This document provides details on a federal solicitation for Hurricane Florence recovery construction work. The Naval Facilities Engineering Command seeks to award a firm-fixed price design-build contract to replace two bridges and a railroad trestle damaged at Marine Corps Base Camp Lejeune during Hurricane Florence. The work includes a movable bridge over the Intracoastal Waterway, replacement of a 2,500 foot White Oak River trestle and 60 foot Queens Creek trestle, and associated approach roads, abutments, lighting and demolition. The period of performance is 1,826 calendar days. The solicitation will utilize a two-phase evaluation including technical, past performance and price factors, with technical factors combined being equal in importance to past performance and all non-price factors combined significantly outweighing price. The anticipated award date is 20 July 2020.

Amendment 0003

View the file

Other files

File Type Posted
Amendment 0017.pdf PDF
Amendment 0016.pdf PDF
TFF Package 4 Price Proposal updated 4-14-20.pdf PDF
Queens Creek Bridge - Pre Demo HAZMAT Survey.pdf PDF
Onslow Beach Bridge - Pre Demo HAZMAT Survey.pdf PDF
White Oak Bridge - Pre Demo HAZMAT Survey.pdf PDF
Amendment 0015.pdf PDF
Amendment 0014.pdf PDF
Amendment 0013.pdf PDF
Updated Attachment H.pdf PDF
Amendment 0012.pdf PDF
Site Visit Log.pdf PDF
Amendment 0011.pdf PDF
CADD FILES ONSLOW AND TRESTLES.zip ZIP file
Amendment_0010.pdf PDF
Amendment_0009.pdf PDF
Site Visit Waiver.pdf PDF
Site Visit Waiver.pdf PDF
Amendment_0008 PDF
Attachment I Price Proposal Form.pdf PDF
Amendment 0007.pdf PDF
Amendment_0006.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
One_Day_Pass_Request.xls XLS spreadsheet
Amendment_0002.pdf PDF
Attachment_C_Con_Des_Exp_Proj_Data__Standard.pdf PDF
Amendment_0001.pdf PDF
Attachment_B_SECNAV_5512.pdf PDF
N4008519R9254.pdf PDF
Attachment_G_Sub_Plan.pdf PDF
Attachment_F_PPQ.pdf PDF
Attachment_C_Con_Des_Exp_Proj_Data__Standard.pdf PDF
Attachment_E_SB_Part_Commit_Strat.pdf PDF
Attachment_H_Proposed_Project_Durations.pdf PDF
Attachment_D_SB_Subcontracting_Record.pdf PDF
Attachment_A_-_PPI_Inquiry_Log.xls XLS spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N40085-19-R-9254 DESIGN-BUILD (DB) HURRICANE FLORENCE RECOVERY MILCON PACKAGE 4, HURRICANE FLORENCE RECOVERY

BRIDGES AT MARINE CORPS BASE (MCB) CAMP LEJEUNE, NORTH CAROLINA

The purpose of this amendment is to provide responses to PPIs and provide updates to RFP Section 00 21 16. See SF 30 Block 14 Continuation Page.

The proposal due date of 08 November 2019 remains unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Oct-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519R9254

X 9B. DATED (SEE ITEM 11)

09-Oct-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Oct-2019

CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008519R9254

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0003

1. Provides PPI responses 1-45.

2. Revises the following in the RFP, Section 00 21 16 - Instructions to Proposers, 3. Evaluation

Factors for Award:

- 3. Basis of Evaluation and Submittal Requirements for Each Factor, B. Non-Price Factors, Changes Proposal copies from eight to nine and font size from 12pt to 10pt

- Factor 1 – Technical Approach, (i) Solicitation Submittal Requirements: (3) Adds language for

Bonding Capacity Requirements

- Factor 2 – Experience, (a) Solicitation Submittal Requirements, (2) Design Experience, Adds language for DOR: Within the five projects, the minimum experience requirement for the factor shall be met by the proposed DOR(s). However, design subcontractors’ projects may also be submitted within the five project maximum but must also meet the size, scope and complexity requirements.

- Factor 2 – Experience, (b) Basis of Evaluation, Removed additional consideration for: Relevant projects that demonstrate experience with construction sequencing to allow rail operations to remain in service periodically may be considered more favorably than those that do not.

- Factor 3 Past Performance, Changes language to read regarding PPQ submittals: Offerors are permitted to submit copies of previously completed PPQs. However, Offerors shall not incorporate previously submitted PPQs submitted for other RFPs by reference into their proposal;

but this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

- Factor 5 Project Management Approach, (a) Solicitation Submittal Requirements, (2) Maintaining Rail Operations, Removed language: while periodically maintaining rail operations.

- Factor 5 Project Management Approach, (a) Solicitation Submittal Requirements, (4) Schedule, Changed language to say structures instead of building.

- Factor 5 Project Management Approach, Basis of Evaluation, (4) Schedule, Revises language from “within 1,461 days” to read “A schedule that phases individual building completion dates within the package so the Government can take beneficial occupancy earlier than the 1,461 days overall completion date may be considered more favorably.

(End of Summary of Changes)