This notice summarizes a federal solicitation for a design-build construction project. The United States Naval Facilities Engineering Command is seeking proposals for a CH-53K Cargo Loading Tower at Marine Corps Air Station New River in North Carolina. The high-bay facility will house an operations trainer to support CH-53K Helicopter Pilot and Crew Chief training. Key requirements include a 9,795 square foot building with deep pile foundation, grade beams, reinforced concrete, CMU walls, metal roof, and roll-up doors to accommodate moving aircraft. Interior spaces must include a high-bay area for the aircraft frame and pallets, overhead crane, compressed air drops, grounding points, windows and LED lighting. Ancillary spaces such as a classroom, break area, and restrooms are also required. The solicitation will utilize lowest price technically acceptable evaluation. Proposals are due by May 2019. The estimated value is between $5-10 million. The contracting office is the United States Naval Facilities Engineering Command.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA SHEET
Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5
|_| DESIGN #1 |_| DESIGN #2 |_| DESIGN #3 |_| DESIGN #4 |_| DESIGN #5
1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)
Firm Name:
Address:
Phone Number:
DUNS Number:
Point of Contact: Contact Phone Number:
2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)
Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
3. Contract Number: Delivery/Task Order Number:
Title:
Location:
4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):
5. Type of work:
|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):
Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.
7. Construction Project:
Award Amount: Final Price:
Type of Contract/Task Order: (Check ALL that apply)
|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):
If Design-Build, identify the Lead Design Firm:______________________________________________
8. Design Project:
A/E Design Fee: Total Construction Value:
Type of Contract/Task Order: (Check ALL that apply)
|_| Design-Build |_| RFP Development |_| Designer of Record |_| Engineering Services |_| Full Plans & Specs
|_| Other (explain):
9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.
10. Provide a detailed description of what work your firm self-performed on this project: