About this file

This document contains an amendment to a solicitation for an 8(a) Multiple Award Construction Contract. The Naval Facilities Engineering Command Washington is seeking to award approximately five indefinite-delivery indefinite-quantity contracts for new construction, repairs, and renovations of various facilities within their area of responsibility, including Washington D.C., Maryland, and Virginia. The contracts would have a one-year base period with options to extend up to a total of eight years, and a maximum total value of $750 million shared among the awardees. Task orders awarded under the contracts would be on a firm-fixed price basis for a variety of small and large construction projects ranging in value from $250,000 to $5,000,000.

View the file

Other files for this federal contract opportunity

Other files attached to 8(a) Small Business Multiple Award Construction Contract, newest first.
File Type Posted
DSC06057.JPG JPG image
DSC06051.JPG JPG image
DSC06046.JPG JPG image
DSC06045.JPG JPG image
DSC06059.JPG JPG image
DSC06058.JPG JPG image
DSC06061.JPG JPG image
DSC06053.JPG JPG image
DSC06052.JPG JPG image
DSC06060.JPG JPG image
AMENDMENT0017.pdf PDF
SET 2 PHOTOS.docx DOCX document
SET 1 PHOTOS.docx DOCX document
57-5.PDF PDF
57.PDF PDF
AMENDMENT0016.pdf PDF
57-2.PDF PDF
Building 57 Data 2015.xlsx XLSX spreadsheet
57-4.PDF PDF
57-3.PDF PDF
57-1.PDF PDF
SITE VISIT SIGN SHEETS.pdf PDF
NRL 57 - Roof Replacement Drawings.pdf PDF
057 1FL panel info.pdf PDF
AMENDMENT 0015.pdf PDF
AMENDMENT 0014.pdf PDF
AMENDMENT 0013.pdf PDF
AMENDMENT 0012.pdf PDF
2022-01-07 NRL 57 FINAL RFP .pdf PDF
NRL Visitor Access Request List.xlsx XLSX spreadsheet
DC WAGE RATE.pdf PDF
NRL Visitor Vaccination Procedures.pdf PDF
AMENDMENT 0011 PHASE II.pdf PDF
SECNAV_ 5512_1 (1) Rev Jan 2021.pdf PDF
SECNAV fax numbers.pdf PDF
AMENDMENT 0010.pdf PDF
AMENDMENT 0009.pdf PDF
AMENDMENT 0008.pdf PDF
AMENDMENT 0007.pdf PDF
AMENDMENT 0006.pdf PDF
AMENDMENT 0005.pdf PDF
AMENDMENT 0004.pdf PDF
AMENDMENT 0003.pdf PDF
ATTACHMENT D-Safety Data Sheet.docx DOCX document
AMENDMENT 0002.pdf PDF
ATTACHMENT C Pre Proposal Inquiry Form PPI Form.docx DOCX document
ATTACHMENT A Construction and Design Experience Project Data Sheet.doc DOC document
ATTACHMENT D Safety Data Sheet.docx DOCX document
ATTACHMENT B Past Performance Questionnaire.doc DOC document
SOLICITATION 19R0001.pdf PDF
Show all 50

8(a) Small Business Multiple Award Construction Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5607219

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION N40080-19-R-0001-8(a) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACc) FOR NEW CONSTRUCTION REPAIR AND RENOVATION OF VARIOUS FACILITIES AT NAVFAC WASHINGTON, AREA OF RESPONSBILITY INCLUDING BUT NOT LIMITED TO

WASHINGTON, DC MARYLAND, AND VIRGINIA

As an amendment the follow ing is hereby incorporated:

General Provisions Responses to Pre Proposal Inquiries (PPI)

CONTINUED

1. CONTRACT ID CODE PAGE OF PAGES

J 1 23

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Apr-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008019R0001

X 9B. DATED (SEE ITEM 11)

18-Mar-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Apr-2021

CODE

NAVAL FACILITIES ENG COMMAND WASHINGTON

1314 HARWOOD ST.

WASHINGTON DC 20374

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008019R0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0001

1. Spec Section : 00 21 13 – Instructions to Bidder

Verifying that there is no business data requirement for Phase I. Business data being bonding information, financials, and reps/certs. We did not see the requirement in the solicitation documents.

GOVERNMENT RESPONSE: BID BOND IS REQUIRED. SUBMIT IN ACCORDANCE

WITH THE RFP.

2.

GOVERNMENT RESPONSE: SEE ATTACHED SECTION OF TABLE OF CONTENTS.

THE INTENDED QUANTITY OF MACC CONTRACTS TO BE AWARDED IS

APPROXIMATELY FIVE (5). REQUIREMENTS WILLNOT BE LOWERED.

3. Solicitation Page 14 – Factor 1 Management Approach states that the management approach narrative shall be limited to two (2) single sided pages including the organizational chart. Please confirm this requirement.

Solicitation Page 19 & 20 – Factor 3 Safety states that the technical approach to safety narrative shall be limited to two (2) single sided pages. Please confirm this requirement.

No specific bonding capability requirements are stated in the solicitation for Phase 1. What are the minimum requirements for both single award and aggregate bonding capacity?

Please provide the missing Sections of the Solicitation as listed in the Table of Contents.

Please provide the Scale and/or Assessment Rating schedule that will be utilized in the basis of evaluation for Factors 2, 3, 4, and 5.

Participation in Phase II is identified as limited to (10), but what is the intended quantity of MACC contracts to be awarded at the close of Phase II?

From previous experience (historical) on 8(a) MACC’s for NAVFAC 50% or more of the task orders tracked fell less than $1M in contract value, please consider lowering the experience requirements for design and construction to $250K on the lower range to allow for this experience to be utilized under this solicitation since it is the most relevant experience. The $1M minimum experience threshold also makes for unduly restriction on competition for 8(a) participants.

Will proof of bonding capacity be required to be submitted with the Phase 1 proposals?

GOVERNMENT RESPONSE: CONFIRM SUBMIT PER THE FACTOR. BID BOND

REQUIRED WITH PHASE I.

4. Pre-solicitation for this requirement stated that the Government intends to award no more than five (5) contracts resulting from this solicitation to the responsible offerors whose proposals represent the best value after evaluation in accordance with the factors in the solicitation. Is this still the intent of this solicitation?

Pre-solicitation for this requirement Page 1 stated that this procurement is limited to certified 8(a) firms located within the geographical area serviced by the SBA Baltimore District Office, the SBA Washington Metropolitan Area District Office, and the SBA Richmond District Office.

This language is not included in the solicitation. Will this requirement apply to this procurement?

GOVERNMENT RESPONSE: YES WE WILL AWARD APPROXIMATELY FIVE (5)

CONTRACTS FROM THIS SOLICITATION. REFER TO THE RFP NOT THE PRE

SOLICITATION.

5. On page 18 of the solicitation, Factor-3 Safety calls out the requirements for submission of this factor. Attachment D was enclosed with the solicitation to be used to fulfill this requirement. Attachment D does not match the requirements in the solicitation. Attachment D

2. calls for EMR’s. No requirement is listed in the solicitation for EMR’s. The DART rate is listed as 3 years on the Attachment D and 5 years in the solicitation. TRC rates are listed as 3 years in Attachment D and 5 years in the solicitation. There is no area in Attachment D to provide the Technical Approach to Safety. Is this section to be stand alone from Attachment D? Please resolve the differences between the solicitation and Attachment D.

GOVERNMENT RESPONSE: ATTACHMENT D IS NO LONGER REQUIRED.

6. Pg. 10-11 of RFP, Section 00 21 13 - Instructions to Bidders references electronic proposal submission instructions as well as hard copy submittal instructions. Please confirm that both electronic and hard copy submittals are required. Please also confirm that we must submit 1 original hard copy and 1 additional hard copy.

GOVERNMENT RESPONSE: CONFIRM BOTH ELECTRONIC AND HARD COPIES

ARE REQUIRED. CONFIRM HARD COPY PROPOSAL CONSIST OF 1 ORIGINAL

AND 1 COPY.

7. Please confirm that MAILED HARD COPIES (one original, one copy) of the proposal are required in addition to the DoD SAFE upload.

GOVERNMENT RESPONSE: SEE RESPONSE TO #6

8. Page 11 of 60 seems to indicate that the mailed proposal hard copies would be due at a later date and time as the electronic proposal submission, which makes sense since hard copies must be finalized and shipped several days prior to the due date and time. With this type of submission, offerors would produce hard copies of the uploaded proposal and ship the required copies to the government.

However, this same page in the solicitation states that the hard copy proposals are due at the same time and date as the electronic proposals. This disconnect creates several items of risk:

With a due date landing on a Monday and hand delivery of proposals specifically prohibited, hard copies will need to be produced and shipped the preceding Thursday or Friday. If any proposal information changes while the hard copy is in transit, the hard copy will not match the uploaded copy. If there are discrepancies between the hard copy and electronic copy, which copy prevails?

There are several options NAVFAC can consider to potentially resolve this issue:

Allow Offerors to print and ship their hard copies after electronic submission (typically 2-3 days after the solicitation closes). This guarantees all copies will be identical.

Remove the requirement to submit hard copies altogether with all offers submitted electronically via DoD SAFE. Remove the requirement for electronic DoD SAFE upload and have electronic copies submitted on CD or thumb drive with the proposal hard copies. Thus, the hard copies and electronic copies will be shipped at the same time, in the same package, guaranteeing all copies will be identical.

GOVERNMENT RESPONSE: SEE RESPONSE TO #6

9. Please consider removing the requirement for the submission of proposal hard copies. With hand delivery of proposals prohibited, this requirement reduces the proposal response time by several days to allow for delivery by commercial carriers.

GOVERNMENT RESPONSE: SEE RESPONSE TO #6

10. Would you please provide clarification on the following from Section 00 21 13 of the above referenced Solicitation:

Proposal submission due date – BOX 13 of the SF1442 indicates 19 April 2021 at 2 PM EST for the Hard Copy proposals but references BOX 13 of the SF1442 is for ELECTRONIC PROPOSAL SUBMISSION. Are both electronic and hard copy submissions due at the same date/time?

GOVERNMENT RESPONSE: YES

11. Section 00 21 13 - Instructions to Bidders (page 10 or 60 of the Solicitation) states that proposals are supposed to be submitted through the DoD SAFE Site; however, later in that section (page 11 of 60 of the Solicitation) it states that hard copy proposals are to be submitted.

Can you please confirm that due to the COVID-19 pandemic that one electronic copy ONLY of the Phase One Proposal is to be submitted electronically via the DoD SAFE Site?

GOVERNMENT RESPONSE: SEE RESPONSE TO #6

12. Factor 3 requires us to submit our DART and TCR rates; however, Attachment D – Safety Data Sheet issued with the solicitation files requires EMR, DART and TCR information. Can you please clarify what information is to be provided in Factor 3 – Safety?

GOVERNMENT RESPONSE: SEE RESPONSE #5.

13. RFP page 10, #7 and #8: The RFP references both electronic submission and mailed hard copy. Does the proposal need to be submitted in both electronic and hard copy?

GOVERNMENT RESPONSE: SEE RESPONSE TO #6

14. RFP page 10 and 11.The RFP states to an electronic copy and a hard copy are required for submission. Solicitation states Hard Copies are required and hand delivery is not permitted. If the electronic copy arrives on time. Will a copy of a FED EX/UPS Shipping Label showing ship date, delivery address and tracking number be acceptable as verification of timely delivery of the Proposal Hard Copy if for some reason the Hard Copy does not make it to the intended address on time?

GOVERNMENT RESPONSE: SEE RESPONSE #6

15. Section 00 21 13 (7) – Instructions to Bidders Under Section 7, it states that Contractors shall send their Electronic Proposal submissions to Cynthia Crowder through the DOD Safe Site. But then in Section 8, it states that we are also to mail a hard copy as well (Price and Non-Price Factors). In Phase I, there is only the submission of the Technical/Non-Price Factors. Please clarify if we need to submit an electronic proposal as well as a hard copy via mail.

GOVERNMENT RESPONSE: SEE RESPONSE #6

16. If we need to submit a hard copy, can the Hard copy, since it cannot be hand delivered, can we send it via FEDEx or UPS?

GOVERNMENT RESPONSE: YES

17. Please confirm that a bid bond is not required to be submitted for Phase.

GOVERNMENT RESPONSE: SEE RESPONSE #3 BID BOND IS REQUIRED.

18. How many Contractors will be selected for this MACC?

GOVERNMENT RESPONSE: SEE RESPONSE TO #4

19. Will all Contractors selected to submit price proposals for Phase II be considered as those that have been selected for the MACC?

GOVERNMENT RESPONSE: NO SEE RESPONSE #4

20. Solicitation Section 00 21 13 – Instruction to Bidders 7. Electronic Submission of Proposals,

8. Mailed Hard Copy] Would the Government please confirm if Offeror’s may choose between Electronic Submission of this Proposal or Mailed Hard Copy Submission and that both submission methods are not required.

GOVERNMENT RESPONSE: SEE RESPONSE #6

21. Solicitation Section 00 21 13 – Instruction to Bidders] Would the Government please advise where to include the SF1442 in Phase I Proposal Submissions.

GOVERNMENT RESPONSE: PHASE I TECHNICAL PROPOSAL SUBMISSION.

OFFEROR SHALL SUBMIT TECHNICAL PROPOSAL IN ACCORDANCE WITH

RESPONSE TO #6 WHICH INCLUDES

1. A COVER PAGE WITH SOLICITATION NUMBER, PROJECT TITLE, PRIME

CONTRACTOR NAME, ADDRESS, PHONE NUMBER, DUNS NUMBER, CAGE

CODE, POINT OF CONTACT, THEIR PHONE NUMBER AND EMAIL

ADDRESS

2. TEXT PAGES 8-1/2 x 11 FORMAT, FONT SIZE 10.

3. SIGNED (SF1442) WITH ALL AMENDMENTS ACKNOWLEDGEA

COMPLETE ELECTRONIC

4. LIMIT IS NOT TO EXCEED THIRTY (30) DOUBLE-SIDED PAGES OR SIXTY

(60) SINGLE-SIDED PAGES FOR PHASE I TECHNICAL PROPOSAL.

SUBMISSION OVER THIS PAGE LIMIT WILL NOT BE EVALUATED.

22. Solicitation Section 00 21 13 – Instruction to Bidders] Would the Government please confirm if a Bonding Letter is required in Phase I Proposal Submissions.

GOVERNMENT RESPONSE: SEE RESPONSE #3

23. Solicitation Section 00 21 13 – Instruction to Bidders Phase II Factor 5 Technical Solutions Price pg. 22 of 60] Would the Government please confirm that none of the items listed in the forementioned section should be provided with Phase I Proposal Submissions as they are only mentioned to be included in Phase II. These items include: SF1442, Reps & Certs, VETS 4212, Cover Page.

GOVERNMENT RESPONSE: ONLY PHASE I PROPOSAL SUBMSSION IS

REQUIRED AT THIS TIME.

24. Solicitation Section 00 21 13 – Instruction to Bidders Phase II Factor 5 Technical Solutions Price pg. 22 of 60] If the Government determines that any documentation listed in the forementioned section shall be included in Phase I Proposal Submissions, please provide instructions on where this documentation shall be included and whether any page limitations will apply.

GOVERNMENT RESPONSE: SUBMIT PER THE RFP.

25. Solicitation Section 00 21 13 – Instruction to Bidders Phase II Factor 5 Technical Solutions Price pg. 22 of 60] The Government has listed in the forementioned section that the proposal shall be 8.5x11 format minimum 10 point font. Please confirm if this also applies to Phase I Proposal Submissions.

GOVERNMENT RESPONSE: CONFIRMED

26. Solicitation Section 00 21 13 – Instruction to Bidders 6 PPI] Does the Government intend to allow an additional two to three calendar days for any follow-on questions that may arise from Government responses to published answered PPIs?

GOVERNMENT RESPONSE: NO

27. RFP Attachment D (Safety Data Sheet) asks for different information than is requested in Section 00 21 13 - Instructions to Bidders. The solicitation instructions for Factor 3 (Safety) indicate that offerors should provide their DART rates and TCRs for calendar years 2015, 2016, 2017, 2018, and 2019. However, the Safety Data Sheet asks for EMRs, DART rates, and TRCs.

Please clarify which safety metrics are to be provided.

GOVERNMENT RESPONSE: SEE RESPONSE #5

28. How many IDIQ contracts does NAVFAC intend to award?

GOVERNMENT RESPONSE: SEE RESPONSE #4

29. How many paper versions are required for the Phase I submission? The SF 1442 Block 13 suggests that it might be one paper original and one paper copy. Is that correct?

GOVERNMENT RESPONSE: SEE RESPONSE TO #6

30. Both the electronic and the paper versions are due before 2:00 p.m. EDT on April 19, correct?

GOVERNMENT RESPONSE: YES

31. There are no restrictions on margins or font size, correct?

GOVERNMENT RESPONSE: SUBMIT PER THE RFP.

32. It appears as though nothing else besides what is required for Factors 1-4 is required for Phase I. No bondability letter, SF 1442, acknowledgement of amendments, or anything else seems to be needed. Is that correct?

GOVERNMENT RESPONSE: SEE #3.

33. Please confirm the number of hard copies required for submission. Section 00 21 13 -

Instructions to Bidders.

GOVERNMENT RESPONSE: SEE RESPONSE #6

34. Please confirm that only the items listed as Phase I factors are due to be submitted by bidders by the proposal response deadline listed in the government’s SF 1442 (Block 13) for this procurement, and that Phase II factors will be submitted at a later (yet to be defined) deadline.

GOVERNMENT RESPONSE: CONFIRMED SEE RESPONSE TO #6 AND #21

35. RFP Reference: Instructions to Bidders, Page 10 of 60, Mailed Hard Copy instructions. Due to COVID, do we have the option to just submit electronically through the DOD Safe Site, and not have to submit a hard copy proposal?

GOVERNMENT RESPONSE: NO OPTION SUBMIT PER THE RFP.

36. RFP Reference: Instructions to Bidders, Phase II, 21/22 of 60, Price. If a Hard Copy submittal is required, are the Copies and Page Limitation requirements for Phase I the same as the requirements for Phase II?

GOVERNMENT RESPONSE: FOLLOW INSTRUCTION FOR SUBMISSION OF

PHASE I.

37. RFP Reference: Section 00 73 00 – Supplementary Conditions, Page 60 of 60, NFAS 28.102-3-100 NOTICE OF BONDING REQUIREMENTS Within 10 days after receipt of award, the offeror to whom the award is made shall furnish the bonds required by FAR Clause 52.228-15. Offerors are hereby notified that the contract time for purposes of fixing the completion date, default, and liquidated damages will be as stated in FAR Clause 52.211-10 Commencement, Prosecution, and Completion of Work, regardless of when performance and payment bonds or deposits in lieu of surety are executed. (End of NAVFAC language). Do we need to provide the government with a bid bond guarantee letter with the proposal?

Requirements were unclear.

GOVERNMENT RESPONSE: SEE RESPONSE TO #3

38. Can you please confirm that a bid guarantee is not required in Phase I as the Price Proposal is not required until Phase II? (Page 1, RFP states “An offer guarantee is required).

GOVERNMENT RESPONSE: SEE RESPONSE #3

39. We kindly request that the requirement for hard copies be waived due to extenuating circumstances surrounding COVID. (Section 00 21 13 - Instructions to Bidders, Page 10, RFP)

GOVERNMENT RESPONSE: SUBMIT PER THE RFP.

40. Can you please confirm the minimum text size and format required in Phase I are 10 point font and 8 ½ x 11? There was only one reference to a text size and font required but it is for Phase II. (Specification Section and Page Number: PRICE Page 22 of the RFP states “Text pages 8 ½ x 11 format, minimum 10 point font.”)

GOVERNMENT RESPONSE: ONLY PHASE I SUBMISSION IS REQUIRED, SUBMIT

PER THE RFP.

41. Please confirm that Hard Copy Proposals are required in addition to electronic proposals – and that both are due at the same time (4/19/2021 @ 2:00 PM EST).

GOVERNMENT RESPONSE: CONFIRMED

43. Section 00 21 13 – Instructions to Bidders, page 10: Are we to submit both electronic AND hard copy proposals, or is it up to the offeror which submission method to use?

GOVERNMENT RESPONSE: SEE RESPONSE #6 AND THE ABOVE RESPONSE.

44. Section 00 21 13 requires electronic submission of proposals, as well as mailed hard copies. In light of the ongoing COVID-19 situation, would the government consider omitting the requirement for hard copies? If hard copies are required, please confirm the number of copies required to be submitted.

GOVERNMENT RESPONSE: NO

45. Page 22 of 60 defines the page size, font and number of copies required for the price proposal.

Do those same requirements apply to the Phase I proposal?

GOVERNMENT RESPONSE: SEE RESPONSE #6

46. Section 00 21 13 | Page 10/60: The government stated that they are wanting HARD COPY submissions. Can you confirm that this is true?

GOVERNMENT RESPONSE: SEE RESPONSE #6.

47. On Section 00 21 13 Instruction to Bidders, para. 8; it states a hard copy is due same time as the Electronic Proposal as shown in Box 13 on SF1442. Is it the intent to have the Electronic Proposal due at the Box 13 stated time and then the Hard Copy due the following day after?

GOVERNMENT RESPONSE: SEE RESPONSE TO #6

48. Is a completed SF 1442 to be submitted in Phase 1 as well ? – Instructions.

GOVERNMENT RESPONSE: YES

49. Is there a cover page to be submitted in Phase 1 as in Phase 2? - Instructions

GOVERNMENT RESPONSE: SEE RESPONSE #21

50. Is a bid bond required for phase 1? (SFI 1442) (Block 12 A)

GOVERNMENT RESPONSE: YES

51. Is there a page limit for the proposal? No indication on Instruction to bidders

GOVERNMENT RESPONSE: SUBMIT PER THE RFP REQUIREMENTS.

52. Is a 11x17 organizational chart allowed? – Management Plan, Instructions

GOVERNMENT RESPONSE: SUBMIT PER THE FACTOR.

SCOPE OF WORK

8(A) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)

N40080-19-R-0009

SECTIONS

01010 01020 01030 01040 01050

SECTION 01010

GENERAL PROVISIONS

1. GENERAL INTENT: The intent of this contract is to affect repairs, renovations, new construction and alterations to shore facilities, and utilities, belonging to the Government within the NAVFAC Washington area of responsibility to include the metropolitan Washington, DC, Maryland and Virginia locations. Work may also be executed throughout any NAVFAC locations within the Continental United States. This contract provides for the award of individual orders, defined hereinafter as “Task Orders,” for the accomplishment of various construction projects for the Naval Facilities Engineering Command activities and customers to multiple awardees. Task Orders will be awarded by this contract considering factors such as past performance, quality of deliverables, ability to meet schedule requirements, relevant experience, cost control and price or cost. The basic contract period shall be for twelve (12) months commencing on the date of contract award. The Government has the option to extend the term of the contract in accordance with the contract clause entitled “Option to Extend the Term of the Contract FAR 52.217-9”. Options shall be for additional performance periods. The total maximum duration of the contract shall not exceed 96 months (8 years) or a shared total of $750,000,000,000.

2. SCOPE OF WORK: The Naval Facilities Engineering Command (NAVFAC) Washington, Navy Yard, DC requires a multiple award contract to perform various dollar sized construction projects in the NAVFAC Washington area of responsibility to include the metropolitan Washington, DC, Maryland and Virginia locations. This indefinite quantity contract has no fixed unit prices. Each Task Order awarded shall include all labor wages, management, supervision, mobilization, material and equipment costs. The contractor shall furnish all project management, planning estimating, labor, transportation, materials, equipment, tools, supervision, design and all other associated costs necessary to fulfill the requirements of the Task Order.

a. Award of Task Orders will be on a firm fixed price basis.

b. Whenever the Government has work to be performed under this contract, the Contracting Officer shall notify the contractor(s) and provide a scope of work that shall include (1) the nature of the work to be performed, (2) the location of the job and (3) mandatory date of completion, unless negotiated. Section 01050 details the Order Issuance provisions of this contract.

c. Each Task Order shall be issued with appropriate technical requirements. Special requirements, including work hours, safety and security regulations, etc. for the specific sites/locations of the identified work will be defined in the Task Order.

d. It is anticipated that approximately 60% of all orders issued under this contract will be design/build. Design/build projects will be identified as such and will require a minimal level of design in order to determine best value and selection.

Design/build orders will incorporate the following contract clauses:

52.236-23 Responsibility of the A/E Contractor 52.236-24 Work Oversight in A/E Contracts 52.236-25 Requirements for Registration of

Designers 252.227-7022 Government Rights (Unlimited) 252.227-7023 Drawings and Other Data to be Property of Government

e. The estimated range of Task Orders awarded under this contract is between $250,000.00 and $5,000,000.00; however, smaller and larger dollar value projects may be considered. As stated in FAR 52.216-19, Order Limitations, the contractor shall honor any order exceeding the maximum order limitation unless the order is returned to the ordering office within three days after issuance, with written notice stating the Contractor’s intent not to honor the order and reasons. Upon receiving this notice, the Government may acquire the services from another source.

END OF SECTION 01010

SECTION 01020

CONTRACT TYPE/PERFORMANCE

1. CONTRACT TYPE

This is an indefinite delivery indefinite quantity (IDIQ) contract with no fixed contract prices. The actual amount of work to be performed and the time of such performance will be determined by the Contracting Officer who will issue Task Orders to the Contractors.

2. TERM OF CONTRACT

The basic contract period shall be for twelve (12) months commencing on the date of contract award.

3. OPTIONS

The Government has the option to extend the term of the contract in accordance with the contract clause entitled “Option to Extend the Term of the Contract” FAR 52.217-9”. Options shall be for additional performance periods. The total maximum duration of the contract shall not exceed 96 months (8 years) or a shared total of $750M.

4. MINIMUM GUARANTEE

The only work authorized under this contract is that ordered by the Government through issuance of a Task Order. The Government makes no representation as to the number of Task Orders or actual amount of work to be ordered; however during the term of the contract, a minimum order of $10,000.00 is guaranteed except for the offeror who receives the award for the seed project. The seed project will be considered to have satisfied the guaranteed minimum for that offeror. This minimum guarantee is applicable for the base performance period.

5. COMMENCEMENT OF WORK

No work under this contract shall commence until a Task Order is issued by the Contracting/Ordering Officer, either in writing or orally. Oral orders will be confirmed by the issuance of a written Task Order within five working days.

6. PLACE OF PERFORMANCE

The place of performance shall be designated on each task order. The majority of work is anticipated to be performed at facilities located in the District of Columbia, Virginia, and Maryland. The following provides a list of NAVFAC Washington activities and locations where work will be performed:

Naval District Washington, Washington, DC

Joint Base Anacostia-Bolling, Washington, DC Marine Corps Base, Quantico, VA Naval Surface Warfare Center, Dahlgren, VA Naval Surface Warfare Center, Indian Head, MD Joint Base Andrews, Camp Springs, MD Naval Air Station, Patuxent River, MD United States Naval Academy, Annapolis, MD Walter Reed National Military Medical Center, Bethesda, MD

This is not a complete list and is provided only to indicate the wide range of locations covered under this contract. The Task Orders awarded for Naval District Washington may include work outside the metropolitan Washington, DC area for all military facilities within a 100 mile radius of the metro area.

7. 5252.215-9300 CONTENT OF PROPOSALS (JAN 2003)

(a) Proposal Requirements. The technical proposal and the price/cost proposal shall be submitted in separate volumes. The technical proposal shall not contain any cost/pricing information. The technical proposal presented by the offeror to whom the award is made may be incorporated into the contract at time of award.

(b) The offeror shall submit the following information:

See “Instructions to Offerors”

(c) Each technical proposal shall be precise, detailed, and complete as to clearly and fully demonstrate a thorough knowledge and understanding of the requirements.

As a minimum, the proposal must contain sufficient detail so that it may be evaluated in accordance with the EVALUATION FACTORS.

(d) Offers are solicited on an “all or none” basis and FAR 52.215-1, INSTRUCTIONS TO OFFERORS-COMPETITIVE ACQUISITION (JAN 2004) is hereby modified. Failure to submit offers for all line items listed shall be cause for rejection of the offer.

END SECTION 01020

SECTION 01030

SPECIAL CONTRACT REQUIREMENTS

1. PROPOSAL PREPARATION AND COSTS

The costs for preparation of Task Order proposals, if required under this contract, shall be the responsibility of the contractor and not reimbursable. All contractors shall propose on each Request For Proposal (RFP) issued under this contract, unless a written determination is forwarded to the Contracting Officer/Ordering Officer which documents why a contractor is unable to propose. This written documentation shall be forwarded to the Contracting Officer/Ordering Officer within 5 days after receipt of the RFP.

2. BID BOND

A bid bond shall be required for each Task Order and shall be submitted with each proposal.

At a later date it may be determined that bid bonds are no longer required for certain task orders and the Administrative Contracting Officer will have the option to waive this requirement.

3. PERFORMANCE AND PAYMENT BONDS

Performance and payment bonds shall be required for each Task Order and shall be submitted for approval to the Contracting Officer within 15 days after award of an Order.

Commencement of construction is contingent upon approval of required bonds.

4. INSURANCE

a. Prior to commencement of any work under this contract, the contractor shall provide the Administrative Contracting Officer a declaration of proof of insurance as required by FAR 52.228-5. The following minimum coverage must be maintained:

COVERAGE

Comprehensive General Liability $500,000.00

Automobile Liability: $200,000 per person, $500,000 per occurrence for bodily injury; $20,000 per occurrence for property damage

Employer’s Liability Coverage: $100,000, except in states where worker’s compensation may not be written by private carriers.

Others as required by Federal and State law.

b. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government’s interest shall not be effective (1) for such period as the laws of the State in which this contract is to be performed prescribe, or (2) until 30 days after the insurer or the contractor gives written notice to the Administrative Contracting Officer, whichever period is longer.

c. The contractor shall insert the substance of this clause, including this paragraph, in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the schedule or elsewhere in the contract. The contractor shall maintain a copy of all subcontractor’s proofs of insurance, and shall make copies available to the Contracting Officer upon request.

6. DAVIS BACON WAGE DETERMINATION

Davis Bacon Wage Determination(s) shall be current and site specific to each order and incorporated at the time the order is placed.

7. DRAWINGS

All drawings, if applicable, accompanying Task Orders shall be considered to be a part of the scope of work.

8. TASK ORDER PERFORMANCE PERIOD

FAR Clause 52.212-3, Commencement, Prosecution and Completion of Work shall be incorporated into each Task Order identifying the construction schedule. The Government reserves the right to negotiate the performance period if determined to be in the best interests of the Government.

9. LIQUIDATED DAMAGES

FAR Clause 52.212-5, Liquidated Damages – Construction, shall be included in each request for proposal and incorporated into the Task Order identifying the liquidated damages rates applicable to that Order. If the contractor fails to complete the work within the time fixed in the Order or any extension thereof, the Contractor shall pay to the Government as liquidated damages for each Task Order, the rate cited in the Order.

10. PREAWARD SITE INSPECTIONS

Upon receipt of the scope of work, including applicable drawings, and following a brief time period for reviewing the documents, the contractor shall inspect the job site. It is expected that if the contractor intends to submit an offer they will be present at the site visit along with any subcontractors or suppliers invited by the contractor. Any deficiencies, conflicts, or other areas of concern existing in the scope of work and applicable drawings, should be brought to the attention of the Contracting Officer, in writing. The contractor shall also notify the Contracting Officer, in writing, upon observing any features in the design that appear to be ambiguous and/or conflicting

11. SUBCONTRACTING RESPONSIBILITIES

a. See the Subcontracting Evaluation factor for the minimum subcontracting goals required for this contract.

b. These goals are applicable to the contract as a whole and not meant to be individually attained for each order performed.

12. SUPERVISION

The contractor shall provide supervision in accordance with FAR Clause 52.236-6, Superintendence by the Contractor, for each Task Order.

13. NOTICE OF CONSTRUCTIVE CHANGES

No order, statement or direction of the Contracting Officer, an authorized representative of the Contracting Officer whether or not acting within the limits of his authority, or any other representative of the Government, shall constitute a change order under the “Changes” clause of this contract or entitle the contractor(s) to an equitable adjustment of the price or delivery schedule, unless such a change is issued in writing and signed by the Contracting Officer.

14. PAYMENTS

Designated paying office will be determined at award of individual Task Orders under this contract. Invoicing procedures shall be stated in each Order and percentage of performance payments shall be processed through the designated Administrative Contracting Officer.

15. PRE-CONSTRUCTION CONFERENCE

Prior to commencing work under an Order, the contractor may be required to meet with the Administrative Contracting Officer and/or designated technical personnel at an agreeable time to both parties to discuss and develop mutual understandings concerning schedule and administering work. Information regarding individuals to contact to arrange a pre-construction conference will be provided at execution of an order. The contractor is responsible for ensuring this conference takes place promptly following award.

16. PARTNERING

The contractor’s key personnel may be required to attend partnering meetings/sessions prior to and/or during performance of an Order, if determined necessary by the Government. The requirements and parties responsibilities for partnering will be described in the order.

17. PERFORMANCE EVALUATIONS

a. Continual monitoring of performance is one critical element to the success of the contract. Performance evaluation reports will be prepared at the time of final acceptance of work, termination or other times, as appropriate. Performance evaluations focus on elements of quality control, effectiveness of management, timely performance and compliance with safety standards.

b. If the evaluating official concludes that a contractor’s overall performance is less than satisfactory, the contractor shall be advised in writing. Contractors taking exception to the evaluation ratings are encouraged to submit comments in writing. If the contractor submits written comments, the evaluating official shall include them in the report, resolve any alleged factual discrepancies, and make appropriate changes to the report.

c. The contractor is ultimately responsible for the management and performance of all subcontractors. It is expected that performance will be monitored and action take if performance is less than satisfactory. Poor performance by a subcontractor may reflect adversely on the contractor’s performance evaluation.

d. The performance evaluations will have an impact on the award of future Task Orders.

Contractor’s performance will be taken into consideration prior to exercising the options.

17. WEBCM

The Government and Contractor shall utilize the Naval Facilities Engineering Command’s (NAVFAC) WebCM system for electronic submittal of all data and documents (unless specified otherwise by the Contracting Officer) throughout the duration of the Contract. WebCM is a web-based electronic media site that is hosted by Primavera Systems, Inc. utilizing their PrimeContract (hereinafter referred to as WebCM) web solution and will be made available only to key Prime Contractor personnel, QC Specialist personnel working for subcontractors and the Designer of Record. The joint use of this system is to facilitate; electronic exchange of information, key processes, and overall management of the contract. WebCM shall be the primary means of project information submission and management. When required by the Contracting Officer, paper documents will also be provided (i.e.; e.g. the signature of Contract Modifications, and submission of Contract Claims). In the event of discrepancy between the electronic version and paper documents, the paper documents will govern.

18. CONTRACTOR SAFETY SELF-EVALUATION CHECKLIST

Contracting Officer will provide a “Contractor Safety Self-Evaluation Checklist” to the Contractor at the pre-construction conference for the individual Task Orders issued under this contract. The checklist will be completed monthly by the Contractor and submitted with each request for payment voucher. An acceptable score of 90 or greater is required. Failure to submit the completed safety self-evaluation checklist or achieve a score of at least 90 will result in retention of up to 10 percent of the voucher.

END OF SECTION 01030

SECTION 01040

CONTRACT ADMINISTRATION

1. PROCURING CONTRACTING OFFICER/ORDER OFFICER

Overall administration of the basic contract shall be the responsibility of the Procuring Contracting Officer (PCO), Acquisition Core Team located at Naval Facilities Engineering Command, Washington, 1314 Harwood Street, Building 212, Washington Navy Yard, DC. 20374. The PCO is responsible for administration of this contract in its entirety and possesses complete authority to modify the terms of the basic contract. Competition and award of Task Orders shall be managed by designated Administrative Contracting Officers (ACOs) at the site specific activities. Only these individuals, or their designated representatives, may negotiate and select a contractor for performance of individual Task Orders.

2. TASK ORDER ADMINISTRATION

Administrative Contracting Officers (ACO) shall be designated, in writing, upon award of individual Task Orders. These individuals may include Contracting Officers located, or responsible for that specific location, where the work is to be accomplished. These individuals shall possess the authority to act on behalf of the Government with respect to the specific Task Order. All day-to-day construction contract administration will be the responsibility of the designated ACO.

3. OMBUSMAN

The agency’s designated Task Order Ombudsman is the Commanding Officer who is located at the Naval Facilities Engineering Command, 1314 Harwood Street, SE, Washington Navy Yard, DC. The Ombudsman is responsible for reviewing complaints from contractors and ensuring that all contractors are afforded a fair opportunity to be considered for award of Task Orders, in accordance with the requirements of the contract.

END OF SECTION 01040

SECTION 01050

TASK ORDER ISSUANCE PROCEDURES

1. GENERAL

a. Work under this contract shall be ordered by written Task Order issued on DD Form 1155 (Order for Supplies or Services) to the contractor by the Administrative Contracting Officer/Ordering Officer.

b. Each award as a result of this solicitation will cite an individual contract number.

Individual Task Orders shall be sequentially numbered relating back to the basic contract.

c. The Government shall not be obligated to reimburse the contractor for work performed, items delivered, or any costs incurred, nor shall the contractor be obligated to perform, deliver, or otherwise incur costs except as authorized by duly executed Task Orders.

d. Task Orders shall be firm fixed price and clearly define the specific services to b performed or the performance desired. Each Order shall contain applicable clauses and provisions specific to that work.

e. Requests for proposals and Order may be issued by mail, facsimile, or electronically.

Method of submission for proposals will be defined in the RFP per individual order.

2. COMPETITION

a. Competition for task orders is limited to those awardees, under this contract. These awardees shall be given a fair opportunity to be considered for each order.

b. Unless the Contracting Officer applies the exceptions noted below, each Task Order will be awarded, as a result of competition to the contractor who offers the best value to the Government considering the criteria specified. The Contracting Officer’s decision for award of an Order cannot be protested unless the protest is on the grounds that the order increases the scope, period, or maximum value of the contract.

c. Each contractor shall be given a fair opportunity to be considered for award of an Order.

However, the Contracting Officer reserves the right to make award of an Order without competition based upon a determination that the Government’s interest are best served by:

(1) Awarding a follow-on effort to a previous Task Order to the incumbent contractor if it is in the Government’s best interest;

(2) Using past performance as sole factor in determining award of a Task Order;

(3) The services are of a unique nature and only one contractor is capable of providing the level of quality to satisfy the Government’s requirements;

(4) Placing on Order with a contractor without competition when an unusual and compelling urgency exists that would be harmful to the Government if an Order was not issued promptly;

(5) Placing an order with the contractor without competition when it becomes evident that the minimum guarantee must be satisfied;

(6) The Contracting Officer otherwise determined that award to another contractor is not in keeping with the Government’s best interest.

3. REQUIREMENT OF PROPOSALS

a. The Government is not obligated to obtain written technical proposals or hold discussions prior to award of an Order. If the Government determines that technical proposals are necessary, proposals may be required in writing and/or through oral presentations. Should proposal(s) contain deficiencies that would preclude awarding the Order, discussions may commence with those considered highly likely to receive award. If discussions are necessary, final proposal revisions will be requested.

b. A written cost proposal will be requested. Cost reasonableness shall always be taken into consideration prior to award of a Task Order.

c. Costs associated with preparation, presentation, and/or negotiations shall not be an allowable direct cost against this contract.

d. Technical Proposals, if required, may address, but not limited to, one or more of the following factors:

- Design

- The contractors technical understanding of the work

- The most efficient and effective plan to accomplish the work

- Rationale for proposed materials, type and quantities

- Qualifications of subcontractors and designers

- Project management team

4. SELECTION CRITERIA

One or more of the following criteria may be considered when contractors compete for award of a Task Order:

- Past Performance: Past Performance shall always be a consideration in selection of a contractor prior to each order. Past performance of subcontractors and designers may also be considered.

- Quality of Deliverables

- Ability to Meet Schedule Requirements

- Relevant Experience: The expertise of proposed subcontractors and designers may be considered

- Cost Control and/or Cost and Price

END OF SECTION 01050

END OF AMENDMENT 0001

SECTION 00 01 10 - TABLE OF CONTENTS

Table of Contents has been deleted

The following have been deleted:

TABLE OF CONTENTS

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been deleted:

INSTRUCTION TO BIDDERS

(End of Summary of Changes)

File details come from the government source that posted it. Updated .