MacD Hall PRICE PROPOSAL FORM_Revised 9-14-2021.pdf
PDF 267 KB Posted
- Solicitation number
- N4008021R0033
About this file
This document summarizes a federal solicitation for construction services to repair MacDonough Hall at the United States Naval Academy in Annapolis, Maryland. The Naval Facilities Engineering Systems Command Washington seeks a firm fixed-price contract to replace the training pool and treatment system, upgrade HVAC, electrical, and fire suppression systems, abate asbestos and lead paint, and make structural, plumbing, and exterior repairs. The base scope includes dismantling temporary spaces. Optional work includes additional masonry and concrete work. Proposals are due in two phases, with prequalification proposals due May 28, 2021 and final proposals from five prequalified firms to follow. The contract duration is 1097 calendar days with a 90-day proposal validity. The estimated value is over $39.5 million.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Naval Academy, Annapolis, MD N40080-21-R-0033
PRICE PROPOSAL FORM
REVISED 09/14/2021
REPAIR MACDONOUGH HALL
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used with the contract.
Provide the Contract Line Item Number (CLIN) lump sum price for the following Items:
CLIN 0001 – BASE PRICE – Price includes the following:
SUB-CLIN DESCRIPTION TOTAL PRICE FOR SUB-CLIN
0001AA Price for the entire work for MacDonough Hall, in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other Bid Item.
0001AB Price for ½” thick mercury catalyzed polyurethane floor system removal on the 3rd floor including shot blasting 1/8” of the concrete subfloor and refinishing.
Include the following unit prices in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other Bid Item. Unit prices shall include all necessary material, delivery, installation, removal, disposal, insurance, applicable taxes, overhead, and profit.
Polyurethane floor system
Square
Foot
Unit Price
# Units
40,000
0001AC Price for additional sampling and testing of Asbestos
Containing Material (ACM). Include the following unit prices in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other Bid Item.
Unit prices shall include all necessary material, delivery, installation, removal, disposal, insurance, applicable taxes, overhead, and profit.
Asbestos
Material
Testing &
Removing
Each Unit Price
0001AD Price for Abatement of ACM Pipe Insulation on piping up to 6” diameter per lineal foot. Include the following unit prices in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other
Bid Item. Unit prices shall include all necessary
Abatement of Pipe
Insulation
Linear
Foot
1,500
0001AE Price for Abatement of ACM Pipe Insulation Fitting on piping up to 6” diameter per fitting. Include the following unit prices in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other
Bid Item. Unit prices shall include all necessary
Abatement of Pipe
Insulation
Fitting
Fitting Unit Price
0001AF Abatement/Cleaning potentially ACM affected areas.
Include the following unit prices in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other Bid Item. Unit prices shall include all necessary
Abatement/
Cleaning of
ACM areas
Square
Foot
2,000
0001AG Price for Abatement/Disposal of ACM Containing
Fire Doors per door. Include the following unit prices in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other Bid Item. Unit prices shall include all necessary material, delivery, installation, removal, disposal, insurance, applicable taxes, overhead, and profit.
Disposal of
ACM Fire
Doors
0001AH Price for Abatement/Disposal of ACM Containing
Floor tile and Mastic. Include the following unit prices in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other Bid Item.
Unit prices shall include all necessary material, Disposal of
ACM Floor tile and
Mastic
Square
Foot
1,000
0001AJ Price for Acoustic ceiling tile removal and disposal related to mold. Include the following unit prices in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other Bid Item. Unit prices shall include all necessary material, delivery, installation, Acoustic ceiling tile
Square
Foot
0001AK Price for Masonry Cleaning related to mold. Include the following unit prices in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other Bid Item. Unit prices shall include all necessary
Masonry
Cleaning
Square
Foot
0001AL Price for removal of remnant steel rail system (up to
40 pound per lineal foot) embedded in flooring, including incidental concrete removal, beyond drawing stated amounts. Include the following unit prices in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other Bid Item.
Unit prices shall include all necessary material, Remnant steel rail system
Linear
Foot
0001AM Price for fire-stopping areas along the Scott
Natatorium. Assume each fire-stopping area of 36 square inches (6” by 6” penetration) with pipe/conduit filling 75% of the space. Include the following unit prices in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other Bid Item.
Unit prices shall include all necessary material, Fire-
Stopping
0001AN Price for light ballasts with PCBs, removal related work and disposal. Include the following unit prices in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other Bid Item. Unit prices shall include all necessary material, delivery, installation, Light ballasts with
PCBs
0001AP Price for Fluorescent light tubes with PCBs, removal related work and disposal. Include the following unit prices in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other Bid Item.
Unit prices shall include all necessary material, Fluorescent light tubes with PCBs
0001AQ Price for High Intensity Discharge Lamp with
Mercury and PCBs, removal related work and disposal. Include the following unit prices in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other Bid Item. Unit prices shall include all necessary material, delivery, installation, High
Intensity
Discharge
Lamp with
Mercury and
PCBs
0001AR Price for partnering session. Include the following unit prices in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other Bid Item.
Unit prices shall include all necessary material, Partnering
Session
Per Day Unit Price
0001AS Price for Helical Pile finished, in place, and tested.
Include the following unit prices in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other Bid Item. Unit prices shall include all necessary
Helical Pile Per Lineal
Foot
0001AT Price for replacement of deteriorate wood, installed, and finished per note 26 on sheet AD002. Include the following unit prices in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other
Bid Item. Unit prices shall include all necessary
Replacement wood
Per Board
Foot
10,000
0001AU Price for raking, removal, replacement and re/pointing of mortar per note 39 on sheet A100. Include the following unit prices in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other
Bid Item. Unit prices shall include all necessary
Mortar work Per lineal
Foot
5,000
0001AV Price for replacement and installation of brick per note
39 on sheet A100. Include the following unit prices in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other Bid Item. Unit prices shall include all necessary material, delivery, installation, Brick replacement
TOTAL PRICE FOR CLIN 0001: (0001AA-0001AV) $_________________
CLIN 0002: Additional Concrete Demolition: Price includes the following:
Price for additional concrete demolition beyond drawing stated amounts. Include the following unit prices in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other Bid Item. Unit prices shall include all necessary material, delivery, installation, removal, disposal, insurance, applicable taxes, Concrete Demolition Cubic Foot
Unit Price $_______
# Units 2,500
TOTAL PRICE FOR CLIN 0002 $_________________
CLIN 0003 – OPTION 1: Additional Mortar Work: Price includes the following:
Price for additional for raking, removal, replacement and re/pointing of mortar per note 39 on sheet
A100.. Include the following unit prices in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other Bid Item. Unit prices shall include all necessary material, delivery, installation, removal, disposal, insurance, Optional Mortar Work Lineal Foot Unit Price $_______
# Units 5,000
TOTAL PRICE FOR CLIN 0003 $_________________
CLIN 0004 – Option 2: Demobilize Dahlgren Hall: Price includes the following
Price for the return of equipment/material and demobilization of the temporary spaces in
Dahlgren Hall in accordance with the drawings and specifications, but not including the work indicated or specified to be provided under any other Bid Item.
TOTAL PRICE FOR CLIN 0004 $_________________
CLIN 0005 – Option 3: Demobilize Halsey Fieldhouse: Price includes the following:
Price for the return of equipment/material and demobilization of the temporary spaces in Halsey
Fieldhouse, in accordance with the drawings and specifications but not including the work
TOTAL PRICE FOR CLIN 0005 $_________________
CLIN 0006 – Option 4: Demobilize Various Other Areas: Price includes the following:
Price for the return of equipment/material and demobilization of the temporary and storage spaces listed in the Master FF&E Binder, in accordance with the drawings and specifications but not including the work indicated or specified to be provided under any other Bid Item.
TOTAL PRICE FOR CLIN 0006 $_________________
CLIN 0007 – OPTION 5: Basketball Court Markings: Price includes the following:
Price for providing scaled basketball court markings for room 309, but not including the work
TOTAL PRICE FOR CLIN 0007 $_________________
TOTAL PRICE FOR ALL CLINS 0001-0007 $_________________
BID NOTES:
1. The Offeror shall provide a price for all items on the Price Schedule. The Government will evaluate offers based on the total evaluated price, which is the sum of CLINS 0001 through
0007.
2. A firm fixed proposed price is required for all CLINs. No provision is made for economic price adjustment.
3. Failure to enter a price for any of the CLINS will result in the proposal being rejected as unacceptable.
4. Options will be evaluated in accordance with FAR 52.217-5 Evaluation of Options. Evaluation of the Options will not obligate the Government to execute any or all of the Options.
5. The Government reserves the unilateral right to award CLINs 0003, 0004, 0005, 0006, and/or
0007 to the Contractor at the proposed price within 365 calendar days after the contract award.
Should the Government choose to exercise any of the options after award, the contract duration will remain the same.
6. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices, which are significantly overstated for other work.
7. The Offeror’s price is valid for 90 days from the receipt of proposals.
8. Total Contract duration is 1097 calendar days after contract award.
9. If CLINs 0003, 0004, 0005, 0006, and/or 0007 are exercised after award, additional bonding and consent of surety will be required. Consequently, the Performance Bond shall reflect 100 percent of the aggregate amount of all items.
10. For Sub-CLINS that require unit pricing, enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be recognized as the intended bid and the total will be recalculated accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be recognized as the intended unit price.
Name and Address of Firm Submitting Offer:
Name and Title of Person Authorized to Sign Offer (Type or Print):
Print Name and Title
Signature Date
ACKNOWLEDGEMENT OF AMENDMENT(S)____________________________________
File details come from the government source that posted it. Updated .