AMEND 0005-ATTACH#3-Revised Price Schedule dated 9 January 2020.docx

DOCX document 16 KB Posted

Attached to
General Design-Bid-Build & Design Build HubZone Multiple Award Construction Contract for New Construction, Repair, and Renovation of Various Facilities at NAVFAC Washington Area
Solicitation number
N4008020R0007
Issued by

About this file

This document contains a revised price schedule for a federal contract to demolish seven above-ground storage tanks and two pump houses at Chesapeake Beach, Maryland. The contract involves removing fuel from the storage tanks including gasoline, heptane, various petroleum fuels, JP-5 fuel, JP-4 fuel, and diesel. It also requires providing, placing, and compacting common fill. Offerors must provide fixed prices for the demolition work under CLIN 0001a and unit prices for the fuel and fill removal under CLIN 0001b. The total price will be awarded based on the combined values of CLIN 0001a and CLIN 0001b. The contract duration is 380 calendar days and prices must remain valid for 120 days from proposal receipt. The Naval Facilities Engineering Command is the contracting agency.

View the file

Other files

File Type Posted
AMENDMENT 0006.pdf PDF
Site Visit Sheet-13JAN2020.pdf PDF
AMEND 0005-ATTACH #1-Masonry and Paint Spec - Div 04 and 09.pdf PDF
AMEND 0005-ATTACH #2-Seeding Specification.pdf PDF
AMENDMENT 0005.pdf PDF
AMENDMENT 0004.pdf PDF
AMENDMENT 0003.pdf PDF
17 December Site Visit Attendance Sheet.pdf PDF
Revised Past Performance Questionnaire.docx DOCX document
PC170005.jpg JPG image
PC170001.jpg JPG image
HUBZONE MACC AMENDMENT 0002.pdf PDF
PC170007.jpg JPG image
PC170006.jpg JPG image
PC170004.jpg JPG image
PC170002.jpg JPG image
PC170003.jpg JPG image
AMENDMENT 0001.pdf PDF
CBD Price Schedule dated 3 December 2019.docx DOCX document
CBD CATEX.pdf PDF
Past Performance Questionnaire.docx DOCX document
CBD Basis of Design Final.pdf PDF
CBD DRAWINGS-FINAL.pdf PDF
CBD SPECS - FINAL.pdf PDF
NRL SECNAV_5512-1.pdf PDF
CONSTRUCTION EXPERIENCE PROJECT DATA SHEET.docx DOCX document
SOLICITATION N4008020R0007 HUBZONE MACC.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVISED PRICE SCHEDULE

215-CBD DEMO SEVEN ABOVE-GROUND STORAGE TANKS AND TWO PUMP HOUSES AT CHESAPEAKE BEACH, MD

9 JANUARY 2020

ITEM DESCRIPTION PRICE

0001 The total price for Item 0001 includes work described in Items 0001a and 0001b.

Basis of Bid for Item 0001 shall be for the entire work for CBD Demo seven above-ground storage tanks and two pump houses, in accordance with the drawings and specifications.

0001a Price for the entire work described in the drawings and specifications, but excluding work described in CLIN 0001b:

TOTAL PRICE FOR ITEM 0001a $_________________

0001b Provide unit prices for items as described in the drawings and specifications and under the FAR 51.211.18, Variation of Estimated Quantities, but excluding work described in CLIN 0001a:

Item Unit Unit Price No. Units Total Price

Fuel Removal - Gasoline Gal _________ x 60 Gal $________________

Fuel Removal - Heptane Gal _________ x 60 Gal $________________

Fuel Removal - Various Petroleum Fuels Gal _________ x 40 Gal $________________

Fuel Removal – JP-5 Fuel Gal _________ x 380 Gal $________________

Fuel Removal – JP-4 Fuel Gal _________ x 180 Gal $________________

Fuel Removal – Diesel Gal _________ x 20 Gal $________________

Provide, place, and compact common fill CY _________ x 180 CY $________________

TOTAL PRICE FOR ITEM 0001b $_________________

TOTAL PRICE FOR ITEM 0001 (0001a through 0001b) $_________________

NOTES

1. Award will be made on the total sum of Contract Line Item 0001 (0001a and 0001b).

2. Offeror shall provide a price for all items on the Price Schedule.

3. A firm fixed price is required for each item and no provision will be made for economic adjustments.

4. The Offeror’s price is valid for 120 days from the receipt of proposals.

5. Contract Clause 52.211-18, Variation in Estimated Quantity, will be included in the contract.

6. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the bidder shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.

7. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

8. Contract duration is 380 calendar days.

Name & Address of Firm Submitting Offer:

Signature:___________________________________

ACKNOWLEDGEMENT OF AMENDMENT(S):___________________________