This notice summarizes a federal solicitation for a design-build construction project. The United States Naval Facilities Engineering Command is seeking proposals for a CH-53K Cargo Loading Tower at Marine Corps Air Station New River in North Carolina. The high-bay facility will house an operations trainer to support CH-53K Helicopter Pilot and Crew Chief training. Key requirements include a 9,795 square foot building with deep pile foundation, grade beams, reinforced concrete, CMU walls, metal roof, and roll-up doors to accommodate moving aircraft. Interior spaces must include a high-bay area for the aircraft frame and pallets, overhead crane, compressed air drops, grounding points, windows and LED lighting. Ancillary spaces such as a classroom, break area, and restrooms are also required. The solicitation will utilize lowest price technically acceptable evaluation. Proposals are due by May 2019. The estimated value is between $5-10 million. The contracting office is the United States Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
Amendment 0011 - Extension.pdf PDF
Amendment 0010 - Wage Determination.pdf PDF
P680_PPI_Log_r3.pdf PDF
Amendment_0009.pdf PDF
CS101.pdf PDF
Amendment_0008.pdf PDF
Fitness_Equip.pdf PDF
Attachment_G_-_Price_Proposal_Form_Rev2.docx DOCX document
P680_PPI_LOG_r2.pdf PDF
P680_Room_Req_Trainer_Room.pdf PDF
Amendment_0007.pdf PDF
Attach_PPI_40.pdf PDF
Amendment_0006.pdf PDF
P680_PPI_LOG_r1.pdf PDF
Attach_PPI_21.pdf PDF
Amendment_0005.pdf PDF
P680_PPI_LOG.pdf PDF
PPI_02b_-_Pages_from_P705_-_IFC_Civil_Drawings_-_032513-2.pdf PDF
Amendment_0004-SignInSheet_and_PPIs.pdf PDF
PPI_02a_-_P705-Lift_Station_Calcs.pdf PDF
Attachment_H_-_MCAS_New_River_Site_Visit.xlsx XLSX spreadsheet
Attachment_I_-_Directions_Map_MCAS_New_River.pdf PDF
Amendment_0003_-_Site_Visit.pdf PDF
Attachment_E_-_Small_Business_Subcontracting_Record.docx DOCX document
Attachment_G_-_Price_Proposal_Form.docx DOCX document
Amendment_0002_-_P680_CH53K_Cargo_Phase_II.pdf PDF
Attachment_F_-_Small_Business_Participation_and_Commitment_Strategy.docx DOCX document
Amendment_0001.pdf PDF
Attachment_B_-_SECNAV_5512.pdf PDF
Attachment_A_-_Pre-Proposal_Inquiry_(PPI)_Form.xlsx XLSX spreadsheet
P680_CH-53K_CARGO_LOAD_TWR.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5

|_| DESIGN #1 |_| DESIGN #2 |_| DESIGN #3 |_| DESIGN #4 |_| DESIGN #5

1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)

Firm Name:

Address:

Phone Number:

DUNS Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

5. Type of work:

|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):

Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Design Project:

A/E Design Fee: Total Construction Value:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| RFP Development |_| Designer of Record |_| Engineering Services |_| Full Plans & Specs

|_| Other (explain):

9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.

10. Provide a detailed description of what work your firm self-performed on this project:

File details come from the government source that posted it. Updated .