About this file

Amendment 0006

View the file

Other files

File Type Posted
N3943014R1405_JA.pdf PDF
ATTACHMENT_7.1_-_NAVFAC_Form_4330-43.xlsx XLSX spreadsheet
SEED_PROJECT_RFP_Part_1_-_Clean _Inspect_and_Repairs _POL_Facilities _NAS_Pensacola_FL.pdf PDF
Answers_to_GPOL_Pre_Proposal_Inquiries.pdf PDF
N39430-14-R-1405_Amendment_0007.pdf PDF
Answers_to_GPOL_RFI_PPI.pdf PDF
Conformed_Solicitation_N39430-14-R-1405.pdf PDF
N39430-14-R-1405_Amendment_0005.pdf PDF
5235953.pdf PDF
5236040.pdf PDF
5236041.pdf PDF
5236043.pdf PDF
5235954.pdf PDF
5236042.pdf PDF
5235948.pdf PDF
5236044.pdf PDF
5236039.pdf PDF
5235952.pdf PDF
N39430-14-R-1405_Amendment_0004.pdf PDF
N39430-14-R-1405_Amendment_0003.pdf PDF
GPOL_Clean _Inspect_and_Repairs_POL_Facilities _NAS_Pensacola_PART_2-6.pdf PDF
GPOL_Pre_Proposal_Conference_Presentation.ppt PPT presentation
GPOL_Seed_Project_Site_Visit_MAP.pdf PDF
SEED_PROJECT_RFP_Part_1_-_Clean _Inspect_and_Repairs _POL_Facilities _NAS_Pensacola_FL.pdf PDF
N39430-14-R-1405_Amendment_0002.pdf PDF
GPOL_Answers_to_PPI_RFI's_01.pdf PDF
GPOL_SEED_PROJECT_Clean_Inspect_Repair_POL_Facilities _Pensacola_FL_Parts_2-6.pdf PDF
GPOL_ATTENDANCE_ROSTER.pdf PDF
ATTACHMENT_7.1_-_NAVFAC_Form_4330-43.xlsx XLSX spreadsheet
GPOL_Amendment_0001.pdf PDF
SEED_PROJECT_PLACE_HOLDER__RFP_Part_1_-_CIR _POL_Facility _MCAS_Beaufort_SC.pdf PDF
GLOBAL_POL_SOLICITATION_RFP_PART_1.docx DOCX document
ATTACHMENT_7_SEED_PROJECT_PLACE_HOLDER_Parts_2-6_CIR_POL_FACILITIES_BEAUFORT_SC.pdf PDF
RFP_Global_POL_MACC_SOW_Combined_Part_2_thru_6.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N39430-14-R-1405 INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR PETROLEUM, OILS AND LUBRICANTS (POL) FUEL SYSTEMS AT VARIOUS LOCATIONS WORLDWIDE.

The purpose of this Amendement is to incorporate changes to the Solicitation, to incorporate a Conformed copy of the Solicitation and to provide answers to Pre Proposal Inquiries.

All other terms and conditions apply.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Mar-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N39430-14-R-1405

X 9B. DATED (SEE ITEM 11)

28-Jan-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Mar-2014

CODE

NAVFAC EXWC

CODE ACQ / NAVAL BASE VENTURA COUNTY

1100 23RD AVE BLDG 1100

PORT HUENEME CA 93043-4301

N39430 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N39430-14-R-1405

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following sections of the Solicitation have been revised. Refer to Incorporated Comformed Copy of the Solicitation.

SECTION 00010 - SOLICITATION CONTRACT FORM

1. SF 1442 – Proposal due date has been revised from 26 Mar 14 to 09 Apr 14.

2. Solicitation Contract Form, Item No. CLIN 0001-0005 (Estimated MAX Amount per Ordering Period of Performance is $160,000,000).

SECTION 00201 - SOLICITATION CONTRACT FORM

3. Sec I, A. Description of Acquisition, Para 1 (Firm Fixed Price – Remove from the first sentence).

SECTION 00210 - SOLICITATION CONTRACT FORM

4. Sec I., first paragraph deleted.

5. Sec I., Non-Price and Price Evaluation Findings (Matrix), (Large Business replaced by Unrestricted Business).

6. Sec II., General Information, Page Limitation Note, (revised to include cover letters, cover pages, table of contents and copies of amendment acknowledgements) are excluded from the page limitation.

7. Sec III – Price Evaluation Factor, add (viii), Attachment 5 and 6, Factor 6 – Small Business Utilization shall be included in Vol 2 – Price Proposal.

8. Sec IV., Factor 1 Corporate Experience, delete “covered by this requirements” to “anticipated in this contract”.

9. Sec IV., Factor 1 Corporate Experience, delete sentence “for Large Business, $500,000 to $1,000,000 for Small Business”.

10. Sec IV. Non Price Evaluation Factors, (1) Factor 1, (i) Solicitation Submittion Requirements, last paragraph, delete “construction”.

11. Sec IV. Non Price Evaluation Factors, (1) Factor 1 Section 00210 – Sec IV. Non Price Evaluation Factors, (1) Factor 2, 1), delete, “Provide an orgainazational chart of no more than three (3) pages” to “Provide an orgainazational chart of no more than five (5) pages”.

12. Sec IV. Non Price Evaluation Factors, (1) Factor 1 Section 00210 – Sec IV. Non Price Evaluation Factors, (1) Factor 3, Project Manager, delete “minimum of five (5) years of experience” to “ minimum of ten (10) years of experience”.

13. Sec IV. Non Price Evaluation Factors, (1) Factor 1 Section 00210 – Sec IV. Non Price Evaluation Factors, (1) Factor 3, Project Manager, add “Must have completed the course entitle “Construction Quality Management (CQM) for Contractors”.

N39430-14-R-1405

14. Sec IV. Non Price Evaluation Factors, (1) Factor 1 Section 00210 – Sec IV. Non Price Evalution Factors, (1) Factor 3, Site Manager, “minimum of five (5) years of experience” to “ minimum of ten (10) years of experience”.

15. Sec IV. Non Price Evaluation Factors, (1) Factor 1 Section 00210 – Sec IV. Non Price Evaluation Factors, (1) Factor 3, Site Manager, add “Must have completed the course entitle “Construction Quality Management (CQM) for Contractors”.

16. Sec IV. Non Price Evaluation Factors, (1) Factor 1 Section 00210 – Sec IV. Non Price Evaluation Factors, (1) Factor 3, Quality Control Manager (QCM), delete “at least two (2) year” to “at least five (5) years experience as QC Manager”.

17. Sec IV. Non Price Evaluation Factors, (1) Factor 1 Section 00210 – Sec IV. Non Price Evaluation Factors, (1) Factor 3, Site Safety Health Officer, add “Must have completed the course entitle “Construction Quality Management (CQM) for Contractors”.

18. Sec IV. Non Price Evaluation Factors, (1) Factor 1 Section 00210 – Sec IV. Non Price Evaluation Factors, (1) Factor 7, moved last paragraph from (i) Solicitatio Submittal Requirement to (ii) Basis of Evaluation.

19. Attachment 5, Based Period and Option Years, add “Option 3 and Option 4” to the table.

20. Attachment 6, Based Period and Option Years, add “Option 3 and Option 4” to the table.

(End of Summary of Changes)