This document package includes a federal contract opportunity notice and supporting technical calculations for a sanitary sewer lift station design.
The federal contract opportunity is for design and construction of a CH-53K Cargo Loading Tower at Marine Corps Air Station New River in North Carolina. The high-bay facility will house an operations trainer to support helicopter pilot and crew chief training. Key requirements include a deep pile foundation, CMU exterior walls, standing seam metal roof, overhead crane, compressed air drops, and hydraulic and electrical systems to operate trainer devices. The estimated contract value is between $5-10 million. The solicitation number is N40085-19-R-9102 and will be issued on May 1, 2019 via the Navy Electronic Commerce Online website.
The technical calculations provide design details for a sanitary sewer lift station to support a new aircraft hangar building at the base. The design basis is 13,320 gallons of daily wastewater flow from personnel and aircraft washings. Pump requirements are estimated at 101 gallons per minute with a total dynamic head of 21.3 feet. Wet well and force main sizing, pump specifications, and buoyancy and NPSH analyses are included. The lift station will connect to existing manholes for conveyance to an offsite pump station.
PPI_02a_-_P705-Lift_Station_Calcs.pdf
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sanitary Sewer Pump Station 1
Project Information:
New River
MCAS
I Contributory Flow:
204 personnel at 30 gal. per person+1,200*6 washings Average Daily Flow / Unit (GPD) 13320 1332 GPH Average Daily Flow (GPM) 22.2 10 HOURS OF WASTE GENERATION Peaking Factor (EPF)-dom. Only 7.5 Peak Flow (GPM) 101.0 see WW generation calc.
Pump Duty Point (GPM) 101.0 Required Pump Capacity= 101 gpm II Wetwell Volume use 5-7.5 min Design Pump Cycle Time (min) 5 Pump Run time: 113 sec
Required Volume (Gal) max 189.38 V=tq/4 Working Storage volumes (Gal) Wetwell Diameter, Inside (ft) 5 Vmin= 126.25 Working Depth (ft) min 0.86 Vmax 189.375 Working Depth (ft) max 1.29
III Wetwell Elevation Settings Pump Station Ground Elevation (msl) 21.6 WETWELL DEPTH
Influent Sewer I.E. (msl) 13.00 12.89 FT Alarm Setting Below Influent Pipe (ft) 0.50
Lag-Alarm Differential (ft) 1.00 Lead-Lag Differential (ft) 1.00 Off-Low Level Alarm Differential (ft) 0.50
High Level Alarm (msl) 12.50 Lag Pump On (msl) 11.50 Lead Pump On (msl) 10.50 Pumps Off (msl) 10.21 Low Level Alarm (msl) 9.71 Pump Suction I.E. (msl) 9.21 Wetwell I.E. (msl) 8.71
IV Total Dynamic Head Forcemain High Point (msl) 17.5 Pressure of ex. FM (msl) 0.0 PSI 0.0 ft
Static Head (ft) 8.3 Forcemain Diameter (in) 4.0 2.0 Pump Station piping
Hazen-Williams coefficient of roughness 130 130 Velocity (ft/s) 2.58 from pump
Forcemain Length (lf) 813.00 25.78 Frictional Head Loss (ft) 11.9 Minor Head Losses 1.1
Gate Valves (K=0.2) 2 0.0 Check Valves (K=2.5) 2 90 Elbows (K=0.7) 3 T (K 1 0) 2Tees (K=1.0) 2 Discharge into Manhole (K=1.0) 1 Total K 10.5 COMPARE=
Total Dynamic Head (ft) 21.3 **' ON PUMP CURVE
V Bouyancy Calculations*
Bouyant Force (lbs) 26,677 Alternate bouyancy calcs Overburden Wetwell Wall Weight (lbs) 22,767 Lip on bottom 1' wide
Required Base Thickness (ft) 6.9 Weight soil + Weight of Base= 23,382 lbs
* Assumes 7" wetwell wall thickness w/ 15% S.F. SF= 1.7 OK use base thickness of 12" Does not consider weight of soil column, pumps & equipment or fillets) Does not consider weight of pumps & equipment or fillets)
Utilizes soil column and base wt. to use 12" base thickness VI Pump Selection
Make & Model No. NP 3085 SH 3 Adaptive 256 Impeller (mm) 116 " discharge
Motor (HP) 4 Discharge (GPM) 101 Velocity (ft/s) 2.6 Pump Cycle Time (min) 10.9 (4 CYCLES PER HOUR) product NP 3085 SH 3 Adaptive 256
TS PROJECT #: P307110088
PROJECT New River - P705 Aircraft Hanger and Apron DES. BY: C.Carlsten
SUBJECT Sanitary Sewage Lift Station Design DATE: 12/13/2012
Criteria Document: UFC 3-240-04A, Wastewater Collection, 16 January 2004
BASIS OF DESIGN: per UFC 3-240-04A using contributing population basis
Average Daily Flow (ADF) = Staff: 204 persons @ 30 gpcd = 6,120 gpd Staff Shower: 204 persons @ 5 gpcd = 1,020 gpd
Industrial (Washrack): 6 aircraft @ 1,200 gpcd = 7,200 gpd ADF = 13,320 gpd
NOTES: 1 Nonresident personnel and civilian employees working 8-hour shifts will be allowed 30 gpcd, per Note 2 of Table 3-1, UFC 3-240-04A.
Average Hourly Flow (AHF) = ADF / actual hours of waste generation 7,140 gpd / 10 hours per work-day = 714 gph
Extreme Peak Flowrate (EPF) = per 3-1.b.(5) of UFC 3-240-04A, peaking factor R = C / Q power (0.167) where C = 38.2 for gallons per day or 22.5 for gallons per hour and Q = average daily flow for large areas or residential zones, or = average hourly flow for small areas or non-residential zones
This project is non-residential and therefore the peaking factor will be based on average hourly flow
R = 22.5 = 7.5 714 power 0.167
EPF = 7.5 x 714 = 5,362 gph converting to gallons per minute for pump sizing = 89 gpm
Add industrial waste to domestic waste for total peak discharge = 12 gpmp g gp
Total EPF = 101 gpm
Note: Industrial waste from the AFFF is not calculated
Required Pump Capacity = per UFC 3-240-04A, para. 3-3.a, small pump stations (flow < 700 gpm) each pump shall be capable of discharging EPF
Required Pump Capacity = 101 gpm
Working Storage Volume: per UFC 3-240-04A, para. 7-5.b. storage volume will be computed as follows;
V = tq/4 where V = required storage volume in gallons t= minimum pump cycle time, in minutes q = pumping capacity
Per Table 7-1, t = 10 to 15 minutes For small pump stations utilizing alternating pump controls, t may be reduced by 50%, therefore, t = 5 to 7.5 minutes
V (min) = 5 minutes x 101 gpm = 127 gallons
V (max) = 7.5 minutes x 101 gpm = 190 gallons per UFC 3-240-04A, para. 7-1.b.(2), force mains service small pump stations For Force Main Design: shall be sized to provide a minimum velocity of 3.5 fps at peak discharge rate.
If under 3.5 fps, both pumps must be operated manually once a week for sufficient period of time to flush out the line.
V (min) = 3.5 fps Q = 101 gpm
Max. D = (4 x Q/ 1410 x V) power 1/2 x 12 = pipe diameter, inches Max. D = 3.4 inches
Revised Sanitary Lift Station Calculations-12-13-2012.xls 12/13/2012
TS PROJECT #: P307110088
PROJECT New River - P705 Aircraft Hanger and Apron DES. BY: C.Carlsten
SUBJECT Sanitary Sewage Lift Station Design DATE: 12/13/2012
Use force main diameter = 4 inches V = 2.6 fps
Recommendation: Provide a duplex lift station capable of pumping 150 gpm with a TDH of 21.3 feet.
both pumps must be operated manually once a week for sufficient period of time to flush out the line.
New River P705 Hanger Notes:
The anticipated sanitary sewage loading for this project is estimated to be 13,320gallons per day. The domestic load is based on 204 personnel working at the hangar building times an estimated generation of 35 gallons per person per day in accordance with North Carolina regulations. The industrial load is based on using 1,200 gallons to wash one aircraft times six aircraft per day. Based on the peak domestic load plus the average industrial load, the required pump station capacity is estimated to be 101 gallons per minute. To maintain a flushing velocity of at least 3.5 feet per second, the force main shall be 3-3.5 inches in diameter, or as designed both pumps must be operated manually once a week for sufficient period of time to flush out the line.
Email - 8/22/2012 form Sonny Scozzari. Stated Lift station AS4125 has two sumbersible 25 HP Reliance pumps, 1255 RMP. Diameter of the well is 8' with an overll depth of 20'. No flow data is available.
Amendment #16, RFI 461 - The sewer flow willl go tie to MH AS053 and connect through MH AS052, MH AS051 to PS AS4125, which has ample capacity to accept flows from P705 project. We will not be connecting to
AS4114.
Email- 8/21/2012 from Derrick Barnhill. Manhole AS053 is shot #522 and has an invert out of 16.54 fet and a rim elevation of 19.84.
Revised Sanitary Lift Station Calculations-12-13-2012.xls 12/13/2012
Sanitary Sewer Pump Station 1
Project Information:
New River
MCAS
I Contributory Flow:
204 personnel at 30 gal. per person+1,200*6 washings
Average Daily Flow / Unit (GPD) 13320 1332 GPH
Average Daily Flow (GPM) 22.2 10 HOURS OF WASTE GENERATION
Peaking Factor (EPF)-dom. Only 7.5
Peak Flow (GPM) 101.0 see WW generation calc.
Pump Duty Point (GPM) 101.0 Required Pump Capacity= 101 gpm
II Wetwell Volume use 5-7.5 min Design Pump Cycle Time (min) 5 Pump Run time: 113 sec
Required Volume (Gal) max 189.38 V=tq/4 Working Storage volumes (Gal)
Wetwell Diameter, Inside (ft) 5 Vmin= 126.25
Working Depth (ft) min 0.86 Vmax 189.375
Working Depth (ft) max 1.29
III Wetwell Elevation Settings
Pump Station Ground Elevation (msl) 21.6 WETWELL DEPTH
Influent Sewer I.E. (msl) 13.00 12.89 FT
Alarm Setting Below Influent Pipe (ft) 0.50
Lag-Alarm Differential (ft) 1.00
Lead-Lag Differential (ft) 1.00
Off-Low Level Alarm Differential (ft) 0.50
High Level Alarm (msl) 12.50
Lag Pump On (msl) 11.50
Lead Pump On (msl) 10.50
Pumps Off (msl) 10.21
Low Level Alarm (msl) 9.71
Pump Suction I.E. (msl) 9.21
Wetwell I.E. (msl) 8.71
IV Total Dynamic Head
Forcemain High Point (msl) 17.5
Pressure of ex. FM (msl) 0.0 PSI 0.0 ft
Static Head (ft) 8.3
Forcemain Diameter (in) 4.0 2.0 Pump Station piping
Hazen-Williams coefficient of roughness 130 130
Velocity (ft/s) 2.58 from pump
Forcemain Length (lf) 813.00 25.78
Frictional Head Loss (ft) 11.9
Minor Head Losses 1.1
Gate Valves (K=0.2) 2 0.0
Check Valves (K=2.5) 2Check Valves (K=2.5) 2
90 Elbows (K=0.7) 3
Tees (K=1.0) 2
Discharge into Manhole (K=1.0) 1
Total K 10.5 COMPARE=
Total Dynamic Head (ft) 21.3 **' ON PUMP CURVE
V Bouyancy Calculations*
Bouyant Force (lbs) 26,677 Alternate bouyancy calcs Overburden
Wetwell Wall Weight (lbs) 22,767 Lip on bottom 1' wide
Required Base Thickness (ft) 6.9 Weight soil + Weight of Base= 23,382 lbs
* Assumes 7" wetwell wall thickness w/ 15% S.F. SF= 1.7 OK use base thickness of 12"
Does not consider weight of soil column, pumps & equipment or fillets) Does not consider weight of pumps & equipment or fillets)
Utilizes soil column and base wt. to use 12" base thickness
VI Pump Selection
Make & Model No. NP 3085 SH 3 Adaptive 256
Impeller (mm) 1164" discharge
Motor (HP) 4
Discharge (GPM) 101
Velocity (ft/s) 2.6
Pump Cycle Time (min) 10.9 (4 CYCLES PER HOUR) product NP 3085 SH 3 Adaptive 256
Project Information: Forcemain Diameter (in) 4 2.0 Pump Station piping
Hazen-Williams coefficient of roughness130 130
Forcemain Length (lf) 813 from pump
Total K 10.5 25.78
VI Generate System Head Curve
Hs Hm From Pump curve
STATIC Hf MINOR TOTAL PUMP
FLOW HEAD FRICTION LOSSES HEAD HEAD Hf=(10.448 * L * Q^1.85)/
(gpm) (feet) LOSS (ft) (feet) LOSS (ft) LOSS (ft) (D^4.8655 * C^1.85)
Hm=K*V^2/2g
0 8.3 0.0 0.0 8.3 77.5
25 8.3 0.9 0.2 9.4 68
75 8.3 7.0 0.5 15.7 59
100 8.3 11.8 0.7 20.8 43
125 8.3 17.9 0.8 27.0 35
150 8.3 25.1 1.0 34.4 23
175 8.3 33.3 1.2 42.8 9
VII Determine WHP
Peak Flow (GPM) 101.0 whp=(q)*TDH/(3960)
TDH= 21.3
WHP= 0.5 HP
Pump efficiency 74%
Brake HP= 0.7 bhp= whp/eff
Use 5 HP Min.
Shaft Power Requirements: 0.7 HP Ps=QHt/(3960Ep)
Forcemain Diameter (in) 4
Hazen-Williams coefficient of roughness 130
Forcemain Length (lf) 813
Total K 10.5
Qpeak 101.00 gpm
VIII Determine NPSH
Atmospheric Pressure. pa 14.7 PSIA
144.0 INS/SF
62.4 PCF
Atmospheric Head, ha 33.92 FT ha= pa/p=14.7*144/62.4
Vapor Pressure, vp 0.26 PSIA
144.0 INS/SF
62.4 PCF
Vapor Pressure head, hvp 0.6 hvp= pvp/p
Static Head, hs 8.3 already calculated
Minor Friction head loss, hf 1.1 hf=hs+hvp
Total 9.4
Hf=(10.448 * L * Q^1.85)/
Static Friction head, hf(s) 6.27 (D^4.8655 * C^1.85)
Available NPSH, NPSHA 47.88 ft NPSHA=ha+hs+hf(s)-hvp
Manufacturers NPSHR 17 ft NPSHA>NPSHR
Satisfies contraint yes
30.0
40.0
50.0
60.0
70.0
80.0
H e a d
L o s s
System head Curve
System Curve
Pump Curve
0.0
10.0
20.0
30.0
0 25 75 100 125 150 175
Flow
System
Requirements