CBD Price Schedule dated 3 December 2019.docx
DOCX document 17 KB Posted
- Solicitation number
- N4008020R0007
About this file
This price schedule outlines pricing requirements for the demolition of seven above-ground storage tanks and two pump houses at Chesapeake Beach, Maryland. Offerors must provide fixed unit pricing and extended totals for fuel and waste water tank removal, new fuel storage tank installation, and fuel and liquid removal quantities. The total price must also include installation of steel sheet piling for the seawall. Pricing is valid for 120 days from proposal receipt. The contract duration is 380 calendar days. This price schedule relates to a solicitation seeking HubZone small businesses for design-build and design-bid-build multiple award construction contracts from the Naval Facilities Engineering Command for new construction, repair, and renovation projects in Washington D.C., Maryland, and Virginia. Awards will be made on the total price provided for all work required in the price schedule.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 0006.pdf | ||
| Site Visit Sheet-13JAN2020.pdf | ||
| AMEND 0005-ATTACH #1-Masonry and Paint Spec - Div 04 and 09.pdf | ||
| AMEND 0005-ATTACH#3-Revised Price Schedule dated 9 January 2020.docx | DOCX document | |
| AMEND 0005-ATTACH #2-Seeding Specification.pdf | ||
| AMENDMENT 0005.pdf | ||
| AMENDMENT 0004.pdf | ||
| AMENDMENT 0003.pdf | ||
| 17 December Site Visit Attendance Sheet.pdf | ||
| Revised Past Performance Questionnaire.docx | DOCX document | |
| PC170005.jpg | JPG image | |
| PC170001.jpg | JPG image | |
| HUBZONE MACC AMENDMENT 0002.pdf | ||
| PC170007.jpg | JPG image | |
| PC170006.jpg | JPG image | |
| PC170004.jpg | JPG image | |
| PC170002.jpg | JPG image | |
| PC170003.jpg | JPG image | |
| AMENDMENT 0001.pdf | ||
| CBD CATEX.pdf | ||
| Past Performance Questionnaire.docx | DOCX document | |
| CBD Basis of Design Final.pdf | ||
| CBD DRAWINGS-FINAL.pdf | ||
| CBD SPECS - FINAL.pdf | ||
| NRL SECNAV_5512-1.pdf | ||
| CONSTRUCTION EXPERIENCE PROJECT DATA SHEET.docx | DOCX document | |
| SOLICITATION N4008020R0007 HUBZONE MACC.pdf |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
215-CBD DEMO SEVEN ABOVE-GROUND STORAGE TANKS AND TWO PUMP HOUSES AT CHESAPEAKE BEACH, MD
3 DECEMBER 2019
ITEM DESCRIPTION PRICE
0001 The total price for Item 0001 includes work described in Items 0001a and 0001b.
Basis of Bid for Item 0001 shall be for the entire work for CBD Demo seven above-ground storage tanks and two pump houses, in accordance with the drawings and specifications.
0001a Price for the CBD Demo seven above-ground storage tanks and two pump houses, in accordance with the drawings and specifications, but excluding work described in CLIN 0001b:
TOTAL PRICE FOR ITEM 0001a $_________________
0001b Price for procurement and installation of steel sheet piling for seawall and all associated work per square foot of accepted sheet pile in place. Complete in accordance with the drawings and specifications, but excluding work described in CLIN 0001a:
Item Unit Unit Price No. Units Total Price Fuel Tank Removal Ea _________ x 7 Ea $________________
New 1000 Gal Double Wall Gasoline Storage Tank Ea _________ x 1 Ea $________________
Fuel Removal - Gasoline Gal _________ x 60 Gal $________________
Fuel Removal - Heptane Gal _________ x 60 Gal $________________
Fuel Removal - Various Petroleum Fuels Gal _________ x 40 Gal $________________
Fuel Removal – JP-5 Fuel Gal _________ x 380 Gal $________________
Fuel Removal – JP-4 Fuel Gal _________ x 180 Gal $________________
Fuel Removal – Diesel Gal _________ x 20 Gal $________________
Sprinkler Waste Water Tank Removal Ea _________ x 2 Ea $________________
Provide, place, and compact common fill CY _________ x 180 CY $________________
TOTAL PRICE FOR ITEM 0001b $_________________
TOTAL PRICE FOR ITEM 0001 (0001a through 0001b) $_________________
NOTES
1. Award will be made on the total sum of Contract Line Item 0001.
2. Offeror shall provide a price for all items on the Price Schedule.
3. A firm fixed price is required for each item and no provision will be made for economic adjustments.
4. The Offeror’s price is valid for 120 days from the receipt of proposals.
5. Contract Clause 52.211-18, Variation in Estimated Quantity, will be included in the contract.
6. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the bidder shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.
7. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
8. Contract duration is 380 calendar days.
Name & Address of Firm Submitting Offer: