N00024-19-R-4455-0005_(CONFORMED).pdf
PDF 896 KB Posted
- Attached to
- USS STETHEM (DDG 63) and USS DECATUR (DDG 73) Extended Dry-Docking Selected Restricted Availability
- Solicitation number
- N00024-19-R-4455
About this file
N00024-19-R-4455-0005 (Conformed)
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 03:00 PM local time 14 May 2019
X
A X B X C X D
EX
X
G F 174 - 179
180 - 194 X H 195 - 199 billy.castleberry@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO-A3 1 199
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00024 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
Section L conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
BILLY W CASTLEBERRY 202-781-1248
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 108
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
109 - 132 133 - 134
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
135 - 138 139 - 147
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 148 - 151 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 152 - 158 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
159 - 172
PART II - CONTRACT CLAUSES
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD, DC 20376-2030
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.
N0002481FR93115
5. DATE ISSUED
08 Feb 2019
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N0002419R4455
Section B - Supplies or Services and Prices
NOTE A
NOTE A: LEVEL OF EFFORT TO COMPLETION –SHIP REPAIR
1. The Contractor agrees to provide the level of effort to completion in the performance of growth CLINs.
80,486 hours and $2,165,059 materials for the USS DECATUR (DDG 73) FY19 EDSRA 104,623 hours and $3,036,459 materials for the USS STETHEM (DDG 63) FY19 EDSRA
2. The total level of effort to completion for the performance of the above CLINs shall be man-hours of direct labor and the associated material required to support that labor and effort. The mix of labor and material may be adjusted, but may not exceed the dollar value of each CLIN listed above.
3. Effort performed in fulfilling the level of effort to completion obligations specified above shall only include effort performed in direct support of this contract and shall not include time and effort expended on such things as (local travel to and from an employee' s usual work location), uncompensated effort while on travel status, truncated lunch periods, work (actual or inferred) at an employee' s residence or other non-work locations.
4. LOE to Completion labor hours and material are within the general scope of the work stated in the contract and may not be used to: (1) direct a change as defined in, "FAR 52.243-1 CHANGES FIXED -PRICE clause of this contract or (2) change any of the terms or conditions of the contract.
5. If, in the opinion of the Contractor, any effort directed in the Growth Management Request Form calls for effort outside the scope of the contract, the Contractor shall notify the Contracting Officer in writing within two (2) working days after the receipt of any such direction. The Contractor shall not proceed with the work affected by the Growth Management Request Form unless and until the Contractor is notified by the Contracting Officer that the directed work is within the scope of this contract. Thereafter, any remaining disagreement on the scope issue shall be a dispute under the Disputes clause; however, nothing in this clause shall excuse the Contractor from proceeding with the subject growth work as directed by the Contracting Officer.
NOTE B
NOTE B: FIXED SHIP REPAIR LABOR AND MATERIAL BURDEN RATES FOR GROWTH AND
NEW WORK
SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)
1. The Contractor’s fully burdened ship repair labor rate will be used for negotiating growth and new work to be performed under this contract. The contractor agrees that the number of man-hours included in its price proposal for contract modifications shall include only direct production man-hours. For these purposes, direct production hours are for skilled labor at the journeyman level expended in direct production including but not limited to the following functions:
Abrasive cleaning/blasting Fire Watch Welding Burning Brazing Carpentry
Machinists (inside and outside) Electrical Work Electronic Work Engineering Design Support Lagging Ship-fitting Boiler-making Painting Sheet-metal Work Pipefitting Rigging General Labor Staging/Scaffolding Diesel Mechanics
2. The fully burdened ship repair labor rate proposed by the contractor listed in paragraph 7 below shall include all costs associated with support functions (whether charged directly or indirectly by the offeror’s accounting systems) provided in support of the direct production man-hour functions listed in paragraph 1 above. Support functions shall be considered to be included in the offeror’s fully burdened ship repair labor rate for direct production man-hours. Labor hours for the below support functions shall not be separately proposed in any circumstance, including in support of subcontractors. Support functions include, and are not limited to, those types listed below:
Testing Quality Assurance Execution Planning Cleaning (except tank cleaning) Supervision Security Surveying Administration Transportation Purchasing Staff Lofting Other indirect support Handling & Warehousing Safety/Environmental
3. The fully burdened ship repair labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit. The fully burdened ship repair labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.
4. Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that are consumed/used in the process of repair and do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor’s fully burdened ship repair labor rate and not separately priced.
5. Physical materials are goods that become an integral part of the repaired vessel in the course of the repair, such as equipment, replacement steel, pipes, paint, and fasteners. The material burden rates apply to physical materials but not to consumable materials. The material burden rate will be applied to the actual cost of the physical material. Actual cost does not include handling charges, general and administrative cost, overhead, profit, or any other indirect cost.
6. For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs
(ODCs) and will be subject to the contract material burden rate shown in paragraph (7) below.
Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to Request for Contract Changes (RCCs), Reservation Task Requests (RTRs) and Growth Management Request Forms issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. The proposed total pricing restriction addressed in the preceding sentence does not apply in any case where the work is required to be performed by Original Equipment Manufacturers (OEMs), Government directed subcontractors, Government authorized vendors, or any other work at the sole discretion of the Administrative Contracting Officer. RCCs and RTRs that are subcontracted for material only (no associated labor required within the RCC) shall not be subject to the Material Burden Rate.
7. The contract fixed fully burdened ship repair labor rate and material burden rate are shown below. These fixed rates shall be used for negotiating growth and new work during the entire availability including any extension to the delivery date:
USS DECATUR FY19 EDSRA
Fully burdened Ship Repair Labor Rate TBD Material Burden Rate TBD
USS STETHEM FY19 EDSRA
Fully burdened Ship Repair Labor Rate TBD Material Burden Rate TBD
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
1 Lot
Base Multiple TYCOM (1B4B) WIs
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS DECATUR (DDG 73) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard DECATUR (DDG 73) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PURCHASE REQUEST NUMBER: N0002481FR93115
PSC CD: J999
NET AMT
PMS 407 OMN WIs
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS DECATUR (DDG 73) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard DECATUR (DDG 73) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PMS 407 OPN WIs
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS DECATUR (DDG 73) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard DECATUR (DDG 73) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
TYCOM AND PMS407 PRORATIONS
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS DECATUR (DDG 73) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard DECATUR (DDG 73) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
ShipAlt DDG-51-90378K
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS DECATUR (DDG 73) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard DECATUR (DDG 73) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
ShipAlt 75874K
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS DECATUR (DDG 73) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard DECATUR (DDG 73) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
CDRLs
FFP
CONTRACT DATA REQUIREMENTS LIST (CDRLs) FOR ALL CLINs, INCLUDING OPTION CLINS, IF EXERCISED
The data to be furnished hereunder shall be prepared and submitted in accordance with the Contract Data Requirements List, DD Form 1423, Exhibits A, B and C attached hereto. The CDRLs form a part of the schedule of this solicitation.
Not Separately Priced (NSP)
ShipAlt DDG51-84646K
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS DECATUR (DDG 73) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard DECATUR (DDG 73) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION Berthing Barge Support TYCOM 1B4B
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS DECATUR (DDG 73) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard DECATUR (DDG 73) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION Defuel Ship; accomplish TYCOM 1B4B
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS DECATUR (DDG 73) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard DECATUR (DDG 73) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION Stbd Waterborne Propulsion TYCOM 1B4B
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS DECATUR (DDG 73) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard DECATUR (DDG 73) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION Pt Waterborne Propulsion TYCOM 1B4B
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS DECATUR (DDG 73) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard DECATUR (DDG 73) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION Sonar Dome Hull Damping TYCOM 1B4B
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS DECATUR (DDG 73) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard DECATUR (DDG 73) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION Ready Service Locker (RSL) TYCOM 1B4B
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS DECATUR (DDG 73) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard DECATUR (DDG 73) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION Fuel Assistance and Towboat TYCOM 1B4B
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS DECATUR (DDG 73) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard DECATUR (DDG 73) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION ShipAlt DDG51-86644K NSWC
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS DECATUR (DDG 73) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard DECATUR (DDG 73) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION ShipAlt 84262K PEO IWS
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS DECATUR (DDG 73) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard DECATUR (DDG 73) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION ShipAlt DDG-51-81961K,DDG-51-85114K NSWC
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS DECATUR (DDG 73) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard DECATUR (DDG 73) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION OrdAlt 86628, 88649, 89524 NSWC
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS DECATUR (DDG 73) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard DECATUR (DDG 73) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION Navy Cash Equipment Refresh NAVSUP
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS DECATUR (DDG 73) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard DECATUR (DDG 73) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION ShipAlt 81961K NSWC
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS DECATUR (DDG 73) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard DECATUR (DDG 73) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION Growth Reservation
FFP
Growth Reservation associated with CLIN 0001. See attachment J-4. See Notes A, B, C, D, E, F, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FFP
Growth Reservation associated with CLIN 0001. See attachment J-4. See Notes A, B, C, D, E, F, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FFP
Growth Reservation associated with CLIN 0002. See attachment J-4. See Notes A, B, C, D, E, F, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FFP
Growth Reservation associated with CLIN 0003. See attachment J-4. See Notes A, B, C, D, E, F, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FFP
Growth Reservation associated with CLIN 0004. See attachment J-4. See Notes A, B, C, D, E, F, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FFP
Growth Reservation associated with CLIN 0005. See attachment J-4. See Notes A, B, C, D, E, F, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FFP
Growth Reservation associated with CLIN 0006. See attachment J-4. See Notes A, B, C, D, E, F, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FFP
Growth Reservation associated with CLIN 0008. See attachment J-4. See Notes A, B, C, D, E, F, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FFP
Growth Reservation associated with CLIN 0009. See attachment J-4. See Notes A, B, C, D, E, F, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FFP
Growth Reservation associated with CLIN 0010. See attachment J-4. See Notes A, B, C, D, E, F, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FFP
Growth Reservation associated with CLIN 0011. See attachment J-4. See Notes A, B, C, D, E, F, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FFP
Growth Reservation associated with CLIN 0012. See attachment J-4. See Notes A, B, C, D, E, F, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FFP
Growth Reservation associated with CLIN 0013. See attachment J-4. See Notes A, B, C, D, E, F, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FFP
Growth Reservation associated with CLIN 0014. See attachment J-4. See Notes A, B, C, D, E, F, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FFP
Growth Reservation associated with CLIN 0015. See attachment J-4. See Notes A, B, C, D, E, F, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FFP
Growth Reservation associated with CLIN 0016. See attachment J-4. See Notes A, B, C, D, E, F, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FFP
Growth Reservation associated with CLIN 0017. See attachment J-4. See Notes A, B, C, D, E, F, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FFP
Growth Reservation associated with CLIN 0018. See attachment J-4. See Notes A, B, C, D, E, F, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FFP
Growth Reservation associated with CLIN 0019. See attachment J-4. See Notes A, B, C, D, E, F, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FFP
Growth Reservation associated with CLIN 0020. See attachment J-4. See Notes A, B, C, D, E, F, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FFP
Growth Reservation associated with CLIN 0021. See attachment J-4. See Notes A, B, C, D, E, F, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
30 Days
OPTION Daily Extensions
FFP
Additional Days in Dock requiring Availability Extension. See attachment J-4. See Notes B, C, D, E, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
5 Days
FFP
Additional Days in Dock NOT requiring Availability Extension. See attachment J-
4. See Notes B, C, D, E, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
50 Days
FFP
Additional Days Pier Side requiring Availability Extension. See attachment J-4.
See Notes B, C, D, E, G, and H.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
Base Multiple TYCOM (1B4B) WIs
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS DECATUR (DDG 63) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-14 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard STETHEM (DDG 63) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Note B, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
PMS 407 OMN WIs
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS STETHEM (DDG 63) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-14 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard STETHEM (DDG 63) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Note B, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
PMS 407 OPN WIs
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS STETHEM (DDG 63) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-14 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard STETHEM (DDG 63) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Note B, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
TYCOM AND PMS407 PRORATIONS
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS STETHEM (DDG 63) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-14 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard STETHEM (DDG 63) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Note B, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
ShipAlt DDG51-84924K
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS STETHEM (DDG 63) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-14 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard STETHEM (DDG 63) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Note B, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
ShipAlt 90378K
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS STETHEM (DDG 63) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-14 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard STETHEM (DDG 63) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Note B, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
CDRLs
FFP
CONTRACT DATA REQUIREMENTS LIST (CDRLs) FOR ALL CLINs, INCLUDING OPTION CLINS, IF EXERCISED
The data to be furnished hereunder shall be prepared and submitted in accordance with the Contract Data Requirements List, DD Form 1423, Exhibits A, B and C attached hereto. The CDRLs form a part of the schedule of this solicitation.
Not Separately Priced (NSP)
ShipAlt 91027K
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS STETHEM (DDG 63) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-14 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard STETHEM (DDG 63) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Note B, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
ShipAlts 80156K and 81382K
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS STETHEM (DDG 63) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-14 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard STETHEM (DDG 63) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Note B, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION Messing and Berthing Barge TYCOM 1B4B
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS STETHEM (DDG 63) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-14 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard STETHEM (DDG 63) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION Hatch; repair TYCOM 1B4B
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS STETHEM (DDG 63) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-14 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard STETHEM (DDG 63) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION Design Airflow; measure TYCOM 1B4B
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS STETHEM (DDG 63) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-14 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard STETHEM (DDG 63) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION Antenna 1-3 and 1-2; repair TYCOM 1B4B
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS STETHEM (DDG 63) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-14 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard STETHEM (DDG 63) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION AS-3772/U Antenna 2-2; repair TYCOM 1B4B
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS STETHEM (DDG 63) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-14 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard STETHEM (DDG 63) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION OE-409/SRC Lightweight TYCOM 1B4B
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS STETHEM (DDG 63) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-14 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard STETHEM (DDG 63) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION AS-3773A/U Antenna 2-3 TYCOM 1B4B
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS STETHEM (DDG 63) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-14 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard STETHEM (DDG 63) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION OE-82 Antenna; repair TYCOM 1B4B
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS STETHEM (DDG 63) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-14 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard STETHEM (DDG 63) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION (SCBA) TYCOM 1B4B
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS STETHEM (DDG 63) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-14 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard STETHEM (DDG 63) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION Splice Towing Hawser TYCOM 1B4B
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS STETHEM (DDG 63) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-14 for list)
The Contractor shall prepare for and accomplish repair and modernization during the EDSRA onboard STETHEM (DDG 63) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Note B, C, D, E, G, H NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION Monorail Chain Hoist; test TYCOM 1B4B
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS STETHEM (DDG 63) DURING FY19 EXTENDED DOCKING
SELECTED RESTRICTED AVAILABILITY (EDSRA) (See attachment J-14 for list)
The Contractor shall prepare for and…