Vendor Price Sheet

View the file

Other versions and copies of DD Form 2018

Who attaches DD Form 2018

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vendor quote sheet

SECTION B PRICING
T.V. KINGS POINTER - ABS SPECIAL PERIODICAL SURVEYS DRYDOCKINGTS FREEDOM STAR ABS PERIODICAL SURVEY DRYDOCKING
ITEMDESCRIPTION OF SERVICESQuanityUnit Descr.Unit PriceExtended PriceOfforer Notes/Exceptions…
0100SECTION 100: GENERAL SERVICES REQUIREMENTSNSP
0101APPLICABILITY OF RULES AND REGULATIONNSP
0102ACCURACY OF INFORMATIONNSP
0103SECURITY- 0
0104FIRE PROTECTION AND SAFETY- 0
0105OFFICE AND ADMINISTRATIVE SERVICES- 0
0106WHARFAGE- 0
0107SURVEYS AND INSPECTIONSNSP
0108ON-SITE CONTRACTOR'S REPRESENTATIVENSP
0109DOCUMENTATION OF OPENINGS, BLANKS AND PLUGS- 0
0110ALLOWANCE FOR SCRAP MATERIALNSP
0111MAINTAIN SHIP'S LIGHTING- 0- 0
0112HAZARDOUS MATERIALS IDENTIFICATION AND DISPOSAL- 0- 0
0113USE OF SHIP'S PARTS AND EQUIPMENTNSP
0114PROVIDE SHORE POWERkWh- 0
0115DISABLE CO2 AND HALON SYSTEMS.- 0
0116MAINTAINING SHIP'S CLEANLINESS- 0
0117MAINTAIN CLEAN BILGES AND DRAIN WELLS- 0
0118PROTECTIVE FLOOR COVERING- 0
0119SURFACE PREPARATION AND PAINTING/COATING GUIDELINENSP
0120SAFE FOR ENTRY AND SAFE FOR HOT WORK CERTIFICATES- 0
0121PRODUCTION REPORTING- 0- 0
0122CRANE SERVICE100HRS- 0
0123STAGING- 0- 0
0124OIL BOOM- 0
0125WELDING / BRAZING PROCEDURESNSP
0126SOUNDINGS- 0
0127SANITARY SYSTEM- 0
0128WASTE WATER AND OILS- 0
0129PORTABLE TOILETS/TEMPORARY FACILITIES- 0
0130COMPRESSED AIR- 0
0200SECTION 200: DRYDOCKING REQUIREMENTS- 0
0201DRY DOCK SHIP- 0
0202TAILSHAFT EXAMINATION- 0
0203RUDDER PINTLE CLEARANCES- 0
0204SEA CHESTS- 0
0205SEA VALVES- 0
0206BLASTING & COATING OF HULL- 0
0207ULTRASONIC THICKNESS GAUGINGS- 0
0208PROPELLER CLEANING, INSPECTION AND COATING- 0
0209INTERNAL STRUCTURAL EXAMS AND TESTING OF FUEL TANKS.- 0
0210INTERNAL STRUCTURAL EXAMS OF BALLAST, VOIDS, COFFERDAMS, and POTABLE & WASH WATER TANKS.- 0
0211ANCHOR CHAINS & LOCKERS- 0
0212ZINC ANODES- 0
213BOW THRUSTER MAINTENANCE- 0
214SHIP SERVICE GENERATORS: CLEANING OF GENERATORS- 0
215ELECTRIC CABLE RENEWAL- 0
216SEWAGE DISCHARGE PUMP AND MOTOR- 0
217CONTROLLABLE PITCH PROPELLER COOLERS- 0
218ANCHOR WINDLASS FOUNDATION REPAIRS- 0
219SSDG EXHAUST THERMAL INSULATION LAGGING- 0
220INSTALL ENGINEER’S ASSISTANCE-NEEDED ALARM- 0
221REPAIR CONTROLLABLE PITCH PROPELLER HYD. STORAGE TANKS- 0
222CALIBRATION OF CRITICAL GAUGES- 0
223CLEAN MAIN SWITCHBOARD- 0
224REPLACE ENGINE ROOM ESCAPE HATCH- 0
225- 0
0300SECTION 300: OPTIONAL AND UNIT PRICED ITEMS- 0
0301OPTION - PROVIDE WET LAY BERTHDay- 0
0302OPTION - SUPPLEMENTAL LABOR3500HRS- 0
0303OPTION - SUPPLEMENTAL MATERIAL1140,000.00
0304OPTION - SUPPLEMENTAL STEEL
304aKTR Provide A Quote for Estimated 1,000 lbs of Flat Steel1000LB- 0
304bKTR Provide A Quote for Estimated 1,000 lbs of Rolled Steel1000LB- 0
304cKTR provide a quotation to prep and re-weld external hull weld seams, of an estimated length of 100 feet of weld.100FT- 0
0305OPTION - AUDIO GAUGINGS ADDITIONAL (Est. 1000 Readings)1000EA- 0
- 0- 0
SUBTOTAL140,000.00

TOTAL 140,000.00

International Ship Repair & Marine Services, Inc.