PPI_02b_-_Pages_from_P705_-_IFC_Civil_Drawings_-_032513-2.pdf

PDF 2 MB Posted

Attached to
P680 CH-53K CARGO LOADING TOWER
Solicitation number
N4008519R9102
Issued by

About this file

This notice provides details for a federal construction solicitation for a Design-Build project to construct a P680 CH-53K Cargo Loading Tower at Marine Corps Air Station New River in North Carolina. The project involves construction of a 9,795 square foot high-bay facility to house an operations trainer and support CH-53K Helicopter Pilot and Crew Chief training. Key requirements include a deep pile foundation, grade beams, reinforced concrete slab, CMU exterior walls, standing seam metal roof, high-bay roll-up doors, concrete drive aprons, overhead crane, compressed air drops, grounding points, clerestory windows and LED lighting. The facility will also include two Advanced Aircrew Training Devices and a hydraulic fluid power system. The estimated value is between $5 million to $10 million. The solicitation will be issued on May 1, 2019 via the Navy Electronic Commerce Online website. The NAICS code is 236220 and small businesses are ineligible due to lack of sufficient qualified small businesses. The Department of the Navy Naval Facilities Engineering Command is the issuing agency.

PPI_02b_-_Pages_from_P705_-_IFC_Civil_Drawings_-_032513-2.pdf

View the file

Other files

File Type Posted
Amendment 0011 - Extension.pdf PDF
Amendment 0010 - Wage Determination.pdf PDF
P680_PPI_Log_r3.pdf PDF
Amendment_0009.pdf PDF
CS101.pdf PDF
Amendment_0008.pdf PDF
Fitness_Equip.pdf PDF
Attachment_G_-_Price_Proposal_Form_Rev2.docx DOCX document
P680_PPI_LOG_r2.pdf PDF
P680_Room_Req_Trainer_Room.pdf PDF
Amendment_0007.pdf PDF
Attach_PPI_40.pdf PDF
Amendment_0006.pdf PDF
P680_PPI_LOG_r1.pdf PDF
Attach_PPI_21.pdf PDF
Amendment_0005.pdf PDF
P680_PPI_LOG.pdf PDF
Amendment_0004-SignInSheet_and_PPIs.pdf PDF
PPI_02a_-_P705-Lift_Station_Calcs.pdf PDF
Attachment_H_-_MCAS_New_River_Site_Visit.xlsx XLSX spreadsheet
Attachment_I_-_Directions_Map_MCAS_New_River.pdf PDF
Amendment_0003_-_Site_Visit.pdf PDF
Attachment_E_-_Small_Business_Subcontracting_Record.docx DOCX document
Attachment_G_-_Price_Proposal_Form.docx DOCX document
Amendment_0002_-_P680_CH53K_Cargo_Phase_II.pdf PDF
Attachment_F_-_Small_Business_Participation_and_Commitment_Strategy.docx DOCX document
Amendment_0001.pdf PDF
Attachment_B_-_SECNAV_5512.pdf PDF
Attachment_C_-_Construction_and_Design_Exp._Project_Data_Sheet.docx DOCX document
Attachment_A_-_Pre-Proposal_Inquiry_(PPI)_Form.xlsx XLSX spreadsheet
P680_CH-53K_CARGO_LOAD_TWR.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

.3

IN

V.

H D

W L.

C O N C

N

ALUMINUM BLDG.

#AS-5040

S T Y

B L

K

A S

OVERHEAD

FOR GAS

CYLINDERS

B L

G

S

F F

.7

#2

AC

#1

AC

RSL

ELEC. HH.

ELEC. HH.

T.

O.

B.

T.

O.

B.

T.

O.

B.

T.O .B

T.O .B

T.

O.

B.

T.

O.

S.

T.

O.

S.

T.

O.

B.

T.

O.

B.

T.

O.

B.

T.

O.

S.

T.

O.

S.

T.

O.

S.

T.

O.

S.

E. UG. ELEC.

E

U G

E L E C

EQSD ARC

EQSD ARC

EQ

S D

AR

C

EQ

S D

AR

C

WOODED AREA

T.O .B

T.O .B

T.

O.

B.

T.

O.

B.

T.

O.

S.

T.

O.

B.

T.O .S

PIPE END

INV. 18" (NE) = 13.53

CONC. HDWL.

INV. 30" = 12.36

BP

P -7

A

IR

C R

A F T M

A

IN

T E

N A

N C

E H

A N

G A

R A

N D A

P R

O N

D E

P A

R T

M E

N

O F

E

V Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A

V

C

IL

IT

IE

G

IN

E E

R

IN

C

M M

A N

D

DRW

S Y

M D

E S

C R

IP

T

IO

N D

A T E

A P

P R

DRAWFORM REVISION: 10 MARCH 2009

CHK

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

OF

EPROJECT NO.:

Mortenson construction

J A

C K

S O

N V

IL

L E

M

W

R

IV

E R

N A

V

C

IL

IT

G

IN

E E

R

M M

A N

D

M

ID

L A

N T

IP

T

M C

N C

N A

V

A T

IO

R F

O L

K

V

IR

G

IN

IA

803726

NORFOLK, VA 23510

101 W. MAIN STREET, SUITE 900

N40085-12-C-7722

DOSS COMER

2/14/13

DES CEC BMSCEC

PROJECT MANAGER T. L. MULLEN

L.K. SHERFEYIPT TECH. BRANCH HEAD

CHIEF ENG/ARCH B. ABBOT

A

NI

LORAC HTU

O S

R E

E N I

G N

E

ANOISSEFORP

S

N E

C I

L

NETSLRAC .E REHP

OT

SI

R

H C

No. 22780

15x15

R

R

L K J

L K J

L K J

L K J

L K J

L K J

SS#1

O W

S

SS#2

"W

1"RW

8"W

W

"W

6"W

813LF - 4"FM

L

S

A N

8"SAN

33 LF

228LF - 6"SAN

SS#3

2"RW

S

A N

S

A N

S

A N

PS#1

VV

EC

SS#4

L F

S

A N

4LF

8"

SAN

6"W

"S

A N

L F

"P

VC

LF

FUTURE APRON EXPANSION

(NIC)

8"SAN

270LF

KEY NOTES:

GRAPHIC SCALE:

0 25’ 50’25’

1" = 25’

AS NOTED

SCALE: 1 IN. = 25 FT.

SHEET NOTES:

M A

T C

H L

IN

E S

H E

E T C

U

MATCHLINE SHEET CU103

CU101

MATCHLINE SHEET CU102 (INSET A)

C3

C-601

S

IT

U

IL

IT

Y

A N

SITE UTILITY PLAN

A3

C-507

TYP

A5

C-505

A3

C-601

TYP

A2

C-505

TYP

A5

C-604

A2

C-601

TYP

B2

C-601

C2

C-601

ALL DIMENSIONS ARE IN FEET UNLESS OTHERWISE NOTED.

PLAN AND NOTES.

REFER TO SHEET C-002 & C-003 FOR SURVEY CONTROL

REFER TO SHEET C-001 FOR LEGEND AND ABBREVIATIONS.

A5

C-506

B4

C-603

TYP

8 10

4 2

C2

C-601

A3TYP

NORTHING EASTINGPT. NO.

352355.86 2464120.22

352380.99 2464144.50

352315.66 2464239.26

352420.79 2464102.96

352431.09 2464092.79

352496.23 2464124.95

352601.09 2464127.69

352613.02 2464128.97

C-507

1 352480.42 2464398.44

352557.98 2464176.97

A2

C-601

TYP

CONNECTION

EMERGENCY PUMP

INV(SE)=13.00

INV(S)=13.00

BOTTOM=8.0

RIM=22.30

NEW PUMP STATION (5’DIA)

RIM=22.30

NEW VALVE VAULT (5.0’DIA)

INV=16.45

RIM=22.60

NEW SS M.H. (AIRFIELD)

SAN INV (SW)18.73

INV(SE)=19.23

INV(NW)=19.27

TOP=22.25

NEW AAFF DIVERTER VALVE

A2

C-601

TYP

SANITARY MANHOLE, NCDOT STD.

RWH WETWELL

BACK UP SERVICE CONNECTION (SEE PLUMBING)

RAINWATER HARVESTING 1-1/2"

TREATMENT HOTBOX

RAINWATER HARVESTING VALVE &

WASH RACK DIVERTER VAULT

SANITARY SEWER CONNECTION

AFFF DIVERSION VAULT

CONNECTION (160 gpm @ 89 TDH)

PUMP STATION, VALVE VAULT AND EMERGENCY PUMP

8"x6" TEE

SANITARY SEWER FORCE MAIN

RAINWATER HARVESTING PRETREATMENT STRUCTURE

W/ 8"x8" TAPPING SLEEVE VALVE

CONNECT 8" WATER SERVICE TO 8" EXIST. MAIN

OIL-WATER SEPARATOR (50 gpm)

RAINWATER HARVESTING SYSTEM

SANITARY MANHOLE, AIRFIELD TYPE

FIRE HYDRANT ASSEMBLY

VALVE WITH VALVE BOX

WASHRACK YARD HYDRANT

B5

C-603

B5

C-603

INV(N)=15.30

INV=(SW)=16.75

INV(SE)=15.30

RIM=21.50

NEW SS M.H. (NCDOT STD.)

VALVE INV=17.08

TOP=21.80

NEW DIVERTER VALVE

INV=14.67

RIM=21.80

NEW SS M.H. (NCDOT STD.)

C E

C

INV=14.66

RIM=23.00

NEW SS M.H. (NCDOT STD.)

A S I

R E

V

IS

C

IE

A

U

E

12644662

12/11/12

-7

A

IR

C R

A F T M

A

IN

T E

N A

N C

E H

A N

G A

R A

N D A

P R

O N

D E

P A

R T

M E

V Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A

V

C

IL

IT

G

IN

E E

R

M M

A N

D

DRW

S Y

M D

E S

C R

IP

T

IO

N D

A T E

A P

P R

DRAWFORM REVISION: 10 MARCH 2009

CHK

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

OF

EPROJECT NO.:

Mortenson construction

J A

C K

S O

N V

IL

L E

W

R

IV

E R

N A

V

C

IL

IT

G

IN

E E

R

M M

A N

D

M

ID

L A

N T

IP

T

M C

N C

N A

V

A T

IO

R F

O L

K

V

IR

G

IN

IA

803726

NORFOLK, VA 23510

101 W. MAIN STREET, SUITE 900

N40085-12-C-7722

DOSS COMER

2/14/13

DES CEC BMSCEC

PROJECT MANAGER T. L. MULLEN

L.K. SHERFEYIPT TECH. BRANCH HEAD

CHIEF ENG/ARCH B. ABBOT

A

NI

LORAC HTU

O S

R E

E N I

G N

E

ANOISSEFORP

S

N E

C I

L

NETSLRAC .E REHP

OT

SI

R

H C

No. 22780

AS NOTED

C-507

5’-0"

12" MIN CRUSHED STONE

12" MIN CRUSHED STONE

NOT TO SCALE

A3

NON-CLOG SUBMERSIBLE PUMP STATION & VALVE VAULT DETAIL

NOT TO SCALE

NOT TO SCALE

FORCE MAIN CONNECTION DETAIL

A5

PLAN VIEW

12’-0" 6’-0"

EMERGENCY PUMP CONNECTION

NOT TO SCALE

PUMP STATION NOTES

PIPE SCHEDULE

18" CONCRETE BASE DEPTH

P U

A T

IO

T A

IL

S

PS#1 W

(EC)

SUBMERSIBLE NON-CLOG PUMP

PEDESTAL AND RED ALARM LIGHT

DUPLEX CONTROL PANEL WITH WIRING

TENSION WIRE

(TYP.)

W/ LIFT BAIL

STAINLESS STEEL LIFT-OUT CHAIN

W/ LIFT BAIL

STAINLESS STEEL LIFT-OUT CHAIN

SECURE TO BASIN WALL

" GALVANIZED RODS2

1(2)

BASIN

GUIDE RAIL, 2 PIPES

FILLET

RAIL SUPPORT CASTING

DISCHARGE REDUCING ELBOW &

SUPPORT (AS REQ’D)

INTERMEDIATE RAIL

EXTENDED MONOLITHIC BASE

WATER TIGHT SEAL TYP

FLOAT SUPPORT BRACKET

FINISHED GRADE

ALUMINUM ACCESS HATCH

DOUBLE LEAF HINGED

VALVE VAULT

PRECAST CONCRETE

BRONZE PLUG

2" GATE VALVE AND

2" AIR RELEASE W/

4" FORCE MAIN

CONCRETE SUPPORT (TYP)

FINISHED GRADE

D D

A

SECTION

MATCH CROWNS

FORCE MAIN

ACCESS HATCH 4’-0" SQUARE

HINGED ALUMINUM ACCESS HATCH

EMERGENCY PUMP CONNECTION

8" INFLUENT PIPE

(TYP FOR 2)

MON CLOG SUBMERSIBLE PUMP

ACCESS HATCH 4’-0" SQUARE

HINGED ALUMINUM ACCESS HATCH

LOCK AND DUST COVER

4" QUICK COUPLER WITH SAFETY

4" = 90 BEND (FLANGE-QUICK COUPLER)

o

4" DUCTILE IRON (M.J.-FLANGE)

4" GATE VALVE

4"x4" TEE

4" FORCE MAIN

4" - 90^ BEND (M.J.)

32^ SQ. THRUST BLOCK

VALVE BOX

NOTE

GRADE

MECHANICAL, RESTRAINED JOINTS VELOW

CONNECTION SHALL BE DUCTILE IRON

PIPE AND FITTINGS FOR EMERGENCY PUMP

K

J

H

G

F

E

D

C

B

A

4 FLANGE TO PLAIN END PIECE3"

4"

4"

4"

4"

4"

4"

4"

2"

4"x4"

FLANGE TO PLAIN END PIECE

FLANGE TO FLANGE PIECE

90^ FLANGE BEND

MECHANICAL JOINT SLEEVE

FLANGE CHECK VALVE

FLANGE GATE VALVE

FLANGE TEE

TAPPED FLANGE

DRAIN PIPE WITH P-TRAP

PUMP SELECTION

TOP OF PUMP STATION ELEV = 22.4

GROUND ELEV = 22.0

HIGH WATER ALARM ELEV = 12.5

TURN ON TWO PUMPS ELEV = 11.5

TURN ON ONE PUMPS ELEV = 10.5

TURN OFF PUMP ELEV = 9.0

BOTTOM OF PUMP STATION ELEV = 8.0

PROVIDE EXPLOSION PROOF MOTOR WITH SUBMERSIBLE NONCLOG PUMP

MAX. SPEED: 1150 RPM

REQUIRED : 101 GPM @ 22 FT., 2 HP, 480 V, 3 PH

SANITARY MANHOLE

MH AS0053

PROVIDE FLOATS ON SINGLE STAINLESS STEEL CHAIN.

NO ELECTRICAL JUNCTION BOXES IN THE WET WELL.

MANUFACTURER FOR THIS PARTICULAR PROJECT.

PROVIDE ANTI-FLOTATION MEASURES AS REQUIRED BY

COATING ON THE INTERIOR.

SPECIFIED. IF CONCRETE IS PROVIDED, INCLUDE EPOXY

OR PRECAST CONCRETE BASIN WITH CONCRETE FILLETS, AS

PROVIDE EITHER FIBERGLASS BASIN WITH FIBERGLASS FILLET

SUPPORT FOR WINCH ASSEMBLY

PROVIDE WINCH AND PIVOTING

8" INFLUENT PIPE

INFLUENT (2) INVERT ELEV = 13.0

12644674

12/11/13

File details come from the government source that posted it. Updated .