About this file

This document is an amendment to a solicitation for a multiple award construction contract. The Navy is seeking design-build and design-bid-build construction services for new construction, repair, and renovation projects at various facilities within the Naval Facilities Engineering Command Washington area of responsibility, including locations in Washington D.C., Maryland, and Virginia. The amendment reschedules a site visit and incorporates a revised wage determination for a seed project in Anne Arundel County, Maryland. All other terms and conditions of the original solicitation remain unchanged.

View the file

Other files

File Type Posted
AMENDMENT 0006.pdf PDF
Site Visit Sheet-13JAN2020.pdf PDF
AMEND 0005-ATTACH #1-Masonry and Paint Spec - Div 04 and 09.pdf PDF
AMEND 0005-ATTACH#3-Revised Price Schedule dated 9 January 2020.docx DOCX document
AMEND 0005-ATTACH #2-Seeding Specification.pdf PDF
AMENDMENT 0005.pdf PDF
AMENDMENT 0003.pdf PDF
17 December Site Visit Attendance Sheet.pdf PDF
Revised Past Performance Questionnaire.docx DOCX document
PC170005.jpg JPG image
PC170001.jpg JPG image
HUBZONE MACC AMENDMENT 0002.pdf PDF
PC170007.jpg JPG image
PC170006.jpg JPG image
PC170004.jpg JPG image
PC170002.jpg JPG image
PC170003.jpg JPG image
AMENDMENT 0001.pdf PDF
CBD Price Schedule dated 3 December 2019.docx DOCX document
CBD CATEX.pdf PDF
Past Performance Questionnaire.docx DOCX document
CBD Basis of Design Final.pdf PDF
CBD DRAWINGS-FINAL.pdf PDF
CBD SPECS - FINAL.pdf PDF
NRL SECNAV_5512-1.pdf PDF
CONSTRUCTION EXPERIENCE PROJECT DATA SHEET.docx DOCX document
SOLICITATION N4008020R0007 HUBZONE MACC.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5771079

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N4008020R0007, DESIGN-BUILD & DESIGN-BID-BUILD HUBZone MULTIPLE AWARD CONSTRUCTION CONTRACT FOR NEW CONSTRUCTION, REPAIR, AND RENOVATION OF VARIOUS FACILITIES AT NAVFAC WASHINGTON AREA OF RESPONSIBILITY INCLUDING BUT NOT LIMITED

TO WASHINGTON, D.C., MARYLAND AND VIRGINIA.

PLEASE SEE SECTION SF 30 BLOCK 14 CONTINUATION PAGE

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Jan-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008020R0007

X 9B. DATED (SEE ITEM 11)

05-Dec-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Jan-2020

CODE

NAVAL FACILITIES ENG COMMAND WASHINGTON

1314 HARWOOD ST

WASHINGTON DC 20374

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008020R0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0004

As an amendment to the solicitation, the following is hereby incorporated:

1. The 2nd Site Visit date has been rescheduled for January 13, 2020 at 10:00 AM at 5813 Bayside Road, Chesapeake Beach, MD 20732 - Naval Research Laboratory Chesapeake Beach Detachment, Building 6. Please refer to Amendment 0003 for instructions.

2. Incorporate revised wage determination for the Seed Project, MD20200039

All other terms and conditions remain unchanged.

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

REVISED WD SEED 01/03/20

Superseded General Decision Number: MD20190039

State: Maryland

Construction Type: Building

County: Anne Arundel County in Maryland.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020

CARP0197-004 04/01/2019

Rates Fringes

CARPENTER (Including Drywall Hanging, Form Work and Metal Stud Installation(Excluding Acoustical)......................$ 26.66 14.83

CARP0219-001 05/01/2019

Rates Fringes

MILLWRIGHT.......................$ 35.99 11.23

CARP0441-002 05/01/2018

Rates Fringes

PILEDRIVERMAN....................$ 30.18 15.03

ELEC0024-012 06/02/2019

Rates Fringes

ELECTRICIAN (Including low voltage wiring for and installation of alarms; HVAC controls)........................$ 38.00 5.25%+16.19

ELEC0024-013 06/02/2019

Rates Fringes

ELECTRICIAN (Communication and Sound Equipment).............$ 28.43 4.75%+13.02

PAID HOLIDAYS: New Year's Day, Memorial Day, Fourth of July, Labor Day, Veterans Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day

ENGI0037-026 04/01/2017

Rates Fringes

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 26.98 12.85+a OPERATOR: Bulldozer.............$ 28.93 12.85+a OPERATOR: Excavator.............$ 28.93 12.85+a OPERATOR: Forklift..............$ 28.93 12.85+a OPERATOR: Gradall...............$ 28.93 12.85+a OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 28.93 12.85+a OPERATOR: Roller excluding Asphalt..........................$ 23.35 12.85+a

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and Christmas Day.

IRON0016-012 04/01/2016

Rates Fringes

GLAZIER..........................$ 28.48 19.45

IRONWORKER (Fence Erection-Chain Link/Cyclone).....$ 28.23 19.45

IRONWORKER, ORNAMENTAL,

REINFORCING AND STRUCTURAL.......$ 28.48 19.45

IRONWORKER, SHEETING.............$ 28.73 19.45

PAIN0051-024 06/01/2018

Rates Fringes

PAINTER

Brush, Roller, Spray, Drywall Finisher/Taper and Paperhanger.................$ 25.06 9.76 Industrial..................$ 31.10 11.48

PLAS0891-005 07/01/2018

Rates Fringes

PLASTERER........................$ 29.53 6.80

PLAS0891-006 02/01/2019

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 28.45 11.28

PLAS0891-008 08/01/2016

Rates Fringes

PLASTERER (Fireproofing Including Sprayer, Mixer, and Handler) Handler.....................$ 16.50 4.89 Mixer/Pump..................$ 18.50 4.89 Sprayer.....................$ 23.00 4.89

PLUM0486-012 12/16/2018

Rates Fringes

PIPEFITTER (Including HVAC Pipe and System Installation)....$ 40.10 19.89

ROOF0030-032 07/01/2019

All Areas South of the following line: where the point at which Maryland Route No. 175 crosses into Anne Arundel County from Howard County, southeast on Highway No. 175 into Highway No. 178 into Highway No. 50, then to Highway No. 2 to West Street; east to Bay Bridge Road and follow Bay Bridge Road to the bay.

ROOFER, Excludes Installation of Metal Roofs...................$ 30.25 13.24

ROOF0030-034 07/01/2019

Remainder of Area

Rates Fringes

ROOFER, Excludes Installation of Metal Roofs...................$ 26.44 12.24

SFMD0669-001 04/01/2019

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 35.60 21.97

* SHEE0100-020 11/01/2019

SHEETMETAL WORKER (HVAC Duct Installation Only)...............$ 33.81 21.13

SUMD2010-087 08/20/2010

Rates Fringes

ABATEMENT WORKER: ASBESTOS

(Removal from Mechanical Systems).........................$ 12.37 3.91

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 22.60 8.26

BRICKLAYER (Excluding Pointing, Caulking and Cleaning)........................$ 24.20 6.22

CARPENTER (Acoustical Installation Only)...............$ 16.00 2.60

ELEVATOR MECHANIC................$ 29.11 6.13

LABORER: Common or General......$ 9.64 2.34

LABORER: Grade Checker..........$ 16.00 2.90

LABORER: Landscape..............$ 10.00 0.00

LABORER: Mason Tender - Brick...$ 12.63 1.29

LABORER: Mason Tender - Cement/Concrete..................$ 17.81 0.00

LABORER: Mason Tender - Stone...$ 14.03 0.00

LABORER: Mason Tender (Pointing, Caulking, Cleaning)...$ 12.93 0.00

LABORER: Mortar Mixer...........$ 16.61 9.08

LABORER: Pipelayer..............$ 16.00 00.00

MASON - STONE....................$ 29.82 10.05

OPERATOR: Asphalt Roller........$ 21.35 5.38

OPERATOR: Backhoe...............$ 22.78 5.94

OPERATOR: Boom..................$ 21.44 8.29

OPERATOR: Crane.................$ 20.17 4.64

OPERATOR: Grader/Blade..........$ 16.75 5.79

OPERATOR: Loader................$ 17.25

PLUMBER..........................$ 27.91 10.85

POINTER, CAULKER, CLEANER,

Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 19.75

SCAFFOLD BUILDER.................$ 16.60 0.56

SHEET METAL WORKER (Excluding HVAC Duct and Metal Roof Installation)....................$ 26.08 7.29

SHEET METAL WORKER (Metal Roof Installation Only)..........$ 20.71 6.23

TILE FINISHER....................$ 17.08 2.10

TILE SETTER......................$ 21.38 4.65

Truck Driver, Dump...............$ 15.40 1.96

TRUCK DRIVER: Tractor Haul Truck............................$ 17.87 9.98

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(End of Summary of Changes)