Attach_PPI_21.pdf
PDF 1 MB Posted
- Attached to
- P680 CH-53K CARGO LOADING TOWER
- Solicitation number
- N4008519R9102
About this file
This document contains a synopsis for a federal solicitation and details of the related construction project opportunity. The solicitation is for a Design-Build project to construct a P680 CH-53K Cargo Loading Tower at Marine Corps Air Station New River in North Carolina. The high-bay facility will house an operations trainer to support CH-53K helicopter pilot and crew chief training. Key requirements include a deep pile foundation, grade beams, concrete slab, CMU exterior walls, standing seam metal roof, high-bay roll-up doors, and overhead crane. Ancillary spaces include a brief/debrief room, classroom, break area, and restrooms. Two advanced aircrew training devices will also be provided. The estimated construction value is between $5-10 million. The solicitation is unrestricted and will utilize lowest price technically acceptable evaluation. The response due date is 1 May 2019 via the Navy Electronic Commerce Online website.
Attach_PPI_21.pdf
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: September 5, 2019
Project: P680
RE: Response to PPI #21
For all telecommunications, all new incoming pathway(s) will be from MHB15-2 into the new facility. All other exterior pathways to MHB15-2 exist except from MHB15-2 into the building. From MHB15-2 into the building, provide a total of three (3) 4 inch conduits. One conduit per system (fiber and copper) and one spare. Conduit(s) must be concrete encased - reference the RFP Part 5, UFGS 33 82 00, Part 2.2.4 Pathways.
Provide 100 pair copper from RP3-1 to MHB15 then to MHB15-1 and then through a series of manholes to MHB15-2. From MHB15-2, provide 25 pair into the building. See copper.pdf for location of RP-3 and P680 CommView.pdf for MHB15-2 location.
Provide 72 strands ALTOS (trunking) fiber from MHB9 through a series of manholes to MHB15-2. From MHB15-2, provide 12 strand fiber into the building. See fiber.pdf for location of MHB9 and P680 CommView.pdf for MHB15-2 location. Provide fabric innerduct within conduit.
All splicing will be done by Base Personnel. Contractor will test all wiring and provide results to the government and Base Telephone POC.
"S
"S
"S
"S
150-22 CA 603A 901-1050
12 FOC 212B 97-108
25-22 CA 603A 751-775
12 FOC NMAS212-1 1-12
1-12
751-775
25-22 CA 603A 726-750
6-22 CA 603A 1199-1200+4DD
1199-1200+4DD
1196-1200
101-125
12 ISOL
49-60
200-22 CA 603A 826-900 125DD
(2) CABLES
150-22 CA 603A 1051-1195, 5DD
12 FOC 212B 73-84
25-22 CA 603A 1196-1200+20DD
300-22 CA 603A 901-1200
24 FOC 212B 73-108
50-22 CA 603A 751-775+25DD
100-24 CA 606A 301-400
12 FOC NMAS212-1 1-12
24 FOC NMAS212-1 13-36
(3) CABLES IN (1) CONDUIT
12 FOC 212B 49-60 ISOL
12 FOC 212B 49-60
50-22 CA603A CA 776-825
776-825
49-60
12 FOC 212B 49-60 ISOL
12 FOC 212B 49-60
49-60
ISOL
96 FOC 212B 1-48+48DD
72 FOC 212H 1-72
44 FOC 3901A 1-44
36 FOC 212F 1-36
12 FOC 212B 49-60
12 FOC 212B 61-72
12 FOC 212F 37-48
600-22 CA 603A 1-425+25DD+451-600
600-24 CA 606A 1-600400-22 CA 603A1-300+100DD+401-600
400-22 CA 606A 601-900+100DD
12 FOC 212B 49-60 ISOL
72 FOC 212H 1-72
48 FOC NMAS212-1 1-48
48 FOC 212F 1-48
44 FOC 3901A 1-44
1200-22 CA 603A 1-425+25DD+451-1200
600-22 CA 606A 1-600
400-22 CA 606A 601-900+100DD
UNKNOWN COPPER CA
12 FOC NMAS212-1 37-48
CA 603A
826-850 CC
CA 603A 601-700CC
WHITE ST
RP3-1
RP D5
MH B15-1
MHD6
MHB15
MHD4
MHD5
mnsBGVC0017
AS4114
AS5040
AS4135
AS4120
AS4187
AS4122
AS4130
AS4188
AS4177
AS4184
AS4106
AS4108
SAS4127
douglas.reimann Text Box
COPPER.PDF
douglas.reimann Typewritten Text
DOUGLAS RD
"S
"S
"S"S
"S "S
"S
12 FOC 212B 133-144
50-22 CA 604A 25DD+726-750
200-22 CA 604A 751-900+50DD
400-24 CA 602 1-375+25DD
72 FOC 212C 1-72
60 FOC 212F 73-132
600-22 CA 606A 1201-1800
60 FOC 2301 1-60
100-22 CA 602A 326-375+50DD
144 FOC 212H 1-144
96 FOC NMAS212-1 1-96
72 FOC 212F 1-72
44 FOC 3901A 1-44
1200-24 CA 603A 1-1200
1200-24 CA 606A 1-1200
900-24 CA 604A 1-750+150DD
600-22 CA 604 1-600 AIP
168 FOC 212B 1-144+24DD
144 FOC 212H 1-144
96 FOC NMAS212-1 1-96
600-22 CA 604A 1-600 AIP
44 FOC 3901A 1-44
1200-24 CA 603 1-1200
900-24 CA 604A 1-750+150DD
168 FOC 212B 1-144+24DD
1200-24 CA 606A 1-1200
72 FOC 212F 1-72
6-22 CA 602A 326-331
100-22 326-350+75DD
67-72
351-375
326-331
200-22 CA 604A 601-750+50DD
200-22 CA 604A 601-725+75DD
133-144
726-750
FOC 212H 73-132 DARK
50-24 ISOL 1-50
12 FOC 212H 133-144
72' COIL IN MHB9
328-329+4DD
326-327
348+1DD PHONE
245-350
348+1DD
2 PAIR AERIAL DROP
WHITE ST
CAMPBELL STRPF3
RPF2
RP10-1
RP10-1R
RPF5
RPF51
RPF4
MHB7
MHB9
HH PMO 8
MHB8 HH PMO 7
MH-N
AS4145
AS143
AS4136
SAS145
AS4151
MWR2
MWR2
AS403
AS440
AS518
AS524
douglas.reimann Text Box
FIBER.PDF
"S "S
"S
"S
"S
"S
"S
"S
"S
"S
"S
"S
"S
13-36
76-100
44 FOC 3901A 1-44
150-22 CA 603A 901-1050
12 FOC 212B 97-108
(2) CABLES SAME TRENCH
50-22 CA 603A 476-525
12 FOC 212B 25-36
25-22 CA 603A 726-750
951-1000
50-22 CA 603A 751-775+25DD
100-24 CA 606A 301-400
12 FOC NMAS212-1 1-12
24 FOC NMAS 212-1 13-36
6-22 CA 603A 1199-1200+4DD
25-36
25-22 CA 603A 451-475+2DD
3-24 BDW CA 603A 748-750
100-22 CA 03 1-75+25DD
24 FOC 212F 1-24
13-24
25-22 CA 603A 726-750
476-525
1196-1200
24 FOC 212-1 13-36
100-24 CA 606A 301-400
50-22 CA603A 126-175
25-22 CA 603A 751-775
12 FOC NMAS212-1 1-12
25-22 CA 603A 1196-1200+20DD
25-22 CA 603A 726-735+15DD
12 FOC 212F 1-12
901-950
44 FOC 3901A 1-44
12 FOC 212F 13-24
(3) CABLES IN (1) CONDUIT
12 FOC 212B 49-60 ISOL
12 FOC 212B 49-60
50 CA 776-825
1-12
1199-1200+4DD
(2) CABLES
300-22 CA 603A 901-1200
24 FOC 212B 73-108
726-735+15DD
25-22 CA 603A 10DD+736-747+3DD
25-24 CA 03 76-100
75-22 CA 603A 451-473+52DD
1001-1050
100-22 CA03 1-75+25DD
25-22 CA 603A 726-747+3DD
10DD+736-747+3DD
451-473+2DD
(2) CABLES
150-22 CA 603A 901-1050
12 FOC 212B 97-108
748-750+3DD
97-108
50-22 CA 603A 126-175
751-775
CA
NA
L
ST
WHITE ST
PE
RIM
ET
ER
R
D RP 4-1-3 RPD4-1-2
RP3-1-1
RP4108D
RP8 1/2
RP2-2L
RP2-3L
F/ORP 1
F/O RP 2
RP D5RP 8 1/2B
RP 1 1/2
RP 1 3/4
RP 8 1/2B
FORP B17-3
MH B15-3
UNK MH
PB B17-4
MH B15-1
MHD6
MHD7
PB B17-3
MHD5
MH B15-2
AS4165
SAS4107
AS5040
AS4135
AS5000
AS4159
AS600
AS4158
AS4148
CONT151
SAS4172
AS4189
AS3916
AS3917
AS4177
AS4184
AS4106
AS4108
AS4111
PVAS4109
PVAS4109
PVAS4109
AS4109
SAS4109N
SAS4109M
SAS4127
SAS5000
P680 COMMVIEW.PDF
douglas.reimann Text Box
P680 - APPROX SITE
| Telecom PPI_No 21 |
| Attach PPI 21_1 |
| Copper CommView |
| Fiber CommView |
| P680 CommView |
File details come from the government source that posted it. Updated .