHMENT E

SMALL BUSINESS PARTICIPATION AND COMMITMENT STRATEGY

(OFFEROR’S NAME)

(ADDRESS)

Solicitation or Contract Number (Title of the Project)

(Location) (Date Prepared)

INSERT INTRODUCTION/EXECUTIVE SUMMARY (Up to 2 pages maximum)

SMALL BUSINESS PARTICIPATION AND COMMITMENT STRATEGY – (Base and Option Years)

1. Estimated value of all planned subcontracting $________________ ____% of contract

2. Estimated value of all work to be self-performed $________________ ____% of contract

3. Total value of the proposal (sum of 1. and 2. above) $________________ 100% of contract

4. Subcontracts for products and services to be awarded under this project.

a. Self-Performed Work:

TYPE OF SERVICE/PRODUCT $ VALUE OF WORK

TOTAL: $________________

PERCENTAGE OF CONTRACT VALUE (line 3) ________________%

If the offeror is a small business, the Government will add self-performed work to the appropriate category(ies) in c. (1) through c. (6) below to calculate overall small business participation rates.

b. Other Than Small (OTS) Business Subcontracts**

NAME OF COMPANY* TYPE OF SERVICE/PRODUCT $ VALUE OF SUBCONTRACT

PERCENTAGE OF CONTRACT VALUE (line 3) ________________%

c. Small Business (SB) Subcontracts

PERCENTAGE OF CONTRACT VALUE (line 3) ______________%

(1) SMALL DISADVANTAGED BUSINESSES: (SDB)

(2) WOMEN-OWNED SMALL BUSINESSES: (WOSB)

TOTAL: $_______________

(3) HISTORICALLY UNDERUTILIZED BUSINESS ZONE (HUBZone) CONCERN:

NAME OF COMPANY* TYPE OF SERVICES $ VALUE OF SUBCONTRACT

(4) VETERAN OWNED SMALL BUSINESS: (VOSB)

(5) SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS: (SDVOSB)

(6) ABILITYONE PROGRAM ORGANIZATIONS

NAME OF ORG* TYPE OF SERVICES $ VALUE OF SUBCONTRACT

* For each company/organization listed, describe the nature of commitment to subcontract and whether or not it is legally binding. If unknown/to be determined, so indicate.

** Include any subcontracts to Historically Black Colleges and Universities/Minority Institutions

(HBCU/MI) in the OTS Business listing.

NOTES:

1. The dollar sum of lines 4.b and 4.c (excluding (1)-(6)) must equal line 1.

2. Lines 4.c. (1) through 4.c. (6) identify various subcategories of small businesses.

Subcontracts to companies that qualify in multiple categories must be reported under each category. For example: A $100,000 subcontract to ABC, a woman-owned, small disadvantaged business that is also a certified HUBZone concern, will be reported as $100,000 on line 4.c., SB, line 4.c. (1), SDB, line 4.c. (2), WOSB and line 4.c.(3), HUBZone concern.

3. Subcontracts to qualified nonprofit agencies participating in the AbilityOne Program are considered small business subcontracts for the purposes of this strategy and any associated small business subcontracting plan.

INSERT SUPPLEMENTAL NARRATIVES (limited to five pages) TO ADDRESS JOINT VENTURE

PARTICULARS AND OTHER STRATEGY ELEMENTS SUCH AS THE NATURE OF

COMMITMENTS/AGREEMENTS COVERING POST AWARD ROLES, SPECIFIC INITIATIVES AND TOOLS

TO ENHANCE SMALL BUSINESS PARTICIPATION AND CAPABILITIES AND HOW SMALL BUSINESS

PARTICIPATION RATES WERE DETERMINED.

CONTRACT LEVEL PERFORMANCE SUMMARY

This document summarizes participation (total contract performance, including self performance and subcontracted efforts) by type of business entity in terms of both dollar value and percentage of total contract value.

Base Option 1 Option 2 TOTAL

DOLLARS

Total contract value $ $ $ $

OTS Business* $ $ $ $

SB* $ $ $ $

SDB $ $ $ $

WOSB $ $ $ $

HUBZone SB $ $ $ $

VOSB $ $ $ $

SDVOSB

ABILITYONE $ $ $ $

PERCENTAGES

(of total contract value)

OTS Business* % % % %

SB* % % % %

OTSB + SB 100 % 100 % 100 % 100 %

SDB % % % %

WOSB % % % %

HUBZone SB % % % %

VOSB % % % %

SDVOSB % % % %

ABILITYONE % % % %

Include additional option years if applicable

* The sums of the “OTS Business” and “SB” dollars lines (excluding subcategories) must equal the associated dollar values on the “Total dollar value of this contract” line. The sum of “OTS Business” and “SB” percentage lines (again, excluding subcategories) must equal 100% and represent all work to be performed under the contract.

Attachments Master

File details come from the government source that posted it. Updated .