About this file

This document is an amendment to a solicitation for a General Design-Bid-Build and Design Build HubZone Multiple Award Construction Contract. The amendment extends the proposal due date from January 10, 2020 to January 17, 2020 at 2:00 PM EST. It also provides responses to offeror questions, the attendance sheet from a December 17 site visit, and a revised past performance questionnaire. The solicitation is for new construction, repair, and renovation of various facilities within the Naval Facilities Engineering Command Washington area of responsibility, including but not limited to locations in Washington D.C., Maryland, and Virginia. The contract value for individual task orders ranges from $250,000 to $2,000,000.

View the file

Other files

File Type Posted
AMENDMENT 0006.pdf PDF
Site Visit Sheet-13JAN2020.pdf PDF
AMEND 0005-ATTACH #1-Masonry and Paint Spec - Div 04 and 09.pdf PDF
AMEND 0005-ATTACH#3-Revised Price Schedule dated 9 January 2020.docx DOCX document
AMEND 0005-ATTACH #2-Seeding Specification.pdf PDF
AMENDMENT 0005.pdf PDF
AMENDMENT 0004.pdf PDF
AMENDMENT 0003.pdf PDF
17 December Site Visit Attendance Sheet.pdf PDF
Revised Past Performance Questionnaire.docx DOCX document
PC170005.jpg JPG image
PC170001.jpg JPG image
PC170007.jpg JPG image
PC170006.jpg JPG image
PC170004.jpg JPG image
PC170002.jpg JPG image
PC170003.jpg JPG image
AMENDMENT 0001.pdf PDF
CBD Price Schedule dated 3 December 2019.docx DOCX document
CBD CATEX.pdf PDF
Past Performance Questionnaire.docx DOCX document
CBD Basis of Design Final.pdf PDF
CBD DRAWINGS-FINAL.pdf PDF
CBD SPECS - FINAL.pdf PDF
NRL SECNAV_5512-1.pdf PDF
CONSTRUCTION EXPERIENCE PROJECT DATA SHEET.docx DOCX document
SOLICITATION N4008020R0007 HUBZONE MACC.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5771079

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION N4008020R0007, IDESIGN-BUILD & DESIGN-BID-BUILD HUBZone MULTIPLE AWARD CONSTRUCTION CONTRACT FOR NEW CONSTRUCTION, REPAIR, AND RENOVATION OF VARIOUS FACILITIES AT NAVFAC WASHINGTON AREA OF RESPONSIBILITY INCLUDING

BUT NOT LIMITED TO WASHINGTON, D.C., MARYLAND AND VIRGINIA

PLEASE SEE SECTION SF30 BLOCK 14 CONTINUATION PAGE

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Dec-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008020R0007

X 9B. DATED (SEE ITEM 11)

05-Dec-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Dec-2020

CODE

NAVAL FACILITIES ENG COMMAND WASHINGTON

1314 HARWOOD ST

WASHINGTON DC 20374

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008020R0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

As an amendment to the solicitation, the following is hereby incorporated:

1. The Proposal due date has been extended to 17 January by 2:00 PM EST

2. Provide RFI Responses

3. Provide 17 December Site Visit Attendance Sheet/Pictures taken at the Site Visit

4. Provide Revised Past Performance Questionnaire

All other terms and conditions remain unchanged.

RFI RESPONSES

1. Please confirm the number of copies required for volume 2 – Non-Price Factors.

GOVERNMENT RESPONSE: Please refer to page 17 of 165 of the SF1442 Solicitation for Proposal Organization and Number of Copies.

2. Please confirm the maximum dollar value allowed for construction experience is $2,000,000.

If so this value seem abnormally low and we suspect that more typical task orders to be released under this MAC would range from 250K – 5M. Please consider revising the range of acceptable Construction Experience and Past Performance from $250K - $7,500,000.

GOVERNMENT RESPONSE: As stated in the RFP, the task order range for this MACC is $250,000 to $2,000,000. Accordingly, the RFP requires offerors to demonstrate construction experience for projects within this range.

3. The relevant projects requirements are that all construction project with a final contract value of $250,000 to $2,000,000 will only qualify. Most new Design-Build construction projects have a much larger final construction cost than $2M. Can you change the final contract value to state $250,000 to $5M so that we can give you good new D-B construction projects?

GOVERNMENT RESPONSE: As stated in Factor 1 - Construction Experience, the task order range for this MACC is $250,000 to $2,000,000. Accordingly, the RFP requires offerors to demonstrate construction experience for projects within this range.

4. Please confirm that projects completed within the past 10 years can be submitted as relevant work experience AND that they will be considered equally relevant.

GOVERNMENT RESPONSE: As stated in the Factor 1 - Construction Experience, relevant projects “shall be complete or ongoing within the past five (5) years of issuance of this RFP.” Projects completed more than five years prior to the issuance of the RFP are not relevant and will not be considered.

5. Would the owner please consider a time extension to submit this proposal.

GOVERNMENT RESPONSE: Per Amendment 0002, the Proposal Due Date has been extended to 17 January 2020 at 2:00 PM EST.

6. Reference: Factor 1 – Construction Experience (page 20) states: Each Offeror SHALL submit a TOTAL OF SIX (6) construction projects that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the projects proposed for this HUBZone MACC.

Joint Ventures of two (2) small business companies (page 21) states: If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects shall be submitted for the Joint Venture members. Offerors are limited to a total of three (3) projects combined for design-build and design-bid-build type projects. Each JV member shall submit at least one relevant project.

a. Please clarify the number of projects to be submitted if the Offeror is a Joint Venture.

b. Please clarify the project types to be submitted if the Offeror is a Joint Venture.

c. Please clarify the relevant project categories if the Offeror is a Joint Venture.

GOVERNMENT RESPONSE: As stated in Factor 1 – Construction Experience, a Joint Venture is required to submit six (6) construction projects: Three design-build and three design-bid-build. If the Joint Venture does not have sufficient shared experience to meet this requirement, projects from individual Joint Venture members may be submitted instead, but no more than a total of three design-build and three design-bid-build for six projects altogether. A Joint Venture is not required to submit three D-B projects and three D-B-B projects for each Joint Venture member as that will exceed the six project total.

ATTACHMENTS

- 17 December Site Visit Attendance Sheet

- Revised Past Performance Questionnaire

- PC170001

- PC170002

- PC170003

- PC170004

- PC170005

- PC170006

- PC170007

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 10-Jan-2020 02:00 PM to 17-Jan-2020 02:00 PM.

(End of Summary of Changes)