This notice announces a proposed firm-fixed price design-build construction services contract for Hurricane Florence Recovery MILCON Package 4 at Marine Corps Base Camp Lejeune in North Carolina. The package includes two projects: Onslow Beach Bridge Replacement and Railroad Trestle Replacement. The contract completion time is 1,826 calendar days after award by 20 July 2020. This two-phase solicitation will evaluate technical, past performance, safety, project management, and small business factors, with price to be considered in phase two. The Naval Facilities Engineering Command Mid-Atlantic office issued this as an unrestricted full and open competition solicitation, with a North American Industry Classification System code of 237310 and small business size standard of $39.5 million.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See SF 30 Block 14 Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 19
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Mar-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519R9254
X 9B. DATED (SEE ITEM 11)
09-Oct-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Mar-2020
CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008519R9254
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0013
DESIGN-BUILD (DB) HURRICANE FLORENCE RECOVERY MILCON PACKAGE 4, BRIDGES AT
MARINE CORPS BASE (MCB) CAMP LEJEUNE, NORTH CAROLINA
SEE SF30 BLOCK 14 CONTINUATION SHEET.
AMENDMENT 0013
The purpose of this amendment is to provide the following:
1. Provide updated Design to Budget language.
2. Provide updates to Instructions to Offerors.
3. Provide responses to PPIs
1. The Design to Budget language issued in Amendment 0011 is replaced with the following:
Design-To Budget for Package 4.
The following Estimated Costs of Construction for each Project in the Package are as follows and are provided for informational purposes and are not hard ceilings.
Project Project Title Design-To-Budget P1387F Onslow Beach Bridge Replacement $71.2M P1505F Railroad Trestle Replacement $53.8M
Package 4 Total $124.9M
2. The Instructions to Offerors section of the RFP has been revised, as shown on the following pages.
01 30 00.05 20 ADMINISTRATIVE REQUIREMENTS FOR DESIGN BUILD
1.6 AMERICAN PREFERENCE POLICY
Delete this paragraph in its entirety.
01 14 00.05 20 WORK RESTRICTIONS
1.3.4.1 Location of Underground Utilities
Add “ e. It is mandatory that the Contractor also contact Public Works Outside Plumbing (910-451-7190) prior to accomplishing any digging at Camp Lejeune, to ensure that all buried water and sanitary lines are identified.“
Part 3B H10 Waterfront Structures (Bridge) H1070 Railroad track Tie Maintenance In the first sentence, delete “deteriorated” and replace with “defective”.
At end of the paragraph add “Each 39 foot segment of rail shall have a minimum of eight non-defective ties.
Inspection and marking of ties to be replaced shall follow the guidelines set forth in FRA Track Safety Standards 213.109.”
Part 4B H10 Waterfront Structures (Bridge) H1070 Railroad Track Tie maintenance
1.1 Design Requirements
In the first sentence, delete “deteriorated” and replace with “defective”.
At end of the paragraph add “Each 39 foot segment of rail shall have a minimum of eight non-defective ties.
Inspection and marking of ties to be replaced shall follow the guidelines set forth in FRA Track Safety Standards 213.109.”
Part 3A
H15 MOVEABLE SPAN
H1530 MOVEABLE SPAN ELECTRICAL
Navigation lighting:
After the first paragraph, add “Use Federal Aviation Administration (FAA) approved dual lighting with red/medium-intensity flashing white light systems.
This system includes red lights (L-864) (20-40 FPM) for nighttime and medium-intensity, flashing white lights (L-
865) (40 FPM) for daytime and twilight use.
They should be placed on each side of the leaf (seen from all directions) so that when it is raised they are at the highest portion, or edge of leaf/bridge.
Specific direction and guidance may be found in FAA Advisory Circular 70/7460-1L CHG 2, special attention to paragraph 5.8 and appendix A-25.
Pilots using NVGs are often unable to acquire red-colored LED obstruction lights, however the bridge/leaf itself will be easily visible to pilots using NVGs due to the abundant light nearby. Typically, as seen in Paragraph 5.2, note on Infrared Specifications for Aviation of the FAA Advisory Circular 70/7460-1L CHG 2 should be taken into account if LED lights are to used.
Must obtain prior approval of the lighting installation from the Commander of the District Office of the U.S. Coast Guard to avoid interference with marine navigation.
Prior to testing & operation of new bascule bridge, a one-time published NOTAM will be required Contact Contracting Officer 21-days in advance so NOTAM can be prepared Contracting Officer shall coordinate with Paul Stenger, MCIEAST G-3/5 Plans, 910-449-9790, paul.stenger@usmc.mil”
SECTION 01 35 13 SPECIAL PROJECT PROCEDURES
Add “3.1.10 Crane Requirements
1) A flag must be place on top of the crane in accordance with FAA Advisory Circular 70/7460-IL CHG 2 chapter
3.5.2. Minimum Size. Each side of the flag marker should be at least 2 feet (0.6 m) in length.
Color Patterns: Flags should be colored as follows:
Solid, aviation orange.
Orange and White, arrange two triangular sections, one aviation orange and the other white to form a rectangle.
Checkerboard, flags 3 feet (0.9 m) or larger should be a checkerboard pattern of aviation orange and white squares, each 1 foot (0.3 m) plus or minus 10 percent.
Shape, flags should be rectangular in shape and have stiffeners to keep them from drooping in calm wind.
2) The crane must be lighted in accordance with FAA Advisory Circular 70/7460-IL CHG 2 Chapter 5.2. Flashing (L-810) light installed as close to the top of the crane as feasible.
3) The crane may only be raised from sunrise to sunset.
4) The crane operator must contact MCB Camp Lejeune Range Control and request permission to raise the crane each day in use.
5) The crane operator must contact MCB Camp Lejeune Range Control to report when the crane has been lowered each day.
6) MCB Camp Lejeune will coordinate with New River Base Operations requesting NOTAM to announce the crane’s location and max height for the duration of the crane’s operation.
7) Prior to erecting crane, a one-time published NOTAM will be required Contact Contracting Officer 21-days in advance so NOTAM can be prepared Contracting Officer shall coordinate with Paul Stenger, MCIEAST G-3/5 Plans, 910-449-9790, paul.stenger@usmc.mil”
SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS
The following have been modified:
INSTRUCTIONS TO PROPOSERS
TABLE OF CONTENTS
1. GENERAL
1.1 GENERAL OVERVIEW OF PROCUREMENT PROCESS
1.2 GENERAL OVERVIEW OF CONTRACT
2. BASIS FOR AWARD
3. EVALUATION FACTORS FOR AWARD
4. PROPOSAL REQUIREMENTS
4.1 PRE-PROPOSAL CONFERENCE AND SITE VISIT
4.2 PROPOSAL SUBMISSION INSTRUCTIONS
4.3 PRE-PROPOSAL INQUIRIES (PPIs)
4.4 FEDBIZOPS (FBO)
5. INCORPORATION OF TECHNICAL PROPOSAL
6. ATTACHMENTS: Will be located on FBO under additional documents
6.1 ATTACHMENT A - PRE-PROPOSAL INQUIRY LOG
6.2 ATTACHMENT B - SECNAV 5512 – BASE ACCESS FORM (Naval Station Norfolk)
6.3 ATTACHMENT C - CONSTRUCTION AND DESIGN EXP. PROJECT DATA SHEET
6.4 ATTACHMENT D – SMALL BUSINESS SUBCONTRACTING RECORD
6.5 ATTACHMENT E – SMALL BUSINESS PART. AND COMMITMENT STRATEGY
6.6 ATTACHMENT F – PAST PERFORMANCE QUESTIONNAIRE
6.7 ATTACHMENT G – SMALL BUSINESS SUBCONTRACTING PLAN
6.8 ATTACHMENT H – PROPOSED PROJECT DURATIONS
1. GENERAL OVERVIEW OF PROCUREMENT PROCESS
1.1.1 This solicitation is being issued as an Unrestricted Full and Open Competition.
1.1.2 The NAICS code for this procurement is 237310 - Highway, Street, and Bridge Construction and the size standard is $39,500,000
1.1.3 This acquisition will be advertised utilizing FAR Part 36.3, Two Phase Design Build Selection Procedures and 15 – Contracting by Negotiations resulting in a Firm Fixed Price (FFP) contract for construction services.
1.1.4 Magnitude of construction per project is as follows, in accordance with DFARS 236.204:
P1505F - RAILROAD TRESTLE REPLACEMENT - $25,000,000 TO $100,000,000
P1387F - ONSLOW BEACH BRIDGE REPLACEMENT - $25,000,000 TO $100,000,000
1.2 GENERAL OVERVIEW OF CONTRACT
The general intent of this solicitation is to award a Fixed Price construction contract for design-build (DB) projects in Package 4, Hurricane Florence Recovery Bridges at MCB Camp Lejeune. Package 4 consists two (2) projects:
P1387F – Onslow Beach Bridge Replacement and P1505F – Railroad Trestle Replacement, Marine Corps Base Camp Lejeune, North Carolina.
P1387F - Onslow Beach Bridge Constructs a moveable bridge across the Intracoastal Waterway. This project also includes new approach roads, bridge abutments, guardrail, lighting, asphalt pavement, and demolition of the existing bridge.
P1505F - Railroad Trestle Replacement Replaces the 2,500 linear foot White Oak River Trestle and 60 linear foot Queens Creek Trestle. Construction includes new trestles, bridge abutments, track ballast, railroad ties, and earthwork and grading.
2. BASIS FOR AWARD
2.1 The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the proposal determined to represent the best value—the proposal most advantageous to the Government, price and other factors considered.
2.2 The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
2.3 The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.
2.4 As will be stated in the solicitation for this two-phase design-build procurement, Factors 1-3 will be evaluated in Phase I and Factors 4-6 will be evaluated in Phase II. Factor 1 will only be rated Acceptable or Unacceptable. If an offeror is rated Unacceptable in Factor 1, then they will not be considered for Phase II unless corrected through discussions. In making the best value award decision after Phase II, the Government will consider Factors 2-6 and price. The relative order of importance of the non-price evaluation factors is that technical factors (Factors 2, 4, 5, and 6) are equal to each other and, when combined, are of equal importance to the performance confidence assessment (Factor 3). All technical factors and the performance confidence assessment (past performance) rating, when combined, are significantly more important than price.
2.5 Any proposal found to have a Deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the Deficiency is corrected through discussions. Proposals may be found to have either a Significant Weakness or multiple Weaknesses that impact either the individual factor rating or the overall rating for the proposal. The evaluation report must document the evaluation board’s assessment of the identified Significant Weakness(s) and/or Weakness(s) and the associated risk to successful contract performance This assessment must provide the rationale for proceeding to award without discussions.
3. EVALUATIONS FOR AWARD
3.1 The solicitation requires the evaluation of price and the following non-price factors:
PHASE I
Factor 1 – Technical Approach Factor 2 – Experience Factor 3 – Past Performance
PHASE II
Factor 4 – Technical Solution Factor 5 – Project Management Approach Factor 6 – Small Business Utilization
The distinction between Experience and Past Performance is that Experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past Performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
Factors 1-3 will be evaluated in Phase I and Factors 4-6 will be evaluated in Phase II. Factor 1 will only be rated Acceptable or Unacceptable. If an offeror is rated Unacceptable in Factor 1, then they will not be considered for Phase II unless corrected through discussions. In making the best value award decision after Phase II, the Government will consider Factors 2-6 and price. The relative order of importance of the non-price evaluation factors is that technical factors (Factors 2, 4, 5, and 6) are equal to each other and, when combined, are of equal importance to the performance confidence assessment (Factor 3). All technical factors and the performance confidence assessment (past performance) rating, when combined, are significantly more important than price.
After evaluating Phase I proposals, the source selection authority shall select the most highly qualified offerors and request that only those offerors submit Phase II proposals. In accordance with FAR 36.303-1(a)(4), the solicitation shall state that a maximum of three offerors will be selected to submit Phase II proposals unless the Government determines that a number greater than three is in the Government’s best interest.
The importance of price will increase if the Offerors’ non-price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-price proposal’s superiority to the Government. Award will be made to the responsible Offeror whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.
3.2 Basis of Evaluation and Submittal Requirements for Each Factor.
a. Price and Factor 6: PHASE II
(1) Solicitation Submittal Requirements:
Price binder: Price shall be submitted on the Price Proposal Form included in the solicitation. The offeror shall submit one (1) original, marked “Original”, and one (1) copy, marked “Copy”, each in a separate three ring binder with the following:
• Cover page with solicitation number, solicitation title, offeror name, address, phone number, fax number, DUNS, CAGE code, Point of Contact (POC), POC phone number, and POC email address;
• Completed SF 1442 signed with all amendments acknowledged;
• Price Proposal Form;
• Copy of Representation and Certifications and proof of registration in System for Award Management
(SAM);
• Confirmation of filing of Veterans’ Employment and Training (VETS) VETS-4212 for the 2018 filing cycle;
• Bid Guarantee in accordance with FAR Clause 52.228-1, Bid Guarantee. Amount shall be at least 20 percent of the proposed price, but shall not exceed $3 million; and
• Responsibility Determination Information (see below).
• Small Business Subcontracting Plan (see below).
• Factor 6 – Small Business Utilization
In the event of a discrepancy between the original and copies, the original version of the proposal will govern. Also, price information included in the non-price/technical proposal will not be considered. Likewise, non-price/technical information included in the price proposal will not be considered.
The offeror is required to submit a complete Price Proposal Form that includes completion of all contract line items numbers (CLINs).
ADDITIONAL INFORMATION TO BE SUBMITTED WITH PRICE PROPOSAL PACKAGE:
RESPONSIBILITY DETERMINATION INFORMATION – In order to be eligible for award, the offeror must be determined responsible in accordance with FAR Part 9, specifically FAR 9.104-1, General Standards. In a separate tab, the offeror shall provide the following information in the price proposal package:
1. One (1) signed bank reference demonstrating adequate financial resources. If offeror’s firm has a line of credit – provide information on how many figures offeror can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required).
2. The offeror shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization.
Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the offeror.
3. Description of offeror’s facilities and equipment.
4. Other offeror’s work presently under contract.
SMALL BUSINESS SUBCONTRACTING PLAN (reference FAR 52.219-9 Alt II and DFARS 252.219-7003).
NAVFAC's command-wide small business subcontracting targets are shown below. These may be higher or lower than percentages that would represent realistic, challenging small business subcontracting goals for this acquisition.
Offerors representing as other than small businesses shall establish small business subcontracting plan goals and shall document in their subcontracting plans the basis for all proposed goals. Plans shall be submitted with initial offers.
SB 45%
SDB 5%
HUBZone SB 3%
WOSB 15%
SDVOSB 5%
Small businesses identified by name shall be listed in small business subcontracting plans submitted pursuant to FAR 52.219-9 in order to facilitate compliance with 252.219-7003(e).
See the Small Business Subcontracting Plan Template (Attachment G) for format.
Although required to be submitted with offeror’s price proposal, this information will not be evaluated as part of the price proposal. This information forms the basis of your firm’s responsibility determination should your firm be considered for award. Proposal packages from unsuccessful offerors will not be returned to the offeror, but shall be destroyed by the Contracting Officer. No certificate of destruction will be issued.
(2) Basis of Evaluation: The Government will evaluate price based on the total price, including all options and planned modifications. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
(a) Comparison of proposed prices received in response to the RFP.
(b) Comparison of proposed prices with the IGCE.
(c) Comparison of proposed prices with available historical information.
(d) Comparison of market survey results.
b. Non-price Factors: Phase I and Phase II
(1) Solicitation Submittal Requirements:
Non-price binder: The offeror shall submit one (1) original, marked “Original”, and nine (9) copies, marked “Copy”, each in a separate three ring binder with the following:
• Cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, DUNS, CAGE Code, Point of Contact, Phone Number, and Email Address;
• 8 ½ x 11 paper, 10-point font;
• Refer to individual factors for page limitations. Pages that exceed indicated page limitations shall not be evaluated; and
• Additionally, include an electronic version of the price and non-price proposal on one CD-ROM.
As with the price proposal, in the event of a discrepancy between the original and copies (or CD-ROM), the original version of the proposal will govern. Furthermore, any price information within the technical proposal (non-price proposal) will not be considered. Likewise, any technical/non-price information within the price proposal will not be considered.
Factor 1 – Technical Approach
(i) Solicitation Submittal Requirements:
The offeror shall submit the following information:
(1) Provide a narrative describing the proposed primary construction firms and primary design firms for this contract and the rationale for proposing this arrangement. Provide the roles, responsibilities, and contractual relationships between the various firms (see FAR Subpart 9.6). The narrative shall also include a simple organizational chart that clearly identifies the lines of authority between the entities. The narrative shall identify the location of the specific offices that will be involved in completing the work included in this solicitation. If the experience of a significant design subcontractor(s) is being claimed in Factor 2 - Experience, the firm must be included in the above narrative and organizational chart.
Note: If the Offeror is proposing to utilize multiple Designers of Records (DOR) (i.e. one DOR for each Project), clearly state which DOR will be designing each Project.
The technical approach narrative and organizational chart shall be limited to two (2) double-sided page or four (4) single-sided pages. The information requested in item #2 below is not included in this page limitation.
(2) In addition to the narrative, the offeror shall submit a signed copy of a joint venture agreement, partnership agreement, teaming agreement, approved mentor protégé agreement (MPA), or letter of commitment for each member of the offeror’s team identified above (e.g., joint venture member, partner, team member, subcontractor, parent company, subsidiary, or other affiliated company, etc.). If providing a letter of commitment, the letter shall be from the proposed DOR on the DOR’s letterhead and addressed to the Offeror.
(3) In addition to the narrative, the offeror shall submit a signed statement from the Surety on the Surety’s letterhead demonstrating a minimum bonding capacity for a single award of $175,000,000.
(ii) Basis of Evaluation:
The assessment of the offeror’s technical approach will be used as a means of evaluating the capability of the offeror to successfully meet the requirements of the RFP. This factor will be rated on an Acceptable or Unacceptable basis.
Failure to provide any of the above required information may result in the offeror being rated Unacceptable.
Offerors that are rated Unacceptable in this factor will be found ineligible to proceed to Phase II unless corrected through discussions (if held).
Factor 2 – Experience
(a) Solicitation Submittal Requirements:
The Offeror shall submit the following information:
(1) Construction Experience:
Submit a minimum of three (3) up to a maximum of five (5) relevant construction projects for the Offeror that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as:
Size/Scope/Complexity: New construction of a:
- Trestle bridge or
- Vehicular bridge with a width of 2 lanes or greater.
- Renovation projects will not be considered relevant. Pedestrian bridges will not be considered relevant.
- At least one relevant bridge meeting the Size/Scope/Complexity requirements must be a bascule type movable bridge.
Projects submitted for the Offeror shall be completed within the past ten (10) years of the date of issuance of this RFP. Furthermore, the offeror must have been the prime contractor on the project. As such, the offeror’s experience as a subcontractor will not be considered. Further, subcontractor experience will not be considered.
A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project;
rather Offerors shall submit the work performed under a task order as a project.
The attached Construction & Design Experience Project Data Sheet (Attachment C) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. The Government reserves the right not to consider a project submitted for both construction and design experience on a single Project Data Sheet. Except as specifically requested, the Government will not consider information submitted in addition to this form nor will the Government consider information submitted via any other medium. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages). The Government will not consider information submitted beyond this page limit.
For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy as defined above to the project requirements of this RFP (i.e., unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features.
If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members. Offerors who fail to submit experience for all Joint Venture members may be rated lower.
Offerors are still limited to a total of five (5) projects combined.
If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.
(2) Design Experience
Submit a minimum of three (3) up to a maximum of five (5) relevant design projects for the Designer of Record(s) that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the RFP. Within the five projects, the minimum experience requirement for the factor shall be met by the proposed DOR(s). However, design subcontractors’ projects may also be submitted within the five project maximum but must also meet the size, scope and complexity requirements. For purposes of this evaluation, a relevant project is further defined as:
Size/Scope/Complexity: Design of a:
- Trestle bridge or
- Vehicular bridge with a width of 2 lanes or greater.
- Renovation projects will not be considered relevant. Pedestrian bridges will not be considered relevant.
- At least one relevant bridge meeting the Size/Scope/Complexity requirements must be a bascule type movable bridge.
Projects submitted shall be completed within the past ten (10) years of the date of issuance of this RFP. For design-build projects, the design portion of the contract shall have been completed within the past ten (10) years of the date of issuance of this RFP. The design completion date shall be clearly stated on the Construction & Design Experience Project Data sheet under Block 4 next to “Design Completion Date.”
A project is defined as a complete design effort performed under a single task order or contract/subcontract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.
The attached Construction & Design Experience Project Data Sheet (Attachment C) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. The Government reserves the right not to consider a project submitted for both construction and design experience on a single Project Data Sheet. Except as specifically requested, the Government will not consider information submitted in addition to this form nor will the Government consider information submitted via any other medium. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages). The Government will not consider information submitted beyond this page limit.
For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy as defined above to the project requirements of this RFP (i.e., unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. The project should clearly state which design office location performed the work.
If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.
The Offeror may utilize experience of a design subcontractor to demonstrate design experience under this evaluation factor. The Offer must provide a supporting joint venture agreement, partnership agreement, teaming agreement, or letter of commitment and an explanation of the meaningful involvement for the design subcontractor. Offerors proposing multiple design firms should submit relevant project experience for all design firms. Failure to do so may result in a lower rating. Offerors are still limited to a total of five (5) projects combined.
(b) Basis of Evaluation:
The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction and design projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five projects for construction and five for design. Any projects submitted in excess of the first five (5) for Construction Experience and first five (5) for Design Experience will not be considered.
Relevant projects where the Offeror and the proposed design firm(s) have previously worked together may be considered more favorably than those that have not worked together.
Relevant projects that demonstrate design-build experience may be considered more favorably than those that do not have design-build experience.
Relevant projects that demonstrate experience with construction sequencing to allow rail operations to remain in service periodically may be considered more favorably that those that do not.
Relevant projects that demonstrate experience with trestle bridge construction may be considered more favorably than those that do not.
Relevant projects that demonstrate experience of the prime contractor may be considered more favorably than those that do not.
Relevant projects that demonstrate experience in constructing multiple vehicular or trestle bridges concurrently may be considered more favorably that those that do not.
Relevant projects that demonstrate experience with bridges spanning a navigable waterway may be considered more favorably that those that do not.
Factor 3 – Past Performance
(i) Solicitation Submittal Requirements:
If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 2 for Construction Experience. If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 2 for Design Experience. If there is not a completed CPARS evaluation, then submit Past Performance Questionnaires (Attachment F) for each project included in Factor 2 for both Construction Experience and Design Experience. The Offeror should provide completed Past Performance Questionnaires (PPQ) in the proposal. Offerors are permitted to submit copies of previously completed PPQs.
However, Offerors shall not incorporate previously submitted PPQs submitted for other RFPs by reference into their proposal; but this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, John Bishop, john.p.bishop1@navy.mil.
Offerors are highly encouraged to provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 2 – Experience. Additionally, Offerors are highly encouraged to address any adverse past performance issues. Explanations shall not exceed two (2) double-sided pages (or four (4) single-sided pages) in total. Information provided beyond this page limit will not be considered.
The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references’ unwillingness to provide the information requested may affect the Government’s evaluation of this factor.
Performance award or additional information submitted will not be considered.
(ii) Basis of Evaluation:
This evaluation will consider how well the Offeror’s team performed on relevant projects submitted under Factor 2 – Experience and may also consider past performance on other projects currently documented in known sources.
The Government will consider the recency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the Offeror’s team’s past performance will be used as a means of evaluating the Offeror’s team’s probability to successfully meet the requirements of the RFP.
Offerors lacking relevant past performance history will receive a NEUTRAL Confidence rating.
Factor 4 – Technical Solution
(a) Solicitation Submittal Requirements:
Provide a narrative describing the technical solution to the project that meets the requirements of the RFP. A technical narrative is required for each of the Projects included in this MILCON Package: P1387F, Onslow Beach Bridge Replacement; P1505F, Railroad Trestle Replacement. The description for each project shall include the following systems:
o Architectural o Structural o Mechanical Systems and controls o Electrical and Communications Systems infrastructure o Boring utilities under waterway o Permitting o Means and Methods for construction of vehicular bridge o Means and methods for construction and maintaining operations of a trestle bridge
Provide concept drawings for: P1387F, Onslow Beach Bridge Replacement and P1505F, Railroad Trestle Replacement
Concept drawings shall include:
o Site Plan o Profiles
Narrative shall not exceed one (1) double-sided pages (or two (2) single-sided pages) for each MILCON project included in the Package. Include up to six (6) conceptual drawings per project for P1387F and P1505F to supplement the narrative. The Government will not consider information submitted beyond this page limit, but the conceptual drawings are not included in the limit.
(b) Basis of Evaluation:
The Government will evaluate the narrative and conceptual drawings (if included) considering the extent to which the Offeror demonstrates a clear understanding of the architectural and engineering requirements of the project. The Government will evaluate the Offeror's technical solution to determine adherence to or enhancing of the technical requirements of the RFP.
The narrative does not require the identification of specific subcontractors. However, if the Offeror identifies a specific subcontractor to perform major or critical aspects of the requirement to demonstrate an acceptable technical solution under this evaluation factor, the proposal must provide a letter of commitment and explanation of the meaningful involvement that the subcontractor will have in performance of this contract.
NOTE: The awardee’s proposed Concept drawings may be incorporated into the contract but may be subject to change at the project CDW.
Factor 5 – Project Management Approach
(a) Solicitation Submittal Requirements:
Provide a narrative describing the project management approach that meets the requirements of the RFP. Organize the narrative into three parts to address the following:
(1) Management Team
- Management of multiple and concurrent construction sites included in this RFP.
- Plan for securing, managing, and maintaining subcontracted labor for this RFP.
- Provide a chart and accompanying narrative to demonstrate the management hierarchy (by position) of the entire Package and each individual project to include both the design and construction teams. This narrative shall include authorities; roles; responsibilities; and a brief synopsis of the names, education, training and experience of key individuals based on the proposed management structure. (Note: Key individuals may vary among offerors based on the proposed management structure.)
(2) Maintaining Rail Operations
- Describe the approach you will use to manage the construction of the White Oak River trestle bridge while periodically maintaining rail operations.
(3) Safety Program
- Describe the plan for safety that will be implemented to evaluate safety performance of potential subcontractors as part of the selection process for all levels of subcontractors.
- Fully describe the safety management system that will be used to oversee the safety compliance and performance of self-performed and subcontractor performed work.
- Describe any innovative methods that will be employed to ensure and monitor safe work practices at self-performed and/or all subcontractor levels.
- Describe methodology to execute an effective safety program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps.
(4) Schedule: In addition to the above narrative, the offeror shall:
- Project Specific Master Schedules:
• Include a Master Schedule for each Project included in this Package (list of Projects below). Each Project Master Schedule shall include a high level schedule with major milestones, for both design and construction on the critical path.
• Include a duration for each Project from contract award.
• Offeror is required to complete Attachment H and include it in their proposal for this factor. In the event of a discrepancy between the Attachment H duration from award and the narrative duration from award, the Attachment H duration from award will govern. Attachment H is not included in the page limit restrictions. NOTE: The awardee’s proposed project duration from award for each Project will be incorporated into the contract. Upon award, each project will have a separate completion date.
- Package Master Schedule:
• Include one Package Master Schedule that addresses the design and construction of all structures within the Package is required. The Package Master Schedule shall include a high level schedule with major milestones, for both design and construction, on the critical path
• The Package Master Schedule shall demonstrate all projects being completed within 1,461 days of award.
• The proposed Package Master Schedule shall account for priority sequence listed below.
Project # Project Title Package Priority
P1387F Onslow Beach Bridge Replacement 1 P1505F Railroad Trestle Replacement 1
The Narrative for elements (1) Management Team, (2) Maintaining Rail Operations, and (3) Safety Program detailed above shall not exceed eight (8) double-sided pages (or 16 single-sided pages). Up to three (3) organizational charts may be provided to supplement the narrative. The Government will not consider information submitted beyond this page limit (which does not include the organizational charts).
The Narrative for element (4) Schedule detailed above shall not exceed one 11x17 sheet per Project Master Schedule and one 11x17 sheet for the Package Master Schedule.
(b) Basis of Evaluation:
(1) Management Team: The Government is seeking to determine that the Offeror has a defined management team identified to properly manage multiple projects and constructions sites simultaneously under this contract. A project management approaches that creatively puts people or processes in place to minimize potential construction delays may be considered more favorably.
(2) Maintaining Rail Operations: The Government will evaluate the Offeror’s approach to construction the White Oak River trestle bridge while maintaining periodic rail operations.
(3) Safety Program: The board will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project. The board will evaluate the narrative to determine the degree to which innovations are being proposed that may enhance safety on this procurement and validate the contractor has addressed methodology to be used in the execution of an effective program that facilitates sound mishap prevention techniques/processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps.
(4) Schedule: The Government will evaluate the Offeror’s proposed schedule to ensure it is technically feasible within the designated construction completion date. The Government will evaluate the Offeror’s proposed completion date for each Project included in this Package. A schedule that phases individual building completion dates within the package so the Government can take beneficial occupancy earlier than the 1,461 days overall completion date may be considered more favorably.
Factor 6 – Small Business Utilization
This factor assesses both the historical achievements in utilizing small business concerns as subcontractors and proposed small business participation and commitment strategies.
(i) Solicitation Submittal Requirements:
1. Achievements - Submit a narrative and supporting information, as follows:
a. All offerors shall submit a narrative, limited to one (1) double-sided page (or two (2) single-sided pages), to describe their achievements in supporting the Government’s policy to provide maximum practicable opportunities for small business (SB), veteran-owned small business (VOSB), service-disabled veteran-owned small business (SDVOSB), historically underutilized business zone (HUBZone) small business, small disadvantaged business (SDB), and women-owned small business (WOSB) concerns to participate as subcontractors consistent with efficient contract performance. Information provided in excess of the page limitation will not be considered.
b. All offerors shall submit small business subcontracting information associated with each project cited under the Experience factor (Factor 2) in the format provided in Attachment D, Small Business Subcontracting Record.
c. Offerors representing as other than small businesses shall also provide copies of the most current individual subcontracting reports (ISRs) associated with each Construction Experience project cited under the Experience factor (Factor 2), if a small business subcontracting plan was required by the contract. If such Construction Experience projects were completed under specific task orders, provide ISRs for the overall contract. For cited projects with state and local government agencies, provide similar subcontracting performance reports, if required by the contracts. When not specifically addressed in the ISR or similar report, offerors shall provide explanations for all instances of failures to meet dollar or percentage goals in individual subcontracting plans.
Notes:
- The Government reserves the right to consider achievements information on other recent, relevant projects from all available sources.
- Offerors utilizing achievements information of team members or key subcontractors shall clearly demonstrate how these companies will have meaningful involvement in the management of the subcontracting program for this acquisition. If not, such achievement information will not be considered under this factor. If the offeror is a new joint venture, partnership, or other entity consisting of more than one company, provide achievements information for each individual business entity(ies) that will be responsible for managing the subcontracting program and clearly describe those responsibilities.
- Failure to provide ISRs or any other requested information must be fully explained and may negatively impact your evaluation.
2. Small Business Participation and Commitment - All offerors shall submit a small business participation and commitment strategy, including all data elements shown in Attachment E, Small Business Participation and Commitment Strategy.
a. Identify in terms of dollar value and percentage of the total acquisition the extent of work the offeror will self-perform as the prime contractor. If submitting an offer as a joint venture, identify the percentage of work each member will be responsible for and indicate the size status of each member (e.g. small business, woman-owned small business, other than small business).
b. Include supplemental narratives (limited to five pages) to address other elements of the offeror’s strategy such as binding agreements covering post award roles for execution of the contract and specific initiatives and tools that will be employed under the contract to enhance small businesses opportunities to both participate in this acquisition and build capabilities to support future NAVFAC acquisitions.
c. The anticipated prime and first tier overall small business participation rate for this acquisition (i.e. work to be performed by small businesses as the prime and/or subcontractors) is 20% of the contract value. Offerors are encouraged to exceed this percentage and seek meaningful levels of participation in each of the small business socioeconomic programs listed in Attachment D consistent with efficient contract performance. If the offeror is not able to meet this anticipated 20% rate, the offeror shall explain the reasoning for not achieving the goal and state what percentage they will meet. Offerors shall explain in their participation and commitment strategies how proposed participation rates were established. The small business participation and commitment strategy must be in agreement with any required small business subcontracting plan and will be made a part of the contract upon award.
(ii) Basis of Evaluation:
Offerors will be evaluated on the extent to which their proposals and other performance information available to the Government demonstrate a history of successfully supporting Government policies concerning utilization of small business concerns as subcontractors including, when applicable, achievements against established small business subcontracting plan goals.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .