N40080-21-R-0033_FINAL PHASE_RFI 01-10 _fv.pdf

PDF 415 KB Posted

Attached to
REPAIR MACDONOUGH HALL BUILDING 102, U. S. NAVAL ACADEMY, ANNAPOLIS, MD
Solicitation number
N4008021R0033
Issued by

About this file

This solicitation package involves a firm fixed-price construction contract for repair of MacDonough Hall at the U.S. Naval Academy in Annapolis, Maryland. The project includes replacing the training pool and treatment system, upgrading HVAC, abating asbestos and lead paint, upgrading electrical and fire suppression systems, structural modifications, and exterior repairs over a 1,090 calendar day performance period. The source selection process will use best value tradeoffs and prequalification of the five most highly rated offerors, who will receive the full plans and specifications for final proposals. Prequalification proposals were due May 28, 2021. The Naval Facilities Engineering Command Washington is the contracting agency. Pricing should remain valid for 90 days, and the work period will commence within 15 days of award and be complete within 1,097 calendar days, including bond approval time.

View the file

Other files

File Type Posted
N40080-21-R-0033-0014.pdf PDF
21R0033 Amendment 0013.pdf PDF
MacD Hall Site Visit 2 Roster.pdf PDF
21R0033 Amendment 0012 16SEPTEMBER2021.pdf PDF
Macdonough HAZMAT Report.pdf PDF
ATTACHMENT E_SMALL BUSINESS PARTICIPATION COMMITMENT DOCUMENT (SBPCD).pdf PDF
21R0033 Amendment 0011 15SEPTEMBER2021.pdf PDF
ATTACHMENT F_PROPOSED SMALL BUSINESS SUBCONTRACTING PLAN.pdf PDF
RFI Response drawing updates.pdf PDF
MacD Hall PRICE PROPOSAL FORM_Revised 9-14-2021.pdf PDF
21R0033 Amendment 0010 13SEPTEMBER2021.pdf PDF
21R0033 Amendment 0009 26AUGUST2021.pdf PDF
21R0033 Amendment 0008 25AUGUST2021.pdf PDF
21R0033 Amendment 0007 18AUGUST2021.pdf PDF
21R0033 Amendment 0006 16AUGUST2021.pdf PDF
01 SR14075750 DRAWINGS VOLUME 01B.pdf PDF
01 SR14075750 DRAWINGS VOLUME 03.pdf PDF
MacDonough Hall_Site Visit Attendance Record.pdf PDF
02 SR14075750 SPECS.pdf PDF
MD20210039_Mod8_8.6.2021.pdf PDF
21R0033 Amendment 0005 06AUGUST2021.pdf PDF
01 SR14075750 DRAWINGS VOLUME 01A.pdf PDF
Master FFE Binder.pdf PDF
ATTACHMENT F - Small Business Commitment Document.pdf PDF
PRICE SCHEDULE.pdf PDF
ATTACHMENT E - Proposed Small Businesses Subcontracting Plan.pdf PDF
21R0033 Amendment 0004 07MAY2021.pdf PDF
01 SR14075750 DRAWINGS VOLUME 04.pdf PDF
01 SR14075750 DRAWINGS VOLUME 02.pdf PDF
R210033 Amendment 0003.pdf PDF
R210033 Amendment 0002 25MAY2021.pdf PDF
21R0033 Amendment 0001 21MAY2021.pdf PDF
N4008021R0033_MacDonough_Hall_6MAY21.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

08/03/2021

REQUEST FOR INFORMATION (RFI) 01-10

Inquiries must be handled expeditiously. If an amendment is necessary, the Contract Specialist should be notified immediately.

CODE ACQ30

1. N40080-21-R-0033, DBB RENOVATE MACDONOUGH HALL, BUILDING 102, U.S. NAVAL

ACADEMY (USNA), ANNAPOLIS, MD

2. PROPOSAL DUE DATE: 23 August 2021

3. DATE OF INQUIRY: 03 August 2021

4. CONTRACT SPECIALIST: Eric T. Walker

5. CONTRACTING OFFICER: Lindsay Brown

6. NATURE OF INQUIRY: See inquiries below.

7. RESPONSE GIVEN BY: Joe Zurzolo

8. AMENDMENT REQUIRED: YES _X___ NO ______

9. PROPOSAL POSTPONEMENT REQUIRED: YES ______ NO __X_____

(If amendment is required less than 10 days prior to proposal due date, an extension should be considered).

If issuance of an amendment will require postponement of the proposal due date, the Contract

Specialist will notify the PM and applicable FEAD.

RFI 01. Section 00010, Solicitation Contract Form, contained within the RFP does not match the separately issued Price Schedule document. We assume the Solicitation

Contract Form in the RFP takes precedence. Please confirm.

GOVERNMENT RESPONSE: Yes. Please disregard the MS Excel price worksheet and utilize the Price Schedule within the solicitation as it takes precedence.

RFI 02. Please clarify if the breakdown by Base and Option Years needs to be submitted as part of the SBE Plan for Attachment E & F.

GOVERNMENT RESPONSE: Offerors do not need to breakout small business utilization for option years. Rather, indicate the specific small business that you will utilize for the entire project in the Base Year and Total columns for both

Attachment E and F.

RFI 03. Please confirm that line 2.k is a duplicate of line 2.j. Both are shown Alaskan

Native Corporation & Indian Tribes in Attachments E.

GOVERNMENT RESPONSE: Yes, both 2.k and 2.j appear to be request the same information in Attachment E, Small Business Subcontracting Plan. However, please complete both sections if they are applicable to your organization.

RFI 04. Dwgs ID110 – ID133, General Notes 2 – 4 states the existing furniture shown on the plans is to be removed from the building by the Contractor. Spec Section 01 30 01.00

22 makes numerous references to removal of FF&E from the existing building. During the site visit, statements were made that a separate swing contractor would be responsible for the removal of existing furniture and equipment. Please confirm the scope per the drawings and specifications is correct.

GOVERNMENT RESPONSE: Offerors are not responsible for the removal of existing furniture and equipment from MacDonough Hall. The scope per the drawings and specifications originally included work for moving the Government out of MacDonough Hall, but was extracted from this project. This effort will now be executed on a parallel track and the information was included in the solicitation for information continuity, understanding of the scope and related work for the items that will be retuned under CLINS 0009, 0010, and 0013. Offerors shall not include pricing for moving FF&E items out of MacDonough Hall in any CLIN.

RFI 05. Dwg ID110 – ID133, Note 1 & 7 drawings refer to an FF&E/GFE Binder. We are unable to locate this information in the solicitation documents. Please provide.

GOVERNMENT RESPONSE: The FF&E/GFE Binder is included in amendment

0005.

RFI 06. Please confirm that the Mechanical QC Specialist, Architectural QC Specialist and Electrical QC Specialist are not required to be full-time/on-site staff on the project.

GOVERNMENT RESPONSE: The requirements for on-site presence of QC

Specialists is stated in paragraph 1.5.5 of section 01 45 00 of the solicitation.

However, if there is no active work of any type on features of work that are the responsibility of the particular specialist, the individual would not need to be on site.

Attendance at a weekly QC meeting by that specialist may be via teleconference provided the contractor ensures adequate and clear communication. Note, submittal review and preparation, material delivery inspections, and other activities that support any of the three phases of QC (preparatory, initial, follow-up, daily reports, testing reports, etc.) are by definition work associated with a specific definable feature of work.

RFI 07. Are Offerors able to provide a summary schedule outside of the 6-page narrative limit?

GOVERNMENT RESPONSE: No. Factor 5b is not a schedule evaluation. The factor is crafted to evaluate the Offeror’s understanding of the contract requirements and the plan for QC team coordination with Government QA for both the physical and documentary work required by the contract to ensure timely coordination and execution of the project.

RFI 08. Can a BIM Model be provided to the bidders?

GOVERNMENT RESPONSE: The REVIT model in four files will be provided for reference purposes only, and does not replace the bid documents. The files will be provided by separate electronic transfer given their size.

RFI 09. Please clarify the responsibility intent for the relocation of FF&E/equipment both to the swing spaces / storage and then from the swing specs to the renovated facility.

Section 01 30 01.00 22- Relocation, Staging, and Installation of FF&E seem to say that there may be a post-award modification for both the initial relocation and the final relocation (plus any associated storage and disposal). Section 01 10 00 Summary item

1.2.1.12 as well as CLIN 0002 and 0003 only appear to talk about the final relocation for the FF&E/Equipment. Please confirm if we should be providing prices for both the initial relocation and the final relocation along with storage and disposal.

GOVERNMENT RESPONSE: Please refer to the Government’s response to RFI

04.

RFI 10. GC, ID, and IF drawings refer to a FF&E/GFE binder. Please issue this document.

GOVERNMENT RESPONSE: Please refer to the Government’s response to RFI

05.