RFI Response drawing updates.pdf
PDF 6 MB Posted
- Solicitation number
- N4008021R0033
About this file
This solicitation is for a firm fixed-price construction contract to repair MacDonough Hall at the U.S. Naval Academy in Annapolis, Maryland. The project scope includes replacing the 157,000 gallon training pool and treatment system, upgrading HVAC, electrical, and fire suppression systems, abating asbestos and lead paint, and making structural, plumbing, and exterior envelope repairs. The prequalification and award process will use best value source selection with tradeoffs. The prequalification phase will evaluate offerors' corporate experience, safety, small business, and past performance records to downselect to the five most qualified for the final phase. The final phase will involve a full technical evaluation and tradeoff of technical and price factors to select the best value offeror. The construction period is estimated at 1,090 calendar days. Prequalification phase proposals are due May 28, 2021, with the final phase submission date to be determined. The Naval Facilities Engineering Command Washington is the contracting agency.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
A
B C D
D.2 D.8
E
E.2 E.8
F
F.2
G
G.2 G.8
H
H.2 H.8
I
I.2 I.8
J
J.2 J.8
K
K.2 K.8
L
L.2 L.8
M
M.2 M.8
N
N.2
P
P.8
Q
Q.8
R S
1.1
1.3
1.8
2.1
2.3
2.4 2.5
2.6
2.7
2.8
2.9
2.10
3.2
3.7
E1
E44
A-201
B1
B1
A-208
A-521
D1
A-202B1
A-204
B1
A-205
B1
G.1 G.7 H.5 I.1 J.9 K.7 L.5
M.3
N.1
Sc Sc Sc Sc Sc Sc
Sc Sc Sc Sc Sc Sc
A-203 B1
B1
A-304
B1
A-304
B1
A-303
B1
A-303
A-305
B1 A3
A-523
A1
A-523
A-200
B1 B2
A-300
B2
A-300
B2
A-302
B2
A-302
A3
A-524
B2
A-301
B2
A-301
A4
A-521
A-524B1
A-526 A1
A-526A1
A3
A-524
A3
A-524
A3
A-523
A1
A-523
A-205
B1
A4
A-521
A-524 C1
A-526A1
A-526 A1
SIM.
SIM.SIM.
SIM.
A3
A-524
B3
A-521
A2
A-521
A-305
B1TOWER D
TOWER C
TOWER A
TOWER B E44 TYP.
TYP.
E44 TYP.
E1
RD
E1
E1
E44 TYP.
A3
A-525
LEGEND:
NEW GUTTER LINER
NEW COPPER
NEW SKYLITE ROOF PANELS
REPLACE ROOF PANELS,
BATTENS AND/ OR BATTEN CAPS
ABBREVIATIONS:
Sc - SCUPPER/ COLLECTOR
BOX WITH DOWNSPOUT
RD - EXISTING ROOF DRAIN
EXISTING METAL ROOF
EXISTING CATWALK
EXISTING GLAZED ROOF PANELS
(NO WORK REQUIRED)
GENERAL NOTES:
1. ALL DIMENSIONS IN THE CONTRACT DOCUMENTS ARE TO BE CONSIDERED
APPROXIMATE AND SUITABLE FOR BIDDING. THE CONTRACTOR WILL TAKE
ACTUAL DIMENSIONS FOR THE DEVELOPMENT OF SHOP DRAWING AND FOR
MANUFACTURING PROCESS. DUE TO THE NATURE OF WORK IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY ALL THE DIMENSIONS,
CONDITIONS AND REQUIREMENTS PRIOR TO COMMENCEMENT OF WORK. FIELD
VERIFICATION MUST BE REQUIRED PRIOR TO DEMOLITION, ORDERING, SHOP
DRAWINGS OR NEW INSTALLATION.
2. SHOP DRAWINGS PRODUCED FOR THIS PROJECT WILL INCLUDE PRODUCT,
DATA, AND INSTRUCTIONS FOR INSTALLATION INCLUDING DATA ON ALL
FASTENERS AND FASTENERS SPACING, PULLOUT DATA, DIAMETER,
EMBEDMENT, AND MATERIAL. PULLOUT TEST USING PROPOSED MATERIALS
MUST BE PERFORMED PRIOR TO DEVELOPMENT OF SHOP DRAWINGS.
DEVELOP SHOP DRAWINGS FOR ALL FASTENER CONDITIONS AND SUBMIT FOR
REVIEW.
3. ALL EXISTING COMPONENTS WHICH ARE TO RECIEVE NEW ROOFING AND
WATERPROOFING COATING OR TREATMENT MUST BE PREPARED ACCORDING
TO WRITTEN MANUFACTURER'S REQUIREMENTS.
4. MANY OF THE DETAILS CONTAINED HEREIN ARE DEVELOPED BASED ON DESIGN
PERFORMANCE CRITERIA AND ARE GENERIC IN NATURE. ACTUAL
INSTALLATION REQUIREMENTS ARE SOMEWHAT DEPENDANT ON SPECIFIC
PRODUCT SELECTION MADE BY CONTRACTOR DURING BIDDING AND
CONSTRUCTION. WHEN REQUIRED BY MANUFACTURER DUE TO
CONSTRUCTION OR INSTALLATION REQUIREMENTS MINOR VARIATIONS FROM
THE DETAILS SHOWN WILL BE CONSIDERED WHEN THEY MEET REQUIREMENTS
FOR CONTRACT DOCUMENTS. THE CONTRACTING OFFICER'S REPRESENTATIVE
WILL DETERMINE EQUIVALENCY OF ANY VARIATION. IF PROPOSED VARIATIONS
ARE NOT ACCEPTED, THE CONTRACTOR WILL EITHER INSTALL THE MATERIAL
AS INDICATED IN CONTRACT DRAWINGS AND SPECIFICATIONS OR REVISE THE
PRODUCT PROPOSED DETAILS AS DIRECTED BY CONTRACTING OFFICER'S
REPRESENTATIVE. MANUFACTURER REQUIREMENTS WILL BE INCORPORATED
AT NO ADDITIONAL COST TO THE GOV.
5. INFORMATION IS NOT AVAILABLE AS TO CONCEALED COMPONENTS IN
EXISTING INSTALLATION OF COPPER FLASHINGS AND DECORATIVE
ORNAMENTAL WORK INCLUDING BLOCKING, CLEATS, AND FASTENERS.
6. PRIOR TO PERFORMING THE WORK THE CONTRACTOR MUST MAKE
EXPLORATORY INVESTIGATIONS AND MUST REMOVE COMPONENTS AS
REQUIRED TO FULLY UNDERSTAND THE WORK. REMOVALS MUST BE
REINSTALLED OR TEMPORARILY WATERPROOFED. SUBMIT SHOP DRAWINGS
ON REPAIRS OF FOUND CONDITIONS. THE CONTRACTOR WILL LOCATE AND
PHOTOGRAPH EACH REPAIR AREA PRIOR TO THE DEVELOPMENT OF SHOP
DRAWINGS FOR REPAIR.
7. COPPER WORK MUST MATCH EXISTING IN DIMENSION, PROFILE, AND
ASSEMBLY. DOCUMENT EXISTING CONDITIONS AND PROVIDE MEASURED AS-
BUILT DRAWINGS FOR APPROVAL PRIOR TO ANY REMOVALS. A SAMPLE OF
EACH EXISTING COPPER COMPONENT AND SUB-ASSEMBLY MUST BE
PRESERVED ON SITE UNTIL THE NEW WORK IS APPROVED.
8. WHERE NEW COPPER IS REQUIRED TO BE SOLDERED TO EXISTING COPPER
THE EXISTING COPPER MUST BE THOROUGHLY CLEANED AND PRE-TINNED.
INITIAL JOINT MUST BE USED AS A SAMPLE AND MUST BE CLEANED AND PRE-
TINNED FOR CONTRACTING OFFICER APPROVAL.
9. CONTRACTOR WILL DRY-IN WEATHER TIGHT ALL AREAS OF WORK DAILY IN
ORDER TO PROTECT THE EXISTING FACILITY & EQUIPMENT. MAINTAIN A
SECURE AND WATERTIGHT FACILITY THROUGHOUT CONSTRUCTION.
10. ANY INSTALLATION PRIOR TO RECEIPT OF APPROVED SHOP DRAWINGS IS NOT
PERMITTED.
11. ALL PMMA COATING WILL BE FULLY REINFORCED AND APPLIED IN
ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS.
12. ALL DRAINAGE SYSTEMS INCLUDING GUTTERS, LEADER HEADS,
DOWNSPOUTS, SCUPPERS, DRAINS, AND LEADERS ARE TO BE INSPECTED AND
CLEANED AS A PART OF THIS WORK. SEE DIRECTIONS UNDER "ADDITIONAL
ROOF REPAIRS" FOR FUTHER INSTRUCTION REGAURDING REPAIRS.
COPPER ROOFING REPAIR NOTES:
VARIOUS REPAIRS TO THE COPPER ROOF ARE IDENTIFIED ON THE DRAWINGS.
1. THE CONTRACTOR WILL LOCATE AND PHOTOGRAPH EACH REPAIR AREA
PRIOR TO THE DEVELOPMENT OF SHOP DRAWINGS FOR REPAIR.
2. FOR ALL EXISTING "SEALANT REPAIRS" THE CONTRACTOR WILL REMOVE THE
SEALANT PRIOR TO PHOTOGRAPHING AND DEVELOP A DETAIL FOR EACH
REPAIR.
3. THE CONTRACTOR IS TO USE SOLDERING TECHNIQUES THAT AVOID POSSIBLE
WOOD DECK IGNITION AT ALL JOINTS.
4. PROVIDE MIN 20 OZ COPPER CLADDING UNLESS NOTED OTHERWISE.
PROVIDE MIN 16 OZ COPPER ROOF PANELS.
NAVIGATION
LUCE
MACDONOUGH
HALL
STREET
SCOTT NATATORIUM
KEYPLAN:
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
DRAWFORM REVISION: 10 MARCH 2009
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE:
D E
P A
R T
M E
N T
O
F
T
H E
V
Y
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
IG
T
O N
D .C
N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
A N
N A
P O
L
IS
M
D
U S
N A
V A
L A
C A
D E
M Y
A N
N A
P O
L
IS
M
D
F Y
P R
O
JE
C T
DES PROD DIR
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE: ON FILE
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
FIRE PROTECTION
P U
B L
IC
W
O R
K S
D E
P A
R T
M E
N T
A N
N A
P O
L
IS
1 2 3 4 5
A
B
C
D
R E
P A
IR
M
A C
D O
N O
U G
H H
A L
L B
L D
G
PLAN NORTH
1662221
8/26/2021
R E
P R
IN
T
R
E
IS
S U
E F
U L
L S
H E
E T
A
U G
A R
C H
IT
E
C T
U R
A L
O
V E
R A
LL
R O
O F
P
LA
N
A-170
JVS DKA ES
13136122
FINAL 04/09/2021
1/16" = 1'-0" B4
OVERALL ROOF PLAN
0 8' 16' 32'
SCALE: 1/16"=1'-0"
PLAN NORTH
LOCATION OF ITEMS SHOWN ON EXISTING
CONDITION/ DEMOLITION AND NEW WORK ROOFING
DRAWINGS IS APPROXIMATE. THE CONTRACTOR WILL
FIELD VERIFY EXACT LOCATION ON SITE. REFER TO
GENERAL NOTES.
WHENEVER REPLACEMENT OF EXISTING ROOF
PANEL IS SHOWN REPLACE ENTIRE LENGTH OF
PANEL FOR BIDDING ASSUME AN AVERAGE 12'
LENGTH PER ROOF PANEL.
ADDITIONAL ROOF REPAIRS
IN ADDITION TO SPECIFIC REPAIRS SHOWN IN THE DRAWINGS,
INCLUDE IN THE BID AS FOLLOWS:
- 4 PATCHES PER DETAIL C4/A-525
- 5 PATCHES PER DETAIL C1/A-525
- 15 BATTEN SEAMS REPAIR PER C2/A-525
- 200LF OF SEAM PREPERATION AND RE-SOLDER
THE CONTRACTOR WILL THOROUGHLY INSPECT THE ROOF, IDENTIFY AND PHOTOGRAPH
ALL DAMAGED CONDITIONS. CONTRACTOR WILL PREPARE AND SUBMIT TO CONTRACTING
OFFICER A LIST OF ADDITIONAL DAMAGED LOCATIONS INCLUDING PHOTOS AND
PROPOSED REPAIRS PRIOR TO PERFORMING ANY WORK ON LISTED ITEMS.
KEYNOTES
E1 PROVIDE NEW CLERESTORY
CLADDING AND FLASHING TO MATCH
ORIGINAL CONDITION
E44 PROVIDE SLOPE TO SCUPPER AT
BOTTOM OF STONE GUTTER. TYPICAL
XX
1/16" = 1'-0"
B C D D.2 D.8 E E.2 E.8 F F.2 G G.2
1.1
1.3
1.8
2.1
2.3
2.4 2.5
2.6
2.7
2.8
2.9
2.10
3.2
3.7
B2
A-300
B2
A-300
E8
E9
E23
E12
E6
E15
E5
E18 E6
E4
E6
E3 E5
E5
E2
E25 E20
E13
E19
E13
E14
E17E17
E11
E4
E3
E15
E12
E9
E8
E25
E10
E6 xE2
E11
E20
E14
E20
E19
E13
E19
E2
E19
E20
E23
E24
E19
VTR
A1
A-522
A1
A-522
C3
A-522
A3
A-526
A1
A-523
A3
A-523
A3
A-526
C3
A-522
A1
A-522
M
A T
C H
L
IN
E A
A
-1
M
A T
C H
L
IN
E A
A
-1
A-200
B1
A-203 B1
A-205
B1
G.1 G.7
E7
C3
A-522
A1
A-522
C3
A-522
A1
A-522
E5
A1
A-523
A3
A-523
E5
E5
E5
E5 E5
E5
E5
E19
E19
E5
E5
E5
TOWER A
TOWER B
Sc Sc
Sc Sc
RD
E11
E22E22
E13
E13
LEGEND:
NEW GUTTER LINER
NEW COPPER
NEW TRANSLUCENT SKYLITE ROOF PANELS
INSPECT AND RE-SOLDER ALL OPEN EXISTING
COPPER SEAMS. ASSUME 20LF OF SEAMS TO
BE RE-SOLDERED AT EAST AND WEST SIDES.
PROVIDE NEW PMMA COATING
Sc
RD
EXISTING SCUPPER. SEE A1/A-523
APPLY PMMA FLASHING IN THE EXISTING
ROOF DRAIN TO THE EXTEND POSSIBLE.
CLEAN, PREPARE, AND PAINT STRAINER.
VTR EXISTING VTR
REPLACE ROOF PANELS,
BATTENS AND/ OR BATTEN CAPS
EXISTING GLAZED ROOF PANELS TO REMAIN
NAVIGATION
LUCE
MACDONOUGH
HALL
STREET
SCOTT NATATORIUM
KEYPLAN:
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
DRAWFORM REVISION: 10 MARCH 2009
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE:
D E
P A
R T
M E
T
V
Y
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
IG
T
O N
D .C
N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
A N
N A
P O
L
IS
M
D
U S
N A
V A
L A
C A
D E
M Y
A N
N A
P O
L
IS
M
D
F Y
P R
O
JE
C T
DES PROD DIR
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE: ON FILE
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
FIRE PROTECTION
P U
B L
IC
W
O R
K S
D E
P A
R T
M E
N T
A N
N A
P O
L
IS
1 2 3 4 5
A
B
C
D
R E
P A
IR
M
A C
D O
N O
U G
H H
A L
L B
L D
G
PLAN NORTH
1662221
8/26/2021
R E
P R
IN
T
R
E
IS
S U
E F
U L
L S
H E
E T
A
U G
A R
C H
IT
E
C T
U R
A L
P
A R
T
IA
L
R O
O F
W
E S
T
P
LA
N
A-171
JVS DKA ES
13136123
FINAL 04/09/2021
1/8" = 1'-0" A3
PARTIAL ROOF PLAN - WEST
PLAN NORTH
4'0 8' 16'
SCALE: 1/8"=1'-0"
KEYNOTES
E2 INSPECT AND REPAIR ROOF TO WALL FLASHING
WHERE DAMAGED PER A1/A-521 (ASSUME 20LF AT
EACH TOWER OR TOTAL OF 80LF). REPLACE SEALANT
ON ENTIRE LENGTH
E3 PROVIDE NEW COPPER DOWNSPOUT. ROUTE TO
GUTTER
E4 CLOSE AND RE-SOLDER OPENED COPPER FLASHING.
SEE C3 AND D3 ON SHEET A-526
E5 REPAIR HOLE IN PANEL SEE C4 AND C1-A-525
E6 SEAL PIPE PENETRATION AT WALL
E7 REPAIR BATTEN COVERS. SEE C2/A-525
E8 NEW COPPER DOWNSPOUT. ROUTE TO THE GUTTER.
SEE C1 AND D3 ON A-526
E9 PROVIDE NEW COPPER EXTENSION. ROUTE TO THE
GUTTER. SEE A3/A-521
E10 REMOVE AND REPLACE SEALANT AT COPPER TO
STONE WALL FLASHING. COAT FLASHING WITH PMMA.
SEE C2/A-522
E11 REPLACE EXISTING SEALANT. ADD PMMA FLASHING TO
HEIGHT OF THE GUTTER. SEE PHOTO 19
E12 COPPER PANELS UNDER CORNICE NOT SHOWN FOR
CLARITY
E13 PROVIDE NEW CLERESTORY CLADDING AND FLASHING
TO MATCH ORIGINAL CONDITION
E14 EXISTING SNOWGUARD TO REMAIN. MODIFY BASE.
SEE C1/A-522 AND PHOTO 35 - TYPICAL AT EACH PANEL
E15 NEW 4"x5" COPPER GUTTER. SEE A3/A-521
E17 REPLACE ROOF PANEL AND ASSOCIATED RIDGE CAP
AS NEEDED. PROVIDE 6" OVERLAP BETWEEN NEW AND
EXISTING RIDGE CAP. A3/A-525 AND B3/A-521
E18 REPLACE ROOF PANEL AND ASSOCIATED ROOF TO
WALL FLASHING. SEE A3/A-525
E19 LOCATE DAMAGED ROOF PANEL, REMOVE, AND
REPLACE WITH NEW PANEL TO MATCH EXISTING.
APPROX. 12'-0" LONG ROOF PANEL. SEE C2 AND
A3/A-525
E20 SLOPE EXISTING GUTTER TO SCUPPERS. DRAINS. SEE
A3/A-523
E22 FABRICATE COPPER CRICKETS. SOLDER TO COPPER
ROOF AND FLASHING. CLEAN COPPER AND REPAIR
COPPER COUNTER FLASHING PRIOR TO INSTALLATION
OF NEW CRICKET
E23 MODIFY EXISTING VTR. SEE B4/A-521
E24 REMOVE AND REINSTALL EXISTING SNOW GUARDS AS
NEEDED TO REPLACE THE PANEL(S)
E25 PROVIDE FULLY SOLDERED SCUPPER AND COLLECTOR
HEAD AND COAT WITH PMMA. CONNECT TO NEW
DOWNSPOUT. SEE B3/A-522
1/8" = 1'-0"
APPLY TO THIS SHEET ONLY
G.8
H
H.2 H.8
I
I.2 I.8
J
J.2 J.8
K
K.2 K.8
L
L.2 L.8
1.1
1.3
1.8
2.1
2.3
2.4
2.5
2.6
2.7
2.8
2.10
3.2
3.7
E11
E2
E8 E6
E7
E9
E3
E3
E8
E11
E9
E10
E2 E11
E4
E11
TYP
TYPICAL EACH PANEL
M
A T
C H
L
IN
E A
A
-1
M
A T
C H
L
IN
E A
A
-1
M
A T
C H
L
IN
E A
A
-1
M
A T
C H
L
IN
E A
A
-1
A-204
B1
A-201
B1
E5
G.7 H.5 I.1 J.9 K.7 L.5
E4 E5
E5
E5 E5
E4
E5
E5 E5
SIM.
E6 TYPICAL EACH PANEL
E5
Sc Sc
Sc Sc
A3
A-525
LEGEND:
NEW GUTTER LINER
NEW COPPER
NEW TRANSLUCENT SKYLITE ROOF PANELS
INSPECT AND RE-SOLDER ALL OPEN EXISTING
COPPER SEAMS. ASSUME 20LF OF SEAMS TO
BE RE-SOLDERED AT EAST AND WEST SIDES.
PROVIDE NEW PMMA COATING
Sc
RD
EXISTING SCUPPER. SEE A1/A-523
APPLY PMMA FLASHING IN THE EXISTING
ROOF DRAIN TO THE EXTEND POSSIBLE.
CLEAN, PREPARE, AND PAINT STRAINER.
VTR EXISTING VTR
REPLACE ROOF PANELS,
BATTENS AND/ OR BATTEN CAPS
EXISTING GLAZED ROOF PANELS TO REMAIN
NAVIGATION
LUCE
MACDONOUGH
HALL
STREET
SCOTT NATATORIUM
KEYPLAN:
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
DRAWFORM REVISION: 10 MARCH 2009
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE:
D E
P A
R T
M E
T
V
Y
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
IG
T
O N
D .C
N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
A N
N A
P O
L
IS
M
D
U S
N A
V A
L A
C A
D E
M Y
A N
N A
P O
L
IS
M
D
F Y
P R
O
JE
C T
DES PROD DIR
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE: ON FILE
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
FIRE PROTECTION
P U
B L
IC
W
O R
K S
D E
P A
R T
M E
N T
A N
N A
P O
L
IS
1 2 3 4 5
A
B
C
D
R E
P A
IR
M
A C
D O
N O
U G
H H
A L
L B
L D
G
PLAN NORTH
1662221
8/26/2021
R E
P R
IN
T
R
E
IS
S U
E F
U L
L S
H E
E T
A
U G
A R
C H
IT
E
C T
U R
A L
P
A R
T
IA
L
R O
O F
C
E N
T R
A L)
P
LA
N
A-172
JVS DKA ES
13136124
FINAL 04/09/2021
1/8" = 1'-0" A3
PARTIAL ROOF PLAN - CENTRAL
PLAN NORTH
4'0 8' 16'
SCALE: 1/8"=1'-0"
1/8" = 1'-0"
E2 NEW GUTTER LINER. SEE A1 AND A3/A-523
E3 LOCATE AND REPLACE DAMAGED (PHOTO 33) ROOF
PANELS. PROVIDE 6" OVERLAP BETWEEN NEW AND
EXISTING. SEE A3/A-525
PROVIDE NEW APPROXIMATELY 1" WIDE BATTEN AND
COPPER BATTEN CAP TO MATCH EXISTING. PATCH PER
C2/A-525
E4 LOCATE AND REPLACE DAMAGED / PATCHED /
PENETRATED ROOF PANELS. SEE A3/A-525
E5 REPAIR PANEL. SEE C1 AND C4/A-525
E6 EXISTING SNOWGUARD TO REMAIN. MODIFY BASE.
SEE C1/A-522 AND PHOTO 35 ON SHEET A-974. TYPICAL
AT EACH PANEL.
E7 REPLACE ROOF PANELS AT LOCATIONS OF EXISTING
SNOW GUARDS
E8 REMOVE AND REINSTALL EXISTING SNOW GUARD AT
REPLACED PANELS.
E9 PROVIDE NEW CLERESTORY CLADDING AND FLASHING
TO MATCH ORIGINAL CONDITION.
E10 WALKWAY SUPPORTS. COAT WITH PMMA UP TO MINIMUM
6" ABOVE GUTTER BOTTOM.
E11 SLOPE EXISTING STONE GUTTER TO SCUPPERS
KEYNOTES APPLY TO THIS SHEET ONLY
L.8
M
M.2 M.8
N
N.2
P
P.8
Q
Q.8
R S
1.1
1.3
1.8
2.1
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
3.2
3.7
E17
E13
E6 E13
E14
E2
E10
E9
E8
E7
E19
E20
E5
E3.
E11
E17
E4
E7
E16
E8
E9
E10
E20
E19
E15
E5
E18
E2
E18
E6
E17
VTR
TOWER D
TOWER C
A3
A-525
C3
A-522
A1
A-522
D3
A-526
A1
A-522
D3
A-526
C3
A-522
A1
A-522 A1
A-522
A-524B1
M
A T
C H
L
IN
E A
A
-1
M
A T
C H
L
IN
E A
A
-1
A-202B1
M.3 N.1
E5 E5
E5
E5
E5
E5
E5
E5 E5
E5
E3
TYPICAL EACH PANEL
TYPICAL EACH PANEL
Sc Sc
Sc Sc
LEGEND:
NEW GUTTER LINER
NEW COPPER
NEW TRANSLUCENT SKYLITE ROOF PANELS
INSPECT AND RE-SOLDER ALL OPEN EXISTING
COPPER SEAMS. ASSUME 20LF OF SEAMS TO
BE RE-SOLDERED AT EAST AND WEST SIDES.
PROVIDE NEW PMMA COATING
Sc
RD
EXISTING SCUPPER. SEE A1/A-523
APPLY PMMA FLASHING IN THE EXISTING
ROOF DRAIN TO THE EXTEND POSSIBLE.
CLEAN, PREPARE, AND PAINT STRAINER.
VTR EXISTING VTR
REPLACE ROOF PANELS,
BATTENS AND/ OR BATTEN CAPS
EXISTING GLAZED ROOF PANELS TO REMAIN
NAVIGATION
LUCE
MACDONOUGH
HALL
STREET
SCOTT NATATORIUM
KEYPLAN:
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
DRAWFORM REVISION: 10 MARCH 2009
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE:
D E
P A
R T
M E
T
V
Y
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
IG
T
O N
D .C
N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
A N
N A
P O
L
IS
M
D
U S
N A
V A
L A
C A
D E
M Y
A N
N A
P O
L
IS
M
D
F Y
P R
O
JE
C T
DES PROD DIR
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE: ON FILE
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
FIRE PROTECTION
P U
B L
IC
W
O R
K S
D E
P A
R T
M E
N T
A N
N A
P O
L
IS
1 2 3 4 5
A
B
C
D
R E
P A
IR
M
A C
D O
N O
U G
H H
A L
L B
L D
G
PLAN NORTH
1662221
8/26/2021
R E
P R
IN
T
R
E
IS
S U
E F
U L
L S
H E
E T
A
U G
A R
C H
IT
E
C T
U R
A L
P
A R
T
IA
L
R O
O F
E
A S
T
P
LA
N
A-173
JVS DKA ES
13136125
FINAL 04/09/2021
1/8" = 1'-0" A3
PARTIAL ROOF PLAN - EAST
PLAN NORTH
4'0 8' 16'
SCALE: 1/8"=1'-0"
1/8" = 1'-0"
E2 NEW GUTTER LINER. SEE A1 AND A3/A-523
E3 INSPECT AND REPAIR ROOF TO WALL FLASHING WHERE
DAMAGED PER A1/A-521 (ASSUME 20LF AT EACH TOWER
OR TOTAL OF 80LF). REPLACE SEALANT ON ENTIRE
LENGTH.
E4 REPAIR REGLET. SEE C3/A-525
E5 REPAIR HOLE AND PANEL AND AREAS OF POOR
PATCHES. REPAIR PER C4/A-525 FOR DAMAGED AREA 1"
TO 2". REPAIR PER C1/A-525 FOR DAMAGED AREA 0" TO 1".
E6 EXISTING SNOWGUARD TO REMAIN. MODIFY BASE.
C1/A-522 AND PICTURE 35. TYPICAL AT EACH PANEL.
E7 PROVIDE NEW COPPER DOWNSPOUT. ROUTE TO GUTTER
E8 NEW 4" X 5" COPPER GUTTER
E9 COPPER PANELS TO REMAIN UNDER THE GUTTER ARE
NOT SHOWN FOR CLARITY.
E10 MODIFY EXISTING STEEL PIPE AS NEEDED TO DRAIN IN
GUTTER. SEE A3/A-521
E11 REMOVE AND REPLACE SEALANT AT COPPER TO STONE
WALL FLASHING. COAT WITH PMMA. SEE C2/A-522
E13 REPLACE 19 PANELS APPROX. 12' LONG AT LOCATION OF
EXISTING SNOW GUARDS.
E14 REMOVE AND REINSTALL SNOW GUARD AT REPLACED
PANELS.
E15 EXISTING COPPER ROOF. INSPECT AND RESOLDER
SEAMS. ASSUME MIN 30LF OF COPPER JOINTS TO BE
RESOLDERED. ITEM IS COVERED BY "ADDITIONAL ROOF
REPAIRS" ON SHEET A-170.
E16 REPLACE PANEL UNDER CORNICE AND ASSOCIATED
ROOF TO WALL FLASHING
E17 PROVIDE NEW COPPER CLADDING AT CLERESTORY.
MATCH ORIGINAL CONDITION.
E18 SLOPE EXISTING STONE GUTTER TO SCUPPERS (DRAINS)
E19 PROVIDE FULLY SOLDERED SCUPPER AND COLLECTOR
HEAD AND COAT WITH PMMA. CONNECT TO NEW
DOWNSPOUT. SEE B3/A-522
E20 NEW COPPER DOWNSPOUT. ROUTE TO THE GUTTER. SEE
A1/A-526
KEYNOTES APPLY TO THIS SHEET ONLY
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
DRAWFORM REVISION: 10 MARCH 2009
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE:
D E
P A
R T
M E
T
V
Y
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
IG
T
O N
D .C
N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
A N
N A
P O
L
IS
M
D
U S
N A
V A
L A
C A
D E
M Y
A N
N A
P O
L
IS
M
D
F Y
P R
O
JE
C T
DES PROD DIR
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO : DATE :
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
FIRE PROTECTION
P U
B L
IC
W O
R K
S D
E P
A R
T M
E N
T A
N N
A P
O L
IS
1 2 3 4 5
A
B
C
D
R E
P A
IR
M
A C
D O
N O
U G
H H
A L
L B
L D
G
R E
P R
IN
T
R
E
IS
S U
E F
U L
L S
H E
E T
A
U G
P
LU
M
B
IN
G D
O M
E S
T
IC
W A
T E
R O
V E
R A
LL
S C
O T
T P
O O
L F
IL
T
E R
L E
V E
L P
LA
N
PL109
1662221
BMK DLG JJB
13136526
ADDENDUM 08/19/2021
1. DRAWINGS HAVE BEEN PRODUCED FROM
EXISTING BUILDING CONSTRUCTION DOCUMENTS.
SOME DISCREPANCIES MAY EXIST. CONTRACTOR
MUST FIELD VERIFY DIMENSIONS AND SIZES
SHOWN AND MAKE ADDITIONAL MEASUREMENTS
FOR SIZES OR DIMENSIONS NOT SHOWN.
2. CONTRACTOR MUST MAKE ALL NECESSARY FIELD
MEASUREMENTS OF EXISTING EQUIPMENT, PIPING,
HVAC, PLUMBING, ELECTRICAL, COMMUNICATION,
STRUCTURAL, AND ARCHITECTURAL ELEMENTS TO
VERIFY DIMENSIONS SHOWN ON DRAWINGS AND
TO PROVIDE DIMENSIONS NOT SHOWN ON
DRAWINGS PRIOR TO FABRICATION OF ANY WORK.
CONTRACTOR MUST MODIFY WORK AS
NECESSARY BASED ON VERIFICATION OF
DIMENSIONS. COST OF MODIFICATIONS DUE TO
LACK OF VERIFICATION OF EXISTING DIMENSIONS
BY FIELD MEASUREMENT MUST BE PAID BY
CONTRACTOR.
GENERAL NOTES:
5'-0"
WIDTH
1'-0" 1'-0"1'-6" 1'-6"
L E
N G
T H
1'-0" 7"
/4
/4
1'-1 3/4"
2'-1 3/4"
E Q
E Q 1
L E
N G
T H
2'-0"2'-0"1'-0"
1'-8"
1'-0"
G.1
2.2 2.22.2
I.1
TYPE P3
HELICAL
PIER (TYP)
OF 3;
CAPACITY =
25 KIPS EA
PILE CAP
TYPE P4
HELICAL
PIER (TYP)
OF 5;
CAPACITY =
25 KIPS EA
PILE CAP
TYPE P5
℄ HELICAL PIERS
HELICAL
PIER (TYP)
OF 4;
CAPACITY =
25 KIPS EA
STABILITY HELICAL
PIER (TYP) OF 4;
CAPACITY = 10 KIPS EA
E M
B E
D
T.O. PILE CAP
= +5'-0" (±)
T.O. 1ST FLOOR SLAB
= +7'-0" (±)
THREADED ANCHOR RODS
W/ DOUBLE NUT & WASHER
BASE PLATE PER SCHEDULE, WITH 1/4"
LEVELING PLATE AND 1-1/2"
NON-SHRINK GROUT
COLUMN PER SCHEDULE
SLAB ON GRADE
PER PLAN
1'-10" SQUARE UNREINFORCED
CONCRETE ENCASEMENT
CENTERED AROUND COLUMN
ISOLATION JOINT
T.O. PILE CAP
1ST FLOOR
2ND FLOOR
B.O. GIRDER
COLUMN SCHEDULE
W x
16"x16"x3/4"
2'-0"DEPTH
REINFORCING
(BOT, E.W. - UNO)P
IL
E
C A
P
BASE PLATE
SIZE (N x B x tp)
COLUMN WORKING
LOAD (KIPS)
= +5'-0" (±)
= +7'-0" (±)
= +22'-10" (±)
MARK 2.2-G.1
ANCHORS (4) 3/4" Ø
2.2-G.7 2.2-H.5 2.2-I.1 2.2-J.9 2.2-K.7 2.2-M.3 2.2-N.12.2-L.5
60 KIPS
= VARIES
W x
W x
W x
W x
W x
W x
W x
W x
TYPE TYPE P3
95 KIPS
TYPE P5
95 KIPS
TYPE P5
#6 @ 8" O.C., E.W.
80 KIPS
TYPE P4
95 KIPS
TYPE P5
105 KIPS
TYPE P5
105 KIPS
TYPE P5
105 KIPS
TYPE P5
105 KIPS
TYPE P5
16"x16"x3/4" 16"x16"x3/4" 16"x16"x3/4" 16"x16"x3/4" 16"x16"x3/4" 16"x16"x3/4" 16"x16"x3/4" 16"x16"x3/4"
(4) 3/4" Ø
2'-0" 2'-0" 2'-0" 2'-0" 2'-0" 2'-0" 2'-0" 2'-0"
(6) #6 E.W. (8) #6 E.W. (8) #6 E.W. (8) #6 E.W. (8) #6 E.W. (8) #6 E.W. (8) #6 E.W.
(4) 3/4" Ø (4) 3/4" Ø (4) 3/4" Ø (4) 3/4" Ø (4) 3/4" Ø (4) 3/4" Ø (4) 3/4" Ø
#6 @ 8" O.C., E.W.
B
PER SCHEDULE
1 1/2" 1 1/2"
N
P E
R S
C H
E D
U L E
/2
/2
COLUMN,
PER
SCHEDULE
BASE PLATE, PER
SCHEDULE
1/4
(4) 3/4"Ø THREADED
ANCHOR RODS W/
DOUBLE NUT &
WASHER, 8"
EMBEDMENT
1'-10"
CONSTRUCTION
OR CONTROL
JOINT PER PLAN
AND STRUCTURAL
NOTES (TYP)
COLUMN, PER SCHEDULE
1/4" ISOLATION JOINT
MATERIAL (TYP), PER SPECS
PLACE THIS SLAB
SECTION AFTER
ADJACENT SLAB
HAS BEEN CAST
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
DRAWFORM REVISION: 10 MARCH 2009
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE:
D E
P A
R T
M E
T
V
Y
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
IG
T
O N
D .C
N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
A N
N A
P O
L
IS
M
D
U S
N A
V A
L A
C A
D E
M Y
A N
N A
P O
L
IS
M
D
F Y
P R
O
JE
C T
DES PROD DIR
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO : DATE :
NO SCALE
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
FIRE PROTECTION
P U
B L
IC
W
O R
K S
D E
P A
R T
M E
N T
A N
N A
P O
L
IS
1 2 3 4 5
A
B
C
D
R E
P A
IR
M
A C
D O
N O
U G
H H
A L
L B
L D
G
R E
P R
IN
T
R
E
IS
S U
E F
U L
L S
H E
E T
A
U G
C O
LU
M
N A
N D
P
IL
E C
A P
S C
H E
D U
LE
S-601
1662221
DPP MLH CJS
FINAL 04/09/2021
NTSS-601
A1 PILE CAP TYPES
NTSS-601
A4 TYPICAL SECTION AT COLUMN BASE
NTSS-601
B1 COLUMN SCHEDULE
NTSS-601
B5 BASE PLATE PLAN DETAIL
NTSS-601
C5
TYPICAL SLAB ON GRADE
ISOLATION JOINT AT COLUMN
| Sheets |
| A-170 - ARCHITECTURAL - OVERALL - ROOF PLAN |
| A-171 - ARCHITECTURAL - PARTIAL - ROOF (WEST) PLAN |
| A-172 - ARCHITECTURAL - PARTIAL - ROOF (CENTRAL) PLAN |
| A-173 - ARCHITECTURAL - PARTIAL - ROOF (EAST) PLAN |
| A-171 - ARCHITECTURAL - PARTIAL - ROOF (WEST) PLAN.pdf |
| Sheets |
| A-170 - ARCHITECTURAL - OVERALL - ROOF PLAN |
| A-171 - ARCHITECTURAL - PARTIAL - ROOF (WEST) PLAN |
| A-172 - ARCHITECTURAL - PARTIAL - ROOF (CENTRAL) PLAN |
| A-173 - ARCHITECTURAL - PARTIAL - ROOF (EAST) PLAN |
| A-172 - ARCHITECTURAL - PARTIAL - ROOF (CENTRAL) PLAN.pdf |
| Sheets |
| A-170 - ARCHITECTURAL - OVERALL - ROOF PLAN |
| A-171 - ARCHITECTURAL - PARTIAL - ROOF (WEST) PLAN |
| A-172 - ARCHITECTURAL - PARTIAL - ROOF (CENTRAL) PLAN |
| A-173 - ARCHITECTURAL - PARTIAL - ROOF (EAST) PLAN |
| A-173 - ARCHITECTURAL - PARTIAL - ROOF (EAST) PLAN.pdf |
| Sheets |
| A-170 - ARCHITECTURAL - OVERALL - ROOF PLAN |
| A-171 - ARCHITECTURAL - PARTIAL - ROOF (WEST) PLAN |
| A-172 - ARCHITECTURAL - PARTIAL - ROOF (CENTRAL) PLAN |
| A-173 - ARCHITECTURAL - PARTIAL - ROOF (EAST) PLAN |
| S-601 REISSUE.pdf |
| Sheets |
| S-601 - COLUMN AND PILE CAP SCHEDULE |
2021-09-08T14:58:50-0400
2021-09-08T14:59:26-0400
2021-09-08T14:59:33-0400
2021-09-08T14:59:42-0400
2021-09-08T14:59:42-0400
2021-09-08T14:59:42-0400
2021-09-08T15:00:32-0400
2021-09-08T15:00:46-0400
2021-09-08T15:00:46-0400
2021-09-08T15:00:46-0400
2021-09-08T15:00:47-0400
2021-09-08T15:00:47-0400
2021-09-08T15:01:01-0400
2021-09-08T15:01:22-0400
2021-09-08T15:01:22-0400
2021-09-08T15:01:23-0400
2021-09-08T15:01:23-0400
2021-09-08T15:01:23-0400
File details come from the government source that posted it. Updated .