MILITARY SEALIFT COMMAND
NORFOLK, VIRGINIA
ROH COVER SHEET
FOR
USNS ROBERT PEARY (T-AKE 5)
USCG No.: CG598801 ABS ID No.: 07136280
IMO No.: 9284350
RFP NO.: N32205-18-R-4250
19 March 2018 thru 1 June 2018 ROH/DD AVAILABILITY
PRINCIPLE DIMENSIONS
LENGTH
688 ft 97 in
BREADTH
105 ft 64 in
DRAFT FULL LOAD (mean) 30 ft 58 in
GROSS TONNAGE
43758 TONS (Registered)
MAXIMUM DISPLACEMENT
44071 TONS
ESTIMATED ARRIVAL DRAFT
25 ft 1 in Fwd
25 ft 6 in Aft
AIR DRAFT WITH MAST DOWN
160 ft 10 in ABL
WORK ITEM INDEX
USNS PEARY (T-AKE 5)
SECTION 0000
GENERAL REQUIREMENTS
NOT SEPARATELY PRICED (NSP) REQUIREMENTS
Intent, Scope, General Requirements, 2-Feb-2018 and Definitions
Technical and Manufacturer’s Representatives 2-Feb-2018
Approach, Berth, and Mooring Requirements 2-Feb-2018
Testing and Quality Assurance
Electrical Safety Procedure Requirements 2-Feb-2018
Heavy Weather Plan 2-Feb-2018
Cold Weather Plan 2-Feb-2018
0024 Physical Security at Private Contractor’s 2-Feb-2018
Facility
CATEGORY “A” WORK ITEMS
Furnish Office for Overhaul Management Team (OMT)2-Feb-2018
Furnish General Services
Telephone Services
Project Planning and Production Status
Monitoring Reports
Preparation of Weight and Moment Report
Integrated Logistics and GFM Support 2-Feb-2018
Requirements
Fire Protection and Ship’s Safety Program
Handling Ship’s Stores
Delivery and Redelivery of the Vessel 2-Feb-2018
Shipboard Access and Security
Gas Free Certificates
Clean and Gas Free Tanks, Voids, Cofferdams and Spaces
Dock Trials and Sea Trials
Hazardous Waste Disposal at a Contractor’s Facility
CATEGORY “B” WORK ITEMS
0025 Physical Security Force Bravo 2-Feb-2018
Continuation of Services 2-Feb-2018 Dry Docking and Undocking Vessel
SECTION 0100
HULL STRUCTURE
Ballast Tank Zinc Inspection 2-Feb-2018
Tank Vent Goosenecks 2-Feb-2018
0105 Deck House Clean/Paint 2-Feb-2018
Tank Boundary Testing 2-Feb-2018 Hull Survey Support 2-Feb-2018
Preservation of RAS Station King Post’s 2-Feb-2018 0113 Remove/Repair/Replace Hazmat Containers 2-Feb-2018 0114 Renew Aft Mooring Deck/Fantail Non-Skid 2-Feb-2018 0115 Renew Focsle Non-Skid 2-Feb-2018 0116 Replace 08 Level Mast Bearings 2-Feb-2018
SECTION 0200
PROPULSION MACHINERY
Propulsion Motor Clean/Inspect/Maintain 2-Feb-2018 MDE Automation Annuals (FME) 2-Feb-2018 0205 Annual MDG Control Safety Inspection & Test (GE) 2-Feb-2018
0206 Vulkan Coupling Annuals 2-Feb-2018 0231 MDG #2/3/4 Splash Oil and Test Circuit 2-Feb-2018 modification (TA 381)
SECTION 0300
ELECTRICAL
Clean Main Generator and Propulsion Control 2-Feb-2018
System (10 yr)
0303 SS Switch Board & Emergency Switchboard 2-Feb-2018
Cleaning
0305 Generator and Propulsion Motor Resistance 2-Feb-2018
Measuring
0306 Emergency Switchboard BTB and EDG GCB 2-Feb-2018 replacement 0331 Bilge Alarms (TA 393) 2-Feb-2018 0351 AESS UPS Installation Shipyard Support 2-Feb-2018
SECTION 0400
COMMUNICATION AND NAVIGATION AIDS
Bridge Annuals 2-Feb-2018
Antenna Preventative Maintenance
Comms System PM 2-Feb-2018
Echo Depth Sounder PM 2-Feb-2018
0441 NAVMACS Shipyard Support Item 2-Feb-2018
SECTION 0500
AUXILIARY MACHINERY SYSTEMS
0501 Fire Fighting Annuals
0502 SCBA Annuals
0503 Repair Sea Water Service piping LTFW CLR #1 2-Feb-2018
10” Bypasses
0504 Cargo Crane Repairs (10YR) 2-Feb-2018 EDG Annuals 2-Feb-2018 EDG Flex Hose Replacement 2-Feb-2018 Relief Valve Testing 2-Feb-2018
0515 Open and Inspect HP Air Receivers & Hydro 2-Feb-2018
HP Flasks 2-Feb-2018 Sewage System Piping Cleaning PM 2-Feb-2018 0519 LTFW Plate Cooler Cleaning & Gasket 2-Feb-2018
Replacement #2
0520 HTFW Plate Cooler Cleaning & Gasket Replacement 2-Feb-2018
#1/#2
0524 Anchor Windlass Annuals 2-Feb-2018 0528 Cargo Hold Magazine Sprinkler CLAVAL overhaul 2-Feb-2018 0556 Steering Gear PM (10 YR) 2-Feb-2018 0559 FWD AFFF Piping Replacement (TA 394) 2-Feb-2018 0560 MMR AFFF Piping Replacement (TA 394) 2-Feb-2018 0564 MDG LO Cooler Gasket Replacement/Cleaning #1/#2 2-Feb-2018 0565 MDG FO Cooler Gasket Replacement/Cleaning #1 2-Feb-2018 0571 OWS Annuals 2-Feb-2018 0572 Brine/Defrost Pump and Motor Overhaul 2-Feb-2018
SECTION 0600
OUTFIT, FURNISHINGS and HABITABILITY
Accom Ladder Inspection/Load Test (10YR)
Lifeboat Cert. and Davit Maint. (10 YR) 2-Feb-2018 0604 Rescue Boat Maintenance and Davit Maint. (10YR) 2-Feb-2018 0605 Liferaft Annuals 2-Feb-2018 0608 Immersion Suit Testing 2-Feb-2018
0610 Galley Equipment Calibration 2-Feb-2018
SECTION 0800
HEATING, VENTILATION and AIR CONDITIONING
Galley & Laundry Exhaust Duct Cleaning 2-Feb-2018
SECTION 0900
DRYDOCKING
Dry-Docking and Undocking Vessel 2-Feb-2018
Propeller Shaft and Stern Tube Inspection 2-Feb-2018
Stern Tube Seal Inspection 2-Feb-2018 Bow Thruster Maintenance (5 YR) 2-Feb-2018
Renew Seachest, Rope Guard, & Bow Thruster Zincs 2-Feb-2018
Anchor and Anchor Chain Ranging 2-Feb-2018
Overhaul Sea Valves 2-Feb-2018
Inspect and Repair Cathodic Protection 2-Feb-2018
0912 Shaft Grounding Maintenance 2-Feb-2018
Renew Waster Pieces 2-Feb-2018
Underwater Hull Cleaning and Painting 2-Feb-2018
Freeboard Cleaning and Painting
0918 Replace Bow Thruster Tunnel Grating (TA 448) 2-Feb-2018
0919 Sea Chest Grating Upgrade (TA 296)
0941 Stern Tube Fresh WATER Loop Installation TA 403 2-Feb-2018
SECTION 1000
UNREP GEAR
1001 Sliding Block/Xfer Head Refurb/Drive Chain Rep. 2-Feb-2018
Fairlead Sheaves/Block Refurb/Overhaul 2-Feb-2018 1003 ASD Fan Motor Repairs/Preservation 2-Feb-2018 1004 HP Air Relief Valve Testing 2-Feb-2018 1005 Sliding Block Rubber Bumper Replacement 2-Feb-2018
1006 Hauling Winch Electric Blower Motor Repair 2-Feb-2018 1007 Renew Flight Deck Non-Skid 2-Feb-2018 List of References
USNS ROBERT PEARY(T-AKE 5)
| Work Item |
| Reference |
| Drawing/Reference Title |
| 101 |
| 2.1.1 |
| NAVSEA Drawing 631-7489175, Corrosion Prevention of Ballast Tanks |
| 102 |
| 2.1.1 |
| NAVSEA DWG 506-7488734 Rev C, Vents, Sounds and Overflows System Diagram |
| 105 |
| 2.1.1 |
| NASSCO STD NO – 77-87-486 Rev B |
| 2.1.2 |
| Steel Structures Painting Council, Good Painting Practice, Volume 1, Fourth Edition |
| 2.1.3 |
| Steel Structures Painting Council, System and Specifications, Volume 2, Eight Edition |
| 2.1.4 |
| SSPC SP11, Power Cleaning to Bare Metal |
| 108 |
| 2.1.1 |
| NAVSEA Drawing 801-8386980, Capacity Plan |
| 2.1.2 |
| NAVSEA Drawing 801-8195241, Trim & Stability Booklet and Loading Manual |
| 2.1.3 |
| 1.1. ABS Rules for Survey After Construction; Part 7 Chapter 3, Section 2 |
| 109 |
| 2.1.1 |
| ABS Steel Vessel Rules |
| 112 |
| 2.1.1 |
| Steel Structures Painting Council, Good Painting Practice, Volume 1, Fourth Edition |
| 2.1.2 |
| Steel Structures Painting Council, System and Specifications, Volume 2, Eight Edition |
| 2.1.3 |
| SSPC SP11, Power Cleaning to Bare Metal |
| 113 |
| 2.1.1 |
| T/M TG830-AB-MMC-010 Hazardous Material Container, Model V126-FR |
| 2.1.2 |
| MSC Dwg W1261103-OD 20’X8’6, Hazardous Material Container |
| 114 |
| 2.1.1 |
| SSPC-SP 10, Near White Metal Blast Cleaning |
| 2.1.2 |
| SSPC SP11, Power Cleaning to Bare Metal |
| 2.1.3 |
| Surface Preparation Standard, SSP-SP 12/NACE 5, Surface Preparation & Cleaning of Metals by Water Jetting Prior to Recoating |
| 115 |
| 2.1.1 |
| SSPC-SP 10, Near White Metal Blast Cleaning |
| 2.1.2 |
| SSPC SP11, Power Cleaning to Bare Metal |
| 2.1.3 |
| Surface Preparation Standard, SSP-SP 12/NACE 5, Surface Preparation & Cleaning of Metals by Water Jetting Prior to Recoating |
| 116 |
| 2.1.1 |
| Drawing 471-Q470-MAST_G |
| 201 |
| 2.1.1 |
| T/M T9235-AG-MMC-010, Propulsion Motor, Synchronous, Motor Design M3HSX 305-126/16 |
| 204 |
| 2.1.1 |
| MSC DWG 079-8499163, MCCS Periodic USCG Safety Test Procedure (PSTP) |
| 205 |
| 2.1.1 |
| MSC DWG 079-8499163, MCCS Periodic USCG Safety Test Procedure (PSTP) |
| 2.1.2 |
| Technical Manual, T9235-AN-MMC-010, T-AKE Propulsion Control System |
| 2.1.3 |
| Technical Manual, T9235-AJ-MMC-010,030,050, T-AKE Machinery Centralized Control Station |
| 206 |
| 2.1 |
| Tech Manual, Vulkan Coupling, Tech Doc DOKU1G531W0013E |
| 2.2 |
| Tech Manual T9233-CF-1MC-070/020, Technical Manual, Diesel Engines, Main Power Generation, Model 9L 48/60 and 8L 48/60, Volume E1-E4 for Main Diesels |
| 2.3 |
| T-AKE Class Notice 015 – Main Diesel Generator Couplings |
| 231 |
| 2.1.1 |
| FME PROCEDURE M12702096 – INSTRUCTIONS, INSTALLATION, AND T-AKE UPGRADE |
| 2.1.2 |
| FME PROCEDURE M12701960 - PROCEDURE, PRE & POST COMMISSIONING SAFETY CHECKS |
| 2.1.3 |
| FME DWG M12702099 - ASSEMBLIES, EXTENSION SACOS CABLE, T-AKE UPGRADE |
| 2.1.4 |
| FME DWG M12702240 - TEST JUNCTION BOX, T-AKE UPGRADE |
| 2.1.5 |
| FME DWG M12702248 - TEST JUNCTION BOX |
| 2.1.6 |
| FME DWG M12702249 - CABLE, 12 METER |
| 2.1.7 |
| FME DWG M12702250 - CABLE 17 METER |
| 2.1.8 |
| FME DWG 10570989 - INTERCONNECT DIAGRAM, ENGINE CONTROL SYSTEM, T-AKE UPGRADE |
| 2.1.9 |
| FME DWG 10570990 - ELECTRICAL SCHEMATIC, ALARM PRE-PROCESSING SYSTEM, T-AKE UPGRADE |
| 2.1.10 |
| FME DWG 10570991 - ELECTRICAL SCHEMATIC, SAFETY SYSTEM, T-AKE UPGRADE |
| 2.1.11 |
| FME DWG 10570992 - CABLE LIST, T-AKE UPGRADE |
| 2.1.12 |
| FME DWG 10570993 - CABLING ELECTRICAL UNITS ON ENGINE, T-AKE UPGRADE |
| 2.1.13 |
| FME DWG 10570994 - ELECTRICAL SCHEMATIC, ENGINE CONTROL SYSTEM, T-AKE UPGRADE |
| 2.1.14 |
| FME DWG M12702222, MOUNTING TERMINAL BOX SUPPORT BRACKET |
| 2.1.15 |
| NAVSEA DWG 802-7499000 Rev. -, SRD GENERAL ARRANGEMENT |
| 301 |
| 2.1.1 |
| Safety Management System 2.1-016-AKE/AKE(RM), High Voltage(HV) Systems |
| 2.1.2 |
| NAVSEA Tech Manual T9235-AK-MMC-010, Generator, Synchronous 6600V, 60 HZ Including Generator Excitation Control Panel |
| 301 |
| 2.1.3 |
| T/M T9233-CF-IMC-070; Diesel Engines, Main Power Generation, Models 9L 48/60 and 8L 48/60, Volume E1-E4, Engine Operating Instructions. |
| 2.1.4 |
| NAVSEA Tech Manual T9235-AN-MMC-010, T-AKE Propulsion Control System |
| 303 |
| 2.11. |
| 1.1 Safety management System 2.1-016-AKE/AKE(RM), High Voltage(HV) Systems |
| 2.1.2 |
| Tech Manual NAVSEA T/M T9235-AL-MMC-010, Main Power Switchboard, 6.6 KV, 2500A |
| 2.1.3 |
| Tech Manual T9324-BU-MMC-010, Switchboards Ships Service 480V |
| 2.1.4 |
| Tech Manual T9324-BT-MMC-010, Emergency Switchboard 480V Dwg 2838 For TAKE |
| 2.1.5 |
| Cutler Hammer, I.B. 32-255-1G, Instructions for Installation, Operation and Maintenance of Type VCP-W Vacuum Circuit Breakers |
| 2.1.6 |
| Tech Manual T6262-AF-MMC-010, Motor Control Centers, Individual Controllers and Miscellaneous Panels |
| 305 |
| 2.1.1 |
| Technical Manual Generator, Synchronous, 6600 V, 60 Hz, Including Generator Excitation Control Panel - T9235-AK-MMC-010 |
| 2.1.2 |
| Technical Manual T-AKE Propulsion Control System - T9235-AN-MMC-010 |
| 2.1.3 |
| Technical Manual Transformers, Propulsion, Type THT 12HN 7M2N - T9235-AM-MMC-010 |
| 2.1.4 |
| T-AKE SAMM maintenance card: Measure Insulation Resistances task 2127-7616 |
| 2.1.5 |
| T-AKE SAMM maintenance card: Measure Insulation Resistances task 926-W241 |
| 306 |
| 2.1.1 |
| T9324-BT-MMC-010 Technical Manual, Switchboard, 480V Emergency, Dwg #2838, for T-AKE |
| 2.1.2 |
| American Bureau of Shipping (ABS) Rules for Building and Classing Steel Vessels |
| 2.1.3 |
| MSC Drawing, 803-7081122, Military Sealift Command General Technical Requirements (GTRs) |
| 2.1.4 |
| IEEE STD 45-2002, Recommended Practice for Electric Installations on Ships |
| 2.1.5 |
| MSC Safety Management System Procedure 2.1-004-ALL, Lock-out/Tag-out |
| 2.1.5 |
| ABS Steel Vessel Rules 2015 |
| 331 |
| 2.1.1 |
| Drawing 324-8495509 Installation of Additional Bilge Alarms BWD. |
| 351 |
| 2.1 |
| MSC Drawing No. 320-8497127; UPS System Arrangement and Elevation Drawings |
| 2.2 |
| MSC Drawing No. 320-8495201; Uninterruptible Power Supply (UPS) Replacement |
| 2.3 |
| MSC Drawing No. 320-8386993; T-AKE Electrical System One-Line Diagram |
| 401 |
| 2.1 |
| NGSM 9200266-31 User Manual for VDR Explorer VM II III IV |
| 2.2 |
| NG-SPERRY BRIDGE MASTER E RADAR SERVICE MANUAL NO. 65800011 |
| 2.3 |
| NG-SPERRY MARINE VMFT ECDIS MS0265-5004027 REV- |
| 402 |
| 2.1 |
| USNS PEARY (T-AKE 5) SHIP ANTENNA LEGEND |
| 2.2 |
| Whip Antenna Maintenance PMS 4411/023, U10 |
| 2.3 |
| Dipole Antenna Maintenance PMS 4411/006 |
| 2.4 |
| NAVSEA Standard-Item 009-32 |
| 2.5 |
| SFLC Standard Specification 6310 |
| 403 |
| 2.2.1 |
| Technical Manual EE682-AA-MMC-020; 1AN/USQ-155 |
| 2.2.2 |
| TVS-AN/USQ-155_MIP 4416/510_M1 (PM System) |
| 2.2.3 |
| TVS-AN/USQ-155_MIP 4416/510_S-1(PM System) |
| 2.2.3 |
| OE-570-MIP 4411/019 MRCS R-1 and Q-1 (PM System) |
| 2.3 |
| Technical Manual EE100-JK-INM-010; RF-5800 400W COMM SYSTEM |
| 2.4 |
| Technical Manual EE172-AB-OMI-010; AN/URN-25 TACAN |
| 2.5 |
| Technical Manual EE685-W7-SUM-010; AN/SYQ-26 NAVMACS II |
| 2.8 |
| Technical Manual EE111-DA-OMI-010/0A-9123,OA-9277 (T-AKE 1-9) |
| 408 |
| 2.1 |
| TE 360-AV-MMC-010 / 0910-LP-104-3397 Installation Technical Manuals |
| 441 |
| 2.1 |
| NAVMACS II AN/SYQ-26(V)7 FDN MODS 8496933 DWG Sheets 1 – 5 (SWBS 184 |
| 501 |
| 2.1.1 |
| MSC Dwg. No. 801-8386997; SRD: Fire Control Plan. |
| 2.1.2 |
| MSC Dwg. No. 521-8386998; SRD: Firemain System |
| 2.1.3 |
| MSC Dwg. No. 555-8386999; FM-200 Fire Extinguishing System Diagram. |
| 2.1.4 |
| Technical Manual T9555-CJ-MMC-010; FM 200 Fire Extinguishing System, Model FM-200 |
| 2.1.5 |
| MSC Dwg. No. 555-8387000; Foam Firefighting System Diagram. |
| 2.1.6 |
| Technical Manual T9555-CL-MMC-010; Fire Protection System, Foam. |
| 2.1.7 |
| Technical Manual T9555-CN-MMC-010; Fire Fighting System, Carbon Dioxide HP, Semi-Fixed Hose Reel; Operation and Maintenance. |
| 2.1.8 |
| Technical Manual TE168-BE-MMC-010; Detection System, Fire and Smoke Installation, MDL CS3000; Operation, and Maintenance Instructions |
| 2.1.9 |
| Technical Manual T9555-CM-MMC-010; Fire Suppression System, MDL WHDR-600, Range Guard |
| 2.1.10 |
| MSCLANT Standard Item No 77, Annual Inspection and Test of Fixed Fire Fighting Systems and Extinguishers |
| 502 |
| 2.1 |
| SMS Procedure 2.3-002-ALL Rev 2.6 - SCBA |
| 503 |
| 2.1.1 |
| NAVSEA Dwg. No. 256-7488724, Rev -; Central Seawater Cooling System – SRD |
| 2.1.2 |
| MSC Dwg. No. 256-8495103, Rev - ; Central Seawater Cooling System Mod |
| 504 |
| 2.1 |
| ABS Guide for Certification of Lifting Appliances, Chapter 2 Guide for Certification of Cranes, Section 7 Surveys |
| 2.2 |
| Class Cargo Crane Recertification Test Procedure; Test No:8390285 Rev/Chg:00 |
| 2.3 |
| Tech Manual TG811-BN-MMC-010, Boom Crane, Electro-Hydraulic DWG AMD-1975 |
| 2.4 |
| Dwg. No. 573-8392503, Hose List Appleton Cargo Crane |
| 2.5 |
| NAVSEA Dwg. No. 803-6397427, Rev. A; Links Radio Frequency, High-Voltage Insulator Link, Cylinder Type |
| 2.6 |
| Appleton Marine, Inc., Memo FSR-16136-01, dated 06 June, 2011, Recommended Wire Rope Spelter Anchorage Inspection, Lubrication and Preservation Procedure |
| 2.7 |
| Appleton Marine, Inc., ABS Required – Turntable Bearing Tilt Test Procedure/Log Book |
| 2.8 |
| Appleton Crane Boom Rebuild Reference |
| 506 |
| 2.1 |
| Technical Manual T9312-AY-IMC-010/020/030; High Displacement Marine Auxiliary, Engine/Emergency Diesel Generator, Model 3526B (Provided onboard) |
| 2.2 |
| MSC Drawing No. 079-8489087; MCCS Periodic U.S.C.G. Safety Test Procedure (PSTP) |
| 507 |
| 2.1 |
| T9312-AY-IMC-010, Technical Manual - High Displacement Marine Auxiliary Engine/Emergency Diesel Generator Model 3516B VOL 1 Part 1. |
| 2.2 |
| T9312-AY-IMC-010, Technical Manual - High Displacement Marine Auxiliary Engine/Emergency Diesel Generator Model 3516B VOL 1 Part 2. |
| 2.3 |
| T9312-AY-IMC-030, Technical Manual - High Displacement Marine Auxiliary Engine/Emergency Diesel Generator Model 3516B VOL 2. |
| 515 |
| 2.1 |
| NAVSEA 551-7488733, SRD, Ship Service & Control Air System Diagram |
| 2.2 |
| NAVSEA 551-7488862, SRD, High Pressure Air System Diagram |
| 2.3 |
| W-ST-001-02-03_A – Main Diesel Engine Starting Air Receiver Tank |
| 2.4 |
| W-ST-002-96-03_ - Receiver Starting Air for Ship’s Emergency Diesel Generators |
| 2.5 |
| W-ST-003-96-03_ - Air Receiver, Control |
| 2.6 |
| W-ST-004-96-03_ - Air Receiver, Ship’s Service |
| 2.7 |
| NSTM 551 – Compressed Air Plants and Systems |
| 516 |
| 2.1.1 |
| NAVSEA Tech Manual T9593-AC-MMC-010, Marine Sanitation Device and Vacuum Collection, Holding and Transfer System for T-AKE |
| 2.1.2 |
| NAVSEA Dwg No. 528-8387019, Vacuum Sewage and Plumbing Drains System Diagram |
| 519 |
| 2.1 |
| NAVSEA DWG No. 256-8386986 Rev -, Central Seawater Cooling System Diagram. |
| 2.2 |
| NAVSEA Dwg No. 532-8387009 Rev -, Low Temperature Freshwater Cooling System Diagram. |
| 2.3 |
| Tech Manual T9532-AZ-MMC-010, Heat Exchangers, Plate/Frame Type Central Low Temp Fresh Water. |
| 520 |
| 2.1 |
| Tech Manual T9532-A2-MMC-010, Heat Exchangers, Plate/Frame Type Central High Temp Fresh Water |
| 524 |
| 2.1 |
| Tech Manual TG813-BV-MMC-010, Electrically Driven Deck Machinery Models |
| 2.2 |
| CHARLES DREW Work Item 108, Modify Anchor Windlass Foundation (T-ALT 326) |
| 2.3 |
| NAVSEA Dwg. No. 581-7489016, Anchor Handling Arrangement and Details |
| 2.4 |
| NAVSEA Dwg. No. 582-7488906, Mooring Arrangement and Details Forward and Towing Package |
| 2.5 |
| NAVSEA Dwg. No. 100-7489051, Forecastle (FS Zone) |
| 2.6 |
| T-AKE Anchor Windlass SAMM Maintenance pdf (133 pages) |
| 528 |
| 2.1 |
| T/M S6435-RZ-MMM-010; Valves Sprinkler, Navy Standard, Sizes 1-1/2″ Through 8″, Dwg. No. 803-639-7408 |
| 2.2 |
| T/M S9522-AA-HBK-010 Rev 4, Description, Operation and Maintenance Handbook for Magazine Sprinkling Systems |
| 2.3 |
| NAVSEA Drawing NO. 471-342-7104 REV D; “CARGO HOLD SPRINKLING SYSTEM DIAGRAM” |
| 2.4 |
| Dwg 803-7081122, Military Sealift Command General Technical Requirements (GTRs) |
| 2.5 |
| MSFSC SMS Procedure 2.1-004-All, Tag out/Lockout |
| 556 |
| 2.1 |
| MSC T/M T9561-BR-MMC-010, STEERING GEAR, ROTARY VANE, MODEL RV 2150-3 |
| 559 |
| 2.1 |
| MSC Drawing 555-8494855, Rev A (ABS Red-Line Corrected) Contract Guidance Drawing, T-AKE 1 Class, Forward AFFF System Piping Replacement Modification |
| 2.2 |
| MSC Drawing 555-8387000, Rev - Selected Record Drawing, T-AKE 3, Foam Firefighting System Diagram |
| 2.3 |
| MSC Standard Drawing 803-7081122, Military Sealift Command General Technical Requirements (GTRs) |
| 2.4 |
| MSFSC SMS Procedure 2.1-004-All, Tagout/Lockout |
| 2.5 |
| ASTM Standard F1166, Standard Practice for Human Engineering Design for Marine Systems, Equipment, and Facilities |
| 2.6 |
| NAVSEA Drawing No. 505-7488748 T-AKE 1 Class Flushing Procedures. |
| 2.7 |
| MSC Drawing 631-7488891, T-AKE Class, Paint Schedule |
| 560 |
| 2.1 |
| MSC Drawing 555-8494867, Rev A, Contract Guidance Drawing, T-AKE 1 Class, MMR AFFF System Piping Replacement Modification |
| 2.2 |
| MSC Drawing 555-8387000, Rev - Selected Record Drawing, T-AKE 3, Foam Firefighting System Diagram |
| 2.3 |
| MSC Standard Drawing 803-7081122, Military Sealift Command General Technical Requirements (GTRs) |
| 2.4 |
| MSFSC SMS Procedure 2.1-004-All, Tagout/Lockout |
| 2.5 |
| ASTM Standard F1166, Standard Practice for Human Engineering Design for Marine Systems, Equipment, and Facilities |
| 2.6 |
| NAVSEA Drawing No. 505-7488748 T-AKE 1 Class Flushing Procedures. |
| 2.7 |
| MSC Drawing 631-7488891, T-AKE Class, Paint Schedule |
| 564 |
| 2.1 |
| Tech Manual T9532-A2-MMC-010, Heat Exchangers, Plate/Frame Type Central High Temp Fresh Water |
| 565 |
| 2.1 |
| Tech Manual T9532-A2-MMC-010, Heat Exchangers, Plate/Frame Type Central High Temp Fresh Water |
| 571 |
| 2.1 |
| NAVSEA Tech Manual T9550-AX-MMC-010 Oily Water Separator, Ultra-Sep Model 5000 |
| 572 |
| 2.1 |
| NAVSEA Drawing No. 516-7488756 Rev F, Cargo Refrigeration Secondary Coolant Circulation System Diagram. |
| 2.2 |
| Military Sealift Standard Work Item #31, Motor driven Pump Overhauls |
| 2.3 |
| TM T9516-BN-MMC-01A, Brine System Installation and Maintenance Manual |
| 602 |
| 2.1 |
| Fassmer Dwg 12.1544-203.00.00C Accommodation Ladder 13.16 X 0.75M with Auto Turning Over Device |
| 2.2 |
| IMO MSC.1/Circ. 1331 dtd 11 June 2009, Guidelines for construction, Installation, Maintenance and Inspection/Survey of Means of Embarkation and Disembarkation. |
| 603 |
| 2.1 |
| TS800-AE-MMC-010 Life Boat With Winch And Davit Installation, Operation And Maintenance Manual |
| 2.2 |
| MSFSC SWIRR 001, Lifeboat, Rescue Boats and Davit Maintenance Requirements |
| 2.3 |
| SOLAS Chap III, Life-Saving Appliances and Arrangements |
| 2.4 |
| IMO MSC.1/Circ. 1206, Annex 1, Guidelines for Periodic Servicing and Maintenance of Lifeboats, Launching Appliances and On-Load Release Gear |
| 604 |
| 2.1 |
| T9583-A8-MMC-010 Boat, Rescue with Davit and Winches, Operation And Maintenance Manual |
| 2.2 |
| MSFSC SWIRR 001, Lifeboat, Rescue Boats and Davit Maintenance Requirements |
| 2.3 |
| SOLAS Chap III, Life-Saving Appliances and Arrangements |
| 2.4 |
| IMO MSC.1/Circ. 1206, Annex 1, Guidelines for Periodic Servicing and Maintenance of Lifeboats, Launching Appliances and On-Load Release Gear |
| 605 |
| 2.1 |
| 46 CFR 160.151-35, Servicing, Inflatable Life Rafts (SOLAS) |
| 2.2 |
| 46 CFR 160.151-57, Servicing Procedures, Inflatable Life Rafts (SOLAS) |
| 2.3 |
| Most recent USCG and SOLAS Approved Inflatable Liferaft Re-inspection Certs for Sixteen (16) life rafts |
| 608 |
| 2.1 |
| Navigation and Vessel Inspection Circular No. 01-08; Subject “Shipboard Inspection and Testing of Immersion Suits |
| 801 |
| 2.1 |
| MSCFSC SWIRR 004, “Ventilation System Cleaning Requirements” |
| 2.2 |
| NAVSEA Drawing 512-7488750, Rev J; HVAC Diagram Accommodation Spaces (Sheets 1, 17 and 22 only) |
| 902 |
| 2.1 |
| Trim & Stability Booklet, Dwg.801-8388070 Rev.- |
| 2.2 |
| Docking Plan, Dwg. 801-8387195 Rev. – |
| 2.3 |
| Capacity Plan, Dwg 801-8387182 |
| 2.4 |
| Safety Certification Program for Dry-docking Facilities and Shipbuilding Ways for U.S. Navy Ships, MIL-STD 1625C(SH) |
| 2.5 |
| COMSC Instruction 9997.1A, Dry dock Standards for MSC Ship Availabilities |
| 903 |
| 2.1.1 |
| NAVSEA Dwg 243-7488962 Rev F, Shaft Arrangement |
| 2.1.2 |
| T/M T9243-AZ-MMC-010 Fixed Pitch Propeller and Shafting with Bearings Model W084836780 |
| 2.1.3 |
| T/M T9561-BR-MMC-010 Steering Gear Rotary Vane, Model # RV 2150-3, and Shorthorn Rudder |
| 2.1.4 |
| Wartsila Drawing W084837233, Assembly Stern Tube |
| 2.1.5 |
| Bot Groningen Drawing 1.1262/1/1 A1, Rudder Project Arrangement |
| 2.1.6 |
| Bot Groningen Drawing 3.1265/1.1 A3, Rudder Trunk Summary |
| 2.1.7 |
| Bot Groningen Drawing 2.1263/1.1 A3, Rudder Cone Coupling |
| 2.1.8 |
| Bot Groningen Drawing 2.1264/1.1 A3, Rudder Hydraulic Nut Summary |
| 2.1.9 |
| Wartsila Drawing WLP001616-001, Assembly Propeller Cap |
| 2.1.10 |
| Wartsila Drawing W084836779, Propeller Boss |
| 2.1.11 |
| Wartsila Drawing W084838596, Assembly Propeller Hydraulic Nut |
| 2.1.12 |
| NASSCO Drawing 471-351-4984, Rope Guard Installation |
| 2.1.13 |
| Wartsila Drawing W084837232, Arrangement Shafting; Spare Parts |
| 2.1.14 |
| Wartsila Drawing W007420313, Round Nut Locking |
| 2.1.15 |
| Wartsila Drawing 9AK30410AS3, Shaft Flange 9FC6-58 AS3 |
| 2.1.16 |
| T-AKE 1 Class Tail Shaft Optical Alignment – In place Machining Support |
| 2.1.17 |
| T-AKE 1 Class Propeller Shafting – Static Bearing Reaction |
| 904 |
| 2.1 |
| T/M T9243-AX-MMC-010, SHAFT SEAL, STERN TUBE, TYPE MD FOR USNS LEWIS AND CLARK (T-AKE 1) CLASS, INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS. |
| 2.2 |
| WARTSILA LIPS Drawing H74985-01 Rev(C), GA of 750 MOD 712 Type MD Seal, provided in Reference |
| 905 |
| 2.1.1 |
| T/M T9568-A2-MMC-010 CHG-A, Bow Thruster |
| 905 |
| 2.1 |
| NAVSEA Dwg. 603-7488868, Paint Lines and Draft Marks. |
| 909 |
| 2.1.1 |
| Surface Preparation Specifications, Steel Structures Painting Council Volume 2 |
| 2.1.3 |
| NAVSEA Dwg. 631-7488891 Rev J, Paint Schedule |
| 2.1.4 |
| NAVSEA DWG. 581-7489016 Rev E, Anchor Handling Arrangement and Details |
| 910 |
| 2.1 |
| MSC Drawing 801-8387195; Docking Plan. |
| 2.2 |
| T/M T6435-CN-MMC-010; T-AKE Motor Operated Valves with Actuators. |
| 911 |
| 2.1 |
| T/M T9633-AS-MMC-010, Cathodic Protection System Impressed Current |
| 912 |
| 2.1 |
| Technical Manual S9243-BY-MMA-010/3AB25; Maintenance Manual for 200 Amp Electronic Grounding Unit |
| 2.2 |
| MSC Dwg. No. 320-8391519 Rev -; T-AKE Shaft Ground Modification Electrical |
| 913 |
| 2.1 |
| MSC Drawing No. 256-8386986; Central Seawater Cooling System Diagram |
| 2.2 |
| MSC Drawing No. 256-8386972; Auxiliary Seawater System Diagram. |
| 2.3 |
| MSC Drawing No. 521-8386998 ; Fire-main System Diagram. |
| 2.4 |
| MSC Drawing No. 529-8386974; Ballast System Diagram |
| 2.5 |
| MSC Drawing No. 531-7488738; Distilling Plant System Diagram. |
| 2.6 |
| NASSCO Drawing No. 73-87-441; Waster Piece, Class 150, 4 NPS and Above |
| 2.7 |
| Drawing No. 256-8390559; Central Seawater Waster Piece Assembly |
| 915 |
| 2.1 |
| NAVSEA Dwg. 603-7488868, Paint Lines and Draft Marks. |
| 917 |
| 2.1 |
| NAVSEA Dwg. 603-7488868, Paint Lines and Draft Marks. |
| 2.2 |
| Steel Structures Painting Council, Good Painting Practice, Volume 1, Fourth Edition. |
| 918 |
| 2.1.1 |
| MSC Drawing No. 100-8496418, BOW THRUSTER TUNNEL PROTECTIVE GRATING MODIFICATIONS |
| 2.1.2 |
| MSC Drawing No. 803-7081122, MSC General Technical Requirements (GTR |
| 2.1.3 |
| MSC Standard Drawing No. 803-7080803, Preparation of Computer Aided Designed (CAD) Drawings for Government Owned Ships |
| 919 |
| 2.1 |
| MSC Drawing 163-8392635, Contract Guidance Drawing, T-AKE 1 Class, Seachest Grating Attachment System Upgrade Ripout for T-AKE 1 thru T-AKE 8 |
| 2.2 |
| MSC Drawing 163-8392636, Contract Guidance Drawing, T-AKE 1 Class, Seachest grating Attachment System Upgrade Installation for T-AKE 1 thru T-AKE 8 |
| 2.3 |
| MSC Standard Drawing 803-7081122, Military Sealift Command General Technical Requirements (GTRs) |
| 2.4 |
| MSC Drawing 100-7489178, T-AKE 1 Class, Seachest Gratings (T-AKE 1 thru T-AKE 8) |
| 2.5 |
| MSC Drawing 801-8387002, General Arrangement |
| 2.6 |
| MSFSC SMS Procedure 2.1-004-All, Tagout/Lockout |
| 2.7 |
| MSC Drawing 631-7488891, T-AKE Class, Paint Schedule |
| 941 |
| 2.1.1 |
| MSC Drawing 530-8495285 Rev A – Fresh Water (Closed Loop) |
| 2.1.2 |
| WARTSILA Drawing H79807-01 REV 11 – Water Circulation Package (Closed Loop) |
| 2.1.3 |
| WARTSILA Drawing H79352-01 REV C – GA 744 TYPE A8 SEAL |
| 2.1.4 |
| WARTSILA Drawing H74985-02 REV 2 – GA of 750 MOD 712 TYPE MD SEAL |
| 2.1.5 |
| WARTSILA Drawing US30305-01 Rev 2 – Proposal Stern Tube Modification for 744 Type A8 Seal |
| 2.1.6 |
| Manchester Head Tank Dwg 302516 (Modified) |
| 2.1.7 |
| Point Eight Power Drawing 2888 |
| 2.1.8 |
| MSC Dwg 320-386993, Electrical System One Line Diagram. |
| 2.1.9 |
| MSC Dwg 531-8386991, Distilled Water Transfer System Diagram. |
| 2.1.10 |
| NASSCO Dwg 471-351-4982, Stern Tube Installation and Chocking (Welding Sequence Schedule). |
| 2.1.11 |
| Closed Loop System Installation Manual |
| 1001 |
| 2.1 |
| NAVSEA Tech Manuals S9570-AC-MMA-A10 & S9570-AC-MMA-020, Navy Standard Sliding Block Drive with Slip Clutch |
| 2.2 |
| NAVSEA Dwg. No. 5210545, Standard Painting Procedures for UNREP Equipment |
| 2.3 |
| NAVSEA Dwg. No. 5363392, Rev. D, Chain, Double Strand |
| 2.4 |
| NAVSEA DWG 5363358 (REV F), Sliding Block Assembly |
| 2.5 |
| NAVSEA DWG 5363431 (REV L), Transfer Head Assembly |
| 2.6 |
| NAVSEA DWG 5363415 (REV C) SHIM, BRAKE SHOE |
| 2.7 |
| NAVSEA DWG 5363416 (REV E) BRAKE SHOE ASSEMBLY |
| 1002 |
| 2.1 |
| NAVSEA Dwg. No. 5210545, Standard Painting Procedures for UNREP Equipment |
| 2.2 |
| NAVSEA Dwg. No. 570-7489004, Selected Record Drawing Arrangement Drawing Stream Cargo Delivery Station 1 (Frame 41 STBD) |
| 2.3 |
| NAVSEA Dwg. No. 570-7489005, Selected Record Drawing Arrangement Drawing Stream Cargo Delivery Station 2 (Frame 41 Port) |
| 2.4 |
| NAVSEA Dwg. No. 570-7489006, Selected Record Drawing Arrangement Drawing Fuel Delivery Station 3 (Frame 49 STBD Single Hose Rig) |
| 2.5 |
| NAVSEA Dwg. No. 570-7489007, Selected Record Drawing Arrangement Drawing Fuel Delivery Station 4 (Frame 49 Port Double Hose Rig) |
| 2.6 |
| NAVSEA Dwg. No. 570-7489008, Selected Record Drawing Arrangement Drawing Stream Cargo Delivery Station 5 (Frame 55 STBD) |
| 2.7 |
| NAVSEA Dwg. No. 570-7489009, Selected Record Drawing Arrangement Drawing Stream Cargo Delivery Station 6 (Frame 55 Port) |
2.8
NAVSEA Dwg. No. 570-7489011, Selected Record Drawing Arrangement Drawing Stream Cargo Delivery Station 8 (Frame 74 Port)
| 2.9 |
| Navsea Tech Manual 0978-LP-035-3010, Single Probe Fueling Systems Rev-2 |
| 2.10 |
| Navsea Tech Manual 0955-LP-026-8010, Double Probe Fueling Systems Rev-1 |
| 1003 |
| 2.1 |
| NAVSEA DWG 5210545, Standard Painting Procedures for UNREP Equipment |
| 2.2 |
| MSCLANT Std Item No. 19 “Recondition Motors, Squirrel Cage (AC) Services” (latest revision). |
| 2.3 |
| NAVSEA Technical Manual S9571-AR-MMA-010, Highline/Spanwire Air Clutch Anti-Slack Device MKS 6-11 & 14, Mods 0-2 |
| 2.4 |
| NAVSEA Technical Manual S9571-AD-MMA-010, Anti-Slack Device, Electric ½ and ¾ Inch Wire, MKS 12-13, MODS 0-1. |
| 1005 |
| 2.1 |
| NAVSEA DWG SK-08-18-14, Bumper, Transfer Head |
| 1006 |
| 2.1 |
| NAVSEA Technical Manual S813-AD-MMA-010 Winch, Electric Hydraulic, Double-Drum, Hauling, Inhaul-Outhaul MK 4 MODS 1 and 2 (Aboard Ship) |
| 2.2 |
| MSCLANT Std Item No. 19 “Recondition Motors, Squirrel Cage (AC) Services” (latest revision). if both bearing shields are installed (Removed outer bearing shield and fill the outer cavity with grease). machine bore/build up sleeve and machine to OEM specifications both end bells. Also machine and build up motor shaft to OEM specification to fit bearings and seals. For |
estimating cost on each motor replace slinger ring, and motor junction boxes. Make sure that at least three pairs of motor overloads wires are coming to the motor junction boxes on each motor.
| 2.3 |
| NAVSEA Drawing 5210545, Standard Painting Procedures for UNREP Equipment. |
| 1007 |
| 2.1 |
| Naval Ships’ Technical Manual (NSTM) Chapter 634 (“Deck Coverings”) |
| 2.2 |
| Naval Air Warfare Center, Visual Landing Aids Installation TAK(E) Class Ships – 627928 |
| 2.3 |
| Surface Preparation Standard No. 10 (SSPC-SP-10) of the steel structures painting council manual |
| 2.4 |
| NAVSEA Dwg. No. 5363392, (Rev. D) Chain Double Strand |
| 2.5 |
| NAVSEA Dwg. No. 5363358, (Rev. F) Sliding Block Assembly |
| 2.6 |
| Surface Preparation Standard, SSPC-SP-12/NACE 5, Surface Preparation and Cleaning of Metals by Water jetting Prior to Recoating |
| 2.7 |
| NAVSEA Dwg 588-7488997 (H), Aviation Support Facilities |