AMENDMENT 0004.pdf
PDF 381 KB Posted
- Attached to
- 8(a) Small Business Multiple Award Construction Contract Federal contract opportunity
- Solicitation number
- N4008019R0001
About this file
This amendment modifies a solicitation for an 8(a) Small Business Multiple Award Construction Contract to provide new construction, repairs and renovations for various facilities within the Naval Facilities Engineering Command area of responsibility including Washington, DC, Maryland and Virginia. The amendment extends the proposal due date to April 27, 2021 while keeping the same time of submission. It also revises the evaluation criteria for factor 2 experience to consider experience of proposed subcontractors if there is a formal agreement such as an SBA Mentor/Protege agreement or joint venture in place. Offerors contemplating a joint venture must provide evidence of an approved SBA Mentor-Protege joint venture agreement in their proposal by the due date or their proposal will be ineligible for award.
View the file
Other files for this federal contract opportunity
Show all 50
8(a) Small Business Multiple Award Construction Contract has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5607219
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SOLICITATION N40080-19-R-0001-8(a) SMALL BUSINESS MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR NEW CONSTRUCTION, REPAIR AND RENOVATION OF VARIOUS FACILITIES AT NAVAL FACILITIES ENGINEERING COMMAND (NAVFAC) WASHINGTON AREA OF RESPONSIBILITY INCLUDING BUT NOT LIMITED TO WASHINGTON, DC, MARYLAND AND VIRGINIA
Proposal due date is hereby extended to 27 April 2021, time of submission remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Apr-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008019R0001
X 9B. DATED (SEE ITEM 11)
18-Mar-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Apr-2021
CODE
NAVAL FACILITIES ENG COMMAND WASHINGTON
1314 HARWOOD ST.
WASHINGTON DC 20374
N40080 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008019R0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0004
Factor 2 Experience response #9 issued in Amendment 0002 is revised see highlighted area that has been revised as follow:
FROM: EXPERIENCE OF PROPOSED SUBCONTRACTORS WILL NOT BE CONSIDERED FOR
CONSTRUCTION EXPERIENCE, UNLESS THERE IS A FORMAL AGREEMENT (I.E.,
MENTOR/PROTÉGÉ. JV, PARTNERING, TEAMING AGREEMENT)
TO: EXPERIENCE OF PROPOSED SUBCONTRACTORS WILL NOT BE CONSIDERED FOR
CONSTRUCTION EXPERIENCE, UNLESS THERE IS A FORMAL AGREEMENT (I.E., SBA
MENTOR/PROTÉGÉ AGREEMENTS AND, JV ARRANGEMENTS)
FROM: IF THE JOINT VENTURE IS AN SBA APPROVED MENTOR/PROTÉGÉ, RELEVANT
PROJECT EXPERIENCE SHOULD BE SUBMITTED FOR PROJECTS COMPLETED EITHER BY THE
MENTOR, THE PROTÉGÉ, OR THE JOINT VENTURE ENTITY. THE OFFEROR SHALL SUBMIT A
SIGNED COPY OF THE JOINT VENTURE AGREEMENT INDICATING THE PROPOSED
PARTICIPATION OF EACH JOINT VENTURE MEMBER. OFFERORS CONTEMPLATING A JOINT
VENTURE SHALL SHOW EVIDENCE IN THEIR PROPOSAL THAT THE JOINT VENTURE
AGREEMENT HAS BEEN DRAFTED PRIOR TO PROPOSAL DUE DATE. FAILURE TO SUBMIT
EVIDENCE IN THEIR PROPOSAL OF THE JOINT VENTURE AGREEMENT PRIOR TO PROPOSAL
DUE DATE MAY RESULT IN A LOWER RATING.
Joint Ventures of an SBA approved mentor/protégé Agreement:
TO: IF THE JOINT VENTURE IS AN SBA APPROVED MENTOR/PROTÉGÉ, RELEVANT PROJECT
EXPERIENCE SHOULD BE SUBMITTED FOR PROJECTS COMPLETED EITHER BY THE MENTOR,
THE PROTÉGÉ, OR THE JOINT VENTURE ENTITY. THE OFFEROR SHALL SUBMIT A SIGNED
COPY OF THE JOINT VENTURE AGREEMENT INDICATING THE PROPOSED PARTICIPATION OF
EACH JOINT VENTURE MEMBER. OFFERORS CONTEMPLATING A JOINT VENTURE SHALL
SHOW EVIDENCE IN THEIR PROPOSAL THAT THE MENTOR-PROTÉGÉ JOINT VENTURE
AGREEMENT HAS BEEN APPROVED BY SBA PRIOR TO PROPOSAL DUE DATE. FAILURE TO
SUBMIT EVIDENCE IN THEIR PROPOSAL OF THE JOINT VENTURE AGREEMENT PRIOR TO
PROPOSAL DUE DATE WILL RESULT IN THE PROPOSAL BEING INELIGIBLE FOR AWARD.
END OF AMENDMENT 0004
(End of Summary of Changes)
File details come from the government source that posted it. Updated .