SEED_PROJECT_PLACE_HOLDER__RFP_Part_1_-_CIR _POL_Facility _MCAS_Beaufort_SC.pdf

PDF 99 KB Posted

Attached to
Justification and Approval for not providing a fair opportunity under the NAVFAC EXWC Global Petroleum Oils and Lubricants (GPOL) Multiple Award Construction Contract (MACC)
Solicitation number
N3943014R1405
Issued by

About this file

Seed Project Place Holder RFP Part 1 Clean Inspect and Repair POL Facility Beaufort South Carolina.

View the file

Other files

File Type Posted
N3943014R1405_JA.pdf PDF
ATTACHMENT_7.1_-_NAVFAC_Form_4330-43.xlsx XLSX spreadsheet
SEED_PROJECT_RFP_Part_1_-_Clean _Inspect_and_Repairs _POL_Facilities _NAS_Pensacola_FL.pdf PDF
Answers_to_GPOL_Pre_Proposal_Inquiries.pdf PDF
N39430-14-R-1405_Amendment_0007.pdf PDF
N39430-14-R-1405 _Amendment_0006.pdf PDF
Answers_to_GPOL_RFI_PPI.pdf PDF
Conformed_Solicitation_N39430-14-R-1405.pdf PDF
N39430-14-R-1405_Amendment_0005.pdf PDF
5235953.pdf PDF
5236040.pdf PDF
5236041.pdf PDF
5236043.pdf PDF
5235954.pdf PDF
5236042.pdf PDF
5235948.pdf PDF
5236044.pdf PDF
5236039.pdf PDF
5235952.pdf PDF
N39430-14-R-1405_Amendment_0004.pdf PDF
N39430-14-R-1405_Amendment_0003.pdf PDF
GPOL_Clean _Inspect_and_Repairs_POL_Facilities _NAS_Pensacola_PART_2-6.pdf PDF
GPOL_Pre_Proposal_Conference_Presentation.ppt PPT presentation
GPOL_Seed_Project_Site_Visit_MAP.pdf PDF
SEED_PROJECT_RFP_Part_1_-_Clean _Inspect_and_Repairs _POL_Facilities _NAS_Pensacola_FL.pdf PDF
N39430-14-R-1405_Amendment_0002.pdf PDF
GPOL_Answers_to_PPI_RFI's_01.pdf PDF
GPOL_SEED_PROJECT_Clean_Inspect_Repair_POL_Facilities _Pensacola_FL_Parts_2-6.pdf PDF
GPOL_ATTENDANCE_ROSTER.pdf PDF
ATTACHMENT_7.1_-_NAVFAC_Form_4330-43.xlsx XLSX spreadsheet
GPOL_Amendment_0001.pdf PDF
GLOBAL_POL_SOLICITATION_RFP_PART_1.docx DOCX document
ATTACHMENT_7_SEED_PROJECT_PLACE_HOLDER_Parts_2-6_CIR_POL_FACILITIES_BEAUFORT_SC.pdf PDF
RFP_Global_POL_MACC_SOW_Combined_Part_2_thru_6.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clean, Inspect and Repairs POL Facility N39430‐14‐R‐XXXX Marine Corps Air Station, Beaufort, SC

N39430-14-R-XXXX

TABLE OF CONTENTS

NOTE: The actual seed project will be incorporated into the solicitation via an amendment at a later date.

The project titled: Clean, Inspect, Repair (CIR) POL Facilities at Marine Corps Air Station (MCAS) Beaufort SC is provided ONLY as a representation of the POL task order seed task that will be added to the solicitation at a later date.

This placeholder seed task illustrates the submittal requirements for the seed project. There is no site visit or submittal requirement associated with the Place holder task order titled CIR POL Facilities MCAS Beaufort SC.

PART 1 - PROPOSAL FORMS & DOCUMENTS

SECTION 00010 REQUEST FOR PROPOSAL (DD FORM 1155)-Price Schedule Form

SECTION 00100 INSTRUCTIONS TO OFFERORS

SECTION 00600 BONDS

SECTION 00700 CONTRACT CLAUSES

SECTION 00800 DAVIS-BACON WAGE DETERMINATION

SEED PROJECT ATTACHMENTS:

1) WAVIER OF LIABILITY, MARINE CORPS AIR STATION BEAUFORT SOUTH

CAROLINA

2) MCAS BASE MAP AND DIRECTION FROM THE AIRPORT.

SECTION 00010

SCHEDULE OF SUPPLIES/SERVICES

The offeror agrees to perform the work required at the proposed Firm Fixed Price specified below in strict accordance with the terms and conditions regulatory requirements of this solicitation, as well as those specified in the original contract which this task order will be issued, if this offer is accepted by the Government in writing within 90 calendar days after the date offers are due. Proposal should include all labor, equipment, materials, lower-tier subcontractors, and supplies necessary to complete the activities specified in the solicitation.

ITEM NO SCHEDULE OF SUPPLIES/SERVICES AMOUNT

Line Item #0001

CLEAN, INSPECT AND REPAIR OF POL

FACILITIES AT MARINE CORPS AIR

STATION, BEAUTFORT, SC.

Line Item #0001: Price shall be considered available for award for 90 calendar days from the date proposals are due.

The contractor shall perform all services necessary for the clean, inspect, and repair of portions of the POL facilities located at Marine Corps Air Station, Beaufort, South Carolina to include condition assessment, inspection, and repair in accordance with American Petroleum Institute (API) Standards 570 and 653, NFPA 30, American Society of Mechanical Engineers (ASME) B31.4 Unified Facilities Guide Specifications, and any additional federal, state, local, service and host requirement. The total completion time for this project is 365 calendar days from the task order award date.

SECTION 00100

INSTRUCTIONS TO OFFERORS

I. INTRODUCTION

A. GENERAL INFORMATION

1. Request for Proposal Part 1 with Attachments are available at and posted to www.fbo.gov as Directed

Solicitation number N39430-14-R-XXXX.

2. FAR 52.216-1 TYPE OF CONTRACT (APR 1984): The Government contemplates award of a firm-fixed-price task order resulting from this Request for Proposal (RFP).

(End of Provision)

B. PRE-PROPOSAL CONFERENCE / SITE VISIT

NOTE: The actual seed project will be incorporated into the solicitation via an amendment at a later date will include all the details and information of the seed task order site visit.

FAR 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995):

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions

Affecting the Work, will be included in any contract awarded as a result of this solicitation.

Accordingly, offerors are urged and expected to inspect the site where work will be performed.

(b) An organized site visit has been scheduled for:

(c) Participants will meet at:

C. PRE-PROPOSAL INQUIRIES (PPI)

NOTE: N/A. No pre proposal inquiries will be accepted for this project, there is no site visit or submittal requirement associated with the Place holder task order titled CIR POL Facilities MCAS Beaufort SC.

ALL INQUIRIES CONCERNING THE TECHNICAL ASPECTS OF THE ATTACHED

SPECIFICATIONS MUST BE SUBMITTED IN WRITING AND MUST BE SUBMITTED TO THE

CONTRACT SPECIALIST AT LEAST 15 DAYS PRIOR TO THE CLOSING DATE OF THE

SOLICITATION IN ORDER TO PROVIDE ADEQUATE TIME TO REPLY TO THE INQUIRY.

All PPIs shall be submitted on the PPI spreadsheet entitled, Pre Award Inquiry Forms (Attachment 8), uploaded to the additional documents section of this RFP on Fedbizopps website. PPIs received after that date may not be answered. All questions shall be submitted in writing to Gloria Quintero, Procuring Contract Specialist, at gloria.quintero@navy.mil.

D. PROPOSAL SUBMITTAL INSTRUCTIONS

PROPOSAL DUE DATE: Proposals shall be submitted no later than _________N/A_____________.

Proposals not received by the time and date specified shall be treated in accordance with FAR 52.215-1 “Instruction to Offerors-Competitive Acquisitions” and may be rejected. The offeror’s proposal must include all data and information required and must be submitted in accordance with these instructions. The offeror shall be compliant with the requirements stated herein, for non-compliance may result in your proposal being rejected as non-responsive.

In response to this Request for Proposal (RFP), the complete proposal shall include both the Price Proposal and the Technical Proposal, submitted as follows:

1. TECHNICAL PROPOSAL

NOTE: N/A. There is no submittal requirements associated with the Place holder task order titled CIR POL Facilities MCAS Beaufort SC.

SEE NON-PRICE FACTOR SUBMITTAL INSTRUCTION IN SECTION 00210.

2. PRICE PROPOSAL

NOTE: N/A. Seed project pricing submittal requirements will be incorporated into the solicitation via an amendment at a later date.

SEE PRICE SUBMITTAL INSTRUCTION IN SECTION 00210 – PRICE EVALUATION FACTOR,

SOLICITATION SUBMITTAL REQUIREMENTS.

3. PROPOSAL DELIVERY

NOTE: N/A. Seed project submittal requirements will be incorporated into the solicitation via an amendment at a later date.

SEE SUBMITTAL INSTRUCTIONS IN SECTION 00210.

II. PROJECT INFORMATION

1. This acquisition will result in a firm fixed-price (FFP) task order for construction. The task order will be procured utilizing negotiated procedures, as it has been determined in accordance with FAR 6.401 to be the most appropriate method of contracting for subject project.

2. The Best Value source selection process to be used for this acquisition is the Trade-off process as described in FAR Part 15. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.

3. Brief Description of Work: The contractor shall perform all services necessary for the clean, inspect, and repair of portions of the POL facilities located at Marine Corps Air Station, Beaufort, South Carolina to include condition assessment, inspection, and repair in accordance with American Petroleum Institute (API) Standards 570 and 653, NFPA 30, American Society of Mechanical

Engineers (ASME) B31.4 Unified Facilities Guide Specifications, and any additional federal, state, local, service and host requirement.

4. LINE ITEM Description: LINE ITEM #0001 - CLEAN, INSPECT AND REPAIR OF POL FACILITIES

AT MARINE CORPS AIR STATION, BEAUTFORT, SC.

5. Completion Date: The project will have a total maximum duration of 365 calendar days. The days are figured from the date of task order award, which includes the initial 15 days allowed for submission and approval of insurance, bonding and other requirements set forth in the task order/MACC.

6. Project Magnitude: Contract Line Item #0001: $1,000,000 - $3,000,000. Liquidated damages for this line item will be assessed in the amount of $849.00 per calendar day of delay.

SECTION 00600

BONDS

1.1 BID BOND.

***** A BID BOND (WITH ORIGINAL SIGNATURE) MUST BE SUBMITTED WITH THE BID IF BID

AMOUNT EXCEEDS $100,000.*****

INSTRUCTIONS TO OFFERORS: REFERENCE STANDARD FORM 24 "BID BOND"

1. The name and address of the Principal as well as the signature of the Principal shall be identical to those on the Department of Defense Standard Form 1442, "Solicitation, Offer, and Award " (SF 1442).

2. The date the Bond is executed must be on or before bid opening date. You must indicate your type of organization and State of incorporation, if applicable.

3. The Surety block shall show the same address as is published in the Department of Treasury Circular. Also, include a telephone number.

4. The Bid Bond must be 20% of the offeror’s total bid price for the project or $3,000,000, whichever amount is less.

(FAR 52.228-1 Bid Guarantee)

5. The Principal's signature shall be identical to that on the Standard Form 1442, "Solicitation, Offer, and Award " (SF 1442), with the typed or printed name entered below. If applicable, imprint with the Corporate Seal.

6. If using individual Sureties, see FAR 28.203 and FAR clause 52.228-11, Pledges of Assets, for acceptability of individual sureties. Attach executed Standard Form 28 "Affidavit of Individual Sureties" for each surety.

7. If using corporate Surety, enter the Branch address, the .State of incorporation and liability amount. Enter the typed or printed name and title below; imprint with Corporate Seal. Attach a Power of Attorney to the Payment Bond.

8. When submitting bonds for Statements of Work under the GPOL Indefinite Delivery Indefinite Quantity Multiple Award Construction Contract (MACC), in the Bid Identification section, insert both your name, address and point of contact and the Solicitation number N39460-14-R-1405 in the block entitled “INVITATION NO.”. In the block following the “FOR” block, insert the project title.

1.2 PERFORMANCE & PAYMENT BONDS

***** A PERFORMANCE AND PAYMENT BOND (WITH ORIGINAL SIGNATURE) MUST BE

SUBMITTED WITHIN 15 DAYS OF CONTRACT AWARD.*****

INSTRUCTIONS TO OFFERORS: REFERENCE STANDARD FORM 24 "BID BOND"

1. The name and address of the Principal as well as the signature of the Principal shall be identical to those on the Department of Defense Standard Form 1442, "Solicitation, Offer, and Award " (SF 1442).

2. You must indicate your type of organization and State of incorporation, if applicable.

3. The beneficiary must be identified.

4. The Surety block shall show the same address as is published in the Department of Treasury Circular. Also, include a telephone number.

5. The Bond must be 100% of the contract award amount. (FAR 52.228-15 Performance and Payment Bonds)

6. The Principal's signature shall be identical to that on the Standard Form 1442, "Solicitation, Offer, and Award " (SF 1442), with the typed or printed name entered below. If applicable, imprint with the Corporate Seal.

7. If using individual Sureties, see FAR 28.203 and FAR clause 52.228-11, Pledges of Assets, for acceptability of individual sureties. Attach executed Standard Form 28 "Affidavit of Individual Sureties" for each surety.

8. If using corporate Surety, enter the Branch address, the State of incorporation and liability amount. Enter the typed or printed name and title below; imprint with Corporate Seal. Attach a Power of Attorney to the Payment Bond.

9. When submitting bonds for Statements of Work under the GPOL Indefinite Delivery Indefinite Quantity Multiple Award Construction Contract (MACC), in the Bid Identification section, insert both your name, address and point of contact and the Solicitation number N39460-14-R-1405 in the block entitled “INVITATION NO.”. In the block following the “FOR” block, insert the project title.

SECTION 00700

CONTRACT CLAUSES

All terms and conditions in Section 00700 of your contract apply to this solicitation, with the exception of the following changes:

FAR 211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to:

(a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed,

(b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than 885 calendar days from award of the task order.* The time stated for completion shall include final cleanup of the premises.

FAR 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (APR 1984);

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $849.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

SECTION 00800

DAVIS-BACON WAGE DETERMINATION

General Decision Number: SC130001 01/04/2013 SC1

Superseded General Decision Number: SC20120001

State: South Carolina

Construction Types: Heavy (Heavy and Sewer and Water Line)

Counties: Abbeville, Allendale, Bamberg, Barnwell, Beaufort, Cherokee, Chester, Chesterfield, Clarendon, Colleton, Dillon, Georgetown, Greenwood, Hampton, Jasper, Lancaster, Lee, Marion, Marlboro, McCormick, Newberry, Oconee, Orangeburg, Union and Williamsburg Counties in South Carolina.

DOES NOT INCLUDE SAVANNAH RIVER SITE IN ALLENDALE AND BARNWELL

COUNTIES

HEAVY CONSTRUCTION PROJECTS (includes Sewer & Water Line projects)

Modification Number Publication Date 0 01/04/2013

SUSC1990-005 02/08/1990

Rates Fringes

Boilermaker (tank work)........$ 12.96 3.315

Bricklayer.....................$ 7.25

Carpenter......................$ 7.42

Cement mason/concrete finisher.....................$ 7.25

Ironworker.....................$ 10.98

Laborers:

Chain saw...................$ 7.25 General.....................$ 7.25 Pipelayer...................$ 7.25

Pipefitter.....................$ 9.09

Power equipment operators:

Backhoe.....................$ 7.25 Bulldozer...................$ 7.25 Crane.......................$ 7.98 Dragline....................$ 7.25

Front End Loader............$ 7.25 Mechanic....................$ 7.25 Motor grader................$ 7.25 Pan Scraper.................$ 7.25

Line Construction: line technician.......................$ 10.08

MANHOLE BUILDER..................$ 7.25

TRUCK DRIVER.....................$ 7.25

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.

0000/9999: weighted union wage rates will be published annually each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

General Decision Number: SC130047 01/04/2013 SC47

Superseded General Decision Number: SC20120047

State: South Carolina

Construction Type: Highway

Counties: Allendale, Bamberg, Barnwell, Beaufort, Colleton, Georgetown, Hampton, Jasper, Newberry, Orangeburg and Williamsburg Counties in South Carolina.

DOES NOT INCLUDE SAVANNAH RIVER SITE IN ALLENDALE AND BARNWELL

COUNTIES

HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction;

bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction;

and other major bridges).

Modification Number Publication Date 0 01/04/2013

SUSC2011-038 09/15/2011

Rates Fringes

CARPENTER (Form Work Only).......$ 14.47

CEMENT MASON/CONCRETE FINISHER...$ 14.11

IRONWORKER, REINFORCING..........$ 15.64

LABORER

Asphalt, Includes Asphalt Distributor, Raker, Shoverler, and Spreader.....$ 10.96 Colleton....................$ 10.16 Common or General Beaufort...................$ 10.15 Colleton...................$ 10.16 Georgetown, Hampton, Jasper.....................$ 10.07 Newberry, Allendale, Bamberg, Barnwell..........$ 11.82 Orangeburg.................$ 12.63 Williamsburg...............$ 10.01 Luteman.....................$ 11.71 Pipelayer...................$ 13.87 Traffic Control-Cone Setter Allendale, Bamber, Barnwell, Newberry, Orangeburg.................$ 12.98 Beaufort, Colleton, Georgetown, Hampton, Jasper, Williamsburg.......$ 12.84 Traffic Control-Flagger.....$ 11.68

POWER EQUIPMENT OPERATOR:

Backhoe/Excavator/Trackhoe Allendale, Bamberg, Barnwell, Newberry, Orangeburg.................$ 17.56 Beaufort...................$ 15.20 Colleton...................$ 17.78 Georgetown, Hampton, Jasper, Williamsburg.......$ 17.23 Bulldozer...................$ 20.12 Crane.......................$ 16.62 Grader/Blade................$ 16.62 Loader (Front End)..........$ 15.51 Mechanic....................$ 18.22 Milling Machine.............$ 18.83 Paver Allendale, Bamberg, Barnwell, Newberry, Orangeburg, Williamsburg...$ 15.01 Beaufort...................$ 14.96 Colleton, Georgetown, Hampton, Jasper............$ 13.67

Roller......................$ 12.76 Screed......................$ 13.01 Tractor.....................$ 13.26

TRUCK DRIVER

Dump Truck..................$ 12.00 Lowboy Truck................$ 14.43 Single Axle, Includes Pilot Car...................$ 12.04 Tractor Haul Truck..........$ 16.25

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.

0000/9999: weighted union wage rates will be published annually each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

General Decision Number: GA120015 01/06/2012 GA15

Superseded General Decision Number: GA20100082

State: Georgia

Construction Type: Heavy Dredging

Counties: Georgia Statewide.

DREDGING CONSTRUCTION PROJECTS GEORGIA (West of the Aucilla and Ocmulgee Rivers within the boundaries of the Mobile District of the Corps of Engineers)

Modification Number Publication Date 0 01/06/2012

* SUGA1990-020 02/15/1990

Rates Fringes

Derrick Operator.................$ 7.25

Dozer Operator...................$ 7.25

Dredge 16" and Over Deckhand....................$ 7.25 Dredge tender operator......$ 7.25 Fireperson..................$ 7.25 First assistant engineer....$ 7.25 Leverperson.................$ 7.25 Oiler.......................$ 7.25 Second assistant engineer...$ 7.25 Shoreperson.................$ 7.25 Third assistant engineer....$ 7.25 Truck driver................$ 7.25

Dredge Under 16" Deckhand....................$ 7.25 Dredge tender operator......$ 7.25 Leverperson.................$ 7.25 Oiler.......................$ 7.25

Hydraulic Dredge First cook..................$ 7.25 Handyperson.................$ 7.25 Janitor, cabin person.......$ 7.25 Second cook.................$ 7.25

Marsh Buggy Dragline, Oiler......$ 7.25

Marsh Buggy Dragline, Operator...$ 7.25

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011.

The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198.

The next number, 005 in the example, is an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.