N39430-14-R-1405-0006
INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR PETROLEUM, OILS AND
LUBRICANTS (POL) FUEL SYSTEMS AT VARIOS LOCATION WORLDWIDE.
The work to be performed includes construction repair services for Clean, Inspect and Repair (CIR), Sustainment, Restoration and Modernization (SRM), and related services for the Petroleum, Oil and Lubricants (POL) Fuel System Program.
GLORIA E. QUINTERO 805-982-5538
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
30-Mar-
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within _______15 calendar days and complete it within ________ calendar days after receiving award, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ 6 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________09 April 2014 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVFAC
CODE ACQ / NAVAL BASE VENTURA COUNTY
1100 23RD AVE BLDG 1100
PORT HUENEME CA 93043-4301
N39430
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 160,000,000 Each
BASE YEAR FOR THE POL IDIQ MACC
FFP
GLOBAL PETROLEUM OIL AND LUBRICANTS (GPOL) INDEFINITE
DELIVERY INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD
CONSTRUCTION CONTRACT (MACC).
FOB: Destination
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 160,000,000 Each
1ST OPTION YEAR FOR THE POL IDIQ MACC
FFP
GLOBAL PETROLEUM OIL AND LUBRICANTS (GPOL) INDEFINITE
DELIVERY INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD
UNIT UNIT PRICE MAX AMOUNT
0003 160,000,000 Each
2ND OPTION YEAR FOR THE POL IDIQ MACC
FFP
GLOBAL PETROLEUM OIL AND LUBRICANTS (GPOL) INDEFINITE
DELIVERY INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD
UNIT UNIT PRICE MAX AMOUNT
0004 160,000,000 Each
3RD OPTION YEAR FOR THE POL IDIQ MACC
FFP
GLOBAL PETROLEUM OIL AND LUBRICANTS (GPOL) INDEFINITE
DELIVERY INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD
UNIT UNIT PRICE MAX AMOUNT
0005 160,000,000 Each
4TH OPTION YEAR FOR THE POL IDIQ MACC
FFP
GLOBAL PETROLEUM OIL AND LUBRICANTS (GPOL) INDEFINITE
DELIVERY INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD
NOTE ON NOT TO EXCEED (NTE)
The maximum value of all of the orders that may be placed during all of the ordering periods under all of the contracts awarded hereunder is $800,000,000. Each ordering period (CLIN) set forth in the schedule includes an estimated quantity of the dollar value of all orders that will be placed during that ordering period. Offerors should use those estimated quantities for planning purposes and in the preparation of its proposals. Circumstances may change after award such that the Government may need to issue orders which exceed the estimated quantity set forth for any particular ordering period. The aggregate of all the estimated quantities for all ordering periods is $800,000,000.00 which is the maximum amount the Government may order under all the contracts as a whole including option ordering periods if exercised.
The Government, may, however place orders during any ordering period which exceed the estimated quantity for that period as long as the contract maximum is not exceeded. As such, the Government may place orders during the first ordering period which consume the contract total. Any estimated quantity not consumed in an ordering period remains available for use in a subsequent ordering period.
The Government intends to issue a task order to obligate the contract minimum guarantee of $25,000 to each contractor. No minimum guarantees apply to the option periods. This task order to obligate the minimum guarantee will be issued concurrently with the award of the basic contract. Contractors may not invoice against this task order. Once the contractor receives a task order which exceeds the minimum guarantee amount, the minimum guarantee task order will be modify to de-obligate the funds from the task order.
SECTION 00201
I. INTRODUCTION
A. DESCRIPTION OF ACQUISITION
1. This acquisition will result in the award of a Global Petroleum Oil and Lubricants (GPOL) Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC), with a Not to Exceed (NTE) maximum value of $800M for all years. Approximately six (6) contracts will be awarded. The contract will include provision for ordering Firm Fixed Price task orders to provide Sustainment, Restoration and Modernization (SRM), Clean, Inspect and Repair (CIR) and related projects at Department of Defense Facilities Worldwide. The contract will be awarded using competitive negotiated procedures, as it has been determined in accordance with FAR 6.401 to be the most appropriate method of contracting for the subject requirement.
2. The purpose of the Global Petroleum, Oil and Lubricant (GPOL) MACC is to provide SRM and CIR for POL systems at various locations worldwide. The work entails design, engineering, inspection, testing, and construction of POL fuel systems and their various components. The services include all aspects of POL project execution. The award of a MACC will serve to establish long-term contractual relationships with multiple firms to reduce procurement and administrative costs, provide a pool of contractors with the required POL skills, and to provide quality and efficiency in delivery of SRM and CIR solutions for DoD POL systems globally. Task orders performed in foreign countries will be subject to the provisions of the applicable host country Status of Forces Agreement (SOFA) or equivalent treaty.
3. The acquisition strategy is to procure a MACC using unrestricted, full and open competition with a requirement to reserve task orders valued at $1,000,000 or less to Small Business if they are to be performed within the 50 US States, excluding US Territories. The best value continuum source selection process to be used for this acquisition is the tradeoff analysis process as described in FAR 15.101-1.
4. Each contract will contain a base ordering year and four (4) 12-month option ordering periods for a maximum of sixty (60) months. The maximum value of all task orders to be awarded under all ordering periods for all contracts is $800,000,000.
Options will be exercised in accordance with FAR Part 17.207, Exercise of Options. Periods of Performance will be negotiated for each individual task order and based upon the requirements size and complexity of each task order.
5. The Government intends to issue a multiple award contract with a guaranteed minimum amount of $25,000 to each contractor for the life of each contract. The Government anticipates the award of a seed task order to one MACC contractor. The award of the seed task order will fulfill the minimum guaranteed amount for that MACC holder. The maximum value of all of the orders that may be placed during all of the ordering periods under all of the contracts awarded hereunder is $800,000,000. The government anticipates awarding approximately six (6) IDIQ contracts under the MACC, with approximately three (3) of the contracts reserved for small business firms. All offers will be evaluated on the same criteria, however, offers from small business will be ranked separately from offers evaluated and ranked from “other than small business” firms. Task orders will be FFP and generally within the value range of $500K to $12,000,000. Task orders estimated at a value of $1,000,000 or less to be performed within the 50 United States will be set aside for the small business MACC holders only. Small Business Set Aside task orders will be competed amongst small businesses, if less than two Small Business MACC holders respond to the request for task order proposal (RFTOP), a new RFTOP will be solicited from all MACC holders.
II. EVALUATION
A. BASIS FOR AWARD
1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contracts; to negotiate with offerors in the competitive range; and to award the contracts to the offerors submitting the proposals determined to represent the best value—those proposals most advantageous to the Government, price and other factors considered.
2. The Government intends to evaluate proposals and award the contracts without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
3. The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.
4. All technical factors when combined are of equal importance to the performance confidence assessment (past performance) rating; and all technical factors and the performance confidence assessment (past performance) rating, when combined are approximately equal to price.
5. Any proposal found to have a deficiency in meeting the solicitation requirements or performance objectives will be considered ineligible for award, unless the deficiency is corrected through discussions.
Proposals may be found to have either a significant weakness or multiple weaknesses that impact either the individual factor rating or the overall rating for the proposal.
SECTION - 00210
I. EVALUATION FACTORS FOR AWARD
1. The solicitation requires the evaluation of price and the following non- price factors and sub-factors:
Factor 1 – Corporate Experience Factor 2 – Management Approach Factor 3 – Key Personnel Factor 4 – Project Execution Approach Factor 5 – Safety Factor 6 – Small Business Utilization
Sub-factor 6.A. – Past Performance in Utilization of Small Business Concerns Sub-factor 6.B. – Small Business Participation Factor 7 – Past Performance
Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
The distinction between corporate experience and past performance is corporate experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity.
2. The relative order of importance of the non- price evaluation factors and sub-factors is the technical factors (Factors 1, 2, 3, 4, 5 and 6 and their respective sub-factors) are of equal importance to each other respectively, and, when combined, are equal in importance to the past performance evaluation performance confidence assessment (Factor 7). When a proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor (the non- price evaluation factors) when combined are approximately equal to price.
The importance of price will increase if the Offerors’ non- price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non- price proposal’s superiority to the Government. Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.
Utilizing the same evaluation criteria for evaluation purposes, the Source Selection Evaluation Board (SSEB) will document the proposal evaluation findings as follows:
Non-Price and Price Evaluation Findings will be documented in four (4) separate matrixes.
Non-Price Evaluation Findings:
1. One (1) matrix for Unrestricted Business
2. One (1) matrix for Small Business
Price Evaluation Findings:
1. One (1) matrix for Unrestricted Business
2. One (1) matrix for Small Business
The best value decision will be based on a comparative assessment of proposals against all source selection criteria established in this Solicitation Evaluation Criteria and Source Selection Plan. The Government intends to make award to offerors submitting the proposals determined to represent the best value and those proposals most advantageous to the Government, price and other factors considered. The government anticipates awarding approximately six (6) IDIQ contracts under the MACC, with approximately three (3) of the contracts reserved for small business firms.
The Price Factor evaluation will be provided to the Technical Evaluation Team Board after evaluation of all non-price factors other than Past Performance has been completed and evaluation findings have been documented.
II. SUBMITTAL REQUIREMENTS FOR EACH FACTOR AND BASIS OF EVALUATION.
A. Time and Date for Receipt of Proposals. Technical and price proposals shall be submitted no later than the date and time provided in Block 13a of the Standard Form 1442 “Additional Solicitation Requirements”. Proposals not received on or before the hour and date set forth will be handled in accordance with FAR provision 52.215-1 “Instruction to Offerors – Competitive Acquisition.”
B. Proposals shall be submitted to the following address:
If sent by mail or private courier:
Naval NAVFAC EXWC Acquisitions Department Code ACQ71 Naval Base Ventura County Attn: Gloria Quintero 1100 23rd Avenue Bldg. 1100 Room B107 Port Hueneme, CA 93043-4333
C. HAND CARRY DELIVERY INSTRUCTIONS: If a contractor chooses to hand carry their offers but has no base access to the Naval Base Ventura County, Port Hueneme CA delivering their offers, instructions are as follows:
(i) A government employee representative from NAVFAC ACQ (EXWC) will be standing by the Pass and ID Office, inside Building Number 1183, at Sunkist Gate, Naval Base Ventura County, Port Hueneme, CA on the morning of 09 Mar 2014, 2014 from 10:00 a.m. to 12:00 p.m.
local time to receive offers to this solicitation.
(ii) Any offers hand delivered before the date, place, and time specified above, offerors must contact by telephone, Gloria Quintero, Contract Specialist at (805) 982-5538 and Russell O.
Dominy Contracting Officer at (805) 982-1006. Please email the following information to gloria.quintero@navy.mil and russell.dominy@navy.mil, one day before the offer deadline date.
Date of Delivery Visitor Last Name Visitor First Name
& Middle Initial Citizenship Name of the
Company
(iii) Offerors are advised to be aware of FAR 15.208 and take proper steps to ensure timely receipt of their proposals at NAVFAC EXWC Acquisitions Department (Code ACQ71), Naval Base Ventura County, Port Hueneme.
General Information: The non-price and price proposals shall be submitted in separate binders, tabbed appropriately, and must include a cover page with the name of the prime contractor addresses, phone and fax numbers, email addresses, solicitation number, and point of contact. Should there be a discrepancy between paper and electronic information provided, the paper copies shall govern. Offerors shall number the pages consecutively for each factor.
Note: The page limitation for the entire proposal (Volumes 1 and 2) is 200 pages. Not withstanding the overall proposal page limitation, copies of joint venture agreements, past performance questionnaires, teaming agreements, letters of commitment, cover letters, cover pages, tabs, table of contents and copies of amendment acknowledgments shall not be applied against the overall proposal 200 page limits. Any pages in excess of the maximum limits will not be evaluated.
Contractors shall submit required information for non-price and price proposals as follows:
Non Price Proposal:
Non Price proposals shall be submitted as one Volume; (Volume 1): Factor 1 – Corporate Experience, Factor 2 – Management Approach, Factor 3 – Key Personnel, Factor 4 – Project Execution Approach, Factor 5 – Safety, Factor 6 – Small Business and Factor 7 – Past Performance.
Volume 1: Submit one (1) original, six (6) copies in 8-1/2 x 11 format, Time New Roman Font, size 12.
Tables and charts can be landscape format, font size 12. Each 11x17 page submitted will count as one (1) page. Proposals shall be submitted in three ring binders and tabbed appropriately. Double sided pages are encouraged to conserve paper. Proposals shall be submitted on a CD as both an Adobe Acrobat file (.pdf) and as MS Word file. Offerors shall bookmark all sections on the CD the same as the tabs in the paper copies. For the MS Word files and the subfolders must be organized and tabbed the same as the .pdf copy.
Note: Past performance questionnaires shall be submitted in Adobe.pdf only.
Technical proposal Volume 1 shall not include any elements of price and shall be organized in the general format as follows:
- Cover page
- Listing of team member names and point of contact information
- Team member corporate name (no abbreviations)
- Address
- Point of Contact
- Phone number
- DUNS number
- CAGE Code
- Introductory Sheets (e.g. Table of Contents, List of Figures, List of Acronyms)
- Copies of letters of commitment from the team members
- Copies of joint venture agreements, or other teaming arrangement agreements
- Factor 1 – Corporate Experience
- Factor 2 – Management Approach
- Factor 3 – Key Personnel
- Factor 4 – Project Execution Approach (Seed Task Order)
- Factor 5 – Safety
- Factor 6 – Small Business Utilization Sub-factor 6.A. – Past Performance in Utilization of Small Business Concerns Sub-factor 6.B. – Small Business Participation
- Factor 7 – Past Performance
Volume 2 – Price Proposal: Price proposal shall be submitted as a separate Volume. Submit one (1) original, two (2) copies in 8-1/2 x 11 format, Time New Roman Font, size 12. Schedules and tables can be landscape format, font size 12. Proposals will be submitted in three ring binders. Double sided pages are encouraged to conserve paper. Additionally, offerors shall submit a complete copy of the price proposal on CD (offerors shall bookmark all sections on the CD the same as the tabs in the paper copies) proposal shall be submitted as both an Adobe Acrobat file (.pdf) and Excel file(s) with live cells.
III. PRICE EVALUATION FACTOR
(a) Solicitation Submittal Requirements:
(i) Signed SF 1442, Offeror shall insert its company name and address in Block #14, telephone number in Block #15, acknowledge all amendments in Block #19 (if applicable), name and title of person authorized to sign in Block #20A, signature in Block #20B, and offer date in Block #20C of the SF1442. In addition, offeror shall also provide its DUNS Number, CAGE code, and Federal Tax ID number with its proposal.
(ii) Offeror shall complete Attachment 7 and 7.1 – Schedule of Price CLIN 0001 – Seed Task Order Project and NAVFAC 4330-43, provided in a separate PDF File.
(iii) Offeror shall complete Attachment 3 – Responsibility Evaluation Information Sheet, provided.
(iv) Bid Bond (SF-24). Offeror shall submit a bid bond (SF-24) in the amount of 20% of total seed project bid price or $3,000,000, whichever amount is less.
(v) Contractor registration. Offeror shall ensure current registration on the System for Award Management Website, www.sam.gov.
(vi) ORCA registration. Offeror shall ensure current Annual Representation and Certification on the System for Award Management SAM website http://www.sam.gov are complete and updated for this procurement.
(vii) VETS-100 registration. Offeror shall ensure current VETS-100 report on the Department of Labor website http://dol.gov/vets/programs/fcp/main.htm is complete and updated for this procurement.
(vii) Attachment 5 and 6 of Factor 6 – Small Business Utilization must be included in Volume 2 – Price Proposal.
NOTE: The bid bond, SAM, and VETS-100 registration must be in the name/CAGE/DUNS of the offeror identified on the SF1442.
(b) Basis of Evaluation: The Government will evaluate the price proposal for compliance with the submission requirements and price reasonableness. The Seed task order price, submitted on the form NAVFAC 4330-43 will be the total price for price evaluation purposes to determine the best value to the Government.
The Government will conduct a price analysis based on the offeror submitted total Price for the Seed task order price to assess fair and reasonable price using one or more of the following techniques:
Comparison of proposed prices received in response to the Solicitation;
Comparison of proposed prices to historical prices paid, whether by the Government or other than the Government, for the same or similar service;
Use parametric estimating methods or application of rough yardsticks (such as dollars per hour, per pound, per horsepower, or any other selected unit of measurement) to highlight significant inconsistencies that may warrant additional price inquiry;
Comparison of proposed prices with competitive published price lists, published market prices, similar indexes, and/or discount or rebate arrangements;
Comparison of proposed prices with independent Government cost estimates;
Comparison of proposed prices with prices obtained through market research for the same or similar items;
Analysis of data other than certified cost or pricing data provided by the offeror.
IV. NON-PRICE EVALUATION FACTORS
(1) Factor 1, CORPORATE EXPERIENCE:
Note: Corporate experience pertains to the type of work and volume of work completed by a contractor that are relevant to the types of work anticipated in this contract.
Relevant Projects include, but are not limited to; worldwide Petroleum, Oil and Lubricants (POL) Fuel System construction projects, sustainment, restoration and modernization (SRM), cleaning, inspection and repairs (CIR) of bulk liquid fuel tanks, repair of liquid fuel pipelines, repair of fuel system support facilities and cathodic protection repair projects valued at approximately $500,000 to $12,000,000.
Projects must have been completed within the last five (5) years of the date of issuance of this RFP.
(i) Solicitation Submittal Requirements:
Submit a Corporate Experience Project Data Sheet for a minimum of three (3) to a maximum of five (5) relevant construction projects that the offeror completed and serve as a prime construction contractor that best demonstrates experience on relevant projects within the past five (5) years. These projects shall be the same projects the offeror has submitted for Factor 7 – Past Performance.
A project is defined as a completed construction project performed under a single task order or contract.
For multiple award and indefinite delivery /indefinite quantity type contracts, the contract as a whole should not be submitted as a project; rather Offerors should submit work performed under an individual task order as a project.
The attached Construction Experience Project Data Sheet (Attachment 2) is MANDATORY and SHALL be used to submit project information. This form is set at 10 pt. font and the font size shall not be altered by the Offeror. The Government will not consider information submitted in addition to this form.
Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).
For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy of the project to the requirements of the RFP, (ea. Fuel Pipeline Repairs).
If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entry. If the Joint Venture does not have shared experience, projects shall be submitted for the Joint Venture partners. Offerors are still limited to a total of five (5) projects combined. Offerors who fails to demonstrate experience of the JV or its partners may be rated lower.
If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (a name is not exactly as stated on the SF 1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.
The Offeror may utilize experience of a key subcontractors to demonstrate experience under this evaluation factor. A key subcontractor is defined as a subcontractor that has performed major and/or critical aspects of work submitted as a project under this factor. The Offer must provide a letter of commitment and an explanation of the meaningful involvement that the subcontractor will have in performance of this contract.
(ii) Corporate Experience Basis of Evaluation:
The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant POL construction projects construction and/or new construction, renovation and repairs. The assessment of the Offeror’s relevant experience will be used as a means of evaluating each offeror’s skills and resources needed to successfully meet the requirements of the RFP. The Government will only review the first five (5) projects submitted in the Offeror’s proposal. Any projects submitted in excess of the first five (5) listed projects will not be considered.
Proposals that fail to provide required and complete information may be rated lower.
Relevant project experience where the Offeror and the proposed team members have previously worked together may receive a higher rating than those that have not worked together.
(2) Factor 2, MANAGEMENT APPROACH:
(i) Solicitation Submittal Requirements:
This requirement considers the effectiveness of the offeror’s management approach and organization to adequately perform the requirements of the solicitation. The Government seeks a comprehensive approach that will maximize quality, be cost effective, takes into account logistical realities and will result in the optimal use of resources. Additionally, the Government seeks Offerors that can provide a rapid response for both CONUS and OCONUS emergency POL construction needs.
Describe your management approach as it pertains to this solicitation, including the following:
1) Provide an organizational chart of no more than five (5) pages, with related narrative. The narrative shall provide the following;
a. The offeror proposed program management organizational structure, including organizational relationships.
b. Information provided shall adequately explain the flow and levels of authority and communication, both internally and with the Government.
c. Describe how and to what extent the field program management organization will interact with the home office organization and other supporting offices under the contract.
d. The narrative shall address prime and subcontractor interfaces and responsibilities.
e. Offerors shall submit unconditional letters of commitment for proposed key subcontractors and team members.
f. Describe how the proposed program management structure will enable efficient management of the work to be performed under the contract.
g. In the event that the use of key subcontractor(s) are proposed, indicate to what extent your firm has worked with the proposed subcontractors in the past. Include identification of the prime and subcontractor, the magnitude and complexity of past projects; and the anticipated responsibilities of the subcontractor(s) under the scope of work for this contract.
h. If a joint venture is proposed, indicate to what extent the members of the joint venture have worked together in the past, including identifications of magnitude and complexity of projects worked on. The roles of each joint venture member in the management of the contract shall also be clearly delineated. Provide information on the structure and decision making responsibilities of the partners in terms of who will control the manner and method of performance of work.
2) Provide a field-staffing plan that fully supports three concurrent task orders. Include position descriptions of key field personnel. Include any plan for hiring the most qualified personnel, retaining and minimizing turnover, and training qualified employees. Describe how staffing needed to perform this contract will be acquired. Provide a narrative describing your proposed plan for field staffing and use of local resources.
3) Address the approach to minimize response time between the award of a task order and the mobilization to a site. Include a discussion on coordination with subcontractors for quick response.
Offerors shall provide details on their ability/resources to provide an initial assessment team to an emergency site within thirty-six (36) hours from a Notice to Proceed. Address your plan to obtain and deliver materials, equipment, and workforce globally, including areas with limited and constrained resources.
4) Address approach for managing quality of work (quality assurance/quality control program), contract administration, and project controls and scheduling. Provide a description of how this QA/QC program has been used successfully on prior projects.
5) Provide a narrative describing your company’s past and current resources with respect to capacity for new work; address the available capacity for each contract year (2014, 2015, 2016, 2017 and 2018).
Include a letter from your bonding company agent certifying the current maximum bonding capacity per project and the aggregate.
Joint Venture and Team Arrangements – FAR Subpart 9.6 defines contractor team arrangements as follows; Contractor team arrangements mean (1) two or more companies form a partnership or joint venture to act as a potential prime contractor or (2) a potential prime contractor agrees with one or more other companies to have them act as its subcontractor under a specified Government contract or acquisition program.
All offerors proposing team members (including a joint venture or key subcontractor (subcontracts performing 20% or more of the prime contract value)) whose resources are relied on in response to the requirement of the RFP, shall submit the following information:
1. Provide a listing of the team members’ corporate name (no abbreviations), address, point of contact, phone number, DUNS Number, and Cage Code. This information should be provided in both the technical and price proposal.
2. Submit a copy of the Joint Venture agreement, other Teaming Arrangement agreement, or signed binding letter of commitment from each team member. All joint ventures, teaming agreements, and letters of commitment shall: (1) clearly identify the expected relationship, role and responsibility between the firms or of the subcontractor or other entity (type and proportion of work to be performed); and (2) shall be signed by the appropriate individual(s) of each firm. Joint Venture Agreements shall be provided in both the technical and price proposal. Letters of commitment shall be provided in the technical proposal.
(ii) Management Approach Basis of Evaluation:
The Government will evaluate the extent to which the offeror’s management plan:
(1) demonstrates an effective and efficient organization structure and logical approach to providing a quality end result;
(2) provides personnel with experience to manage the contract;
(3) provides an efficient and cost effective plan for staffing/resourcing all locations covered by this contract, including making use of local resources;
(4) demonstrate rapid mobilization capabilities including: coordination with subcontractors, acquisition/delivery of equipment, materials and workforce globally and
(5) provides for a QA/QC program, which demonstrate that data quality control measures are in place and have been successfully used on previous projects.
The offeror’s proposal should demonstrate that they possess a management team that has proven experience relevant to the work required under this contract. Particular emphasis will be placed on the degree to which the offeror's management can demonstrate a concise relationship between its past performance data and its systemic improvement efforts as well as presenting the systemic improvement management approach to be used during execution of the proposed contract.
(3) Factor 3, KEY PERSONNEL
Submit a resume for the key personnel listed below. Resume shall include professional licenses and certifications, number of years of experience, firms they worked for, a list of relevant POL projects (in accordance with the definition of relevant projects provided above) that they have completed, and their role on these projects. Resumes for each individual shall be limited to two (2) pages in length. Each resume must show experience on two or more relevant projects. (Note: Do NOT submit resumes of more than two (2) pages in length; only the first two (2) pages will be evaluated if more than two (2) pages are submitted).
- Program Manager :
The Program Manager is the primary point of contact for global issues associated with the basic contract.
Their involvement in the day-to-day execution of each task order is not expected, but will be requested in the event that problems cannot be resolved via another core position. The Program Manager shall be responsible for the content of all proposals and compliance with the requirements of the basic contract as well as quality assurance for all task orders.
The Program Manager must be a full time permanent employee of the prime contractor. No exceptions will be considered. The desired credentials for the Program Manager are:
Minimum of Bachelors of Science degree in Civil, Chemical or Mechanical Engineering.
Minimum of ten (10) years experience in POL facilities, engineering, including at least five (5) years experience in the management of engineering design, inspection, testing, and construction of POL facilities.
Demonstrated capacity to organize, plan, direct, supervise, and control all technical and management programs, which include multidisciplinary tasks and requirements, and perform fiscal and administrative functions.
Experience in POL Systems Professional Engineering License API 510/570/653 certification
- Project Engineer :
This is a permanent full-time position. Temporary or subcontractor employees will be considered by the Government, on a case by case basis. This individual will be responsible for all technical content of the task order assigned to them. The Project Engineer is expected to engage when technical expertise beyond the skill of the site manager or project manager is required or at the request of the government for engineering evaluation of a technical issue. The Project Engineer will be expected to be on-site during project execution to diagnose, investigate, and analyze any and all technical issues requested by the government. The project engineer’s specific experience must match the technical content of the task order.
The desired credentials for Project Engineer are:
Minimum of Bachelors of Science degree in Civil, Chemical or Mechanical Engineering.
Minimum seven (7) years experience in POL facilities engineering, including design, inspection, testing and construction.
Experience in POL Systems Current knowledge of POL Specifications in accordance with the Unified Facilities Guide
Specifications (UFGS).
Professional Engineering License
- Project Manager:
The Project Manager is responsible for the status reporting, financial tracking, scheduling and all project correspondence and documentation. The project manager is expected to be the Government’s primary Point of Contact for the task order assigned to them. This position and the project engineer or site manager may be filled by the same person upon approval from the Government on a case by case basis provided the person has the qualification for both positions.
The project manager should be a full time permanent employee of the prime contractor. The desired credentials for the Project Manager are:
Minimum ten (10) years experience in the POL Facility industry, five (5) years experience in managing
POL construction projects.
Demonstrated ability to collect and organize project documentation and correspondence Knowledge of POL systems sufficient to communicate and understand technical issues Current Knowledge of POL Specifications Must have completed the course entitle “Construction Quality Management (CQM) for
Contractors” Knowledge of Quality Control and Quality Assurance methods
- Site Manager:
The Site Manager is responsible for quality assurance and scope compliance for the task order they are assigned to. They will be expected to be on-site during project execution and oversee all sub-contractor and /or trades work. The site manager will be responsible for compliance with all applicable Health, Safety and Environmental regulations specific to the geographic site.
The site manager should be a full time permanent employee of the prime contractor. The desired credentials for the site manager are:
Minimum ten (10) years experience in the POL Facility industry.
Training in engineering, construction management Academic training in construction Health & Safety Training in construction quality control Must have completed the course entitle “Construction Quality Management (CQM) for
Contractors” Sufficient practical, technical, and managerial experience NDE/NDT knowledge relevant to the project Experience in POL System
- Quality Control Manager (QCM):
The Quality Control Manager is responsible to implement and manage the Quality Control Program. The QCM is required to perform the three phases of control, perform submittal review and approval, ensure testing is performed and provide QC certification and documentation required in this contract.
The Quality Control Manager should be a full time permanent employee of the prime contractor, exception will be considered on a case by case basis. The desired credentials for the Quality Control Manager are:
Have completed the course entitle “Construction Quality Management (CQM) for Contractors” and shall maintain a current course certificate.
Have ten (10) years of combined experience as a Superintendent, QC Manager, Project Manager, or Project Engineer on similar size and type construction contract and at least five (5) years experience as a QC Manager.
Be familiar with requirements of USACE EM 385-1-1, and experience in the areas of hazard identification, safety compliance and sustainability.
- Site Safety and Health Officer (SSHO):
The Site Safety and Health Officer is responsible for managing, implementing and enforcing the Contractor’s Safety and Health Program in accordance with the accepted Accident Prevention Plan
(APP).
The Site Safety and Health Officer should be a full time permanent employee of the prime contractor, exceptions will be considered on a case by case basis. The desired credentials for the Site Safety and Health Officer are:
Minimum five (5) years experience in the POL Facility industry, Minimum five (5) years experience in management of POL construction projects.
Minimum five (5) years of construction industry safety experience or three (3) years if possesses a Certified Safety Professional (CSP) or safety and health degree.
Must have completed the 30 hour OSHA Construction Safety Class Must have completed the course entitle “Construction Quality Management (CQM) for
Contractors” Demonstrated ability to implement and manage a Safety Program Demonstrated ability to collect and organize project documentation and correspondence Be familiar with requirements of USACE EM 385-1-1, and experience in the areas of hazard identification, safety compliance and sustainability.
(ii) Basis of Evaluation:
The offeror will be evaluated on proposed key personnel in determining how the technical knowledge and capability of proposed personnel will contribute to the offerors ability to meet the contract requirement based on resume information provided and its relevancy to the functional areas specified in the RFP.
Education/experience requirements are a pre requisite for key personnel.
(4) Factor 4, PROJECT EXECUTION APPROACH (SEED TASK ORDER):
The factor submission shall comply with the general preparation instructions contained in Attachment 7.
The submittal shall address the following:
a. TECHNICAL SOLUTION:
Submittal Requirements:
Offeror Technical Solution: Provide a narrative describing how the offeror’s technical approach to the seed project will meet the requirements of the RFP. Narrative shall focus on the following:
Work plan/technical approach (e.g., how will tasks be performed, mitigation of potential problems, logistics issues, testing procedures, safety considerations, etc.)
Responsibility of all parties (i.e., who is doing what) List of assumptions and RFP deviations For this Task Order, the Project Engineer shall be a licensed. Provide resume of the
Project Engineer detailing expertise relevant to Task Order activities Information on subcontractor experience/qualifications/certifications relevant to RFP requirements.
b. SCHEDULE:
Submittal Requirements: Provide a Critical Path Method (CMP) time scaled logic diagram and schedule reports showing critical path activities using software such as Microsoft Project, SURTRACK, or Primavera Project Planner Software. This schedule should include key milestones and activities, including submittals, procurement, major construction items, Quality Control and Testing, and work requirements as specified in section 01 14 00.05 20. The schedule shall consider potential work stoppage and possible delays as described in Section 04 14 00.05 20. The awardees proposed schedule will become the basis for initial schedule submission as outline in Section 01 31 17.00 20.
(ii) Basis of Evaluation: The Government will evaluate the narrative and schedule considering the extent to which the Offeror demonstrates a clear understanding of the requirements of the project. The Government will evaluate the effectiveness of the technical solution and approach to schedule to determine the likelihood that the work will be performed in accordance with the technical requirements of the RFP.
(5) Factor 5, SAFETY:
The Offeror shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each contractor who is part of the partnership or joint venture;
however, only one safety narrative is required. EMR and DART Rates shall not be submitted for subcontractors.)
(1) Experience Modification Rate (EMR):
For the three previous complete calendar years (2010, 2011, 2012), submit your EMR (which compares your company’s annual losses in insurance claims against its policy premiums over a three year period).
If you have no EMR, affirmatively state so, and explain why. Any extenuating circumstances that affected the EMR and upward or downward trends should be addressed as part of this element. Lower EMRs will be given greater weight in the evaluation.
(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate:
For the three previous complete calendar years (2010, 2011, 2012), submit your OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate, as defined by the U.S. Department of Labor, Occupational Safety and Health Administration. If you cannot submit an OSHA DART Rate, affirmatively state so, and explain why. Any extenuating circumstances that affected the OSHA DART Rate data and upward or downward trends should be addressed as part of this element. Lower OSHA DART Rates will be given greater weight in the evaluation.
(3) Subcontracting Safety Narrative:
Describe the plan that the Offeror will implement to evaluate safety performance of potential subcontractors, as a part of the selection process for all levels of subcontractors. Also, describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at all subcontractor levels. The Safety Narrative shall be limited to two pages.
The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The Government’s safety evaluation will collectively consider the following three elements for each offeror: (1) Experience Modification Rate; (2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate; and (3) Subcontracting Safety Narrative.
(1) Experience Modification Rate (EMR)
The Government will evaluate the EMR to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward or downward trends and extenuating circumstances that impact the rating. Lower EMRs will be evaluated more favorably. For consistency, as a general guideline, the Government will use the table below to assist in evaluating the EMRs of the offerors.
Risk EMR Very Low Risk Less than 0.6
Low Risk From 0.6 to less than 0.8 Moderate Risk From 0.8 to 1.0 High Risk Greater than1.0 to 1.1 Extremely High Risk Greater than 1.1
(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate
The Government will evaluate the OSHA DART Rate to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward or downward trends and extenuating circumstances that impact the rates. Lower OSHA DART Rates will be evaluated more favorably. For consistency, as a general guideline, the Government will use the table below to assist in evaluating the DART rates of the offerors.
Risk DART Rate Very Low Risk Less Than 1.0 Low Risk From 1.0 to 1.99 Moderate Risk From 2.0 to 2.99 High Risk From 3.0 to 4.0 Extremely High Risk Greater than 4.0
(3) Subcontracting Safety Narrative
The Government will evaluate the subcontracting safety narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of…